Lövö bridge, Dragsfjärd, Finland • Fabrication and installation Main contractor: Skanska Infra Oy • 1000 tons, 500 m Designer: • Year 2010 Investor: 1 Tiehallinto Ramboll Finland Oy www.ruukki.com/steel-bridges Lövö bridge, Dragsfjärd, Finland • Over 100 m long bridge sections were lifted directly into place by sea crane and welded together • Total steel structure installation time on site were cut from half a year to just one month compared to conventional construction methods 2 www.ruukki.com/steel-bridges Särkijärvi bridge, Finland Investor: City of Tampere • Length 300 m Main contractor: Insinööritoimisto Seppo Rantala Oy • 950 tonnes • Year 2010 Designer: 3 Insinööritoimisto Pontek Oy www.ruukki.com/steel-bridges Partihallsförbindelse bridges, Göteborg, Sweden Investor: Trafikverket Main contractor: Skanska Sverige Ab Designer: 4 • 3 000 ton • 1,2 km long Ramböll Sverige Ab www.ruukki.com/steel-bridges Fabrication and installation 2010-2011 Rv 50 Vätternbron, Motala, Sweden Investor: Trafikverket • 3000 ton, 600 m Main contractor: NCC Sverige Ab • Fabrication and installation Designer: • Year 2013 5 ELU Konsult Ab www.ruukki.com/steel-bridges Rv 50 Vätternbron, Motala, Sweden Investor: Traffikverket Main contractor: NCC Sverige Ab Designer: 6 ELU Konsult Ab www.ruukki.com/steel-bridges • 3000 ton, 600 m • Fabrication and installation • Year 2013 Arenastaden Arch Bridge, Sweden Developer: Råsta Projektutveckling Ab Main contractor: Peab Sverige Ab Designer: 7 Elukonsult AB www.ruukki.com/steel-bridges • 300 tons • 2011 8 www.ruukki.com/steel-bridges
© Copyright 2024