PROJECT – KESUM-KAPCHEBIT COMMUNITY WATER PROJECT: PROPOSED CONSTRUCTION OF INTAKE WEIR AND PIPE LAYING OF GRAVITY MAIN Kesum-Chemunada community Gravity water project (Intake) is located in Embontangasir River which emanates from Tembu forest in Koisungur of Marakwet West Sub County. The proposed intake site can be accessed through Kapsowar-Cheptongei-Chebilbai-Koisungur Road. The Contractor is advised to visit the site and familiarize himself with site conditions prior to bidding. NO ITEM DESCRIPTION 1.00 PRELIMINARY ITEMS 1.01 RIVER DIVERSION The contractor must allow for construction of a temporary river diversion to allow construction to take place in a dry site. UN IT QTY L/s Item 1.10 EXCAVATIONS To include for all trimming to levels, back fillings with approved selected spoils, compacting, disposal of surplus materials and reinstatement. 1.11 Clear site from all undergrowth shrubs and trees, including stubbing uproots and removal of all deleterious materials from site M2 50 Excavate river bank in a normal soil to take wing walls, abutments, weir, riprap, key, aprons and cut off walls 1.5m deep M3 40 1.13 Ditto for excavation in hard rock M3 5 1.14 Backfilling with approved selected spoil compacted to specification to both sides of the weir and wing wall M3 25 CONCRETE WORKS Sawn form work as described to sides of weir body and wing walls M2 40 Provide and place 100mm class B GI pipes for outlet pipe, scour pipe and over flow No 3 1.12 1.200 1.201 1.202 AMOUNT 1.203 concrete blinding under weir wing walls as specified(1:3:6) 1.204 Mass concrete 1:2:4 in weir, wing walls, cutoff walls, 200mm thick 1.205 Provide and place to exposed faces of weir and wing walls 20mm thick mortar 1:3 plaster including water proof cement 1.300 RIPRAP 1.301 200mm thick grouted riprap as specified upstream and down stream 1.400 1.401 Weeping holes Provide and place 63mmø UPVC pipe class C along the bottom of the riprap upstream and down stream of the weir facing the aprons M3 2.0 M3 9 M2 32 M3 25 No 4 Kg 60 Kg 10 1.500 1.501 Reinforcement High yield square trusted base to BS 4461 10mmø in head walls, wing walls, weir body 1.502 Provide binding wire for item 1.3 Kg 5 1.503 1.600 1.601 Allow for nails for item 1.2 Sub -Total Pipes and Fittings. Provide, Handle and install 100mmø G.I Elbow. No. 3 1.602 1.603 1.604 1.605 Ditto Ditto Ditto Ditto G.I Union G.I Socket G.I Plug Gate valves(Pegler England) No. No. No. No. 3 3 1 3 1.606 Provide, Handle and install Fine screen No. 1 1.607 Provide, Handle and install Course screen No. 1 1.608 Provide, Handle and install Manhole cover (450x600mm) No. 1 Sub-total Total for Intake Weir, pipes and fittings.. GRAVITY MAIN 2.00 GRAVITY MAIN. 2.01 Bush clear the proposed pipeline route m 3,260 2.02 Excavate and backfill 900mm depth x 300mm width trench in soft ground m 3200 2.03 Ditto in hard murram m 60 2.04 Provide, lay, joint and test 4'' Ø UPVC class D pipes m 3,200 2.050 Ditto 4'' Ø G.I class B pipes m 60 2.060 Install double air valve AVs no 2 2.070 Install Wash outs no 2 2.080 Construct 900 x 900 x 1000 mm depth valve chamber with a lockable cover Publicity Sign Post Sub Total for Gravity Main no 2 no 1 Launching and Commissioning of Project Allow for Engineers supervision. . Grand Total (intake and Gravity Main) 100,000.00 200,000.00
© Copyright 2024