The road of success for implementing a multi-vendor GSM-R ERTMS network

The road of success for implementing
a multi-vendor GSM-R ERTMS network
Turkey, a multi-vendor region linking Asia with Europe
Extensive multi-annual rollout of GSM-R lines
* Picture source: Wikipedia
1
What is a multi-vendor GSM-R
network?
Core Network
(NSS)
SCP(NS)
• NSS vendor 1
MSC(NS)
A interface
HLR(NS)
More competition

Variety to rail customers

Assurance for system
integrators
Access
Network (BSS)
M2000(HW)
BSC(HW)

• BSS vendor 2

Flexibility & innovations
in solutions
BTS(HW)
Teminals
DBS(HW)
• OPH, GPH,
Dispatchers…
(additional
vendors)
Um Interface
OPH
GPH
GPH
OPH
GPH
GPH
2

Protecting investment

…
Latest multi-vendor GSM-R Projects in
Turkey
Eskisehir-Kutahya-
Alsancak-Cumaovası
Balikesir

ETCS L2
Alstom

GSM-R core (R99):
NSN

Macro & Distributed BTS:

Full SDH Network:

Outdoor trackphones and PBX

Mobile and fixed GSM-R terminals

464 km, 42 tunnels

ETCS L2:
Thales

GSM-R core (R99):

GSM-R core (R99):
NSN

Macro and Distributed BTS: Huawei

Macro & Distributed BTS:

Full SDH Network:

366 km, 23 tunnels

GSM-R design: ETCS L2 ready
Huawei
Huawei
Huawei
Kayas-Kayseri

Full SDH Network:
Huawei

Mobile and fixed GSM-R terminals

51 km, 1 tunnel
A true multi-vendor GSM-R/ERTMS architecture for Turkey
3
NSN
Huawei
The path to multivendor GSM-R
networks

Clear public standards

Appointed Notified Bodies

Conformity Assessments

Intermediate Statement of

Verification “ISV”
specific)

DBS
tunnel
4
Harmonised Test Specification
(EU/global)

BTS
Test Specification (NoBo
Availability of Test laboratories
DBS
mountain
BTS+DBS
Shunting yard
The history of a harmonised GSM-R
Test Specification
* From B.Wendler, DB-Systel presentation at ERA CCRCC 25th October 2011
5
DB Test Specification published in
2011

Number of test cases 360

NoBo validated for completeness

Including EIRENE traceability matrix:
* From B.Wendler, DB-Systel presentation at ERA CCRCC 25th October 2011
6
ERA drives Interoperability

ERA published

final DB test specification

Draft Network Assessment specification for
review by stakeholders

Set process to arrive at a “Harmonised
GSM-R Test Specification”
7
The BSS integration into GSM-R NSS of
Turkey

Test Specification: source ERA server, DB-Systel Test
Legacy
R99 NSS
Specification

Applicable Test Cases according to Test Specification: 136

BSS integration test period: 4 months

Test execution and correctness witnessed by Alstom
8
BSS
Multi-vendor GSM-R integration results

Huawei BSS system was successfully integrated to TCDD’s
GSM-R Core Network.

The final test report was issued 30th April 2013 and ratified in
May 2013

Press Release : “The completion of the multivendor GSM-R
integration is an important project milestone for the Eskisehir-AlayuntKutahya-Balikesir (EKB) European Rail Traffic Management System
(ERTMS) Line. … Stringent GSM-R specifications and equipment
guidelines enable railways globally to setup multivendor systems such
as the one now fully integrated for the EKB High Speed line with a
total length of 464 km.“
With the integration completed TCDD takes benefits of an open, feature-rich and
competitive GSM-R multivendor market.
9
Turkey, an integrated IT rail network
Ankara – Eskisehir
Pehlivanköy Pythion

IP Cameras

SDH

Video Analysis

OMC

DWDM

Equipment implementation

Switch

Maintenance

Geo-redundant Storage

Training

OMC

Equipment implementation

Maintenance

Training
10
Ankara Sincan North
Line

SDH

OMC

Equipment implementation

Maintenance

Training
Article 5th
December 2013
NEWS flash LTE for Rail
Zhengzhou Metro
Now under
passenger operation
(26th December 2013)
11
Conclusion

Strong demand and utilization of
GSM-R outside of Europe

UIC vital role to promote GSM-R
and its evolution

Promotion campaigns in Central
Asia, South America and Africa
would help the continuation of this
success
12
HUAWEI ENTERPRISE ICT SOLUTIONS
A BETTER WAY
Copyright©2014 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product
portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive
statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time
without notice.