10 Management Skills that Make the Best Sales Managers Stand Out

The Weekly Bulletin
Serving the Construction Industry and Bay Area Community since 1932
2014 BOARD OF DIRECTORS
OFFICERS
Nancy Brinkerhoff, President
Ironwood Commercial Builders, Inc.
Lydia Roze, Vice President
Vista Universal, Inc.
Eric Kavert, Treasurer
Pacific Coast General Engineering,
Inc.
Forrest Towe, Past President
Anvil Builders
John C. Roeber, Past President
J. Roeber & Associates
DIRECTORS
Greg Adams,
Shimmick Construction Co., Inc.
Joe Maltifano
London Construction
Thom Miles
TMA Construction Services.
John Parker
Janus Corporation
Ken Regevig
K. Regevig Roofing
EXECUTIVE DIRECTOR
Scott P Leary
DIRECTOR OF OPERATIONS
Denice McDavid
The Weekly Bulletin (USP3 3633) is published
every Week by the BAY AREA BUILDERS
EXCHANGE, 3055 Alvarado Street, San
Leandro, CA 94577-5711. Subscription rate
for non-members is $525 per year.
POSTMASTER: Send address changes to
BAY AREA Builders Exchange , 3055
Alvarado Street, San Leandro, CA 945775711.. Tel.: 510.483.8880. Fax 510.352.1509.
November 7, 2014
www.bayareabx.com
10 Management Skills that Make the Best
Sales Managers Stand Out
By Joe Diliberto
Managing a team of sales reps with various motivations and egos is no
easy feat. And if you're a sales manager, you know that it can be a
complicated and sometimes challenging role that requires a number of
management skills to be successful. At Sandler Training, we've
discovered that highly effective sales managers possess a set of skills and
characteristics that make them stand out from the rest.
So how do some sales managers continually lead successful and goaloriented sales teams while others repeatedly hit roadblocks and obstacles?
Here are 10 management skills that set some sales managers above the
rest.
They lead by example
Nothing builds and sustains credibility like a sales manager who leads by
example. In order to keep a sales team performing, sales managers must
lead by example and establish an environment that facilitates cohesion,
confidence, and success.
They do more leading and less micro-managing
Too often sales managers rely on deadlines and metrics to drive
performance, which can quickly turn into micro managing. Though
metrics are important, effective sales managers understand how to work
alongside their team members rather than over their shoulders. These sales
managers seek to mentor their sales reps and tweak motivation and reward
tactics to align with individual preferences.
They know when to coach
The overarching goal of coaching is to make individuals and the team
better. For sales managers, mastering the skill of coaching is particularly
important. Highly effective sales managers realize that placing priority on
coaching will build confidence among team members. Therefore, they
seek opportunities to provide feedback that will make their sales reps
better and don't hesitate to drop everything to help sales reps solve
problems.
Sales
Continued from front page …
On the other hand, great sales managers also recognize when sales reps don't need or want to be coached
and leave them alone to do their high-priority tasks.
They don't overcomplicate processes
Every team needs a sales methodology and goals to drive sales team performance. However, because
highly regimented, complex sales methodologies can confuse sales reps, the process should only be as
complex as it absolutely needs to be. An effective sales manager knows how to enable, explain, and
support a sales process to make it easier for sales reps to understand and relate to without making the
sales process feel like a strait jacket.
They communicate clear expectations
Sales teams work best when they know exactly what is expected of them and when deliverables are due.
Though key performance indicators (KPIs) vary from company to company, sales reps should know
exactly what happens when they meet expectations and what to expect when they miss. It is the
responsibility of the sales manager to ensure their team fully understands expectations.
They pay attention to negative patterns
Highly effective sales managers think ahead and pay particular attention to team morale. These sales
managers can recognize what small trends and negative patterns indicate before they become significant
issues. By paying attention to small changes in sales reps' performance, the sales manager can be
proactive with coaching and mentoring before it is too late.
They choose their team carefully
Because sales managers rarely hire on a daily, weekly, or even monthly basis, developing impeccable
hiring skills can be a challenge. However, great sales manager who can find and retain the right sales
talent will improve team performance and sales results. Picking the sales team carefully means knowing
how to leverage the strengths of high-performing outliers and when to coach up or part ways with underperformers.
They enable their team by protecting their time
Great sales managers practice good time management habits and eliminate demands for sales reps that
don't directly drive revenue. This makes the most of the sales team's time and shows the team that their
sales manager genuinely cares about and respects their time.
They can see the big picture
Sales reps are responsible for their own quotas and accounts, whereas sales managers must organize the
whole team's needs. Successful sales managers have the ability to step back and analyze the big picture
before making decisions that will impact the entire team.
They look for ways to make it fun
Sales managers who genuinely care about the happiness of individuals on their team tend to get more
from their sales reps. These sales managers understand the importance of showing appreciation and
celebrating wins often. Making work fun boosts productivity and helps to alleviate the constant pressures
that come with sales.
Even the best sales managers aren't perfect. But once you understand the management skills that make
certain sales managers stand out from the rest, you can begin looking for sales management training that
will align with your needs and help you to evolve into a great sales manager.
About Joe Diliberto: Joe specializes in working with business owners, CEO's and senior managers to
maximize the return on what is often their most underutilized resource, the sales team. To contact Joe, click
here, or call 510/530-5060.
***
MALACHI PAVING & GRADING INC.
P.O. Box 8567 Emeryville CA, 94662
CA LIC# 946337 A
(510) 652-­‐5496 Phone [email protected] INVITATION TO BID
(510) 652-­‐5498 Fax Malachi Paving & Grading Inc. is seeking quotes from qualified UDBE/MBE/ WBE/ SBE/
OBE/ LBE/ DVBE business and invites your bid/quote on the following project/contract:
Project:
Drainage Inlet Structure Replacement at Various Locations on
Foothill Road and Mines Road in Pleasanton and Murray
Townships of Alameda County, California
Spec No:
2272
Bid Date:
Bid Time:
November 18th, 2014
2:00 PM
Seeking all trades including but not limited to:
• For the following (but not limited to) work: Trucking, Cold Planing, Furnishing Base
Rock or Asphalt Material, and Grading, Traffic Control
• Plans, specifications and requirements for the project are available to be picked up
from your local plan room or viewed at our office. Please contact us at the above
listed number for further information regarding bidding on this project.
• We are an equal opportunity employer, for assistance in obtaining bonds, lines of
credit, and/or insurance please contact our office.
Will you be bidding this project? Please fax response to (510) 652-5498
________Yes
________No
Company/Contract _________________________ Phone ________________________
Trades Bidding ____________________________ Fax __________________________
How to Avoid Affordable Care Act
AUDITS & PENALTIES! My name is Don Beaton, past President of the Builders Exchange of Alameda County and 40 years a California Contractor. During the time I was on the Board of Directors and Past President of the Builders Exchange, I remember OSHA becoming a federally mandated law. The reason I mention this is because there is now another federally mandated law, called the Affordable Care Act (ACA). A business owner’s obligation to the Affordable Care Act (ACA) is of the utmost importance at this time. Non-­‐compliance to this federally mandated Law can cost you hundreds, if not thousands of dollars. In an effort to help your business, I am working with a company who has designed a Reference Guide, Obamacare Compliance Kit, to get you through this maze. In all my years in business, this is by far “the best” tool and “a must have” for business owners to stay in compliance and navigate the new ACA law. The ERguide is part of an annual subscription and includes the following: Ø ERguide –Binder format (270 pages) Ø Webinar Series – Tutorials on how to use the ERguide Ø Email Call Center – Info@Healthcare-­‐Compliance-­‐Inc.com Ø Legislative Update – Includes recent changes, additions and deletions to the ACA Ø CD – Includes rules, regulations & notices from DOL, HHS & IRS Ø Periodic Newsletters & Bulletin Emails Ø Workshop Series – Live presentations on a variety of ACA topics You would pay, a number of experts, hundreds, if not thousands, of dollars to compile this much pertinent information. The annual subscription for the Basic ERguide -­‐ $360.00. * Please note, if your company is over 50 employees, you would choose the Advanced ERguide -­‐ $1,250. Healthcare Compliance Inc. (HCI) was created by Janet Mlynar, MBA, CFP®, in 2010, and incorporated in 2013, to address the problems faced by business owners and employers who now must comply with ever-­‐changing mandates created by the implementation of the Affordable Care Act (ACA). Janet is an innovator and leader in both Insurance and Financial Planning. She is considered a foremost expert on the Affordable Care Act and it is my pleasure to work with the HCI team to bring you the most up-­‐to-­‐
date information on the ACA – especially as it relates to business owners. To receive your copy of the ERguide Subscription today, Call Don Beaton: (541)-­‐997-­‐8849 E-­‐mail: [email protected] The Affordable Care Act – Where Healthcare Meets Compliance www.Healthcare-­‐Compliance-­‐Inc.com BAY AREA BUILDERS EXCHANGE - TELEPHONE (510) 483-8880. FAX (510) 352-1509
WEEKLY PLAN LIST - Friday, November 07, 2014
To view plans online go to: www.beac.com
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
11/7/2014 10:00 AM
State of Good Repair Bus Stop Improvements
10/20 @ 1PM at 3501 Civic Center Dr., San Rafael
Mill
Valley/Ross,
San
Rafael/Novat
o
Engineers # of
Plan
Estimate Addenda #
ONLINE
Temporary traffic control, water pollution control, landscape, aggregate base, hot mix asphalt, signage, wood & plastic lumber structures, concrete curbs &
sidewalks, painting
Kristin MacDonald @ 209-370-1908
10:00 AM
Concord
Online
Concord Avenue Retail Project
Construct new Retail Buildings (2) with site work
1. Please break out pricing separately for Building A and Building B.
2. HVAC, Electrical, Plumbing, and Fire Sprinklers are Design-Build. Please refer to the “MEP Basis of Design” criteria for bidding these trades.
3. Please include all work within the suites as per the “LandlordWork Letters” document.
4. Please submit all RFI’s in writing, to Curtis Basore atWoodland Construction, if clarification is required. Please do not contact the Owner, Architect, or
Engineers directly with questions.
Please fax bids to: (209) 545-2114, or email to “[email protected]”
2:00 PM
Modesto
2:00 PM
San
Francisco
2:00 PM
Stockton
2:00 PM
Watsonville
Traffic Counting Services for Signal Re-Timing in the Downtown
ONLINE
The City of Modesto is soliciting requests for proposals for traffic data collection services at all signalized intersections in the downtown area.
2015 Prequalification for SFUSD Projects Eligible for State Funding
10/9 @ 3PM at 135 Van Ness Ave, San Francisco
ONLINE
The San Francisco Unified School Dist is prequalifying general contractors,, mechanical, electrical, plumbing, fire protection & underground pipeline
subcontractors to bid on state-funding eligible projects
Demolition of Partially Built Single Family Residence
10/24 @ 10AM at 1444 N. Chrocicle Ave, Stockton
San Joaquin County is seeking qualified vendors for the demoltion of a fire-damaged, partially built single family residence. The structure is being ordered
demolished as a public nuisance.
$40000
Elkhorn Slough Water System Maintenance
MAND 10/28 @ 10AM
Contractor shall provide all supplies and materials needed for water sampling, disinfection, residual monitoring, and repairs to the California Department of Fish
and Wildlife, Elkhorn Slough Ecological Reserve, Water System No. 2702226, Transient Non-Community Water System, Elkhorn Slough Ecological Reserve,
(CDFW,ESER), located at 1700 Elkhorn Road, Watsonville, CA 95076.
Page 1 of 41
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
11/7/2014 4:00 PM
RFP-Design Engineering Consultant Services for Charcot Ave
Extension over I-880
San Jose
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
The City of San Jose's Department of Transportation is seeking qualified consultant engineering firms or Partnering Organizations to provide transportation
planning and engineering services related to the preparation of scoping, environmental studies, project reports, plans, specifications and estimate for the
Charcot Avenue Extension Over I-880.
5:00 PM
Carmichael
ONLINE
Winston Churchill New 21st Century Classroom Bldgs Contractor
Prequalification Requirements
The Winston Churchill Middle School New 21st Century classrom buildings project is a lease-leaseback job. It consists of four (4) new buildings totalling
approximately 14,000 sf including 12 new classrooms & a restroom cluster.
5:00 PM
San
Francisco
NOTE:Contractors will not be allowed to submit a bid/proposal for this project unless you've submitted your company prequalification package through this
process.
RFP-Parking Garage Management at 1650 Mission Street
10/22 @ 10AM at 25 Van Ness Ave, Ste 70, San Francisco
ONLINE
Manage the complete Parking Lot Operation at 1650 Mission Street Parking Garage. The current lot has 105 parking stalls.
11/10/2014 10:00 AM
Tracy
Landscape, Parks and Channelways Maintenance
10/23 @ 9AM
The general scope of services includes approximately 226 acres of landscape, including turf, shrubs, groundcover & spacialized maintenance services for
streetscapes, medians, channelways & LMD parks
11:30 PM
Cotati
2014 Pavement Maintenance Project
$490000
ONLINE
E343B
Digout, crack seal, slurry seal & associated re-striping
12:00 PM
Alameda
NEW RFQ Cleaning and Maintenance of Webster Street, Park Street and
ONLINE
Marina Village
The Ciy of Alameda is requestig proposals from qualified organizations for ongoing cleaning & maintenance on Park St, Webster St & Marina. Prospective
bidders must be prequalified by submitting a statement of pre-qualification package in the form provided by the owner.
12:00 PM
Fairfield
ONLINE
Nelson Retail Shell Building-Fairfield
New single story multi tenant retail building
2:00 PM
San
Francisco
2:00 PM
San Jose
MAND 10/13 @ 10AM at 1600 Holloway Ave, Room 200
Capital Planning & Construction, San Francisco
Work consists of all labor and materials necessary to remove and dispose of asbestos-containing thermal system insulation from piping systems within the crawl
spaces of Apartment Buildings #1, 3, 4, 5 & 10 at University Park North on campus. Work also includes the removal & disposal of all asbestos debris, all foreign
matter, all insulation remnants existing on the surfaces of the “rat slab,” concrete footings and wood framing members throughout the crawl spaces in
accordance with plans and specifications prepared by WSR Architects
University Park-North Garden Apartment Building #1,3,4,5&10
Asbestos Aba - CANCELLED
Pending
Compete bid documents will be posted once available
ONLINE
Wing Stop-San Jose
1,644 SF Tenant Improvement of an existing space to become a wing Stop restaurant.
NOTE:DO NOT CONTACT OWNER/ARCHITECT/CONSULTANTS
Page 2 of 41
Bid Date Bid Time Location
Plan Name / Scope of Work
11/10/2014 2:00 PM
Fire Station 23 Interior Remodel - Phase 2
2:00 PM
2:00 PM
Engineers # of
Plan
Estimate Addenda #
$39000
MAND 11/5 @ 10AM at 31 W. 27th Ave, San Mateo
Selective demolition, wall framing & drywall, custom casework/cabinetry, custom tile, doors & hardware, paint & finishes, flooring, HVAC, plumbing, electrical,
data & communications
ONLINE
Sacramento NEW Johnston Low Lift Pump Station
Provide a Johnston Pump Bowl Assembly. Serial # JS-6881-82. 1 stage 30LS Bowl water lubricated for 36" column, 2 7/16" shaft, bell suction. 5 blade 19 "
bronze impellar. Driven by 300 HP motor @ 710 RPM. Pump performance 21,000 GPM at 49ft TDH.
$800000 Farm Bureau Road Safe Routes to School Project
MAND 10/27 @ 10AM at 1435 Gasoline Alley, Concord
Concord
ONLINE
San Mateo
ONLINE
$850000
2:00 PM
Sacramento
3:00 PM
Sacramento
11/11/2014 1:00 PM
Prebid Information
Marina
The work to be done in general consists of mobilization, traffic control, storm water pollution control, open trench construction of storm drain, street pavement,
concrete curb and gutter construction, concrete sidewalk construction, concrete ADA ramp construction, tree removal, potholing of existing utilities, traffic striping
and markings, street lighting and landscape and irrigation construction and all other work as shown on the Plans and as specified in the Special Provisions.
Roof Replacement Project Greenhouse Offices and Storage Facility MAND 10/24 @ 1:30PM
Replace the roof & exterior siding of the California Dept of Food & Agriculture's Greenhouse offices & storage facility
Retrofit Access Control and Instrusion Systems
MAND 10/28 @ 2PM at 2450 Florin Rd, Sacramento
Retrofit access control & instrusion systems
ONLINE
ONLINE
10/16 @ 1PM & 10/28 @ 1PM
Preston Park Window and Door Replacement
ONLINE
Doors & windows
1:00 PM
Sacramento
Landscaping and Engineering Services (3 Years)
10/28 @ 3PM
Perform various landscape design and construction, road / area grading, walkway paving and repairs, retaining walls and associated work to support tasks to be
performed at SMUD's various facilities during normal business hours.
ONLINE
10:00 AM
Greenfield
Magnolia Place Senior Apartments
ONLINE
12:00 PM
Anderson
Construction of a 32-unit, 26,220 SF building complete with architectural, civil, electrical, landscaping, plumbing, mechanical & structural trades.
ONLINE
ARCO AM/PM - Anderson
GROUND UP CONSTRUCTION OF NEW C-STORE. WITH FUTURE TENANT TO BE BUILT IN ADJACENT TENANT SPACE.
TRADES NEEDED: Survey/Staking, Erosion Control, Grading/Paving, Utilities, Striping, Landscaping, Concrete, Concrete Sealer, CMU, Structural Steel, Rough
Carpentry, Insulation, Roofing, Flashing & Metals, Sealing & Caulking, Doors, Storefront, Stucco, Drywall, Tile, Flooring, Paint, T-Bar, FRP/Marlite, Restrooms,
Plumbing, HVAC, Electrical
2:00 PM
Patterson
$650000 $750000
Non-Potable Water System Phase III
ONLINE
The major work consists of installation of approximately 7,200 linear feet of new non-potable water line ranging in size from 2 inches to 10 inches, water valves,
fire hydrants, A.C. pavement removal and replacement, in the City of Patterson
3:00 PM
Palo Alto
Pre-proposal Teleconference 10/7 @ 1:30PM
The City of Palo Alto is seeking proposals from qualified firms to provide services to launch integrated programs to reduce traffic and parking demand in the
Downtown core, and is also seeking to more effectively optimize and manage its existing parking supply. Important City goals include providing improved access
to information on parking and transportation within the Downtown, and helping motorists to find available parking quickly and efficiently.
RFP-Parking Wayfinding
Page 3 of 41
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
11/12/2014 1:00 PM
Cable Plant and Hardware, Conduit Pathway and Network
Electronics at Four of the District's School Campuses
Capitola
1:30 PM
Brentwood
1:30 PM
Castro
Valley/Alam
o
1:30 PM
Stockton
1:30 PM
Ukiah
1:30 PM
Valley
Springs
11:00 AM
Oakland
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 10/29 @ 1PM at 620 Monterey Ave, Capitola
Network infrastructure including but not limited to internal connections of cabling, network electronics, servers, installation of four schools in the district
RFQ-Bixler Maintenance Center Fuel Dispenser Replacement Project MAND 10/22 @ 1:30 PM
Replacement of the existing gasoline & diesel fuel dispensers, pumps, hoses & related appurtenances & installation of new fuel dispensers, pumps, hoses & all
related appurtenances required to complete the work, start-up & calibration of new dispensers & performe required testing
$3000000 Eden Reservoir Replacement and Round Hill Reservoir
10/20 @ 9:30AM
ONLINE
002C/B6
$4000000
Rehabilitation
Work includes: 1) At Eden Reservoir: Perform earthwork; install District-furnished 0.28 million gallon bolted steel temporary tank, foundation, related piping, and
appurtenances; demolish existing 1.6-MG welded steel Eden Reservoir including the exterior wooden architectural screen; construct two, 0.45 million gallon
welded steel reservoirs with aluminum geodesic dome roofs, foundations, piping, valve structures, coatings, and appurtenances; disassemble and store 0.28
million gallon bolted steel temporary tank, restore temporary tank site, pave reservoir site, install irrigation and landscaping, install fencing and perform related
work as specified in the Contract Documents at Eden Reservoir, located near the intersection of Coolidge Court and Summerglen Place in Castro Valley
(Unincorporated Alameda County), California. 2) At Round Hill Reservoir: Construct radio communication towers and related cable and conduit; perform
earthwork; provide and install 0.16 million gallon bolted steel temporary tank, foundation, piping, and appurtenances; remove exterior wooden architectural
screen from existing Round Hill Reservoir; abrasive blast and recoat tank interior; low-pressure water clean, prime and top coat tank exterior; disassemble and
store 0.16 million gallon bolted steel temporary tank, pave reservoir site, install fencing; and perform related work as specified in the Contract Documents at
Round Hill Reservoir, located between 574 and 582 Oakshire Place in Alamo (Unincorporated Contra Costa County), California. 3) At Hink No. 2 Reservoir:
Disassemble 0.28-MG bolted steel temporary tank, deliver to Eden Reservoir, remove and replace fencing, restore site, and perform related work as specified in
the Contract Documents at Hink No. 2 Reservoir located at the end of Vista Bella Drive, Lafayette, California.
RFQ-Stockton Field Operations Center Fuel Dispenser Replacement MAND 10/22 @ 11:30AM at 1804 W Main St., Stockton
Replacement of the existing gasoline & diesel fuel dispensers, pumps, hoses & related appurtenances & installation of new fuel dispensers, pumps, hoses & all
related appurtenances required to complete the work, start-up & calibration of new dispensers & performe required testing
Gate Install at Corp Yard
MAND 11/5 @ 10AM
Provide all Materials, Equipment and Labor to install 2-14' slide gates, open chain link with 3 rows of barbwire across the top, with new safety track.
RFQ-Pardee Center Fuel Dispenser Replacement
MAND 10/22 @ 9AM at 3535 Sandretto Rd., Valley Springs
Replacement of the existing gasoline & diesel fuel dispensers, pumps, hoses & related appurtenances & installation of new fuel dispensers, pumps, hoses & all
related appurtenances required to complete the work, start-up & calibration of new dispensers & performe required testing
Renovation of 3824 West St., Oakland
Voluntary 10/23 @ 10AM at 250 Frank Ogawa Plaza, 4th Fl, $196000
Oakland
Rrenovation of a two story single family home built in 1915 at 3824 West St. in Oakland, including selective demolition; cast-in-place concrete; metal
fabrications; miscellaneous rough carpentry; wood decking; finish carpentry; solid surface paneling; Div_07-thermal insulation; weather barriers; wood shingles
& shake siding; joint sealants; residential doors; wood window repair; vinyl windows; door hardware; glazing; fixed louvers, wall vents; gypsum board; tile;
resilient flooring, painting; toilet accessories; residential cabinetry; plumbing; bathroom exhaust fans, electrical; exterior improvements
Page 4 of 41
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
11/12/2014 11:00 AM
RFP-Engineering Design Services for Oceanside Plant
Encouraged 10/27 @ 9AM
San
Francisco
Engineers # of
Plan
Estimate Addenda #
ONLINE
Thed San Francisco Public Utilities Commission seeks to retain the services of two (2) qualified proposers to provide engineering design services for the sewer
improvement program projects at Oceanside Water Pollution Control Plant
12:00 PM
Fremont
12:00 PM
Red Bluff
2:00 AM
Sausalito
2:00 PM
San
Francisco
NEW Boneheads Grill
Approximately 2,400 square foot tenant improvement for Boneheads Restaurant, including exterior signage, doors & hardware, painting, flooring, ceiling, kitchen
equipment, plumbing, HVAC, lighting, electrical
ONLINE
Online
Wal-Mart #1608 Supercenter - Red Bluff
Construction of a new WalMart Supercenter with associated on and off site work. Subcontractors are required to participate in the I9 Program. Wal-Mart requires
proof of ID be provided to our office for review and approval. All information will be stored in a secured area with limited access and security restrictions. Please
note all WalMart requirements & restrictions and review all the general bid documentation.
$205000
Miscellaneous Upgrades Project
MAND 11/4 @ 10AM at 1 East Road, Sausalito
This project consists of 6 tasks:
1.Exterior painting of several small buildings.
2.Structural improvements to foundation supports.
3.Replacement of 4 air relief valves on the District’s sewer force main.
4.Collector system modifications to two sewer sediment tanks.
5.One sewer pump replacement.
6.Modifications to a pump station wet well.
ONLINE
ONLINE
Moving and Storage Services San Francisco Unified School District
Moving & storage services
2:00 PM
San Jose
2:00 PM
Napa
2:00 PM
Milpitas
2:00 PM
Livingston
New 2014 Godwin 4" and 6" Pumps Modifications
$28000
The City of San Jose is seeking quotes from qualified vendors to modify new 2014 Godwin CD150M and CD103M model Pumps for the Public Works
Department as described in the Specification.
$500000
Fire Alarm and Fire Pump Testing
MAND 10/31 @ 9AM at 2100 Napa Valley Hwy, Napa
The department is seeking bids for a contractor to perform Fire Alarm and Fire Pump Testing Services to the Department of State Hospitals—Napa (DSH-Napa)
Milpitas High School Temporary Locker Portables
11/4 @ 1PM at 1285 Escuela Parkway, Milpitas
Div_02-selective site demolition; Div_06-miscellaneous rough carpentry; Div_10-panel signage; Div_22-plumbing; Div_26-electrical; Div_27-data/telephone
cabling system, paging system; Div_28-fire alarm system; Div_32-trenching, backfilling & compacting; Div-32-asphalt concrete paving, chain link fences & gates
Joseph Gallo Park Improvements
10/30 @ 10AM
Constructing a playground with owner-furnished playground equipment, wood chips, mow strip curb, ADA accessible path & drain path pipe, constructing three
(3) picnic patios with owner-furnished shelter system, tables, trash receptacles, barbeque fixtures, concrete slab & approximately 534 sf of accessible path,
constructing a restroom with water, sewer & electrical service & planting thirteen box trees.
Page 5 of 41
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
11/12/2014 2:00 PM
Santa Rita Jail Water Tank Paint Job
Dublin
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Prepare & paint exterior of 1 million gallon metal water tank 93' across & 20' high utilizing specifications as provided by Kelly Moore.
THIS IS A SUBCONTRACTING OPPORTUNITY to work for Agbayani Construction under Alameda County's Job Order Contract (JOC)program. For details
regarding this job please contact Micheal Schalchi 650.994.9380 or via email at [email protected]. Alameda County ECOP requirements apply.
2:00 PM
Dublin
ONLINE
Santa Rita Jail Asphalt Re-Paving Service Road
Remove cattle grate & designated roadway areas of failed asphalt; perform off-haul all materials & drbris for recylcing; clean & prepare all cracks1/4 or wider &
fill with hot rubberized crack filler; scarify re-grade & compact base materials in areas identified in jint scope meeting; supply & install 2" ofd new compacted
asphalt concrete.
THIS IS A SUBCONTRACTING OPPORTUNITY to work for Agbayani Construction under Alameda County's Job Order Contract (JOC)program. For details
regarding this job please contact Micheal Schalchi 650.994.9380 or via email at [email protected]. Alameda County ECOP requirements apply.
2:00 PM
2:30 PM
Alameda
County
San
Francisco
10/22 @ 9:30AM at 951 Turner Ct., Rm 230, Hayward
On-Call Utility Potholing at Various Locations
Prospecting & psoitively locating (both horizontally & vertically) various underground utility lines by "non-destructuve vacuum excavation," providing tarffic
control; restoration of disturbed roadway pavement; cleaning site & miscellnaeous work; furnishing all labor, material, tools, equipment, mechanical
workmanship, transportation & services necessary to be done in order to perform a complete job.
Pavement Renovation and Sewer Replacement Cresent and Husdon 10/30 @ 2PM at 1680 Mission St., 3rd Fl, san Francisco
E839B/0
ONLINE
Avenues
Demolition, pavement renovation, sewer replacement & drainage work, curb ramp construction, traffic routing
Ramon Kong, Proj Mgr, @ 415-554-8280
10/28/14 @ 9amMAND 10/30/14 @ 9am
Recreation Park Stadim Lighting Project, Phase 2...This project requires the Contractor to have a Class A or combination of Class C licenses to perform all
aspects of work.
Ocean Avenue and Persia Avenue Pavement Renovation and Sewer 10/24 @ 1:30 PM at 1680 MIssion St., 4th Fl, San Francisco $3000000
2:30 PM
Visalia
RFB-14-15-36 Recreation Park Stadium Lighting Project, Phase 2
2:30 PM
San
Francisco
Replacement
Online
ONLINE
Pavement renovation, TEP b ulbout & curb ramp construction, sewer replacement, water support work, traffic signal & streetlight support work, traffic routing &
all associated work.
Ramon Kong, Proj Mgr, @ 415-554-8280
3:00 PM
Sunnyvale
Fire Station Roll Up Door Replacement
Optional 11/4 @ 10:30AM at 171 N. Mathilda Ave,
Sunnyvale
ONLINE
MAND 10/22 @ 10AM at 12345 El Monte Rd., Bldg D160,
Los Altos Hill
ONLINE
Replacing eleven (11) roll-up doors at three fire stations in the City of Sunnyvale
3:00 PM
Los Altos
Smithwick Theater Hardware Improvements-Foothill College
Div_08-wood doors, FRP doors, door hardware; Div_09-painting
Page 6 of 41
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
11/12/2014 3:00 PM
Palo Alto
ONLINE
3:00 PM
Petaluma
3:00 PM
Stockton
10/29 @ 10AM at 155 El Caino Real, Palo Alto
The City of Palo Alto is seeking proposals from qualified firms to provide construction management services during the construction of the El Camino Park
Restoration Project. The required services and performance conditions are described in the Scope of Services.
Victoria Lift Station Upgrades
MAND 11/04/14 @ 10:00 am
The WORK includes: Modifications to the existing pump station including but not limited to the following: forcemain tie-in, dry pit valve replacement, removal and
replacement of submersible pumps, wet well top replacements, electrical equipment, controls and instrumentation, bypass pumping during construction, site
work, and related work as shown in the Contract Documents. Work also includes electrical improvements at the La Cresta Water Tanks for SCADA upgrades ..
BNSF/Port of Stockton Navy Drive BNSF Underpass Project
MAND 10/15 @ 10AM at 2201 W. Washington St., Stockton
Water pollution control, earthwork, erosion control, subbases & bases, hot mix asphalt, concrete pavement, piling, concrete structures, waterproofing, steel
structures, painting, pumping equipment & controls, miscellaneous metal, fences
4:00 PM
Merced
NEW Parcade TI General Contractor Prqualification
The project consists of a full renovation of approximately 5,590 gsf to create two suites (Suite A and Suite B) that are flexible for future and near term use. Suite
A will consist of an administrative center including offices, open offices, conference rooms, lactation room, and data/telecommunications room. Suite B will
consist of both the Business Incubator program and the Small Business Development Center including offices, open office, and conference rooms. The project
is located in Downtown Merced on the southwest corner of M Street and 18th Street.
ONLINE
4:00 PM
Atherton
Prebid Information
RFP for El Camino Park Restoration Project
ONLINE
ONLINE
ONLINE
RFP for Phase 1-El Camino Real Safety and Lane Reduction Traffic
Study
The Town of Atherton intends to retain a qualified professional engineering consultant to provide traffic engineering services required to prepare a traffic study
for the Atherton-El Camino Real Lane Reduction Study
4:00 PM
Cloverdale
5:00 PM
Pleasanton
NEW Rush Creek Lodge, Reception/Retail Building and Hotel
Construct a new 87,000 SF retail building / hotel, trades bidding are drywall, rough carpentry, flashing and sheet metal, doors, glass and glazing and plaster.
ONLINE
ONLINE
Pleasanton Dealership Chrysler Dodge Jeep
All phases of work, excluding site grading, base rock U/slab, AC paving & base.
Mechanical and Electrical trades are design build
NOTE: DO NOT CONTACT OWNER, ARCHITECT & CONSULTANTS
5:00 PM
11/13/2014 1:00 PM
NEW Maximize Chiropractic
West
Sacramento
Tenant improvements, includuing demising wall & tenant wall installation, restroom, electrical panels, phone board, placing roof top unit & ducting for space,
ceiling installation with lighting
Daly City
10/30/14 @ 11:00 am at site
Extension of Westlake Warehouse
$150000 $220000
Design and construction of a pre-fabricated warehouse as detailed in the plans and specifications; including but not limited to: Construct warehouse foundation
based on soils report recently completed; construct warehouse, coordinate with City's Inspector
to design and construct an extension of the fire sprinklers; installation of a ramp, installation of electrical equipment and acquire all necessary permits and any
other work required for acomplete and fully functional warehouse.
Page 7 of 41
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
11/13/2014 11:00 AM
Northern Plume Monitoring Well Installation Project
2:00 PM
2:00 PM
2:00 PM
Lodi
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$152000
The work consists of installing a nested groundwater monitoring well at location as shown on the vicinity map in the project specifications. Contractor will be
required to obtain all permits associated with monitoring well construction and will include a California-licensed Professional Geologist or Engineer. The work
includes collecting groundwater samples and procuring analyses from a State certified lab as outlined in the project specifications. This project is being
completed under the regulatory oversight of the California Regional Water Quality Control Board, Central Valley Region (RWQCB). The monitoring well shall be
constructed in accordance with California and San Joaquin County Well Standards. The well shall be constructed as a nested monitoring well.
NEW Public Safety Facility-Door Replacement
Optional 11/7 @ 2PM at 244 North Broadway, Turlock
Turlock
The work consists, in general, of: Remove and replace door 155, remove and replace door 197A, coordination of miscellaneous improvements and furnishing all
necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place
Access Barrier Removal Only - Automatic Door Opener & Push
MAND 10/23/14 @ 10:30 at 1501 Capitol Mall, Sacramento
Sacramento
ONLINE
ONLINE
ONLINE
Plates
Salinas
2:00 PM
San
Francisco
2:00 PM
San
Francisco
Major components of Project Work consist of: Minor demolition, door operator, push
plates, signage, new fire rated door, electrical and related work.
Natividad Medical Center JOC 2014
MAND 10/30/14 @ 9am
$25000 $4000000
This Job Order Contract(s) (JOC) is an indefinite quantity contract pursuant to which Contractor performs a variety of projects, consisting of specific construction
tasks. Scope is for general construction, repair, remodel, and other repetitive related work. County has published a Construction Task Catalog® (CTC)
containing a series of construction tasks with preset Unit Prices (UP) developed using experienced labor and high quality materials. All UPs are based on local
labor, materials, and equipment prices, including current prevailing wages. Contractor is to bid Adjustment Factors (AF) to be applied to UPs. Price of an
individual project is determined by multiplying preset UPs and appropriate quantities by the appropriate AFs.
Replace Drinking Water Fountains Public Utilities Commission
MAND 10/29 @ 10:30AM at 505 Van Ness Ave, Rm 2012,
Building 418
San Francisco
The Contractor shall provide all labor, equipment and materials required to remove, dispose of and re-install new drinking water fountains and water chiller units
for the drinking fountains.
Job Order Contract 53, Electrical (C-10 License), San Francisco,
10/9 @ 10AM
Online
ONLINE
ONLINE
Peninsula and East Bay
A Job Order Contract is an indefinite quantity contract pursuant to which the San Francisco Public Utilities Commission may accomplish a series of projects with
a single, competitively bid contract awarded before the projects are identified. Contractors bid an adjustment factor to pre-set unit prices. Work is accomplished
by issuing task orders to the successful contractor during the two year term of the contract.
Mindy Lee @ 415-554-3136
2:00 PM
San
Francisco
NEW Building 575 RDM Office Remodel
11/6 @ 10AM
$168000
The project converts an existing open office area with existing systems workstations to a combined open/closed office area with reassembled existing systems
workstations, and associated improvements. The work includes, but is not limited to; architectural, mechanical and electrical building systems remodeling; and
the re-use of existing systems workstations through their disassembly and reassembly as indicated in the Drawings. The project requires working within an
active, occupied office environment, with temporary construction separations and barriers, and construction procedures for occupied spaces as described in the
Contract Documents and in the latest edition of the Airport?s Tenant Improvement Guide.
Jorge Garcia, Contract Mgr, @ 650-821-5515
Page 8 of 41
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
11/13/2014 2:00 PM
TG08.3-Skylights
Highly Rncouraged 8/21 @ 2PM
San
Francisco
2:00 PM
San Rafael
2:00 PM
West
Sacramento
Engineers # of
Plan
Estimate Addenda #
ONLINE
Webcor/Obayashi Joint Venture issues this Request for Proposals (RFP) for the Skylights Package for the Transbay Transit Center Project from firms (Trade
Subcontractors) with expertise in Design, fabrication and installation of skylights. The successful Proposer must demonstrate experience in its respective field as
outlined within this RFP.
Terra Linda Pool House Renovation Project
Optional 10/23 @ 10AM at 670 Del Ganado Rd., San Rafael
Earthwork, clearing, water systems, chain link fence. concrete, structural steel, rough carpentry, glued laminayed construction, wood I jists, waterproofing, bldg
insulation, slab-on-grade vapor barrier, bldg envelope underlayment, modified membrane roof, flashing & sheet metal, firestopping, joint sealers, access doors &
panels, aluminum window walls, door hardware, glazing, gypsum board assemblies, epoxy floor, wood doors, resilient base, fiberglass wall panels, cultured
marble panels, paints & coatings, room finish schedule, lockers, fire extinguisher cabinets, window shades, plumbing, fire sprinkler systems, HVAV piping,
lighting, electrical
CHP Academy Water Conservation Landscaping Services
MAND 10/22 @ 9AM
021C/R0
ONLINE
Water conservation landscaping services fo the CA Highway Patrol Academy
Cassandra Stanton @ 916-843-3610
2:00 PM
Sacramento
Online
10/8 @ 11am
CRC HVAC Infrastructure Renovation
Procurement and installation of HVAC equipment and infrastructure.
2:00 PM
San
Francisco
NEW West Field Garage Modifications
Recommended 11/6 @ 10AM
$530000
ONLINE
The following is a general description of work by discipline, and shall not be considered as being limited to items listed. The Project provides for modifications of
existing facility for the Airport's West Field Garage. Lowering of the existing garage slab and all associated site and utility work described in the drawings and
specifications. Work includes, but is not limited to, labor and materials to excavate, lower grade beams, trenching and backfill, install ADA Ramps and concrete
retaining wall, sidewalks, drainage system additions, improvements, and connections to existing system, AC grind and pave/overlay, PCC curbing and PCC
pavement replacement, curbing handrail replacement, traffic control, dust control, and all substantial electrical work. Contractor shall phase and conduct the
work to allow for concurrent occupancy of the Airport's West Field Garage and its activities.
Stan Palat @ 650-821-7735
$85000
MAND 11/6 @ @ 9AM at 655 S. First St. Dixon
Remove, save & reuse were possible, all parking stops & parking signs, ADA spaces; mill & grind surface asphalt paving; removal & replacement of all wood
headers; excavation; protect all subgrade piping, drains & utilities & oak tree in southwest corner of parking lot; placement of a geotextile fiber barrier; placement
of three-inch thick 1/2 inch barrier medium type A PG 64 new hot mix asphalt
2:00 PM
Dixon
Fairground Parking Lot B Repaving Project
2:00 PM
Sacramento
HVAC Infrastructure Renovation @ Cosumnes River College
10/8 @ 11AM
$1800000
Pending
ONLINE
Procure and install HVAC equipment and infrastructure
2:00 PM
Antioch
$128000
11/3 @ 9AM
Concrete; metal fabrications; rough carpentry; joint sealants; painting & protective coatings, insulated metal wall panels, pipe & pipe fittings; electrical
Operations Equipment and Storage Facilities
Page 9 of 41
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
11/13/2014 2:00 PM
Construct Communications Towers & Vaults
Colby
Mountain
Prebid Information
Engineers # of
Plan
Estimate Addenda #
MAND 10/23/14 @ 10:00 am at 995 Fir Street, Chico
ONLINE
Major components of Project Work consist of: Labor, material and services necessary
for construction of a new telecommunication tower and supporting infrastructure at an existing tower site in Tehama County. Work includes transporting, erecting
and installing owner furnished premanufactured 120' tower from West Sacramento to Colby Mountain. Tower is a self-supporting, 4 legged metal improvement.
Foundations, separate generator building with emergency backup generator, photovoltaic panel field, propane fuel system, and electrical utilities are also a part.
Selective demolition of existing towers, vault and infrastructure identified will be delayed until construction is complete.
2:00 PM
2:00 PM
2:00 PM
NEW Sportsman's Warehouse Fresno
New building for Sportsman’s Warehouse. Project consists of, but is not limited to, earthwork, concrete work, chain link fence, CMU masonry, stone work,
structural steel, Steel Joists, Metal deck, rough carpentry, sheathing, millwork, countertops, insulation, EIFS, membrane roofing, flashing and sheet metal, roof
accessories, steel doors and frames, wood doors, overhead doors, aluminum storefront, automatic entrance doors, door hardware, glass and glazing, metal stud
framing, drywall, resilient flooring, FRP, carpet, painting, sealed concrete floors, toilet compartments, toilet and bath accessories, fire suppression, HVAC,
plumbing, and electrical work.
Villa Annex Restroom Upgrade
MAND 11/6 @ 9AM at 860 Chanticleer Way, Healdsburg
Healdsburg
Div_02-selective demolition; Div_06-miscellaneous rough carpentry, interior arch woodwork, platic paneling; Div-07-penetration firestopping, joint sealants; Div08-flush wood doors, door hardware; Div-09-gypsum board, resilient base & accessories, resilient sheet flooring, interior painting; Div-10-panel signage, toilet
compartments, toilet accessories; Div_22-plumbing; Div-26-electrical
Janitorial Services for the Los Gatos DMV Field Office
Optional 10/22 $ 8AM at 600 N Santa Cruz Ave, Los Gatos
Los Gatos
Contractor agrees to provide the Dept of Motor Vehicles all labor, tools, materials, equipment & travel necessary to perform janitorial services at the Los Gatos
DMV.
Fresno
ONLINE
ONLINE
ONLINE
Kary Ride @ 916-651-2555
2:00 PM
2:00 PM
Marina
Pleasant Hill
Regional Treatment Plant Fueling System Upgrade and
Underground Storage Tank Facility Removal
MAND 11/4 @ 10AM at 14811 Del Monte Blvd, Marina
Div_02-demolition & reconstruction, site preparation, earthwork, trenching, backfilling & compacting for utilities, asphaltic concrete vehicular paving,
underground storage tank removal; Div_03-concrete; Div_09-coatings; Div_15-flammable liquid storage & dispensing systems using protected aboveground
storage tanks; Div_16-electrical
RFP for Golf Club Road/Old Quarry Road Improvement Project
10/27 @ 10AM at 100 Gregory Ln, Pleasant Hill
ONLINE
ONLINE
Design Services
City of Pleasant Hill is soliciting proposals to perform survey, engineering, design, and right of way services for the Golf Club Road/Old Quarry Road
Improvement Project. The project intends to implement "complete street" elements along Golf Club Road and Old Quarry Road near the Diablo Valley College
campus, including two new traffic signals, potential roundabout, sidewalk, bike lanes, LED street lighting,
and landscaping.
2:00 PM
Roseville
ONLINE
Zarah at Roseville Galleria
Shell work for proposed tenant improvemnt. Trades to include: demolition, concrete, rebar, masonry, structural steel, insulation, caulking, drywall/metal framing,
ceramic tile, painting and electrical.
2:00 PM
Sacramento
Theater Screen Replacement at the California State Railroad Museum
Replace the Da-Lite scenic roller project screen
Page 10 of 41
ONLINE
Bid Date Bid Time Location
11/13/2014 2:00 PM
2:30 PM
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Pizza Hut-Brentwood
Tenant Improvement of existing 1,208 sq. ft. space for future Pizza Hut restaurant. Trades Include: Rough Carpentry, Millwork, Insulation, Roofing, Sheet Metal,
Doors/ Frames/ Hardware, Glass- Tint/ Film, Drywall & Metal Stud, Ceramic Tile, Acoustic Ceiling, Painting, FRP, Toilet Partitions & Accessories, Fire
Suppression, Plumbing, HVAC, Electrical, etc.
$2622
Carmichael NEW Waste Removal Services for the Carmichael DMV Field Office
The Contractor agrees to provide the Department of Motor Vehicles (DMV) all labor, tools, materials, equipment, and travel necessary to perform waste bin
rental and non-hazardous waste removal services at the Carmichael DMV field office.
Brentwood
ONLINE
ONLINE
Cindy Huyhn @ 916-657-6972
2:30 PM
Sacramento
Online
MAND 10/9/14 @ 11am
Asbestos Abatement for DMV Headquarters.
Asbestos Abatement for DMV Headquarters.
2:30 PM
San Mateo
County
2:30 PM
Turlock
3:00 PM
Salinas
3:00 PM
Solano
County
Memorial Park Water Treatment Improvement Project
Encouraged 11/4 @ 2:30PM
$820000
Mobilization, maintaining traffic, clearing & grubbing, erosion & sediment control, temporary silt fence, temporary erosion control, asphalt concrete, aspahltic
emulsion, liquid asphalt, fences, cosntruction staking & layout, water pollutuion control, PVC pressure pipe, miscellaneous piping, valves, fittings &
appurtenances, pressure pipeline testing & disinfection, utility trenching, potholing, pump station, water treatment plant tanks, cast-in-place concrete, domestic
water tanks, ductile iron fittings, polywrap, protective coating, electrical, demolition
NEW Public Safety Facility-Miscellaneous Site Improvements
Optional 11/7 @ 2PM at 244 North Broadway, Turlock
The work consists, in general, of: Boring, anchoring of curb with rebar, constructing 6" vertical curb at stairs, constructing 6" vertical curb at ramps, installing
handrails at ramps, welding of pipe sleeves at handrails, POR-ROK anchoring cement, gate latch system w/cane bolt and receivers and furnishing all necessary
labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place.
$4550000
JOC Roads & Bridges (2014)
MAND 10/30/14 @ 3:45pm
This Job Order Contract(s) (JOC) is an indefinite quantity contract pursuant to which Contractor performs a variety of projects, consisting of specific construction
tasks. Scope is for general construction, repair, remodel, and other repetitive related work. County has published a Construction Task Catalog® (CTC)
containing a series of construction tasks with preset Unit Prices (UP) developed using experienced labor and high quality materials. All UPs are based on local
labor, materials, and equipment prices, including current prevailing wages. Contractor is to bid Adjustment Factors (AF) to be applied to UPs. Price of an
individual project is determined by multiplying preset UPs and appropriate quantities by the appropriate AFs.
ONLINE
ONLINE
Online
ONLINE
Hot Applied Asphalt Crack Sealant
Contractor shall all personnel, equipment, tools, parts & any other materials necessary to furnish hot applied asphalt crack sealant for highways & roads at
various locations in Solano County
Fred Connor @ 707-784-6976
3:00 PM
Mountain
View
MAND 10/28 @ 10AM at 231 N Whisman Rd., Mountain
View
Install ten (10) street light poles & street lights & ten (10) concrete footing in various locations throughout the City of Mountain View.
Lot Street Light System Repairs and Installation
Page 11 of 41
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
11/13/2014 4:00 PM
Mold and Asbestos Remediation Services
Richmond
Prebid Information
Engineers # of
Plan
Estimate Addenda #
Online O
The Richmond Housing Authority manages and requires mold and/or asbestos remediation services for Public Housing Developments and Authority owned
properties; which includes the following facilities: Hacienda; Nevin Plaza; Friendship Manor; Triangle Court, Nystrom Village. Of the 5 residential properties,
approximate quantity of units of mold & asbestos remediation services are unknown at this time.
5:00 PM
Antioch
ONLINE
RFQ for On-Call Planning Services
The City of Antioch is seeking qualified consultants to submit a statement of interest & qualifications demonstrating the ability to perform professional planning
services on private developmental applications on an on-call basis. Consultants are expected to have expertise in multiple disciplines that are necessary to
process development applications for residential & commercial development projects including:land planning, CEQA, subdivision map act, architecture &
landscape architecture
5:00 PM
Fortuna
ONLINE
Yarrow Village Affordable Senior Housing
Construction of twenry five (25) affordable senior single-story townhomes, a laundry facility, trash & recycling enclosure, a gazebo & related on-site
development, including, but not limited to, driveway, parking, walkways, on-site utilities & landscape, off-site work such as sidewalk, curb ramps, trail, pedestrian
bridge, watrer meters, etc is part of a separate contract
11/14/2014 10:00 AM
Palo Alto
MAND 11/4 @ 10am at Churchill Ave, Bldg D, Palo Alto
The removal of all existing fire alarm equipment & furnishing & installing new fire alarm system
Corporation Yard Fire Alarm Replacement
$82000
Complete documents will be posted once available
NEW Kentucky Mine Water System Improvement Project
Div_06-carpentry; Div_07-metal roof; Div_08-metal doors & frames, hardware; Div_09-paints & coatings; Div_11-chemical feed systems, valves &
apputenances; Div_13-water storage tanks; Div_15-pipes & fittings
Relocation and Modification of Modular Building Corporation Yard
MAND 11/4 @ 1PM at 25 Churchill Ave, Bldg D, Palo Alto $115000
Work includes but is not limited to:new interior walls, roofing, lighting, data/phones, wall framing, drywall, tack board, cabinets, plumbing, electrical, modification
of existing HVAC system, lighting, alarm systems, cabinet, flooring
10:00 AM
Sierra City
10:15 AM
Palo Alto
2:00 PM
Richmond
2:00 PM
Watsonville NEW RFQ for Environmental Consulting Services Pajaro Valley Unified
MAND 10/24 @ 1PM at 440 Civic Center Plaza, Richmond $300000
Removal and installation of 275 (200 Base Bid + 75 Alternate) newtraffic rated boxes and construction of reinforced concrete pads around the boxes in
accordanceto City Standards, removal of asphalt concrete and concrete sidewalk as required, and thecomplete re-wire of the traffic signal interconnect system
along the Richmond Parkway (BaseBid) from San Pablo Avenue to I-580 and Castro Street (Alternate Bid). (See Plans Attached),and for all other work, items or
details not mentioned above that are required by the Drawings,Standard Specifications, or these Special
Richmond Parkway Interconnect Wire and Pullbox Replacement
School District
The Pajaro Unified School Dist is requesting qualified persons, firms, partnerships, corporations, associations or professional organizations to enter into
agreements with the district to provide the District with the services neccessary to assure that their capital improvement bond program & specific bond projects
comply with the requirements of the CEQA.
Page 12 of 41
Pending
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
11/14/2014 2:00 PM
Avaya Telecom Switch Maintenance
Sacramento
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Sacramento State is seeking an AVAYA Platinum certified partner to provide maintenance service for the University’s existing AVAYA Telecom Switch system.
The service shall be AVAYA Hardware Support, Support Advantage, Upgrade Advantage and Terminal Coverage. All bidders must be an AVAYA certified at
the Platinum level to resell AVAYA Direct Maintenance and Support at the time of submitting this Invitation for Bid B140006 to the University. All bids shall be
for 100% delivered AVAYA Services only.
2:00 PM
2:00 PM
Carmel
San
Francisco
$450000
RFQ for Phase 1-Staff Facilities Locker Room
The Carmel Area Water District is seeking qualified construction/building contractor or firm with the expertise, successful project history & current capability to
ensure successful construction of a new staff facilities locker room.
Design Build Services for New Boarding Area B Reconstruction
10/20 @ 9:30AM
ONLINE
ONLINE
Project and Terminal 1 Center Renovation Project
Design Build Services for the programming, design and construction for the redevelopment of Terminal 1 Center Renovation Project and of New Boarding Area
B Reconstruction Project.
Reuben Hailii, Contracts Mgr, @ 650-821-7803
Folsom
Commons at Folsom - Assisted Living Facility (No GC Openings)
ONLINE
3:00 PM
Sacramento
Construct a two-story residential health-care assisted living facility and related site improvements consisting of 91 units total in the assisted living facility, 19
units in the Memory Care, +/- 3,000 SF of dining and living spaces and associated therapy areas, food service and offices.
RFP-Prefabricated Modular Data Center
10/17 @ 9AM
The Request for Proposal (RFP) is not an order. The purpose of this Request for Proposal (RFP) is to purcahse a Prefrabricated Modular Data Center Container
as described in the attached detailed statement of work, equipment list, and technical requirements sections.
ONLINE
5:00 PM
Mountain
View
Oro Loma Project
ONLINE
3:00 PM
The project consists of 8 buildings / 28 Townhomes / 2 accessible lots 11 & 4 with associated on site and off site work. The project will be constructed in one
phase. Construction will begin January 15, 2015.
11/17/2014 12:00 PM
Stockton
2:00 PM
Richmond
2:00 PM
San
Francisco
NEW Champs - Stockton
Trades to complete this project are as follows (but not limited to): DEMOLITION; FRAMING & DRYWALL; GLASS & GLAZING; CARPENTRY; MILLWORK;
PAINTING; WALLCOVERING; FIXTURE; ELECTRICAL
$412000
Social Security Administration Interior Modifications
MAND 11/5 @ 2PM at 3164 Garrity Way, Richmond
Site & building accessibilty upgrades; expanded lobby & service windows; storefront modification, walls, ceilings, floors, doors & finishes; selective demolition;
modified electrical, data, communications, security, plumbing & HVAC systems
ONLINE
ONLINE
Ridge Greene @ 925-787-7970
SFO-Design Build Services for Long Term Parking Garage No. 2
Project
10/10 @ 10AM
The Long-Term Parking Garage No. 2 Project consists of the programming, design, and construction of one or more multi-level above-ground parking
structure(s) within the Airport's Lot DD in order to increase on-Airport long-term parking capacity by a net 3,000 parking spaces.
Tasso Mavroudis, Contracts Mgr, @ 650-821-7758
Page 13 of 41
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
11/17/2014 2:00 PM
Richmond
3300 Regatta Build Out for Museums
MAND 10/30 @ 9:30 AM & 10/31 @ 9:30AM at 3300 Regatta $1400000
Blvd, Richmond
Renovation of approximately 21,000 sf of an existing warehouse space into a collection srorage & work facility for the University's museum, which will have two
separate zones of temperature & humidity controlled rooms wuth tight tolerance. Main work includes but is not limited ti reconfiguration of spaces, mechanical,
electrical, plumbing & fire protection systems. Storage equipment systems are not included in the project scope.
ONLINE
Los Altos
Annual Concrete Repair
ONLINE
2:00 PM
Prebid Information
Performing concrete curb, gutter, driveway & sidewalk repairs; pruning existing tree roots; installing city-standard cast-iron truncated domes; installing root
barrier & replacing existing asphalt concrete patches & patching existinf AC after completion of the installation of new concrete gutters, curbs & sidewalks
alongside the concrete improvements
3:00 PM
Modesto
3:00 PM
San
Francisco
3:00 PM
Fremont
NEW RFP for Architectural Services to Modest City Schools
Modesto City Schools is inviting proposals from qualified firms, partnerships, corporations, associations or professional organiztions to provide a pool of
comprehensive professional architectural services to Modesto City Schools for the next five years for modernization or other school district facility projects
$60000
NEW Ocean Avenue Campus Cafeteria Security Gate Replacement
Remove & demolish existing folding grilles as described at cafe located within Smith Hall/Statler Wing; furnish & install aluminum folding grille, hardware &
accessories; paint trim to match; protect floors & walls from paint spray & damage & maintain clean work area.
RFP-State Route 84 Widening from Pigeon Pass ro Interstate 680
10/14 @ 1PM at 1111 Broadway, Stew 800, Oakland
ONLINE
ONLINE
ONLINE
Project Approval and Environmental Documents (PA&ED) Phase
The Alameda County of Transportation Commission is seekinmg proposals to provide professional engineering services for the project approval & environmental
document phase of the State Route 84 Widening from Pigeon Pass to Interstate 680
4:00 PM
4:00 PM
11/18/2014 1:00 PM
Joan Fisher @ 510-208-7466
NEW Consolidated Plan Consulting Services
The City of Richmond is soliciting requests for proposals from firms with experience to prepare the City’s FY 2015-2020 Consolidated Plan and the FY 20152020 Analysis of Impediments to Fair Housing Choice.
Auburn Boulevard at Arcade Creek Bridge Replacement Project
10/29 @ 2PM at 915 I st., Rm 2000, Sacramento
Sacramento
This Auburn Boulevard Bridge is located in North Sacramento where Auburn Boulevard crosses Arcade Creek just east of Winding Way and west of Park Road
and the I-80 ramps. The existing structure was constructed in 1927 and widened in 1965. In its current condition, the structure has spalling at the girders and
bents and insufficient deck width to provide the City with standard lane widths and bike lanes. The existing structure is located within 150’ of the Winding Way
intersection which does not have ADA compliant ramps or crossing facilities. This project will require work within the County of Sacramento. Close coordination,
input, and approval, from County reviewers will be required during preliminary engineering and design of project improvements.This project will seek to replace
the existing structurally deficient and functionally obsolete bridge. The new bridge will be a structure that provides a minimum of five 12’ lanes, two 6’ bike
lanes, a raised median, and two 6’ sidewalks. The proposed project has the potential to impact the current configuration of the Auburn Boulevard/Winding Way
signalized intersection. During the preliminary engineering and development of the Project Report, the necessity and alternatives for modifications to the
intersection must be investigated.
Richmond
Berkeley
NEW Cory Hall-Elevator Modernization
MAND 11/6 @ 10AM
Modernize two elevators, including fire curtains, fire alarm, electrical, patching, painting & partial demolition
Page 14 of 41
$545000
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
11/18/2014 10:00 AM
Bollman WTP Sodium Hypochlorite Tank T-46 Repair Project
Concord
12:00 PM
Lincoln
2:00 PM
Monterey
2:00 PM
Mountain
View
2:00 PM
Oakland
2:00 PM
2:00 PM
Prebid Information
Engineers # of
Plan
Estimate Addenda #
10/30 @ 10AM at 2015 Bates Ave, Concord
The Work includes supply, erection, and removal of scaffolding; the supply, erection, operation, and removal of an environment control (ventilation) system and
lighting for activities inside the tank; the supply, erection, operation, and removal of an abrasive and dust containment enclosure; pressure washing of interior
surfaces and removal and disposal of all wash water rinsate; removal of existing resin lining; removal and proper disposal of debris materials; welding steel
plates as patches over pits and corroded areas on the tank interior as directed; repair of
the hole in the tank wall by welding steel plates on the tank interior and exterior; preparation of surfaces for new coatings; application and curing of multiple
layers of new vinyl ester resin lining system; replacement of flanges, hardware, and gaskets on the four nozzles on the bottom of the tank; furnishing emergency
rescue services while personnel are working inside the tank; reconnection of all inlet, outlet, and drain piping; hydrostatic test of tank for leakage; and supplying
tools, materials, and appurtenant equipment as required for a complete rehabilitation of
Sodium Hypochlorite Tank T-46. The Work also includes supply, erection and removal of scaffolding, the supply, erection, operation, and removal of an
environment control (ventilation) system and lighting for inspection activities inside each tank, and furnishing emergency rescue services while personnel are
inside each tank to facilitate the inspection of the two other sodium hypochlorite tanks T-44 and T-45.
NEW Senior Living at Lincoln
CD Smith Construction Inc is seeking pricing on the following scopes:Site Grading & Earthwork, Site Utilities, Landscaping, Irrigation, Design/Build Water
Feature, Curb & Gutter, Site Concrete, Asphalt Paving
$200000 NEW 2014 CIPP Storm Drain Rehabilitation Project
E345B/0
ONLINE
ONLINE
$300000
In general the works consists of lining 1,039 lineal feet of storm drain pipe and re-establishing a 36” CIPP internal connection. Pipe sizes range from 10”-36”; and
materials range from corrugated metal pipe (CMP), reinforced concrete pipe (RCP), to asbestos cement pipe (ACP). Other work may be included as additive
alternate bid items, which consist of additional lining and re-establishing internal pipe connections.
$200000 Interceptor Sewer Trunk Main Manhole Construction
11/5 @ 11AM at 500 Castro St., Mountain View
ONLINE
$250000
Construction of four sanitary sewer trunk main manholes with shoring and dewatering.
NEW Mobile Doosan Generator for Harbor Facilities
Furnish & isntall Doosan Generator for Harbor facilities
Drainage Inlet Structure Replacement at Various Locations on
MAND 10/29/14 @ 2:00 at 951 Turner Court, Room 301,
Pleasanton
Foothill Road & Mines Road
Hayward
The project consists of preparing construction schedules; preparing traffic and detour plans; installing temporary traffic control systems; providing construction
area signs; furnishing and implementing water pollution control plan; furnishing and applying water; installing and removing temporary high visibility and
silt/wildlife exclusion fence and posts at each project site; relocating roadside signs/mile markers and post; installing roadside signs and posts; removing existing
concrete headwalls and drop inlets; removing part of existing CMP/RCP culverts; removing and disposing of unsuitable subgrade material, if encountered, as
directed by the Engineer; removing and disposing of excess and waste material; extending existing CMP/RCP/Box culverts; installing reinforced concrete pipe
collars; constructing new reinforced concrete headwalls and drop inlets; clearing/removing all debris from existing CMP/RCP/box culverts; coordinating with
various utility companies; coordinating with property owners; the cleaning of the site at the end of the job.
TG07.9 Bollards & Barriers
8/27 @ 2PM at 175 Beale St., San Francisco
San
Francisco
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with designing, furnishing and installing bollards, wedge barriers,
impact attenuators, hydraulic power units, controls and piping, and integration with safety and security systems on complex projects. Also included are
engineering, coordination, procurement and complete installation of the respective systems.
Page 15 of 41
ONLINE
023C/R0
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
11/18/2014 2:00 PM
TG07.8 Expansion Joints
9/3 @ 2PM at 175 Beale St., San Francisco
San
Francisco
2:00 PM
San Pablo
2:00 PM
Santa Cruz
2:00 PM
Fremont
Engineers # of
Plan
Estimate Addenda #
$900000
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with expansion joints, miscellaneous metals and engineering on
complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems.
Plaza San Pablo Roadway Improvements Project Phases 1 and 2
MAND 11/12/14 @ 2:00 pm at project site
Demolition of existing concrete sidewalk, curb & gutter, AC pavement & select utilities; installation of new underground utilities, storm drain piping & inlets,
sanitary sewer main pipe & sanitary sewer manhole, fine grading & placement of baserock, concrete sidewalk, curb & gutter, AC pavement, ADA ramps, signage
& striping, bio-swales, landscaping & planting & irrigation system; construction of a water fountain & installation of street lighting & traffic signals
$350000
Wastewater Treatment Facility Digester # 4 Cleaning
MAND 11/5/14 @ 11am
Full service removal and disposal of all liquids and solids from Digester # 4 and wash down of interior. Digester # 4 is 95' inside diameter at a depth of 31 feet.
The City will reduce the amount of material to approximately 18.5' just above the upper draw off line. The Contractor shall break the seal. The amount of material
the Contractor shall remove is approximatley 994,000 gallons.
Intersection Improvements on Blacow Road at Grimmer Boulevard,
Boone Drive, Robin Street/Omar Street and Fremont Boulevard
ONLINE
ONLINE
Online O
$1500000
ONLINE
$2444000
E344B/0
Upgrade traffic signals; install pedestrain countdown heads & safety lighting, widen sidewalks& construct new curb returns
2:00 PM
San Ramon
& Danville
2:00 PM
Alamo
2:00 PM
Merced
2:00 PM
Alameda
I-680 Auxiliary Lanes, Segment 2, Landscape Project
Install highway planting & irrigation systems
NEW Panera Bread-Alamo
TRADES NEEDED: Demo/Sawcutting, Concrete, Rough Carpentry, Finish Carpentry, Cabinets & Tops, Insulation, Roofing, Flashing & Metals, Sealing &
Caulking, Doors, Storefront, Stucco, Drywall, Tile, Flooring, Paint, T-Bar, FRP/Marlite, Wallcovering, Restroom, Fire Extinguishers, Corner Guards, Furniture
Install, Fire Sprinklers, Plumbing, HVAC, Electrical, Fire Alarm.
Wastewater Treatment Plant Dry Solids Storage Building
11/04/14 @ 10:00 am at 678 West 18th Street, Merced
The work to be done consists, in general of the construction of a 70’ x 180’ metal storage building with Granitstone wall panels, roof vents and metal roof
panels. The building will have a concrete floor with a 8’-0” high concrete wall on the inside of the building, and solar exhaust fans. In addition site work, including
clearing and grubbing, fill, concrete driveway approach and slab. All work shall be done at the Merced Wastewater Treatment Plant within the City of Merced
Storm Drain Video Inspection and Cleaning Phase I
Work consists of cleaning and video inspection of storm drains using CCTV, including proper logging of storm drain video inspection reports. Digital CCTV data
acquisition software program shall be Granite XP.
Page 16 of 41
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
11/18/2014 2:00 PM
Warm Springs Extension Wetland Mitigation Site
2:00 PM
Fremont
Bay Area
2:00 PM
Berkeley
2:00 PM
Cupertino
Prebid Information
Engineers # of
Plan
Estimate Addenda #
10/28 @ 11AM
The Work of this Contract includes furnishing all labor, equipment, materials (except for District-furnished plants and cuttings), and services to construct a
wetland mitigation site adjacent to the Warm Springs Extension trackway in the City of Fremont, California. The Work includes but is not limited to the following:
1. Mobilization, construction staging, temporary fences and barricades, demolition, clearing and grubbing, grading, earthwork, and Jobsite maintenance during
construction.
2. Modifications to existing Alameda County Flood Control and Water Conservation District (ACFCD) drainage facilities.
3. Temporary drainage diversions.
4. Planting of District-furnished plants and cuttings.
5. Irrigation.
6. Fencing, gates, and signage.
7. Minor concrete facilities
$1100000 BART Earthquake Safety Programs Seismic Retrofit and Repairs at
10/3 @ 10AM at at 300 Lakeside Drive, Oakland
ONLINE
S009/01
$1500000
Various Locations
Div_02-preservation & restoration, selective structure demolition; Div_03-concrete; Div_04-unit masonry restoration; Div-05-metal welding, metal fabrications;
Div_06-rough carpentry; Div_07-modified bituminous sheet waterproofing; Div_09-cutting & patching; Div_20-restoration of facility services, raceways for facility
services; Div_26-lighting, electrical; Div_32-pavement markings, plant irrigation, planting
$360000
NEW Haas School of Business S480 AV Renovation
MAND 11/6 @ 9AM
Renovate the educational technology equipment & capabilities of the Executive Learning Classroom. The room is a high-end existing space requiringa complete
refresh of audio visual & presentation technologies, including dual HD computer & video from project screens & projectors, sound system with both presneter
wireless mics & 60 student desk mics, HD video lecture capture & live streaming capabilities
ONLINE
11/4 @ 2PM at 10185 N. Stelling Rd., Cupertino
Quinlan Community Center Interior Upgrades
ONLINE
Interior finishes upgrade to the existing Quinlan Community Center Building
2:00 PM
Daly City
Replace Glass Panels at Daly City Station Platform
10/29/14 @ 10AM at 300 Lakeside Dr., Oakland
$80000 $100000
Contractor shall provide all labor, equipment, materials & services required for replacing non-tempered glass panels with tempered glass at the platform level at
the BART Daly City Station
Anita Maynar @ 510-464-6543
Complete documents will be posted once available
Page 17 of 41
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
11/18/2014 2:00 PM
Monte Vista High School Increment 1 Bleacher Replacement
Project - Electrical Package
10/29 @ 10AM at 3131 Stone Valley Rd., Danville
Danville
Engineers # of
Plan
Estimate Addenda #
$140000
ONLINE
Electrical work
•It is the responsibility of all bidders to ascertain prior to bid whether addenda have been issued on the project.
•Prequalification is required for this project and applications were to be submitted 10 business days before the date for the opening of bids on the Project
(November 4, 2014), which would have been October 21, 2014. A list of currently qualified contractors is posted on San ramon valley Unified School District
website and will be updated 5 days before the opening of bid.
2:00 PM
Elk Grove
2:30 PM
Modesto
3:00 PM
Palo Alto
3:00 PM
Richmond
$82500
MAND 11/5 @ 2PM at 10250 Iron Rock Way, Elk Grove
The proposed Work shall be performed in accordance with the plans, specifications and other contract documents and shall include but not be limited to the
following: mechanical and electrical upgrades for the MESA II processing and storage rooms in an existing Elk Grove facility. Improvements consists of minor
demolition work to an existing T-bar ceiling and the installation of a new hard lid ceiling, mechanical exhaust and cooling systems as well as additional power
and lighting. Work is limited to the two rooms shown on the plans as well as minor work in the building’s electrical room for new circuits. There will also be the
addition of roof mounted mechanical equipment and requisite electrical (Work), and work to route plumbing lines to nearest the restroom (Work).
Elk Grove Mesa II Processing Room Project
Evelyn Han @ 916-627-3320
NEW Modernization of Elevators at County's Main Library and Health
Services Agency
11/4 @ 9AM
Moderinzation of two county elevators
NEW City Hall Trane Chiller Overhaul
MAND 11/12 @ 8:30 AM at 250 Hamilton Ave, Palo Alto
This project will disassemble, inspect, reassemble and test the Trane centrifugal chiller per factory overhaul standard procedures. This project shall also include
bearing replacements, first and third stage guide vane overhaul, and the installation of the economizer flange retrofit kit. The Trane chiller located in the 8th floor
mechanical room in the Civic Center.
NEW RFP for Landscape Maintenance
MAND 11/6 @ 10AM at 1300 Roosevelt Ave, Richmond
The Richmond Housing Authority (RHA) is soliciting proposals from qualified contractors to perform landscape maintenance services for the properties owned
and operated by Richmond Housing Authority. The scope of work will include, but is not limited to:•Pick up litter/debris from all turf areas, front yards, walkways
and parking lots•Mow all turf areas•Edge and trim all shrubbery•Shrub bed weeding and cleaning•Shrub pruning•Tree pruning (small trees only)•Fertilizing
•Irrigation setting and minor repair•Mow Handicap backyards only (approximately 5 – 10 units)•Maintain litter control on all playgrounds and ball field
ONLINE
ONLINE
ONLINE
ONLINE
Allison Boldyc @ 510-307-8017
3:00 PM
Santa Clara
County
Integrated Pest Management Services for Structural Facilities
MAND 10/31 @ 8AM
The County of Santa Clara will be requesting proposals from qualified contractors to provide structural & related pest control services for structural facilities
Page 18 of 41
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
11/18/2014 4:00 PM
San Mateo
Los Prados Park Synthetic Turf Soccer Fields
4:00 PM
Santa Rosa
Demolish existing natural turf; export existing material; import new base; grade; install synthetic turf; repair A/C pathway; ADA/parking improvements;
landscaping. Alternates- Install synthetic turf at infields; Tree relocation.
RFQ-Renewable Energy Cleaning and Maintenance
MAND 10/16 @ 9AM at 4300 Llano Rd., Santa Rosa
The City of Santa Rosa desires to contract for solar photovoltaic system maintenance and cleaning in accordance with the terms, conditions and specifications
herein.
5:00 PM
San Jose
5:00 PM
El Dorado
County
Prebid Information
$2500000
NEW Standard Agreement for Landscape Architectural Consultant for
E347B/0
ONLINE
ONLINE
Three Creeks Trail
The CITY of San José, Department of Public Works, City Facilities Architectural Services Division is working on behalf of the Parks Department to provide
engineering, landscape design and project management services in order to deliver new projects. The City seeks a licensed landscape architectural firm
(hereinafter “Consultant”) to perform all tasks necessary to prepare final and approved construction documents for the western alignment of the Three Creeks
Trail. Construction documents will be based on the Three Creeks Trail Master Plan. Consultant will also provide construction management assistance to the
City, resulting in the delivery of a built project. A secured State grant for this project mandates that the construction be completed before the anticipated deadline
of December 2017.
Union Valley Generator Rehabilitation Project
MAND 10/28 @ 9AM
ONLINE
Provide SMUD with a rehabilitated Union Valley Powerhouse generator rated at 50 MVA, power factor 0.95, 13.8kV, 60 hertz, including complete rehabilitation
of Union Valley generator (excluding new rotors), to 50 MVA, power factor 0.95, wye connected, 13.8kV, 60 hertz, and to include the following: all design,
calculations, material for the stator coils, surge rings, neutral rings, field poles refurbishment, turbine guide bearings, and packing box; assembling new
replacement generator stator windings and resistance temperature devices (RTD’s); removal / disposal of existing generator winding coils; refurbishing existing
rotor field pole pieces with new insulation; disposal of existing field pole insulation and full testing and commissioning.
5:00 PM
Novato
RFP for Hill Recreation Area/Margaret Todd Senior Center Master
Plan and Design
ONLINE
The City of Novato (City) is seeking a firm to provide professional planning and design services in the development of a Parks and Recreation Area Master Plan
and then detailed plans and specifications for the Hill Recreation Area/Margaret Todd Senior Center Capital Improvement Project 01-005
11/19/2014 10:00 AM
Rocklin
11:00 AM
Lodi
12:00 PM
Martinez
NEW City of Rocklin Corporation Yard Remodel
MAND 11/12 @ 10AM at 4081 Alvis Ct., Rocklin
Div-02-subsurface investigation, demolition, clearing, property & bldg layout, grading, excavating, backfilling & compacting, trenching, backfilling & compaction,
concrete curbs, asphaltic concrete paving & subbase materials, portland cement concrete paving, water distribution system, underground fire protection system,
strom sewerage system, sanitary sewerage system; Div_03-concrete; Div_05-structural steel, metal fabrication; Div_06-rough carpentry, glue-laminated
structural units, finish carpentry; Div-07-sheet membrane waterproofing, bldg insulation, firestopiing, single ply membrane roofing, flashing & sheet metal,
sealants & caulking; Div_08-metal doors & frames, wood doors, aluminum entrances & storefronts, finish hardware, glazing; Div_09-lath & plaster, gyspum
wallboard system, acoustical ceilings, painting; Div_10-fire extinguishers & cabinest; Div_15-plumbing, automatic fire protection sprinkler system, HVAC; Div_16electrical
$55000
City Hall Boiler Replacement
MAND 10/28 @ 10AM
The work consists of removing and replacing the existing City Hall boiler and other incidental and related work, all as described in the specifications for the
above project.
Boiler Replacement 555 Escobar Street
MAND 11/5 @ 2PM at 555 Escobar St., Martinez
Remove the existing 2 Mbtu boiler and associated piping; Disconnect combustion air duct and exhaust flue; Safe off electrical and gas services; Install new
Boiler and re-pipe system to primary/secondary; Install new pump, accessories and piping; Reconnect electrical, gas, and make-up water.
Page 19 of 41
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
11/19/2014 12:00 PM
2:00 PM
2:00 PM
2:00 PM
2:00 PM
2:00 PM
San
Francisco
Rohnert
Park
West
Sacramento
Plan Name / Scope of Work
Prebid Information
NEW Saks Off 5th Avenue-San Francisco
Engineers # of
Plan
Estimate Addenda #
ONLINE
11/7 @ 11AM
Trades to complete this project are as follows (but not limited to): DEMOLITION; CONCRETE; STURCTURAL STEEL; METALS; CARPENTRY; ROUGH
CARPENTRY; MILLWORK; ROOFING; DOORS, FRAMES & HARDWARE; GLASS & GLAZING; DRYWALL; CEILINGS; PAINING; WALLCOVERING;
FLOORING; CERAMIC TILE; TOILET ACCESSORIOS; TOILET PARTITIONS; OVERHEAD DOORS; PLUMBING; FIRE SPRINKLERS' HVAC' ELECTRICAL;
FIRE ALARMS.
$130000
A&F Salazar Hall Offices
10/29 @ 3PM
Perfom tenant improvments & construct offices in Admin & Finance at Sonoma State University, including demolition, storefront, doors & hardware, painting,
partitions, ceilings, dlooring, HVAC, lighting, electrical
NEW Emergency Backup Generators for Fire Stations 42, 43 and 44
11/6 @ 10AM at 905 Fremeont St., West Sacramento
Installation of emergency backup generators (city provided), automatic transfer swicthes (city provided), all natural gas piping, electrical conduits, wires, testing
of natural gas pipes & all other equipments, materials and labor for the complete installation of all three fire stations
11/12 @ 10AM at 69 Stony Circle, Santa Rosa
Santa Rosa NEW Delport Ave and McMinn Ave Sewer and Water Improvements
Dust control, traffic control, earthwork, aggregate base, bituminous seals, asphalt concrete, aspahlt concrete trench paving, signs, soil & groundwater disposal,
sanitary sewer system, concrete curbs & sidewalks, traffic stripes & pavement markings, raised pavement markers, water system, material recycling
$271226
Sacramento NEW Measure U Park Irrigation Improvements-Package B
The work to be performed consists of upgrading the existing irrigation controllers at Zapata and Tahoe Parks with new central irrigation controllers, install new
booster pumps, tube steel fencing, concrete paving, decomposed granite paving, landscape repair, new points of connection for domestic and irrigation water.
NEW Air Compressor and Auxiliary Equipment Maintenance and Repair
Martinez
The Central Costa Sanitary District is requesting quotations for maintenance & repair of air compressor & auxiliary equipment
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Pam McMillan @ 925-229-7314
2:00 PM
2:00 PM
2:00 PM
MAND 11/4 @ 11AM at 6500 Soquel Dr., Bldg 2030, Aptos
Selective demolition, rough carpentry, gypsum board assemblies, paints & coatings, HVAC, testing & balancing, lighting, electrical
Alameda College Sitework Improvements
MAND 11/4 @ 10AM 555 Ralph Appezzato Memorial Pkw,
Alameda
Alameda
Maintenance of existing condition, selective site demolition, asphalt paving
MAND 11/10 @ 10AM at 4300 Llano Rd., Santa Rosa
Santa Rosa NEW Laguna Treatment Plant Filter Valve Actuators and Valve
Aptos
ONLINE
Building 1550 and 1600 HVAC and Lighting Renovations
ONLINE
$1025500
ONLINE
$250000
ONLINE
Refurbishment
Filter valve actuator & valve refurbishment
2:30 PM
San
Francisco
NEW Above Grade PCS and Signal Visibility Project (Micro-LBE Set-Aside
Program)
Installing new pedestrian countdown signals, replacing existing 8-inch traffic signal heads with 12-inch traffic signal heads, traffic routing & all associated work.
Steven Lee, Proj Mgr, @ 415-558-5226
Page 20 of 41
Bid Date Bid Time Location
Plan Name / Scope of Work
11/19/2014 4:00 PM
376 Larkin Parking Garage Repairs
San
Francisco
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 10/30 @ 1PM at 200 McAllister St., San Francisco
Parking garage repairs.
5:00 PM
Brian Agiius @ 415-565-4717
Menlo Park NEW Maintenance Services for the City's Street Lights, Traffic Siganls &
ONLINE
Ligthings, Lighted Croswalks, Radar Speed Feedback Signs, Pay
Parking Machines
The City of Menlo Park Public Works Department is soliciting proposals for Maintenance Services for the City’s Street Lights, Traffic Signals & Lightings, Lighted
Crosswalks, Radar Speed Feedback Signs, Pay Parking Machines, and other City equipment.
9:00 AM
11/20/2014 11:00 AM
12:00 PM
Carmichael NEW Proposition 39 Energy Planning and/or Design Services
The San Juan Unified School Dist is seeking statements of Qualifications with Proposal from interested, independent, established & experienced firms to
perform Proposition 3--Claifornia Clean Energy Jobs Act Energy Planning & Design Services
Lodi
Napa
County
$75000
MAND 10/28 @ 10AM at 2001 W. Turner Rd., Lodi
The work consists of trenching and installation of 56 lineal feet of 54-inch Class III reinforced concrete pipe, concrete outfall structures, 48-inch aluminum slide
gate, and other incidental and related work, all as shown on the plans and specifications for the above project
Lodi Lake Storm Drain Outfall Improvement Project
ONLINE
ONLINE
ONLINE
NEW RFQ for On-Call Engineering and Construction Support Services
The Napa County Department of Public Works requests statements of qualifications from qualified firms to provide on-call engineering & construction support
services, including all augmentation of various county capital improvement design & construction projects including, but not limoted to roads, brisges & drainage
systems.
2:00 PM
2:00 PM
San
Francisco
Vallejo
NEW Replace Control Panels on Liftstations Candlestick State Recreation
$20000
ONLINE
Area
Contractor to remove and replace sewage lift pump control panel at two comfort stations in the Candlestick Point State Recreation Area.
Baffle Replacement Project
MAND 11/4 @ 10AM
In general, the work consists of the replacement of all, or part, of the existing baffle wall attached to the existing CMA Small Boat Harbor Pier. The entirety of the
work is anticipated to take place in multiple phases with each phase comprising one or more wall sections. Each phase consists of a single mobilization and the
demolition and replacement of one, or more, existing 3/8 in. z-shaped sheet pile wall section(s) with new ½ in. z-shaped steel PZ40 sheet pile, connected to
each other by walers. Each section consists of ten pairs (20 sheets). Replacement will consist of steel sheet pile in alternating pairs of 50 ft. length and pairs of
shorter, sediment window, lengths. The basic scope of work includes one phase of work in 2014, addressing a single section of baffle wall. Unit pricing is
required for including additional sections in a given phase and for additional phases.
Page 21 of 41
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
11/20/2014 2:00 PM
MAND 10/28 @ 2PM
This Notice to Contractors is for the award of up to three (3) Job Order Contracts (JOC). A JOC is a competitively bid, firm fixed priced, indefinite quantity
contract. The scope of work includes a collection of detailed repair and construction tasks and specifications that have established unit prices. It is placed with
the “Contractor” for the accomplishment of repair, alteration, modernization, maintenance, rehabilitation, demolition and construction of infrastructure, buildings,
structures, or other real property. Work is accomplished by means of issuance of individual job orders against the JOC. Under the JOC concept, the Contractor
furnishes all management, documentation, labor, materials, and equipment needed to perform the work. A JOC awarded under this solicitation will have a
minimum value of $50,000.00 and a maximum value of $1,000,000.00, with one option to extend the maximum value of work that can be ordered during the term
or the contract by two hundred and fifty thousand dollars ($250,000.00). Options will be extended by mutual consent of both parties, California Maritime
Academy and the JOC Contractor.
Vallejo
Prebid Information
JOC.14/15PW.CMA - Job Order Contract
ONLINE
Additional Documents will be available at the mandatory walk
2:00 PM
Stockton
2:00 PM
South San
Francisco
2:00 PM
Santa Rosa
2:00 PM
San Pablo
2:00 PM
San Jose
MAND 11/06 @ 10am
MSC conveyor system maintenance & repair services at California Health Care Facility
MSC Conveyor System Maintenance and Repair Services
Suzanne Livingston @ 916-255-6136
NEW Four Parks Playground Renovation Project
MAND 11/10 @ 9AM
Protection of existing trees; demolition of specified existing play equipment & site furnishings; demolition of concrete curbs & aspahlt paving; demolition of
lantings; removal & stockpiling of existing wood fiber safety surfacing; furnishing & installation of new concrete curbs; synthetic & wood fiber safety surfacing;
subsurface drainlines; concrete & aspahlt paving; granite surfacing; boulder, concrete seat wakk, site furnishings, new fence & gate, new accessible parking
area with curb ramps, of ramp & sstairs with handrails, and new signage; resurfacing existing asphalt paths to conform with ADA stanfards; site grading;
adjustment of existing drainage & site utilities; installation of new play structures supplied by owner
$1758143
Brigham Ave and Gordon Ln Sewer and Water Improvements-Vallejo 11/13 @ 10AM at 69 Stony Circle, Santa Rosa
ONLINE
ONLINE
ONLINE
St to Jeffrey St
Dust control, traffic control, earthwork, aggregate base, asphalt concrete, asphalt concrete trench paving, soil & groundwater disposal, reinforced concrete pipe,
sanitary sewer system, concrete curbs & sidewalks, monuments, traffic stripes & pavement markings, pavement markers, portland cement & sand slurry mixture,
cell concrete, water system, asphalt concrete dike, tree surgery (sidewalk maintenance), material recycling
Vista Del Camino Office Repair Project
11/12 @ 10AM at 2324 College Ln, San Pablo
Making repairs to a portion of the roof & interior office, including repairs and/or replacements of all damaaged components throughout the designated interior &
exterior area of the office building
NEW Capriotti's Sandwich Shop
Tenant Improvement. Trades to include: sawcut, demolition, post tension slab coring, concrete (topping slab), masonry (brick veneer), finish carpentry, cabinets
& countertops, frp, insulation, doors/frames/hardware, storefront/glazing, drywall/metal framing, ceramic tile, acoustical ceiling, painting, toilet accessories, fire
sprinklers, plumbing, HVAC and electrical.
Page 22 of 41
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
11/20/2014 2:00 PM
Solar Photovoltaic Electric System and Parking Structure, East
Parking Area-Romberg Tiburon Center-Rebid
11/6 @ 1PM at 3150 Paradise Dr., Tiburon
2:00 PM
Belvedere
Tiburon
San
Francisco
Engineers # of
Plan
Estimate Addenda #
$440000
Work consists of furnishing labor and material necessary to construct a solar photovoltaic (PV) electric system producing 68 kW AC output with solar panels
supported by a parking canopy structure covering a double row of existing parking spaces south-east of Building 84 at the Romberg Tiburon Center in
accordance with plans and specifications prepared by Kenwood Energy, P.O. Box 692, Kenwood, California 95452, Telephone: (707) 833-1028. Estimated
Project Cost is $440,000.00. License required: Class A, B or C-10. Project Duration is one hundred eighty (180) calendar days. Liquidated damage shall be
assessed at $250.00 for each day project completion is delayed beyond the 180 calendar days.
$47000000 Regional Groundwater Storage and Recovery-WILL NOT BE ONLINE 10/7 @ 10am
ONLINE
178C
$50000000
The objective of the project is to drill, install, and construct 13 groundwater well facilities, including site preparation; clearing/grubbing and grading; various work
on existing groundwater wells; building foundations, temporary shoring and retaining walls; new pumps, motors and related appurtenances; ventilation system;
trenching and pipeline and conduit construction; cathodic protection system; chemical treatment equipment, tanks and pumping systems; electrical power
distribution systems, SCADA and I&C control systems; perimeter security fence; security monitoring and control systems; final grading and drainage; landscape
and irrigation systems; sanitary and storm drain piping and connections to municipal systems; paving and various other site improvements; construct
approximately 7,100 feet of 8-inch and 12-inch diameter ductile iron water transmission pipeline. The work is to be performed in San Mateo, California. The
Engineer's estimate is approximately between $47 to $50 million. The Contract will be awarded to the lowest responsible and responsive bidder.
2:00 PM
San
Francisco
ONLINE
Booker T. Washington Community Service Center
Demolition, concrete and rebar, shotcrete, gypsum underlayment, stone countertops, structural steel and metal fabrications, rough carpentry, casework,
waterproofing, insulation, roofing, cement siding, sheet metal flashing, expansion joints, doors frames - hardware, sectional doors, storefronts and windows,
plaster, gypsum board assemblies, tile, acoustical ceilings, wood athletic flooring, carpet and resilient, painting, signage, toilet partitions and accessories, wire
mesh partitions, operable partitions, lockers, appliances, projection screens, athletic equipment, play structures, window shades, entry grilles, bleachers, site
furnishings, bike racks, elevators, trash chutes, fire suppression, plumbing, HVAC, electrical, fire alarm, earthwork, A/C paving, site concrete, playground
surfacing, metal and wood fences and gates, planting and irrigation, underground utilities.
2:00 PM
2:00 PM
Plans will be posted once available
MAND 11/7 @ 9:30AM at 1419-16th St,, Sacramento
Sacramento NEW Former Mercury Cleaners Plant Removal
Div_02-structure demolition, underground storage tank removal, hazardous materials abatement work plan; Div_31-earth moving, erosion & sedimentation
control; Div_32-asphalt concrete cap
FY 2014-2015 Interior Painting Vacant/Occupied and Common Areas
Sacramento
Graffiti removal & interior painting
ONLINE
ONLINE
Anna Marie Will @ 916-322-2114
2:00 PM
Los Altos
Rehabilitation of Loyola Overcrossing at Foothill Expressway
(Bridge No. 37C0117)
MAND 11/10 @ 10AM at 101 Skyport Dr., San Jose
Bridge removal (portions); adding additional traffic lanes & bicycle lanes in each direction; reconstruct bridge railing; placing CIDH piles behind existing
abutment walls, columns to the pier; protecting in place a retaining wall as well as associated roadway work for the structure briefly described as: Loyola
Overcrossing at Foothill Expressway
Page 23 of 41
011C
Bid Date Bid Time Location
11/20/2014 2:00 PM
2:00 PM
Lodi
Gilroy
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Walmart Building-Lodi (No GC Openings)
NEGOTIATED PROJECT Requesting all trades for a new 209,689 SF retail store: Final cleaning, survey, SWPPP, termite control, earthwork, asphalt, striping &
signage, site concrete, utilities, traffic signals, chain link fencing, site furnishings - installation, landscaping, rebar, concrete, concrete floor polish, masonry, stone
veneer, structural steel, rough carpentry, finish carpentry, FRP - installation, insulation, roofing, sheet metal, roof hatch, caulking, doors/frames/hardware installation, traffic doors, aluminum storefront, skylights - installation, plaster, drywall/metal framing, ceramic tile - installation, acoustic ceiling, floor covering installation, paint, toilet partitions & accessories - installation, fabric structure – installation, seismic protection, pneumatic tube system, control fire sprinkler,
plumbing, HVAC, and electrical. Breakout Your Proposals as listed below: Building $ On-Site $ Off-Site $ Off-Site Cal Trans $ Plans can be viewed on line or
downloaded at: ftp://server.ewbinc.com User name: EWB Bid Password: Bid Please note user name and password are case sensitive!! Please contact James
Morefield ([email protected]) with any scope questions and B Austin ([email protected]) with and plan distribution needs at 916-408-6950. PLEASE
RESPOND TO THIS INVITATION!! Thank you EWBI / James Morefield - [email protected]
ONLINE
ONLINE
Eigleberry Street Resurfacing Project
Temporary traffic control, hot mix asphalt, pavement markers
2:00 PM
San
Francisco
Networking Confedrence 10/29 @ 10AM
Schwerin Street Sewer System Improvement
$4250000
ONLINE
Div_02-demolition, environmental management of excavated materials, jet grouting, premeation grouting, ground movement, vibration instrument & monitoring,
pavement cutting, trench excavation & support work, backfilling & compaction, dewatering & groundwater control, microtunneling, stormwater & erosion control,
asphalt concrete planing, asphaltic concrete paving, portland cement concrete paving, reinforced concrete pipe, glass fiber-reinforced thermosetting resin
jacking pipe, glass fiber reinforced thermosetting resin pipe sewerage systems; Div_03-concrete; Div_05-stainless steel; Div_09-cast-in-place detectable surface
tiles.
2:30 PM
Danville
2:30 PM
Livermore
3:00 PM
San Jose
$61000
Lawrence Road Traffic Safety Improvements
The Lawrence Road Traffic Safety Improvements, includes median concrete curb construction, cobble rock paving, traffic signs, pavement markings, &
landscape boulders. The work will occur on Lawrence Road from Casablanca Street to 80 feet south of Jasmine Way in Danville, California.
$3214000
Livermore Pleasanton Fire Station No. 9
11/4 @ 10:30AM at 1919 Cordoba St., Livermore
Div_02-bldg demolition, HazMat abatement; Div_03-concrete; Div_04-masonry mortar, unit masonry, adhered mansonry veneer; Div_05-structural steel framing,
metal fabrications, metal ladders; Div_06-rough carpentry, shop-fabricated wood trusses, glue-laminated construction, finish carpentry, wood-veneer-faced arch
cabinets; Div_07-water repellents, blanket insulation, nailable insulated sheathing, TPR, sheet metal roofing, sheet metal flashing & trim, manufactured guttes &
downspouts, roof hatches, firestopping, joint sealants; Div_08-hollow metal doors & frames, wood doors, access doors & frames, overhead coiling doors,
aluminum windows, tubular skylights, door hardware, glazing; Div_09-gypsum board assemblies, cement plastering, acoustical panel ceiling, resilient flooring,
tile carpeting, fiber reinforced plastic panel, painting, utility protective systems, graffiti resistant coating; Div_10-markerboards & tackboards, signage, toilet
accessories, fire protection specialties, flagpoles, grilles & screens; Div_11-vehicle exhaust removal system, miscellaneous equipment; Div_12-vertical louver
blinds; Div_21-fire suppression sprinkler system; Div_22-plumbing; Div_23-hvac, testing, adjusting & balancing for hvac; Div_26-generator, electrical; Div_27-tv
signal distribution system, sound system; Div_28-fire alarm system; Div_31-rough grading, finish grading, excavation, backfilling, trenching; Div_32-asphalt
paving, concrete paving, chain link fences & gatews, automatic gates, ladscaping, irrigation system; Div_33-utilities
Removal and Replacement of Concrete within the Public Right-OfWay
The City of San Jose(hereinafter ?City") is soliciting bids from qualified Contractors (hereinafter ?Bidder") to provide replacement and removal of concrete within
the City of San Jose public right-of-ways (sidewalks, curbs & gutters, driveway approaches, park strips) on an as needed basis.
Page 24 of 41
Online
022C/R0
ONLINE
Bid Date Bid Time Location
11/20/2014 4:00 PM
4:00 PM
4:00 PM
5:00 PM
11/21/2014 11:00 AM
2:00 PM
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Maple Park Phase 2 Senior Apartments
The project is a new +/- 23,000 square foot, 35 unit senior apartment facility, including Div_03-concrete; Div_04-unit masonry; Div_05-structural steel framing,
metal fabrications, metal stairs; Div_06-rough carpentry, sheathing, shop-fabricated wood trusses, interior arch woodwork; Div_07-bitumen sheet waterproofing
flashing membrane, thermal insulation, radiant barriers, water resistant barriers, under slab vapor barrier/retarder, fiber cement siding, sheet metal flashing &
trim, joint sealants; Div_08-hollow metal doors & frames, prefinished steel door & window frames, flush wood doors, residential doors, steel windows, vinyl
windows, door hardware, glazing, fire resistant glazing, mirrors, louvers & vents; Div_09-portland cement plaster, gypsum board, tiling, acoustical mat, resilient
base & accessories, resilient sheet flooring, resilient linoleum sheet flooring, resilient tile flooring, sheet carpeting, exterior painting, interior painting, staining &
transparent finishing, water repellant anti-graffiti wall coatings; Div_10-toilet & custodial accessories, fire extinguisher cabinets, fire extinguishers, postal
specialties; Div_12- residential appliances; Div_12-horizontal louver blinds, vertical louver blinds, residential casework, site furnishings; Div 14-hydraulic
elevators; Fiv_22-solar energy plumbing equipment, plumbing; Div_23-HVAC; Div_26-lighting, electrical; Div_27-communications horizontal cabling; Div_28-fire
detection & alarm system; Div_31-site clearing, site grading, trenching, termite control; Div_32-aggregate base courses, asphalt paving, striping, signage, site
concrete & truncated domes, flexible porous paving, decomposed granite paving, tactile warning surfacing, irrigation, planting; Div_33-utilities
Roseville Road Bridge Replacement Project
10/30 @ 2PM at 915 I St., Sacramento
Sacramento
This Request for Proposals (RFP) solicits a proposal for consultant services to provide Resident Engineer, inspection, specialized sole source inspection,
construction staking, materials testing, labor compliance and contract administration services for the Roseville Road Bridge Replacement Project.
RFQ-Architectural and Engineering Team Design Criteria Consulting 10/16 @ 1PM at 30 Van Ness Ave, San Francisco
San
fo San Francisco Sheriff's Dept Rehabilitation Detention Center
Francisco
The design team will provide programming, architectural, engineering & all related services to plan & develop the perfformance & technical criteria package
necessary to assist the City with the solicitation & procurement of design build entity for the design & construction of a new Rehabilitation Detention Facility to
replace existing county jails bumber 3 & 4 cirrently located on the 65th & 7th floor of the Hall of Justice
RFQ On-Call and Prequalified Shortlist for Construction
Contra
11/5 @ 2PM at 255 Glacier Dr., Martinez
Management Services (2015-2018)
Costa
County
Contra Costa County invites your firm to submit a Statement of Qualifications (SOQ) for providing On-Call Construction Management Services and establish a
shortlist of construction management firms for future projects. It is anticipated that the County will advertise up to 25 capital projects in 2015 and subsequent
years, in addition to overseeing encroachment permits and subdivision projects. The County is interested in retaining a consultant team with varied and
extensive municipal experience to assist in construction management and oversight of public works infrastructure projects. The County intends to request
proposals from consultants selected for this “shortlist” for future construction management projects for the next 3 years.
ONLINE
$250000
10/27 @ 9AM at 530 Water St., Oakland
The Port of Oakland (Port) is requesting proposals from qualified firms to provide asbestos and lead-based paint consulting services on an as-needed basis, in
support of the Port’s Environmental Programs and Planning Division. It is the intent of the Port to enter into three separate comprehensive on-call consultant
contracts
$150000
Forsyth Hall Air Handing Units Upgrade Project
NEW
MAND 11/12 @ 1PM
Santa Rosa
Air handling units upgrade
ONLINE
Live Oak
Oakland
RFP On-Call Asbestos and Lead Paint Consulting
If a subcontractor wants to be included on the plan holder’s list for any potential addenda, they must complete the attached plan receipt form and fax it to 707527-4870.
Page 25 of 41
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
11/21/2014 2:00 PM
Horizontal Drilling at US Coast Guard Island Base
Alameda
Prebid Information
Engineers # of
Plan
Estimate Addenda #
11/17 @ 10AM
Furnishing & installing underground utilities using the directional boring (horizontal directional drilling, HDD) method of installation, also commonly referred to as
guided horizontal boring. The work shall include all services, equipment, materials & labor for the complete & proper installation, testing, restoration of
underground utilities & environmental protection & restoration
ONLINE
Steve Almgren @ 206-947-3845
2:00 PM
3:00 PM
4:00 PM
5:00 PM
Rohnert
Park
Student Center Water Softener Project-Rebid II
Installation of a turnkey water softener system
Santa Cruz NEW Multiple Location-Baskin Engineering and E2 Absorption Chiller
Installations
San
Francisco
Various
Cities
11/13 @ 2PM
$130000
ONLINE
MAND 11/7 @ 1:30 PM at 1156 High St., Barn G, Santa Cruz
Provide & install new absorption chillers at Baskin Emgineering & Engineering 2, including demolition, mechanical & electrical
RFQ-Contsruction Manager/General Contractor for a New ESER
11/4 @ 3PM at 30 Van N ess Ave, San Francisco
ONLINE
$11000000
ONLINE
2010 Bond Fire Station 5
Teh Dept of Public Works announces a RFQ for a construction manager/general contractor to provide general contracting & construction servvices for the ESER
2010 Bond Fire Startion 5 Facililty, which will include the demolition of an existing fire station & replacement with a new two-story fire station with mezzanine
storage, a second story terrace & development of an outdoor parking area & landscaping design as outlined & approved conceptual plans.
RFP-Solar PV Energy California Department of Corrections and
MAND 9/4 @ 5PM
ONLINE
Rehabilitation
A qualified pool members are invited to review & respond to this Request for Proposal for the installation & operation of solar photovoltaic energy generation
systems under a third party ownership power purchase agreement business model
11/24/2014 10:00 AM
10:00 AM
11:00 AM
$3500 San Benito NEW Heating Ventilation Air Conditioning (HVAC) Maintenance
$4500
Boiler/Chiller
County
Perform annual and semi annual preventative maintenance on county owned HVAC Chillers, Boilers, Cooling Towers, Air Handlers.
Site General Building Contractor, Mountain View Revitalization Pilot 10/14 @ 10AM at 741 Flint Ave, Stockton
San
Program, Conway Homes and Sierra Vista Homes
Joaquin
County
The Housing Authority of the County of San Joaquin (HACSJ) is seeking bids from licensed and bonded General Contractors (“Contractor”) to provide
construction services for the Site General Building Contractor, Mountain View Revitalization Pilot Program, Conway Homes and Sierra Vista Homes. Bid
packages & specifications may be downloaded from the HACSJ website at HACSJ.com under the “Vendors & Contractors” tab.
$8000 San Benito NEW Emergency Generator Maintenance
$10000
County
Annual preventative maintenace on a variety of emergency generators at variouse location in San Benito County.
Maintenance to include annual load testing, fluids maintenance, and reports to San Benito County with recommendations for further maintenance and or
component replacement.
For a complete list of "Projects Out To Bid" visit www.bayareabx.com
Page 26 of 41
ONLINE
ONLINE
ONLINE
Executive Office Space for Lease
Small Private Offices Available: TWO LOCATIONS
110 - 300 square feet
San Leandro
Concord
Ideal space for satellite office, estimators, sales &
service representatives
Amenities include:
GREAT LOCATIONS
Free WiFi
FREE PARKING
UPS SERVICE DAILY
SECURITY SYSTEM
ACCESS TO KITCHEN
JANITORIAL SERVICE
ALL UTILITIES
24 HOUR ACCESS
CONFERENCE | BOARD ROOMS
MAIL PICKUP AND DELIVERY
FAX / COPY Machines Available
San Leandro
Concord
3055 Alvarado Street
San Leandro, CA 94577
510.483.8880
2440 Stanwell Drive
Concord, CA 94520
925.685.8630
For more information call Scott Leary at 510.483.8880 (San Leandro)
or Denice McDavid at 925.685.8630 (Concord)
Misc.: Leases are month to month. 1st month and security deposit to start lease.
Credit Check. Telephone / upgraded cable internet service not included.
Advertising Rates
Weekly Bulletin
Our Bulletin runs weekly in 8 1/2 " X 11 " Size Format, Black & White
Member
(Total cost)
NonMember
(Total cost)
$100
$150
$150
$200
$75
$110
$115
$150
$35
$60
$50
$80
$30
$50
$50
$75
Full Page:
One or two weeks
Three or four weeks
1/2 PAGE:
One or two weeks
Three or four weeks
1/4 PAGE:
One or two weeks
Three or four weeks
Business Card &
MBE/WBE/SBE
Sub Bid Requests:
One or two weeks
Three or four weeks
CLASSIFIED:
Up to 7 lines
One or two weeks
$25
Three or four weeks
$35
(Each additional line)
$2.50
Note: A line is 30 Character / spaces.
$40
$55
$4.50
Please fax a typed written sample of your ad to 510-352-1509 or email copy text to
[email protected] and indicate the number of Weekly Bulletin issues the ad is to run.
Ad deadline is 12:00 P.M. Thursdays, the Weekly Bulletin is published every Friday.
**** Ads for Nonmembers must be paid in advance.
3055 Alvarado Street, San Leandro, CA 94577. Tel: 510-483-8880. Fax 510-352-1509.
www.bayareabx.com. [email protected]
Gary A. Duckworth, CPCU, ARM
Insurance Broker / Cook, Disharoon & Greathouse, Inc. / Oakland, CA
Workers’ Compensation PLUS Program
* Comparative Pricing * Bureau Review * Classification Review
* Audit Review * Claims Management * Local Representation
Ph. 510-437-1900, x 2006
/ Fax 510-437-1979
[email protected]
www.cdginsurance.com
Notice to Contractors
San Jose Unified School District
is inviting all licensed contractors to
submit the name of your firm for inclusion of the San Jose Unified School District
2015 Bidder’s List. Contractors can register at SJUSD.org on the Bonds and
Construction page under Bidder List Registration with the following information:
Contractor’s name
Contractor’s mailing address
Contractor’s phone number, fax number, and email address
Type of work (earthwork, pipelines, electrical, painting, general, etc.)
Class of contractor’s license(s)
Contractor’s license number(s)
January 1, 2015:
Workers Compensation Insurance Renewals:
ASK FOR:
Group 825
“Insurance Quote”
Group
825
State Fund + BAY AREA Builders Exchange
= 6% SAVINGS