COOK ISLANDS GOVERNMENT INFORMATION DOCUMENT Issued on 24 NOVEMBER 2014 Fo r TE MATO VAI STAGE 2 – CONSTRUCTION AND OPERATION Contact Entity: TE MATO VAI PROJECT MANAGEMENT UNIT, MINISTRY OF FINANCE and ECONOMIC MANAGEMENT Table of contents 1. 2. 3. 4. General Information ....................................................................................................................... 1 1.1 Introduction .......................................................................................................................... 1 1.2 Purpose ................................................................................................................................ 1 1.3 Reliance on this Document and/or any information Contained in this Document ............... 1 Scope of Work ................................................................................................................................ 2 2.1 Locations and Project Drawings .......................................................................................... 2 1.1 Design and Build Works – Headworks ................................................................................ 2 1.2 Build Only Works – Operations, Roads and Pipelines ........................................................ 3 Design and Build Requirements .................................................................................................... 6 1.3 Concept Design ................................................................................................................... 6 3.1 Treatment Facility Performance ........................................................................................... 7 Other Information ........................................................................................................................... 9 4.1 Site Visit and Presentation ................................................................................................... 9 4.2 Tender timeline .................................................................................................................... 9 4.3 Local Contractor Involvement .............................................................................................. 9 Appendices Appendix A - Drawings Appendix B – Watercare Water Quality Report Appendix C – Local Contractors Te Mato Vai | Information Pack for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 | i 1. General Information 1.1 Introduction This document covers the general requirements for the construction and refurbishment of water intakes, treatment, storage and water supply (to the ring main) for the Government of the Cook Islands, through the Ministry of Finance, Economic Management (MFEM), Te Mato Vai PMU. The Te Mato Vai project is generally made up of the following components: 1) The design and construction of the inner and outer ring mains (construction currently being undertaken). 2) The design and construction of new water treatment facilities (currently part of this potential tender). 3) The design and construction of replacement trunk mains as required (currently part of this potential tender). 4) Upgrade of roading assets to improve all weather access to the water treatment facilities (currently part of this potential tender). 5) The installation of domestic and commercial meters for the purposes of monitoring water consumption (as part of a future tender). 6) The design and installation of a SCADA system (as part of a future tender). 1.2 Purpose The purpose of this document is to provide some project specific design information to the industry prior to the release of the tender document in order to assist the contracting industry to prepare for the tender and understand the scope of work. 1.3 Reliance on this Document and/or Any Information Contained in this Document Information contained in this document is subject to change and no reliance can be placed on the scope of the tender being the same as the information contained in this document. Every attempt was made to ensure the accuracy of the information contained in this document at the time of release however it should be noted that this may not be exactly reflected in the full tender document put to the market. Also, the issue of this document does not constitute a tender, or infer that any tender will actually be released for this work at any point in the future. Any costs incurred by any prospective contractor will be at that contractor’sthat contractor’s risk, irrespective of whether any tender, in any form, is actually released at any point in the future. Report for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 | 1 2. Scope of Work 2.1 Locations and Project Drawings The contract works are located across eleven (11) sites in Rarotonga, Cook Islands: The 11 sites are: Site Drawing Site Location Number Avana 01 Avatiu 02 Matavera 03 Akaoa 04 Ngatoe 05 Papua 06 Taipara 08 Takuvaine 09 Tupapa 10 Turangi 11 Totokoitu 12 Preliminary site layout drawings and P&ID’s have been provided for information purposes 2.2 Design and Build Works – Headworks For the purposes of this project, Headworks are defined as stream intakes, pre-treatment facilities, treatment facilities and, where specified, any storage identified for each of the locations. The headworks, and hence the scope of the design build, does not include the trunk main pipeline works. 2.2.1 Design Works It is intended that the headworks will be a design and build component, with the design works incorporating the design, design report, drawings, documentation and Principal’s approval (on a site by site basis) of all works required to be constructed for the headworks. The activities to be completed under the design will be, but not necessarily limited to: Production of all Design Documentation Production of Process Documentation Production of the Contractor Quality Plan Approval of the design and relevant documentation by the Engineer Other project requirements as necessary to satisfactorily complete the design of the headworks 2.2.2 Headworks Construction It is intended that the Headworks Construction is a ‘design and build’ component and shall incorporate all works required to complete the construction of detailed design as approved by the Engineer. It includes the following sites: 2 | Report for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 Intake* Site Water Treatment Plant Max Flow Min Flow 3 3 (m /day) (m /day) N/A N/A Storage 3 (m ) Akaoa N/A 1400 Avatiu New 2000 450 4800 Avana Upgrade 3400 1200 1400 Matavera Upgrade 1200 325 600 Ngatoe Upgrade 2000 250 2800 Papua Upgrade 2000 1200 1400 Taipara New 1200 250 N/A Takuvaine Upgrade 3000 675 600 Totokoitu New 2000 400 N/A Tupapa Upgrade 1200 275 1400 Turangi New 3000 1200 2800 *Note these are based on the concept design layouts and hydraulics, this can be altered depending on the design and build recommendations. The activities to be completed under the headworks construction will be, but not necessarily limited to: Production of the Contractors Construction Management Plan and Programme Review and update of the Contractor Construction Management Plan and Programme Completion of construction works to the satisfaction of the Engineer Initial commissioning of the Headworks to the satisfaction of the Engineer Production of As built documentation Production of Operation and Maintenance manuals Approval of Operation and Maintenance manuals by the Engineer 2.3 Build Only Works – Operations, Roads and Pipelines 2.3.1 Headworks Operational Period Headworks Operation Period is a ‘build only’ component and shall require the contractor to complete all works required to prove the performance of the plant installed in the headworks locations. It is likely that the contract will be required to operate the headworks components for 12 months. The activities to be completed under this separable portion are, but not necessarily limited to: Post commissioning of the plant to refine the production process Supply and shipment of any coagulant required to operate the plant Provision of water quality testing equipment for ICI(new SOE) operations staff Water quality testing to prove the performance of the treatment process Report for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 | 3 Training of TMV staff on the operation of the plant (both formal office based training and on-site training) Direction of TMV operation staff in the day to day operation of the water treatment plants 2.3.2 Pipelines Construction Pipelines Construction is a ‘build only‘ component and shall incorporate supply and construction of the following pipelines. The work starts at the extent of the ‘design and build’ component works and ends at (and including) the connection to the ring main. Pipe Material Pipeline Length (m) Akaoa 225 OD PE100 PN10 180 Avana 315 OD PE100 PN10 4174 Avatiu 355 OD PE100 PN10 2624 Matavera 200 uPVC Repairs Only Ngatoe 200 uPVC Repairs Only Papua 225 OD PE100 PN10 1503 Taipara 200 uPVC Repairs Only Takuvaine 200 uPVC Repairs Only Totokoitu 315 OD PE100 PN10 1695 Tupapa 200 uPVC Repairs Only Turangi 315 OD PE100 PN10 1864 Site The activities to be completed the pipeline construction will be, but not necessarily limited to: Review and update of the Contractor Construction Management Plan and Programme Supply and installation of pipeline materials Weld testing Pipeline Pressure testing Flushing and cleaning of pipeline Supply and installation of pipeline fittings Reinstatement of disturbed surfaces Removal and disposal of existing pipeline materials where disturbed by the works Production of as built documentation Production of Operation and Maintenance manuals Approval of Operation and Maintenance manuals by the Engineer 4 | Report for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 2.3.3 Access Road Construction Access Roads Construction is a ‘build only‘ component and shall incorporate supply and construction of improvements to the access roads. Generally, road require improvements to the surface drainage, pavement replenishment and construction of stream crossings. The work to be undertaken is based on the following: Existing Road Distance (m) River Ford Crossings (No.) Avana 4060 19 Akaoa 180 N/A Ngatoe 1590 1 Taipara 1200 0 Matavera 1660 3 Tupapa 2020 2 Turangi 2220 0 Site The activities to be completed under this separable portion are, but not necessarily limited to: Review and update of the Contractor Construction Management Plan and Programme Clearing of vegetation Creation of road water table drains Supply and construction of additional pavement Construction of concrete river ford crossings Report for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 | 5 3. Design and Build Requirements 3.1 General Design Requirements The design of the treatment facilities will be robust in terms of performance under varying weather conditions and as such shall: Use robust mechanical and hydraulic flow controls. Eliminate, or minimise, the use of electricity (it is not available at most of the sites). All Site must be reliably controlled. Incorporate simple, low maintenance hydraulic chemical dosing systems (where required). Be of simple construction using long design life materials (i.e. concrete) where possible for civil structures and when this is not possible metal structures shall be adequately protected for coastal and tropical environments. Have standardised treatment systems and equipment across all sites. Allowance for access for ongoing operation and maintenance of equipment being installed. The footprint of the headworks to be kept to a minimum. Equipment shall be located to minimise the extent and associated cost of new infrastructure. Headworks location to minimise the need for erosion protection due to the proximity to the stream and the requirement for stream protection works. Minimise lengths of watermain pipes and stream crossings. Levels shown on Process Flow Diagram drawings are indicative only and may be modified to meet the design requirements. Where storage is proposed at a site, floor levels of the storage tanks proposed by the contractor shall not be below the design floor level of the tank as shown in the concept design. Deviations from these levels will need to be check during tender to prove no detrimental impact to the operation of the supply system. Where no storage is proposed at a site, the outlet from the filtration device proposed by the contractor shall not be below the outlet level of the AVG shown in the concept design. Deviations from these levels will need to be check during tender to prove no detrimental impact to the operation of the supply system. 3.2 Concept Design A concept design for an appropriate treatment process has been developed for proof of concept purposes, based on the result of water quality investigations carried out at all intakes, site constraints identified during the site investigations and a review of available technology. The concept design is as follows: Intakes upgraded to improve water capture and reduce occurrences of blockages caused by debris in stream flows. Settling tank with flow control arrangement at inlet to settlement tank, coagulant dosing and settlement (possibly including further aeration). 6 | Report for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 No Parameter 1 Sites 2 Detention time Water Treatment Plant Max Flow: 3 2900-3700 m /day Water Treatment Plant Max Flow: 3 1600- 2200 m /day Water Treatment Plant Max Flow: 3 1200-1400 m /day Avana, Turangi, Takuvaine Avatiu, Ngatoe, Papua, Totokoitu Matavera, Taipara, Tupapa 3.5 hrs 3.5 hrs 3.5 hrs 3 2 3 2 3 2 3 Loading rate 25 m / m / hr 25 m / m / hr 25 m / m / hr 4 Minimum Length:width 4:1 4:1 4:1 5 No of tanks 2 2 1 2 64 m – 100 m 2 2 6 Surface area of one tank 7 Length 15 - 19 16 - 18 12 - 14 8 Width 4-4 4-4 4-4 9 Depth depth end) 2.9 2.9 2.9 (minimum at outlet 58 m – 72 m 1 2 40 m - 56 m 2 An Automatic Valveless Gravity (AVG) filter(s) directly fed by gravity from the outlet of the settling tank. No Description Rate 1 Filtration rate Not to exceed 9 m / hr / m (2.5 l / s / m ) 2 Backwash rate Declining rate within range 7 mm / s – 18 mm / s 3 Backwash initiation Automatic based on pressure loss with provision for manual over-ride 4 Control Hydraulic control module 3 2 2 Sediment collection, drainage, drying and collection for backwash and settling tank scour. Provision for connection of disinfection facilities if later required. Storage tanks. The concept design has been provided in good faith and the Contractor will be deemed to have carried out further research and investigations as needed before either offering an optimised design based on the concept design, or an alternative design. 3.3 Treatment Facility Performance The objectives of the treatment facilities are those consistent with the Hydraulic Levels of Service as set out in the ICI Technical Standards for Water Supply, May 2014, Section 3.0 Design Levels of Service which states the treatment system design will not include any disinfection. In terms of the Te Mato Vai Project the specific water quality objectives for treatment are to generally meet WHO Guidelines for aesthetic determinands at all times with allowance for unusual weather events as summarised in the table below. Report for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 | 7 No Determinand Treated Water Requirements 1 Turbidity (NTU) 1 or < 1 NTU 2 Apparent colour (TCU) 5 or < 5 NTU 3 Total iron (mg/l) < 0.1 mg/l 4 Manganese (mg/l) < 0.1 mg/l A water quality assessment and report has been completed and is included in Appendix B. This information will be required to be expanded on by the contractor after award of contract. 8 | Report for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 4. Other Information 4.1 Site Visit and Presentation As part of the pretender information pack it is proposed to hold a Presentation and site visit day. The details are as follows: th Date: 12 December 2014 Start time: 9am (CKT) Meeting Venue: CCECC Conference Room, Te Mato Vai Compound Sites to be visited: Matavera, Avana, Akaoa, Totokoitu Prospective Tenderers shall notify their interest in attending the site visit to Latu Kupa th ([email protected]) by 12noon 05 December 2014 (CKT). Information to be supplied when notifying interest in attending the site visit is as follows: - Names of all people attending the presentation site visit - Names of delegated representative to attend the site visit - Name of company There will be a maximum of 30 places available on the site visit component, as such and unless attendance allows otherwise, it is only intended that representatives of companies intending to tender for the entire project works will be selected to attend the site visit. Companies that are looking to subcontract as part of the greater project are not intended to be catered for during the site visit, however, they will be welcome to attend the presentation. If necessary, and as available spaces dictate, it may be required to limit attendance at the site visit to 1 or 2 people per prospective tenderer. 4.2 Tender Timeline It is proposed that the tender timeline would be as follows: Release of Tender document: 16/12/2014 Close of Tender: 06/02/2015 Tender Award: 27/02/2015 Start of construction: 20/03/2015 These are general timeline and should not necessarily be replied on. The Te Mato Vai project reserve the right to change, alter or cease the tender process at any time. 4.3 Existing Site Investigation Information Other information that has been collected during the design stage, and will be issued during the tender phase is as follows: 1) Basic factual geotechnical report 2) Environmental Impact Assessment (EIA) 4.4 Local Contractor Involvement A key component of selecting the preferred tender for this construction works will be the level of involvement of local contractors (loosely defined as a company, or operation, that would be Report for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 | 9 registered, or domiciled, in the Cook Islands, has a majority ownership by nationals of the Cook Islands and generally, or wholly, employs people that permanently reside in the Cook Islands), and can show a successful term track record of operating in the Cook Islands. During the design process, local contractors were requested to submit their interest in providing services to the project. Their names, contacts and general skill areas are contained in the table below, and their actual registration forms are attached in Appendix C. There is no representation that any information supplied in this document in relation to the skills, or suitability, of these registered local contractors to complete any works associated with this project can be relied upon. The list is not extensive and is not meant to provide a full list of available local contractors. The list is also not exclusive, and any other local contractor not registered on this list would be considered in the same context as the ones that are contained on this list. No screening has been undertaken on this list, and it is replied upon that the prospective tenderers would satisfy themselves that any contractor listed here is in fact a local contractor. 4.5 Further Information Further information on this project can be requested through contacting Latu Kupa ([email protected]). No individual correspondence will be entered into with any one prospective tenderer, however, if deemed to be suitable at this point in the project process, further information may be released to all prospective tenderers by way of the Cook Islands tender website where this document has been sourced from. www.tematovai.com; www.procurement.gov.ck; www.pwwa.ws; www.gets.govt.nz 10 | Report for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 AC Drainage Limited Riki Cowan +682 23582 +682 58723 [email protected] Baker Tree Services Limited Nooroa Baker +682 22164 +682 55964 [email protected] Chris Holford Chris Holford +682 28499 +682 71733 [email protected] PO BOX 041 Muri PO BOX 3277 Avarua N/A G & S Contractors Robert Wichman +692 26980 +682 26980 [email protected] Landholdings Limited W.G. Doherty +682 23415 +682 55103 [email protected] Maoate Contractors Limited Paul Maoate +682 31773 +682 54335 [email protected] Master Builder Vira Williams +682 78365 [email protected] Mike Rennie Builders Limited Mike Rennie +682 20375 +682 55256 Pati's Landscaping & Construction Limited Samuel Patiora Heather PTS The Plumbing Shop Ian Ibbetson PO BOX 2033 Arorangi PO BOX 94 Yes General Civil / Earthworks Postal Address Construction Email Pipeline / Meters Contact Number Roading Contact Person Concrete Company Yes Yes Yes Staff 3 5 Yes Yes PO BOX 132 Aitutaki PO BOX 3290 Yes [email protected] PO BOX 32 Avarua Yes +682 21967 +682 54038 [email protected] +682 22199 '+682 55199 [email protected] PO BOX 3080 Avatiu Rarotonga PO BOX 154 Yes Yes Yes 1 Yes Yes Yes Yes 7 Yes Yes Yes Yes 52 Yes 11 Yes Yes Comments Arborist 30 Yes Yes Yes Yes 8 8 Report for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 | 11 Rarotonga Mining Limited Charlie Strickland +682 55770 [email protected] Rarotonga Plumbings & Drainage Limited Rio Heather Moana Bates +682 25218 +682 55218 [email protected] k Rio Heather +682 72849 +682 57027 [email protected] RVK Contractors Limited Keta Williams +682 55359 [email protected] S & T Contractors Limited Henry Ariihe'e +682 26699 +682 55929 [email protected] PO BOX 362 Yes T & M Heather Limited Joseph Heather +682 24249 +682 55688 jojocontractorheather@gma il.com PO BOX 303 Avarua Rarotonga Yes 12 | Report for Cook Islands Government - Te Mato Vai Stage 2 - Construction and Operation, 51/32561/00 PO BOX 203 Avarua PO BOX 845 PO BOX 2197 Arorangi PO BOX 328 5 Yes 9 Yes 1 Yes Yes Yes Yes Yes Yes 26 Yes 12 Yes 17 Aggregate supplier Appendices Appendix A - Drawings Drawings Content: 51-32561-01-G001 – Water Supply - Cover Page 51-32561-01-W002 – Avana – WTP Layout Plan 51-32561-01-W003 – Avana – Process Flow Diagram 51-32561-02-W002 – Avatiu – WTP Layout Plan 51-32561-02-W003 – Avatiu – Process Flow Diagram 51-32561-03-W002 – Matavera – WTP Layout Plan 51-32561-03-W003 – Matavera – Process Flow Diagram 51-32561-04-W002 – Akaoa – WTP Layout Plan 51-32561-04-W003 – Akaoa – Process Flow Diagram 51-32561-05-W002 – Ngatoe – WTP Layout Plan 51-32561-05-W003 – Ngatoe – Process Flow Diagram 51-32561-06-W002 – Papua – WTP Layout Plan 51-32561-06-W003 – Papua – Process Flow Diagram 51-32561-08-W002 – Taipara – WTP Layout Plan 51-32561-08-W003 – Taipara – Process Flow Diagram 51-32561-09-W002 – Takavaine – WTP Layout Plan 51-32561-09-W003 – Takuvaine – Process Flow Diagram 51-32561-10-W002 – Totokoitu – WTP Layout Plan 51-32561-10-W003 – Totokoitu – Process Flow Diagram 51-32561-11-W002 – Tupapa – WTP Layout Plan 51-32561-11-W003 – Tupapa – Process Flow Diagram 51-32561-12-W002 – Turangi – WTP Layout Plan 51-32561-12-W003 – Turangi – Process Flow Diagram Appendix B – Watercare Water Quality Report Water Quality Report Please contact Latu Kupa for a copy of this report [email protected] Appendix C – Local Contractors Contractor Registration Sheets: AC Drainage Ltd Baker Tree Services Limited Chris Holford G&S Contractors Land holdings Limited Maoate Contractors Limited Master Builder Mike Rennie Builders Limited Pati’s Landscape & Construction Limited PTS The Plumbing Shop Rarotonga Mining Limited Rarotonga Plumbing & Drainage Limited Rio Heather RVK Contractors Limited S&T Contractors Limited T&M Heather Limited
© Copyright 2024