Contract Maintenance Models Trends and Options Presented by: Walter Rafin DTZ 0 Presentation Roadmap Facilities Management versus Facilities Maintenance Summary 1 Facilities Management versus Facilities Maintenance Facilities Management integrates all organisational processes, people and workplace. Includes property | space management, infrastructure, support services, administration and asset management Facilities Maintenance sustains building and asset performance to design intent, to increase reliability, reduce equipment degradation, and sustain energy efficiency, whilst maintaining mandatory compliance requirements. 2 Preventative Maintenance Usually fixed PM fee Normally includes some corrective elements (e.g. coil cleaning) Not usually inclusive of repair or reactive works Asset owner takes on almost all risk Results in too little or too much maintenance – unclear requirements Budgeting & cost control difficult 3 Inspection (or Reactive) Based ‘Fly-by’ inspections Usually fixed inspection fee Excludes any corrective elements (e.g. cleaning filters) Not inclusive of repair or reactive works Reporting of issues only Usually least expensive option Least effective 4 End Results (or Reliability) Not yet widely used All or part risk transfer Risk based on defined end result requirement (e.g. comfort) Payment based on results Usually tied to Guaranteed Maximum Price (GMP) Difficult to define parameters 5 Comprehensive Fixed Fee all inclusive – budget certainty Full risk transfer to contractor Excludes capital replacement, refurbishment and/or rehabilitation Usually subject to condition assessment and latent conditions Contractor manages risk via rigorous PM or not enough PM Significant administration savings 6 Semi-Comprehensive Inclusive of all labour only Fixed labour fee Normally excludes parts and materials 2nd most expensive model Works best for large sites or portfolios Budgeting can be difficult Less risk transferred to contractor 7 Repair Work Limit (RWL) Research shows for M.E.F services: • 66% <$1000 • 20% rehab | refurb | capex & chargeable • 14% >$1000 & chargeable Most reactive calls minor Labour Materials Capped risk at predetermined/agreed threshold or ‘RWL’ Parts Usually subject to condition assessment and latent conditions Significant administration savings 8 Summary Choose wisely and do your homework Consider: - Economic conditions and what you can afford - Technical advances - Your portfolio condition Keep - Your risk profile - Contract flexibility for change - Performance management and reporting framework 9
© Copyright 2024