REFERENCE PROJECTS Al-Mousel Execution Date: 2013 Location: Iraq Contractor: United Company for Electrical Projects (UCEP) Client: ALSTOM Grid SAS (as a Main Contractor) + AlSamama Trading Group Co. (as a Subcontractor) Owner : the Ministry of Electricity / Electrical Transmission Project (ETP) Description: Execution & Completion of Works for Moussel East 400/132 kV GIS Substation . Services Provided: Execution & Completion of Works for Moussel East 400/132 kV GIS Substation M'Sila Execution Date: 2013 Location: Algeria Contractor: United Company for Electrical Projects (UCEP) Client: Sonel Gaz . (as a Main Contractor) + Power projects Turkey Branch+ GE general electric. (as a Subcontractor) Owner : Sonel GAZ Description: Supervision on Erection Testing, 1|Page Commissioning and Energization of 6 mobile Substation 11.5/230 kV 20 MVA Services Provided: Supervision on Erection Testing, Commissioning and Energization of 6 mobile Substation 11.5/230 kV 20 MVA Reference Projects F'Kirina Execution Date: 2013 Location: Algeria Contractor: United Company for Electrical Projects (UCEP) Client: Sonel Gaz . (as a Main Contractor) + Power projects Turkey Branch+ GE general electric. (as a Subcontractor) Owner : Sonel GAZ Description: Supervision on Erection Testing, Commissioning and Energization of 6 mobile Substation 11.5/230 kV 20 MVA Services Provided: Supervision on Erection Testing, Commissioning and Energization of 6 mobile Substation 11.5/230 kV 20 MVA CIPREL 4/ Etde/ 225kV 2|Page Execution Date: 2013 Location: Ivory Coast Contractor: United Company for Electrical Projects (UCEP) Client: ALSTOM (as a Subcontractor) Description: Protection Relays Testing and Commissioning. Services Provided: Protection. Reference Projects Al-Khirat Power Plant Execution Date: 2013 Location: Iraq Contractor: United Company for Electrical Projects (UCEP) Client: Calik Energy. (as a Main Contractor) + ALSTOM Grid SAS Iraq Branch. (as a Subcontractor) Owner : MOE " Minister of Electricity in Iraq" Description: Testing, Commissioning and Energization of Complete DSAgile Substation Control System of Al-Khirat Power Plant Project 400/132 kV "10x125 MW 9E GAS TURBINES" Services Provided: Testing, Commissioning and Energization of Complete DSAgile Substation Control System Nainawa Power Plant Execution Date: 2013 Location: Iraq Contractor: United Company for Electrical Projects (UCEP) Client: Calik Energy. (as a Main Contractor) + ALSTOM Grid SAS Iraq Branch. (as a Subcontractor) Owner : MOE " Minister of Electricity in Iraq" Description: Testing, Commissioning and Energization of 3|Page Complete DSAgile Substation Control System of Nainawa Power Plant Project 400/132 kV "6x125 MW 9E GAS TURBINES" Services Provided: Testing, Commissioning and Energization of Complete DSAgile Substation Control System Reference Projects Extension Of Deir Ali Substation Execution Date: 2013 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: METKA Co. (as a Main Contractor) Owner : PETE " Public Establishment of Transmission of Electricity " Description: Extension Of Deir Ali Substation in Damascus, 700mw Combined Cycle Power Plant 400/230 KV Substation Control System Operation Services Provided: Substation Control System Operation Contract No. 428 Execution Date: 2012 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: PEDEEE-Public Establishment for Distribution & 4|Page Exploitation of Electrical Energy Description: Design, Rendering the Electrical Civil Study For the Substation 66 / 20 KV Of Free Zones in Damascus & Adra On Turn Key Basis Services Provided: Design, Rendering the Electrical Civil Study Reference Projects Extension Of Deir Ali Substation Execution Date: 2012 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: METKA Co. (as a Main Contractor) + ALSTOM Co. (as a Subcontractor) Owner : PETE " Public Establishment of Transmission of Electricity " Description: Extension Of Deir Ali Substation in Damascus, Contract No. 414 5|Page 700mw Combined Cycle Power Plant 400/230 KV Substations + Commissioning job for Protection & DCS Systems Services Provided: DCS & Protection. Execution Date: 2012 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: PEDEEE-Public Establishment for Distribution & Exploitation of Electrical Energy Description: Design, Rendering the Electrical Civil Study For ten 66 / 20 KV Conventional Outdoor Substations On Turn Key Basis Services Provided: Design, Rendering the Electrical Civil Study Reference Projects Contract No. 544 Execution Date: 2012 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: PEEGT-Public Establishment of Electricity for Generation & transmission Description: Designing, Manufacturing, Supplying, Transporting, Insurance of ten 230 KV Transformer bays + ten 66 KV Incomer bays + 66 KV Capacitor bank On the basis of CIF Services Provided: Designing, Manufacturing, Supplying, Transporting, Insurance Con. No. 424 for protection & control panels 6|Page Execution Date: 2012 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: PEDEEE-Public Establishment for Distribution & Exploitation of Electrical Energy. Description: Tender No. 452 / Con. 424 for protection & control panels Services Provided: Design & Assembly Reference Projects Contract No. 13 Execution Date: 2011-2012 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: General Company for Electrical & Communication Works- Syrianet. Description: supply of 66 / 6.3 kV, 20MVA equipment for the pumping station at Ein Ezzarka Services Provided: Engineering, Supplying, Supervision on Installation & Commissioning Contract No. 52 7|Page Execution Date: 2011-2012 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: Ministry of Irrigation / General Organization for Land Development Description: Contract No. 52 / 11 for the supply & erection of MV Switchgear Services Provided: Engineering, Supplying, Erection, Installation & Commissioning. Reference Projects Extension of 66/20 KV Substation Execution Date: 2011-2012 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: Da'aboul Industrial Group / MADAR Coil Coating (Private) Description: 66/20 KV Substation extension (Feeder line & Feeder Transformer) Services Provided: Engineering, Installation, Erection & Commissioning Erection of 230 / 33-20 KV substation Execution Date: 2010 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: Syrian Metal Industries (Private) Services Provided: Erection Supply & Erection of 66 / 20 KV substation 8|Page Execution Date: 2010 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: Syrian Metal Industries (Private) Description: Supply & Erection of 66 / 20 KV, 20MVA substation Services Provided: Engineering, Supplying, Erection, Installation & Commissioning. Reference Projects Addendum No. 1 of Contract No. 355 Execution Date: 2009 till Present Location: Syria - Damascus Contractor: United Company for Electrical Projects (UCEP) Client: PEDEEE-Public Establishment for Distribution & Exploitation of Electrical Energy Description: Addendum No. 1 of Contract No. 355 for the design, manufacture, supply, and erection of ten 66 / 20kV outdoor substations (2 Extension Substation). Services Provided: Engineering, Supplying, Erection, Installation & Commissioning Supply & Erection of switchgear & transformers 9|Page Execution Date: 2008 Location: Syria - Damascus Contractor: United Company for Electrical Projects (UCEP) Client: Da'aboul Industrial Group / MADAR Coil Coating (Damascus City-Private) Description: Supply & Erection of switchgear & transformers Services Provided: Supply & Erection Reference Projects Contract No. 55 Contract No. 490 Execution Date: 2008 Location: Syria - Banias Contractor: United Company for Electrical Projects (UCEP) Client: Syrian Company for Oil Transport (Banias City) Description: Design, supply and erection of 66 / 6.6 kV, 20 MVA outdoor substation Services Provided: Engineering, Supplying, Erection, Installation, Civil Works & Commissioning. Execution Date: 2008 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: PEEGT-Public Establishment of Electricity for Generation & transmission Description: Supplying of 400 & 230 & 66 KV Current transformers Services Provided: Supplying 10 | P a g e Reference Projects Supply & Erection of conventional (66 / 3.3 kV) outdoor substation Execution Date: 2008 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: Stroy Trans Gas Description: Supply & Erection of conventional (66 / 3.3 kV) outdoor substation (40 km from Homs City) Services Provided: Engineering, Supplying, Erection, Installation, & Commissioning. Contract No. 355 11 | P a g e Execution Date: 2007 till Present Location: Syria - Damascus Contractor: United Company for Electrical Projects (UCEP) Client: PEDEEE-Public Establishment for Distribution & Exploitation of Electrical Energy Description: Contract No. 355 for the design, manufacture, supply, and erection of ten 66 / 20kV outdoor substation all around Syria (UCEP & AREVA as Consortium). Services Provided: Engineering, Supplying, Erection, Installation, Civil Works & Commissioning. Reference Projects Supply of 3.3 / 0.4 switchgear Execution Date: 2007 Location: Syria - Banias Contractor: United Company for Electrical Projects (UCEP) Client: Syrian Company for Oil Transportation (Banias City) Description: Supply of 3.3 / 0.4 switchgear Services Provided: Supplying 20 kV Secondary Distribution Center & transformers Execution Date: 2007 Location: Syria - Damascus Contractor: United Company for Electrical Projects (UCEP) Client: Masa Ceramic (Private) Description: Supply & erection of switchgear & transformer Services Provided: Supply & Erection 20 kV Secondary Distribution Center & transformers Execution Date: 2006 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: Cham Ceramic Factory (Alkesoeh region-Private) Description: 20 KV secondary distribution center with all its related accessories. Services Provided: Engineering, Installation, Erection & Commissioning 12 | P a g e Reference Projects 20 kV Secondary Distribution Center & transformers Execution Date: 2006 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: Cham City Center-Private Description: 20 KV secondary distribution center with all its related accessories, including 12 switchgears. Services Provided: Engineering, Installation, Erection & Commissioning 20 kV Secondary Distribution Center & transformers Execution Date: 2006 Description: 20 KV secondary distribution center with all its related accessories. 13 | P a g e Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: DINATEX (paper manufacture in ADRA Industrial City-Private) Services Provided: Engineering, Installation, Erection & Commissioning Reference Projects Al-Kesweh 66 KV Line feeder bay Extension Execution Date: 2005 & 2006 Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: Da'aboul Industrial Group / MADAR Coil CoatingPrivate Description: Al-Kesweh 66 KV line feeder bay Services Provided: Engineering, Installation, Erection & Commissioning in Life 230/66 KV Substation Supply and installation of vacuum circuit breakers 14 | P a g e Execution Date: 2004 & 2005 Description: Supply and installation of vacuum circuit breakers Location: Syria - TARTOUS Contractor: United Company for Electrical Projects (UCEP) Client: General Company for Cement & Building’s Materials TARTOUS Services Provided: Supply and installation Reference Projects Supply of vacuum circuit breakers Execution Date: 2004 & 2005 Description: Supply of vacuum circuit breakers Location: Syria - TARTOUS Contractor: United Company for Electrical Projects (UCEP) Client: General Company for Cement & Building’s Materials TARTOUS Services Provided: Supplying 66 / 20 kV substation Execution Date: 2005 Description: 66 / 20 kV substation 20MVA with all its related accessories (one Feeder Line, one Feeder Transformer Bay with Cubicles & IEDs) Location: Syria Contractor: United Company for Electrical Projects (UCEP) Client: Da'aboul Industrial Group / MADAR Coil Coating (Private) Services Provided: Engineering, Installation, Erection & Commissioning 15 | P a g e Reference Projects Delivery & installation of electrical new equipment Execution Date: 2004 Services Provided: Delivery & installation Location: Syria - TARTOUS Contractor: United Company for Electrical Projects (UCEP) Client: TARTOUS Port General Company TARTOUS Description: Delivery & installation of electrical new equipment for 20 & 6.3 kV disconnection centers and related distribution centers for MV & LV tensions Supply and installation of digital protection relays Execution Date: 2004 Location: Syria - TARTOUS Contractor: United Company for Electrical Projects (UCEP) Client: General Company for Cement & Building’s Materials TARTOUS Description: Supply and installation of digital protection relays Services Provided: Supply and installation 16 | P a g e Reference Projects
© Copyright 2024