LIST OF COMPLETED PROECTS S. N. Contract Title Customer 1 O & M Service Contract with SEC-SRB (ex SCECO South) covering The Asir Central Power Station (3-50 MW GE Gas Turbine & 9-10MW Diesel Engine), the associated HV 132 KV transmission system and the 33/13.8 KV primary distribution system from 1985-1987. SEC- SOA 2 Shifting, installation, testing and commissioning of one Auxiliary Transformer 1500KVA/400V SEC- SOA 3 Inspection/Testing/ full rewinding of Generator No.3 Al-Baha P/P. SEC-SOA 4 Supply, installation and commissioning of No. 2 UPS 20KVA@Al-Jouf Power Plan SEC-EOA 5 Install, test & comm. of transformer 13.8 KV @ Qurayyat PP2 SEC-EOA 6 To perform Generator life assessment, Diagnostic & analysis of GT #5 FARAS PP SEC-EOA 7 Repair (1) each Tap Changer of 26.4 MVA Alsthom Transformer of unit #!( Arar PP) SEC-EOA 8 Installation, testing and commissioning of a microprocessor based Fuel Additive System at Najran P.P. SEC- SOA 9 Replacement of 15 kava cables at Qurayyat PP SEC-EOA 10 Re-wedging of 01 Each Generator Stator Ex. Shedgum PP unit #1 SEC-EOA 11 Relocation, installation and commissioning of one each 13.8KV Transformer from ARAR to Qurayat Power Plant SEC-EOA 12 Overhaul/Restoration of GT#1 Generator; Calibration of protective relays and Commissioning of Control Circuit. MARAFIQ 13 Testing and Commissioning of Excitation System for Gas Turbine No. 2 and Modification of oil vapor extractor fan for GT#1 MARAFIQ 14 Rehabilitation of Generator Excitation of Gas Turbine #2 MARAFIQ 15 Marafiq yanbu, replacement of underground 15 kv.cable - YANBU MARAFIQ 16 Pre-commissioning testing of transformer in Abu Ali Island Aramco Site Office R.H.Al- Marri 17 Commissioning of two switch racks in 42 TL and inside QGOSP-1 Qatif Maintain Potential Project (ARAMCO Project) R.H.Al- Marri 18 Pre-commissioning testing of ground fault relay & circuit breaker in Qatif Maintain Potential Project located at Jauyma Eastern Province (ARAMCO Project) R.H.Al- Marri 19 Pre-commissioning of 9 LV Switch racks which involved 13.8KV/480V transformers, functional testing of molded case circuit breakers, testing of instrument transformer and functional test of controls R.H.Al- Marri 20 Switch-Rack Pre-Commissioning test in Qatif Maintain Potential Project (ARAMCO Project) R.H.Al- Marri 21 Supply and Installation of Lube Oil Coolers (05 units) at Jezan Power Plant of SEC-SOA SAECO 22 Testing and commissioning of 5 switchgears for AL-Hunay Booster Pumping Station Project (Quraish) SAECO 23 Testing of transformer & switch rack in Qatif Maintain Potential Project located at Jauyma Eastern Province (ARAMCO Project) SAECO 24 Testing of transformer & switch rack in Qatif Maintain Potential Project located at Jauyma Eastern Province (ARAMCO Project) SAECO 25 Testing of switch gear in Qatif Maintain Potential Project located at Jauyma Eastern Province (ARAMCO Project) SAECO 26 Pre-operation test for all electrical equipment HV, MV, LV Transformers, MCC, Motor, Panel, CB etc. GULF FERRO ALLOYS Co. (SABAYEK) 27 Pre-commissioning test of No.2 Circuit Breaker for Hai Al Shatie Project. CIVIL WORK COMPANY (CWC) 28 Supply, install and commission of No. 1 Automatic Transfer Switch and No. 2 Main Distribution Panels for ARAMCO Abu Hadriyah Electrical Upgrade Saudi Delta 29 Pre- Commissioning test and inspection for switch rack at REM#08 at Qatif Maintain Potential Project FAIZAL M. QAHTANI SONS "FMQ" 30 Pre-commissioning of 10 LV Switch rack which includes 13.8KV/480V transformer, functional testing of molded case circuit breakers, testing of instrument transformer, meters and relays FAIZAL M. QAHTANI SONS "FMQ" 31 Testing and Commissioning of No. 18 Switch racks FAIZAL M. QAHTANI SONS "FMQ" 32 Testing and Commissioning of Switch Gear FAIZAL M. QAHTANI SONS 33 Testing & Comm. Of switch racks at Juamyah PP FAIZAL M. QAHTANI SONS 34 Testing & Comm. Of switch racks at Juamyah PP FAIZAL M. QAHTANI SONS 35 switch racks testing & commissioning @ Tanjeeb FAIZAL M. QAHTANI SONS 36 Commissioning of 467 Switch rack at Qurais - Saudi Aramco FAIZAL M. QAHTANI SONS 37 Calibration of Existing Protective Relays and Review Setting Co-ordination KAMC 38 Major overhaul of W251B8 Gas Turbine; Testing of all components at MCC; Calibration of Generator Protection and Functional check of Generator Breaker. KAMC 39 Rehabilitation of damaged medium voltage Switchgear KAMC 40 Major Overhauling of 01 each of W251B8 Gas Turbines KAMC 41 Modification of load shedding system KAMC 42 Testing & Pre -Comm. Of MVC. CT, PR MV SWTG. 43 Testing and commissioning of Power Panel @ JGP site 44 Replacement of Cables for Qurayyat PP 45 SUPPLY , INSTALLTION AND COMMISSIONING OF UPS FOR UNIT # 6 & 7 Panels AT DCS 46 Replacement of 15 Kv XPLE Cable, Single Core Unarmored 47 Replacement of Various Existing Cable for GT unit # 15 at Jazan P/P 48 Repair of Power Transformer (T1) 13.8/33 Kv. At Arar PP 49 Major Inspection of WH 501D5 unit # 17 at Jazan Power Plant 50 Electrical Installation Work at Qaisumah Power Plant SEC- ERB 51 Repair of Power Transformer (T3) 13.8/33Kv SEC- ERB 52 Fabrication of new control panel including Battery charger for starting Diesel Engine of Dammam PP unit # 7 SEC –ERB 53 installation of additional lighting at Dammam PP Turbine Hall of unit 19,20&21 SEC- ERB 54 Laying of New Cable (15 Kv) at Qaisumah PP SEC- ERB 55 Repair Works for lifetime extension for W501D Gas Turbine at EOA SEC- ERB 56 To Check, Repair(03) EA. Fire Pumps(02) Electric Motor and & 01 Ea. Diesel Engine driven SEC-ERB 57 Replacement of 5 Kv cable Feeders to Administration Building at Marafiq Yanbu Marafiq 58 Replacement of Various Existing Cable for GT unit # 15 at Jazan P/P SADELMI FMQ SEC –ERB SEC –SOUTH SEC –ERB SEC –SOUTH SEC –ERB SEC –SOUTH SEC –SOUTH 59 Repair Works for lifetime extension for W501D Gas Turbine at EOA AT Shedgum PP. SEC- ERB 60 Erection and Electrification of workshop machinery at Ma'aden Phosphate Company Ma'aden 61 Replacement of 5 Kv cable Feeders to Administration Building at Marafiq Yanbu Marafiq 62 Supply & installation of level switch for Qisuamah 63 Testing and Commissioning of Switch Racks. SJP 64 To Install 10 EA Lights at Dammam New South Plant Turbine Hall. SEC 65 Testing of 3 Induction Motors at Ras tanura Sinopec 66 Testing Of Circuit Breakers. Sinopec 67 Performing the Test for Seven Circuit Breakers Sinopec 68 Electrical Works at Mujahidin Camp Maaden 69 Testing of One Switch Racks at RTR Power Plant. Sinopec 70 Testing & Commissioning of Switch Rack at Khurais - 154,158,399 & 526 71 To Check and Repair Generator Cables at Dammam P/P Unit # 16 as required. SEC-ERB 72 Testing for switch racks at Haradh Al-Bader 73 Testing for switch racks at Type-A Al Fdhl-614 FMQ 74 Testing & Commissioning of Switch Rack at Khurais 299 FMQ 75 Testing & Commissioning of Switch Rack at Nuayyim site-129,130,131. FMQ 76 To Renovate Dammam Gate Room by adding new roof A/C window & power supply (110 & 220V A/C). SEC-ERB SEC - ERB FMQ 77 Testing for switch racks at Haradh Al-Bader 78 Supply & Installation of Energy meter MAADEN 79 Supply of Cable, copper, PVC Double insulated,ARMORED,70 SQMM+35SQMM & Transformer DRY TYPE 75 KVA 3 Phase 480 Delta/220127 WYE,60 HZ MAADEN 80 Testing of One Molded Circuit Breakers For Aramco Site 81 Pre-Commissioning of switch racks 82 Pre-Commissioning & Testing of Transformer Makamin Petroleum 83 Replacement of RMU-RM6 in SEC Schneider Elec. 84 Repair of damaged cable inside Power Plant Maaden 85 Supply & Installation of manual transfer switch as cb Maaden 86 Testing & Commissioning of Nine Switch Racks at Harmanya Site 87 Insulation Test, Contact Resistance Test, Trip Test for Uthmaniya 1598 and 106 wells as per Aramco Standard Hammam ALsaif Est Salim M. AlJoaib & Partners co. Al-Kawari co Salim M. AlJoaib & Partners co. 88 Testing & commissioning 1 Switch racks at Riyadh NMR-603 FMQ 89 Provide shop repair of Company Equipment SEC - EOA 90 Shop repair of Company Equipment SEC - EOA 91 Addition of fuel unloading system in Bisha Power Plant SEC-SOA 92 Repair various components of Fiat Gas Turbine units of Najran Central Power Plant SEC - SOA 93 Shop Repair of Company Equipment SEC-SOA 94 Major overhaul and rehabilitation of two (2) FiatAvio TG# 20B7/8 gas turbine units including the replacement of some of the major parts SEC - SOA 95 Repair of damaged compressor casing of TG20B7/8 Gas Turbine of Najran CPS SEC- SOA 96 G Modification of 2 each of blade ring of Fiat TG20B7/8 Gas Turbine SEC-SOA 97 G Modification of 2 each of blade ring of Fiat TG20b7/8 Gas Turbine SEC-SOA 98 Supply & Install Turbine Wash Water Heating System at Al- Jouf Power Plant SEC-EOA 99 Repair of air inlet filter houses, exhaust ducts and chimneys of units#3,4,5 and 6 of Dammam Power Plant SEC-EOA 100 Provide technical training on the control system of FiatAvio TG#20B7/8U in Al Jouf Power Station. SEC - EOA 101 Provide technical training on the O & M of FiatAvio TG #20B7/8U in Al Jouf Power Station. SEC - EOA 102 Provide technical advisory and services to troubleshoot/repair gas turbines and its auxiliary SEC - EOA 103 Replacement of Lube Oil Coolers for Generation units SEC-COA 104 Addition of Bearing Vacuum System for Generators. SEC-COA 105 Supply and Installation of air dryer at Al-Jouf Power Plant SEC-EOA 106 Modification of fuel filtration system in Al-Jouf Power Plant SEC-EOA 107 Modification of inlet filter houses and exhaust stacks of 4 GT units in Dammam P/P SEC-EOA 108 Relocation of (1) GEC mobile unit from Arar to Qurayat SEC-EOA 109 Repair of hot gas of GE # 12 - Burayda P.P. SEC-EOA 110 Provide of (02) Mechanical Technician and (07) EA Mechanical & Instrument Helper for manpower support at Dammam PP , common and aux. equipment maintenance activities SEC-EOA 111 REPAIR OF(1) WARTSILA WATER PUMP FOR BLACK START Diesel Engine .EX. Jouf Unit SEC-EOA 112 Repair of BBC Chimney & Exhaust diffusers of BHEL units SEC-EOA 113 Relocation of (1) each Wartsila mobile unit from Rafha -Jouf PP. SEC-EOA 114 repair of exhaust stack in Dammam Power Plant [PRR 74569] SEC-EOA 115 Repair of 01 Exhaust Stack, Ex- Unit#3 Berri PP unit #3 SEC-EOA 116 Fabrication and installation of 02 each silencer panel and 02 each of turning wheel for Ex-Barri unit #3 SEC-EOA 117 Dismantling of (16) Ea. HYD. Jacks from Quryyat PP GEC unit and install to Arar PP GEC unit SEC-EOA 118 Supply, installation and commissioning of air compressor at Shedgum Power Plant SEC-EOA 119 Relocation of (1) LM 2500 mobile unit from Faras to Qurayat power plant SEC-EOA 120 Testing and Commissioning of one each LM2500 Mobile Gas Turbine Unit#1 at Qurayyat Power Plant SEC-EOA 121 Testing and Commissioning of one each LM2500 Mobile Gas Turbine Unit#2 at Qurayyat Power Plant SEC-EOA 123 Rehabilitation of Gas Turbine No.2 and supply of required spare parts for the repair From December 2003 to December 2004. MARAFIQ 124 Hot Path Gas, combustion inspection GT# 02 –Jubail MARAFIQ 125 Rehabilitation of Generator Excitation of Gas Turbine #2 MARAFIQ 126 Marafiq yanbu, replacement of underground 15 kv.cable - YANBU MARAFIQ 127 Supply of stand by pre-filter at sales receiving station, Yanbu - YANBU MARAFIQ 128 Rehabilitation of GT#1(Fiat GT16) MARAFIQ 129 Perform internal damage assessment of one – (1) FiatAvio TG 16 gas turbine unit#2 SAUDI OGER Co. ltd. 130 Rectify the defects of FiatAvio TG16 gas turbine unit#1 SAUDI OGER Co. ltd. 131 KTS was contracted by Schneider to replace No. 24 Ring Main Unit SCHNEIDER 132 Upgrade of No.26 Ring Main Units SCHNEIDER 133 Replacement of sixty (60) Ring Main Units in Medina, Taif, Makkah and Jeddah SCHNEIDER 134 Replacement of Ring Main Units SCHNEIDER 135 Replacement of RM6 in SEC-Makkah/Jeddah/Medina/Tabuk SCHNEIDER 136 Ring Main Unit No. 1000 Operation and Modification G855+IA+VIP SCHNEIDER 137 Replacement of Ring Main Units SCHNEIDER 138 RMU operation G855+IAP + VIP SEC -C SCHNEIDER 139 Replacement of No. 28 RM6 in SEC-MAKKAH/ JEDDAH SCHNEIDER 140 Project Coordinator Services SCHNEIDER 141 Replacement of RM6 in SEC-WEST -TABUK (10 units) SCHNEIDER 142 Setting and testing of Sepam 40 at AL-Khobar Sewage Water Plant CIVIL WORK COMPANY (CWC) 143 Testing and Commissioning of No. 3 Merlin Gerin Switchgears CIVIL WORK COMPANY (CWC) 144 Testing and Commissioning of Circulation Heater(INDEECO PID – 360 series821KW-433V) AFIFI Trading 145 Testing and Commissioning of Compressor (O.S.D –Model KD-303L -22KW) AFIFI Trading 146 Repair various components of gas turbine model W251B8 KAMC 147 Removal and reinstallation of insulation and cladding work of Gas Turbine KAMC 148 Supply and Installation of insulation blanket for W251B8 Gas Turbine KAMC 149 Major Inspection of Generator of 2 each of Gas Turbines KAMC 150 Repair of Components of W251B8 Gas Turbine KAMC 151 Project Coordinator Services SCHNEIDER 152 Replacement of RM6 in SEC-WEST -TABUK (10 units) SCHNEIDER 153 Replacement of RM6 in SEC-WEST -TABUK(10 units) SCHNEIDER 154 Prefabrication, Installation ,Testing of Diesel Oil , Raw Water, Fuel Gas and Crude oil Pipe line as per Sadelmi Scope of work SADELMI 155 Fabrication of Rack support (49 pcs.) SADELMI 156 Prefabricated Atmospheric tank (Slope oil tanks number of 3 Pcs.) SADELMI 157 Rental of Piping Superintendent for 18 days SADELMI 158 Prefabrication, Installation , Testing of Piping for Fire Fighting above ground , Fire fighting under ground , Compressed air & Instrument air Dematerialized water Soften Water SADELMI 159 Tihama power station HRSG's Tube Leakage Repair at UGP TIHAMA 160 Supply of seamless tube:SA192.38oDmmX5mm WTx1-3 Mr. R/L TIHAMA 161 Welder Rental to Tihama Power Plant TIHAMA 162 Supply and Installation of Gas Filters at Power Plant No:9. SEC-COA BEMCO 163 Replace existing of Fuel oil Gauging system with Radar Tank Gauging (RTG) system for Al-Jouf & Arar PP DPITS/SEC 164 Supply of technical Advisory Man Power For Westinghouse at sec- south PP (unit Rate Price) SEC -SOA 165 Addition of Fuel Unloading System in Bisha PP (alt.2) SEC -SOA 166 Complete Overhauling of Gas Turbo Generator - Westinghouse Model No. W-251B8 Unit #4 167 Erection of GEC unit mobile unit at Tabarjal PP 168 Hot Gas Path Inspection of Combustion Gas Turbo Generator - GE frame 6 unit #5 KAMC 169 Hot Gas Path Inspection of Combustion Gas Turbo Generator Westinghouse (W251-B8) unit # 2 KAMC 170 check & Repair of Exhaust Stack silencer of Dammam PP unit # 9 SEC -ERB 171 Repair of Diesel Leakage of unit # 1 7at Dammam PP SEC -ERB 172 Repair of Synorwave Welding Machine for Shedgum PP SEC -ERB 173 Materials For Erection of GEC unit at Tabarjal Power Plant SEC -ERB 174 Install of (8) each Ventilation Fans for Dammam Old South Plant Turbine hall and insulation sheets on the control Room Wall SEC -ERB 175 Disconnect Turbine ,Generator & Reduction Gear from Base Exciter & Starting package for Westinghouse &Mitsubishi Turbines Located at Rastaura Saudi Aramco 176 Check & Repair Sweet Water Pipe of Dammam P/P due to Heavy Leak SEC -ERB 177 Supply of Mark VI e Engineer for CPP Sadelmi 178 Civil work for Bisha Unloading Area KAMC SEC -ERB Shiryan Steel SEC -SOUTH 179 Inspection and of Atomizing Air Pipes GT IB at SCC Hofuf Plant Sadelmi 180 Fabrication and Repair of Atomizing Air Pipes GT IB at SCC Hofuf Plant Sadelmi 181 Project Co-coordinator Services Schneider Electric 182 Replacement of Overhead Crane Power Cable SEC- ERB 183 Rental of Manpower for CT11 Insulation Removal and re-installation 184 Services of KTS Engineer Schneider Elec. 185 Upgrade of fuel Pump & Piping Modifications for GT 2 at Aramco Refinery, Jeddah Al-Tamimi 186 Upgrade of fuel Pump & Piping Modifications for GT 2 at Aramco Refinery, Jeddah Al-Tamimi 187 Fabrication of Cylindrical Tank for Air filter Pulsing system In Shedgum SEC- ERB 188 Replacement of RM6 in SEC -Jeddah Schneider Elec. 189 NDT Specialist with tools to perform Ultrasonic Test at Najaran PP SEC -SOA 190 To Perform Complete Cleaning and removal of Balancing weight for Qaisumah PP unit # GT 4 SEC-ERB 191 Check and repair High Pressure Fuel Pump of GT 2 Qaisumah PP SEC-ERB 192 Check and repair Heavy leak of Sweet water at Dammam PP SEC-ERB 193 Check and repair High Pressure Fuel Pump of GT6 Qaisumah PP SEC-ERB 194 Replacement of Air Compressor at Shedgum PP SEC- ERB 195 To Remove, Check ,Repair and Re-Install ,Atomizing Air Heat Exchanger at Qaisumah PP unit No. 6 SEC-ERB JEC 196 To Install Lube Oil Pump with Motor of Lube Oil System at Qasiuamah PP Unit No. 3 and perform the necessary Welding SEC-ERB 197 To Check and Repair Ventilation Fan at Dammam PP unit 15 SEC-ERB 198 To perform Welding Job on the Turbine left side support leg at Qaisuamah PP unit # 5 SEC-ERB 199 To Open Compressor or casings (Low & High Pressure for Juaymah Pp Unit No. 3 Inspect ,submit Findings and Box Up The opened Casings SEC- ERB 200 Check &Repair of Exhaust Stack Chimney for Dammam Units No,8,13,19 & 21 SEC-ERB 201 Installation of(10) Ventilation Fans at Dammam North Plant Turbine Hall and Insulation sheet on the control Room Wall SEC-ERB 202 Erection and Electrification of workshop machinery at Ma'aden Phosphate Company Ma'aden 203 Pumping of Waste from Oil Tank Separator of the Burn Bit out Side Qaisuamah PP SEC-ERB 204 Repair of JFG Compressor 6th & 11th Stages bleed valves at Jouf PP SEC-ERB 205 To Provide Manpower (Helpers)) to work at Dammam PP for (6) months SEC-ERB 206 To Replace Compressor Bleed Valves with new diaphragm actuator valves instead of Piston type, replace Flame Igniters , Flame Scanner system ,place Alarm Annunciation panel for unit # 7 at Dammam PP SEC-ERB 207 To Replace Compressor Bleed Valves with new diaphragm actuator valves instead of Piston type, replace Flame Igniters , Flame Scanner system ,place Alarm Annunciation panel for unit # 8 at Dammam PP SEC-ERB 208 To Replace Compressor Bleed Valves with new diaphragm actuator valves instead of Piston type, replace Flame Igniters , Flame Scanner system ,place Alarm Annunciation panel for unit # 9 at Dammam PP SEC-ERB 209 To Replace Compressor Bleed Valves with new diaphragm actuator valves instead of Piston type, replace Flame Igniters , Flame Scanner system ,place Alarm Annunciation panel for unit # 10 at Dammam PP SEC-ERB 210 To Replace Compressor Bleed Valves with new diaphragm actuator valves instead of Piston type, replace Flame Igniters , Flame Scanner system ,place Alarm Annunciation panel for unit # 13 at Dammam PP SEC-ERB 211 To Replace Compressor Bleed Valves with new diaphragm actuator valves instead of Piston type, replace Flame Igniters , Flame Scanner system ,place Alarm Annunciation panel for unit # 14 at Dammam PP SEC-ERB 212 To Replace Compressor Bleed Valves with new diaphragm actuator valves instead of Piston type, replace Flame Igniters , Flame Scanner system ,place Alarm Annunciation panel for unit # 15 at Dammam PP SEC-ERB 213 To Replace Compressor Bleed Valves with new diaphragm actuator valves instead of Piston type, replace Flame Igniters , Flame Scanner system ,place Alarm Annunciation panel for unit # 16 at Dammam PP SEC-ERB 214 To Replace Compressor Bleed Valves with new diaphragm actuator valves instead of Piston type, replace Flame Igniters , Flame Scanner system ,place Alarm Annunciation panel for unit # 5 at Dammam PP SEC-ERB 215 To Replace Compressor Bleed Valves with new diaphragm actuator valves instead of Piston type, replace Flame Igniters , Flame Scanner system ,place Alarm Annunciation panel for unit # 6 at Dammam PP SEC-ERB 216 Project Co-coordinator Services Schneider Electric 217 Fabrication of new control panel including Battery charger for starting Diesel Engine of Dammam PP unit # 7 SEC -ERB 218 Fabrication of new control panel including Battery charger for starting Diesel Engine of Dammam PP unit #7(14) SEC -ERB 219 Services of KTS Engineer Schneider Elec. 220 Replacement of RM6 in SEC -Jeddah Schneider Elec. 221 Check and repair Heavy leak of Sweet water at Dammam PP SEC-ERB 222 To Provide Manpower (Helpers)) to work at Dammam PP for (6) months SEC-ERB 223 To check and repair 03Ea fire pumps, 02 Ea Electrical Motor Driven and 01 Ea Diesel Engine Driven at Quaysumah SEC-ERB 224 Repair of 01 Ea Alsthom generator rotor and repair of generator stator at Arar Unit # 2 SEC 225 Check &Repair of Exhaust Stack Chimney for Dammam Units No:8,13,19 & 21 SEC-ERB 226 To Replace 3 EA & paint the inside walls of the control room of unit #& at Dammam P/P SEC-SOA 227 To Check & Repair Exhaust Stack Chimney at Juayamah Power Plant SEC-ERB 228 Repair & Reconditioning of Exhaust Duct Plenum of GT No.1 & 3 at Aindar Power Plant. 229 Laboratory Electrical modification at Al-Jalamid MA'ADEN 230 Fabrication of Miscellaneous items Gas Turbine (GT) Auxiliaries at Al-Jouf Power Plant. SEC-ERB 231 To Clean Lube Oil Radiators and replace Air Filters at Dammam Power Plant units. SEC - ERB 232 Water Pump Repair for Fiat GT - 7 SEC Saudi Cement 233 Replacement of Oil Cooler Piping at Dammam # 13 SEC-ERB 234 Bleed Valves Repair at Al - Jouf Power Plant (repair kit) 235 To check & repair defective Fence - lights at Juaymah P/P SEC-ERB 236 To Check & Repair finch Light at Berry Power Plant. SEC-ERB 237 To check & repair defective Fence - lights at Safaniyah P/P SEC-ERB 238 To Install a New Manual Rolling Door at Dammam Power Plant Air Station SEC-ERB 239 To Check, Clean and Repair of 01 Ea Oil Leakages at Dammam Power Plant. SEC-ERB SEC 240 To Perform Inspection and Repair Jobs on FIAT TG20B7//8 (TG # 2). Services of Mechanical Advisor Required at Najran Power Plant. SEC-SOA 241 To clean lube oil Radiators and Replace Air Filters at Dammam Power Plant Units. SEC-ERB 242 To Fix High Conductivity Problem of Shedgum Power Plant Dimen Water System. 243 Work Shop Equipment Hoist Chain Block & Hoooist Liver Come along Testing & Certification SEC-ERB 244 Refurbishment of Boiler # 3 at Al-Jouf PP SEC-ERB 245 Repair of Exhaust Cladding Sheet at Al - Jouf Power Plant SEC-ERB 246 Fabrication of industrial Doors( Shutter Doors) SEC-ERB 247 Repair and Calibration of Chemical Testing devices at Al- Jouf Laboratory. SEC-ERB 248 Repair of Demineralizers of Plant at Al-Jouf PP SEC-ERB 249 Provide Tech support for Investigation of root cause of failure SEC-ERB 250 To clean lube oil Radiators and Replace Air Filters at Dammam Power Plant Units. SEC-ERB 251 Cleaning by Dry Ice Blasting Generator (Stator & Rotor) at ARAR Power Plant. SEC-ERB 252 Repair and replace the damage parts of the exhaust expansion joint for get #6 SEC-ERB 253 To run discavity alarm cables at Dammam P/P Units # 7& 10 from MCC to Control Room SEC-ERB 254 Painting of Workshop, Turbine hall & repair of street lights at Jouf Power Plant. SEC-ERB 255 Fabricate New Plunger and Piston as per the sample (H2, Hydrogen Compressor # 2 at Faras Power Plant. SEC-ERB SEC 256 Repair and replace the damage parts of the exhaust expansion joint for gt #5 SEC-ERB 257 To repair Labyrinth seal, shaft dia=1020mm,width=90mm for second stage on fiat gas turbine TG20B 7/8 and 7/8U,complete with fixing accessories FIAT P/N: 331651at Al jouf Power Plant. SEC-EOA 258 To Check & Repair Exhaust Roof Fans at Dammam main plant due to not working. SEC-ERB 259 Testing of One Molded Circuit Breakers For Aramco Site 260 To repair Labyrinth seal, shaft dia=1020mm, width=90mm for second stage on fiat gas turbine TG20B 7/8 and 7/8U,complete with fixing accessories FIAT P/N: 331651at Al jouf Power Plant. SEC-EOA 261 Supply of Thermocouple at Al-Jouf PP SEC-EOA 262 Supply of Adapter Ring required to repair the main Coupling Flange W501D4 Qassim#9 Rotor SEC-COA Salim M. AlJoaib & Partners co.
© Copyright 2024