Future Projects District 3 Central Minnesota 2015-2018 2015 - 2018 Construction Walker 6 Remer 34 200 Hill City Longville CASS 84 Backus Outing 87 Emily Pine River Sebeka 371 WADENA Hewitt Deerwood 2016-2018 Staples 210 210 Pillager Baxter Motley Eagle Bend 371 Garrison 27 287 Osakis 28 25 Randall Swanville 238 71 237 94 New Munich 4 Brooten MILLE MORRISON Cold Spring Richmond 55 Belgrade 2014-2015 23 Paynesville 15 Kimball 4 St. Cloud Clearwater 24 Eden Valley MEEKER 94 Pine Brook WRIGHT Buffalo Montrose 12 25 Watertown 2014-2015 Cambridge 169 SHERBURNE Isanti ISANTI Zimmerman 10 Becker Big Lake ANOKA Elk River 25 55 Braham Princeton Enfield Monticello Annandale Cokato 47 95 2015-2016 22 Brunswick Bock 23 Foley Clear Lake 107 70 Milaca St. Augusta Brook Park Ogilvie 25 STEARNS KANABEC Mora Little Rock Sauk Rapids 65 169 Rice Sartell Waite Park LACS 2015-2016 BENTON Albany Woodland Onamia Pierz Royalton Isle Cove Genola 10 Upsala Westport AITKIN 18 27 27 Lastrup 27 Little Falls 28 Sauk Centre 169 Vineland 115 27 Long Prairie 47 Lake Mille Lacs 371 Camp Ripley Cushing Browerville 18 18 BUS 10 71 2015 2016 2017 2018 6 Brainerd Bertha TODD Construct 210 Aitkin Crosby Ironton Wadena 10 Hassman Pequot Lakes Nisswa 29 6 CROW WING Jenkins 64 71 169 84 Menahga 101 Otsego 2014-2015 241 St. Michael Rogers Albertville Rockford Delano N 2015 Construction Hwy Description Detour Cost 4 Replace the bridge over the Sauk River one mile south of I-94 Yes $1.9 million 6 Install pedestrian access improvements from Hwy 210 to 4th St in Crosby No $100,000 10 Resurface road (bituminous) from Benton CR 40 (Halfway Crossing) to Benton CR 4 south of Watab No $2.8 million EB 10 Resurface (bituminous) eastbound one mile east of Hwy 23 in St. Cloud to west of Hwy 24 in Clear Lake No $2 million 10 Resurface (concrete) road from Benton CR 4 to north of E St. Germain St in Sauk Rapids. Completed – Reconstruct Hwy 15 from Hwy 10 to Benton Dr. in Sauk Rapids/Sartell (two-of-two year construct) No $18.9 million 10 Install median cable guardrail from Sherburne CR 43 in Big Lake to Waco St in Elk River No $370,000 12 Install intersection safety improvements (Continuous T-Signal System) at east junction Hwy 25 south of Buffalo No $1.4 million 15 Resurface road from the Meeker/Stearns County line to Kimball No $838,000 23 Install intersection safety improvements at Stearns CR 158 (Cold Spring Granite) No $145,000 24 Replace Mississippi River bridge in Clearwater (one-of-two year construct) No $24.0 million 25 Reconstruct road from Wright CR 106 to west of School Blvd and install a traffic signal at Wright CR 106, and resurface road from west of School Blvd to I-94 in Monticello No $6.1 million 27 Install pedestrian access improvements from 13th St at Pine Grove Park to the Mississippi River bridge in Little Falls No $250,000 84 Replace the bridge over Ada Brook north of Pine River Yes $576,000 I-94 Install capacity improvements from Hwy 241 in St. Michael to Hwy 101 in Rogers, includes widening Crow River bridges (Corridors of Commerce project; two-of-two year construct) No $28.3 million I-94 Upgrade bridge deck, approaches and railings at the Wright CR 111 overpass, seven miles west of Hwy 25/Monticello No $410,000 EB I-94 Resurface eastbound I-94 from Wright CR 75 in Monticello to Hwy 241 in St. Michael No $4.0 million 95 Replace Rum River bridge west of Cambridge (two-of-two year construct) Yes $6 million NB 169 Reconstruct northbound Hwy 169 and extend turn lanes from Mille Lacs CR 11 north of Milaca to the Rum River Rest Area (one-of-two-year construct) No $7.3 million 169 Replace bridge over the Rum River in Vineland Yes $1.9 million 210 Construct dual left-turn lanes at junction Hwy 371 in Baxter No $850,000 371 Resurface road (bituminous) Walker to Cass Lake (District 3 funds; District 2 construct) No $4.9 million DW* Bituminous crack sealing project at various locations in the District No $145,000 *Not highlighted on map. DW: Districtwide. TBD: To be determined. Updated October 2014 – Central Minnesota MnDOT District 3 Information is subject to change, including construction year(s) and costs; smaller projects may not be listed. 2016 Construction Hwy Description Detour Cost 10* Replace signs from Rice to Wadena No $420,000 10 Upgrade railroad crossing in Motley Yes $275,000 15 Resurface road from north junction Hwy 23 to the Mississippi River, includes installing a dual southbound left turn lane at 12th St N in St. Cloud and at Stearns CR 1 in Sartell No $3 million 24 Replace Mississippi River bridge in Clearwater (two-of-two year construct) No $24 million 25 Reconstruct road from Hwy 55 to Catlin St in Buffalo and upgrade Hwy 55 traffic signal No $5 million 27 Install pedestrian access improvements from east of the Mississippi River to 10th St in Little Falls No $250,000 27 Resurface road from Hwy 169 to Hennepin Ave in Isle, includes turn lanes at Hwy 47 No $2.3 million 27 Replace bridge over Rice Creek east of Little Falls Yes $900,000 27 Replace bridge over Skunk River six miles east of Lastrup Yes $500,000 27 71 Resurface Hwy 27 from north junction Hwy 71 to 9th St. NE in Long Prairie and Hwy 71 from south limits of Long Prairie north to the Long Prairie River No $1.2 million 55 Construct a left-turn lane and detached right turn lane at Wright CR 14 No $450,000 71 Resurface road (mill and overlay) east junction Hwy 55 in Belgrade to I-94 in Sauk Centre No $6.2 million 84 Replace the bridge over Norway Brook Dam in Pine River Yes $3 million 84 Replace the Boy River bridge south of Longville (^Detour for oversize vehicles ) No^ $800,000 Resurface road (mill and overlay) from Stearns CR 159 at Collegeville east to Stearns CR 75 and Resurface road (unbounded concrete) from Stearns CR 75 west of St. Joseph to the bridges over the Sauk River No $16.5 million 95 Landscaping at bridge over Rum River in Cambridge No $30,000 115 Upgrade railroad crossing in Randall No $275,000 169 Resurface road from the bridge over the Rum River to north end of four-lane, south of Wagidaaki Rd No $4.1 million 169 Improve alignment, construct southbound acceleration lane, resurface road and upgrade signal at Sherburne CR 4 in Zimmerman (District 3 funds; Sherburne County construct) No $450,000 NB 169 Reconstruct northbound Hwy 169 and extend turn lanes from Mille Lacs CR 11 north of Milaca to the Rum River Rest Area (two-of-two year construct) No $7.3 million 371 Expand to a four lane divided expressway Nisswa to Crow Wing CR 16 in Jenkins (Corridors of Commerce project; (one-of-three year construct with local detours) No $58 million I-94 *Not highlighted on map. DW: Districtwide. TBD: To be determined. Updated October 2014 – Central Minnesota MnDOT District 3 Information is subject to change, including construction year(s) and costs; smaller projects may not be listed. 2017 Construction Hwy Description Detour Cost 6 Resurfacing from Hwy 200 in Remer to Cass/Itasca County line No $3.3 million 10 Replace Lake Orono/Elk River bridge in Elk River Yes $10 million 25 Resurface road (bituminous), includes shoulders, Hwy 95 to Foley No $2.9 million 25 Resurface road from Little Rock to south of Genola No $2.6 million 71 Resurface road (bituminous) from Bertha to the Wadena/Todd County line No $3 million 169 Restore bridge south of Hwy 18 in Garrison No $1 million 210 Replace Sissabagamah Creek bridge east of Aitkin (District 1 funds; District 3 construct) TBD $1 million 238 Resurface road (reclaim) from Albany to Upsala, includes quarter-mile segment in Albany Yes $7.1 million 371 Expand to a four lane divided expressway Nisswa to Crow Wing CR 16 in Jenkins (Corridors of Commerce project; two-of-three year construct with detours) No $58 million 371B Reconstruct, includes curbs, gutters and sidewalks, from Joseph St. to Hwy 210/Washington St. in Brainerd Yes $7.5 million 2018 Construction Hwy Description Detour Cost 6 Reconstruct road in town and install intersection safety improvements at CR 1 in Emily Yes $2.2 million 6 Resurface road from south of the Mississippi River to south of Moriz Rd north of Perry Lake No $2.1 million 10 Resurface from end of four-lane west of Wadena to Oink Joint Rd and reconstruction 3rd St NW to 2nd St NE, including railroad signal upgrade TBD $9.6 million 24 Resurfacing from I-94 in Clearwater to US 10 in Clear Lake No $2.2 million 25 Resurfacing from Hwy 23 in Foley to Benton/Morrison County line No $6.6 million 25 Resurfacing from Carver CR 10A in Watertown to Hwy 12 in Montrose, including replacing bridge at creek TBD $3.7 million 210 Replace bridge over Moran Brook east of Todd CR 9 No $1.8 million 371 Expand to a four lane divided expressway Nisswa to Crow Wing CR 16 in Jenkins (Corridors of Commerce project; three-of-three year construct with local detours) TBD $58 million Please note: Not all FY 2018 projects listed/scheduled. *Not highlighted on map. DW: Districtwide. TBD: To be determined. Updated October 2014 – Central Minnesota MnDOT District 3 Information is subject to change, including construction year(s) and costs; smaller projects may not be listed.
© Copyright 2024