The Weekly Bulletin - Bay Area Builders Exchange

The Weekly Bulletin
Serving the Construction Industry and Bay Area Community since 1932
2014 BOARD OF DIRECTORS
December 19, 2014
OFFICERS
Cindi A. Christenson Named Contractors State
License Board Registrar of Contractors
Nancy Brinkerhoff, President
Ironwood Commercial Builders, Inc.
Lydia Roze, Vice President
Vista Universal, Inc.
Eric Kavert, Treasurer
Pacific Coast General Engineering,
Inc.
Forrest Towe, Past President
Anvil Builders
John C. Roeber, Past President
J. Roeber & Associates
DIRECTORS
Greg Adams,
Shimmick Construction Co., Inc.
Thom Miles
TMA Construction Services.
John Parker
Janus Corporation
Ken Regevig
K. Regevig Roofing
EXECUTIVE DIRECTOR
Scott P Leary
DIRECTOR OF OPERATIONS
Denice McDavid
The Weekly Bulletin (USP3 3633) is published
every Week by the BAY AREA BUILDERS
EXCHANGE, 3055 Alvarado Street, San
Leandro, CA 94577-5711. Subscription rate
for non-members is $525 per year.
POSTMASTER:
Send address changes to BAY AREA
Builders Exchange , 3055 Alvarado Street,
San Leandro, CA 94577-5711.. Tel.:
510.483.8880. Fax 510.352.1509.
www.bayareabx.com
SACRAMENTO – California Contractors State License Board (CSLB)
Board Chairman David Dias today announced the selection of CSLB Chief
Deputy Registrar Cindi A. Christenson to serve as the board’s new Registrar
of Contractors, effective January 1, 2015, following a nationwide executive
search.
“We are pleased and confident with our decision to promote Cindi
Christenson who, as a 33-year career state executive, has successfully
demonstrated her fiscal, policy, regulation, legislative, and operational
management abilities,” added Dias. “She also will have the distinction of
serving as CSLB’s first female Registrar of Contractors, among the known 15
executives who have served in this position since 1929.”
Ms. Christenson has served as second in command for CSLB’s more than
400 employees and eight consumer protection offices, with direct oversight
of the board’s $60 million budget, operating policies and procedures, and
executive team since 2009.
“My knowledge and appreciation for our state’s construction industry has
grown under Steve Sands’ leadership,” said Christenson. “We will continue
to meet our consumer protection mission, and serve as a strong industry
partner in our efforts to curb the underground economy and establish more
streamlined processes for state licensure.”
Before joining CSLB, Ms. Christenson was the executive officer for the
California Board of Professional Engineers and Land Surveyors from 1996 to
2009 and, from 1988 to 1996, was that organization’s senior engineering
registrar. She also worked with the state Department of Water Resources as
an associate mechanical engineer from 1981 to 1988.
Ms. Christenson received her juris doctorate from the Lincoln Law School of
Sacramento in 2003, and is a licensed mechanical engineer after earning her
Bachelor of Science degree in Mechanical Engineering from California
Polytechnic State University, San Luis Obispo. She and her husband,
Michael, are residents of El Dorado Hills, CA.
The Contractors State License Board operates under the umbrella of the
California Department of Consumer Affairs.
***
MALACHI PAVING & GRADING INC.
P.O. Box 8567 Emeryville CA, 94662
CA LIC# 946337 A
(510) 652-5496 Phone
[email protected]
(510) 652-5498 Fax
INVITATION TO BID
Malachi Paving & Grading Inc. is seeking quotes from qualified UDBE/MBE/ WBE/ SBE/ OBE/ LBE/ DVBE
business and invites your bid/quote on the following project/contract:
Project:
Embankment Restoration Along Line G From Confluence Of
Line E to 1300 Feet Upstream, City Of Fremont, Alameda County,
California, Zone No.6
Spec No:
FC6-M-131
Bid Date:
January 8th, 2015
Bid Time:
2:00 PM
Seeking all trades including but not limited to:
For the following (but not limited to) work: Trucking, Cold Planing, Furnishing Base Rock or Asphalt Material, and Grading, Traffic Control
Plans, specifications and requirements for the project are available to be picked up from your local plan
room or viewed at our office. Please contact us at the above listed number for further information regarding bidding on this project.
We are an equal opportunity employer, for assistance in obtaining bonds, lines of credit, and/or insurance
please contact our office.
Interested in bidding this project? Please respond to (510) 652-5498 or Email: [email protected]
Executive Office Space for Lease
Ideal space for satellite office, estimators, sales & service representatives
San Leandro
3055 Alvarado Street
San Leandro, CA
94577
510-483-8880
Concord
2440 Stanwell Drive
Concord, CA 94520
925-685-8630
For more information call Scott Leary or
Denice McDavid at 510-483-8880
HELP WANTED
Detect All Security & Fire is a r apidly gr owing company with established r oots in the
Greater Bay Area. We are in need of a new technician to meet our increasing demand. We are
looking for an ambitious person who is excited to be a part of this expansion. Detect All
Security & Fire is an alarm company specializing in security alarm, fire alarms, video
surveillance, and access control. We install, test, inspect and repair for both commercial and
residential applications, and are UL certified for commercial fire. We are known for our quality
installations and excellent customer service and follow up.
Training and Certifications/License:
■
■
■
Must have clean driving record and be able to pass drug test and background check
High school diploma or equivalent, some college or trade school a plus
Fire/life safety card is a plus
Accreditation as a Registered Locksmith, RL, in the Associated Locksmiths of America, Inc.,
ALOA, or equivalent is a plus
Email Leah Ingram: [email protected]
Gary A. Duckworth, CPCU, ARM
Insurance Broker / Cook, Disharoon & Greathouse, Inc. / Oakland, CA
Workers’ Compensation PLUS Program
* Comparative Pricing * Bureau Review * Classification Review
* Audit Review * Claims Management * Local Representation
Ph. 510-437-1900, x 2006
/ Fax 510-437-1979
[email protected] . www.cdginsurance.com
www.
thebluebook
.com
BAY AREA BUILDERS EXCHANGE - TELEPHONE (510) 483-8880. FAX (510) 352-1509
WEEKLY PLAN LIST - Friday, December 19, 2014
To view plans online go to: www.beac.com
Bid Date Bid Time Location
Plan Name / Scope of Work
12/19/2014 12:00 PM
Pacific Commons J1 and S5-Building Shells
Fremont
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
2:00 PM
Alameda
2:00 PM
Livermore
This bid is for the building shells for buildings J1 and S5 at Pacific Commons, the foundations for this project has been previously bid. Trades required include:
concrete, masonry, structural & misc. steel, rough carpentry, insulation, roofing, sheet metal, caulking, doors, frames & hardware, storefront, plaster, steel studs
& drywall, painting, fire sprinklers, plumbing, HVAC and electrical.
RFP Janitorial and Cleaning Services
12/9 @ 10AM
The Housing Authority of the City of Alameda (AHA) is requesting proposals from commercial janitorial cleaning companies for janitorial and cleaning services at
the AHA administrative office. AHA retains the right to exercise the option to renew the contract for a maximum of two additional one-year terms based on
satisfactory service results and budget approval. The Request for Proposal” (RFP) may be found below.
Renovate Audiology & Prosthetics Relocation Project 640A4-14-109L Encouraged 12/2 @ 10:30AM at 4951 Arroyo Rd., Bldg 64, $500000 $1000000
Livermore
Div_02-demolition; Div_03-concrete repair mortar; Div_05-metal fabrications; Div_06-rough carpentry, millwork; Div_07-firestopping; Div_08-hollow metal doors
& frames, interior wood doors, door hardware, automatic door operators, glazing; Div_09-non-structural metal framing, gypsum board, acoustical ceilings,
resilient base & accessories, resilient sheet flooring, resilient tile flooring, carfpeting, sound absorbing wall units, painting; Div_10-signage, cubicle curtain tracks,
wall & door protection, toilet, bath & laundry accessories; Div_11-refrigerators, projection screens; Div_13-seismic restraint requirements for non-structural
components, sound conditioned rooms; Div_21-wet-pipe sprinkler systems; Div_22-plumbing; Div_23-HVAC; Div_26-interior lighting, electrical; Div_27communications; Div_28-fire alarm system
2:00 PM
Oakland
528 Thomas Berkeley Way 24 Condo Unit (Design Build)
2:00 PM
Oakland
Here is the information for the 24 condo unit with one commercial space at 528 Thomas Berkeley in Oakland, it is design build. Because of that the
documentation is limited which can be a good thing as it will give an opportunity for a solid team of subcontractors to provide this General Contractor with input
for the design phase. Proforma has been awarded the design portion of this project already with a clause to continue to construction given that this general
works well with the owners. Because Proforma is still designing, there is no solid date for when we need our bids by, however as of now we are setting a
tentative date to receive all bids by Dec. 19th at 2 PM.
$1546647
Broadway/Keith Avenue to Golden Gate Way Bicycle Pedestrian
MAND 11/20 @ 2PM at 250 Frank Ogawa Plaza, 4th Fl,
Project
Oakland
The proposed work consists, in general of the installation of a new Class I Bicycle Facility along Broadway from Keith Avenue to Golden Gate Way; a traffic
signal upgrade and modification at Broadway and Keith; grading and paving work; installation of a median; signing and striping; and other work specifically
shown on the project plans or included in the Special Provisions.
Mohamed Alaoui, Proj Mgr, @ 510-238-3469
Page 1 of 43
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
12/19/2014 2:00 PM
Rio Vista
Solano Wind Site Support Services
2:00 PM
San
Francisco
SFO-Project Management Support Services for Ground
Transportation Unit (GTU) Relocation Proje
Prebid Information
Engineers # of
Plan
Estimate Addenda #
Recommended 12/3 @ 9AM at 1785 Toland Ln., Rio Vista
The Contractor shall furnish all supervision, labor, materials, equipment, and incidentals ecessary to accomplish the work in accordance with the Contract. The
work generally consists of: As-needed Work: The contractor shall provide SMUD with “SOLANO WIND SITE SUPPORT SERVICES.” The site support shall be
on an as defined, as needed, as-is basis and there is no guarantee that any specific quantity of work will be authorized by SMUD. The contract work scope
includes any site work that does not directly involve the wind turbine generators (WTGs), including assistance in the maintenance and development of the
balance of property owned by SMUD. The site includes the following features: •Graded gravel roads on the site to access the WTGs and substation. •Six (6)
permanent metrological towers are installed on the site. •There are 107 wind turbine generators at the site. •The WTG power is collected via a system of
underground and overhead conductors that connect to SMUD’s substation located approximately 4 miles to the west at 6523 Montezuma Hills Rd., Birds
Landing, CA 94512. •SMUD O&M buildings and outbuildings located at 1785 Toland Lane, Rio Vista, CA 94571. •SMUD currently has an active grazing and
farming lessee on the property. AS-NEEDED POTENTIAL WORK TASKS -See the solicitation documents for the listing Erosion Remediation Specific Project
Work: Remediation includes excavating erosion sites, backfilling and compacting, lime treating, re-grading to improve drainage, installing culvert extensions,
installing flow dissipaters, installing jute netting, wattles, and hydro-seeding impacted areas. Eight sites are currently identified for significant repairs and 20-25
additional sites have been identified as in need of BMP maintenance repairs.
ONLINE
Kiauna Norman @ 916-732-7443
$13000000
ONLINE
This Project will replace the existing Ground Transportation Unit (GTU) facilities in order to accommodate the expansion of Boarding Area B. The GTU, which
includes a co-located Radio Shop, Gas Station, and Car/Bus Wash, will be relocated from the South Field area of the Airport to an existing parking lot in the
North Field.
Tania Gharechedaghy, Contract Mgr, @ 650-821-5568
2:00 PM
San
Francisco
SFO - CM/CG Services for South Field Tenant Relocations
12/1 @ 10AM
$12000000 $15000000
ONLINE
This Project will provide improvements to non-terminal facilities, including West Field and North Field cargo buildings, for warehouse, Ground Service
Equipment (GSE), maintenance, office, and client service spaces necessary to relocate Airport Commission leasing tenants, such as Third Party Airline Service
Providers. The Project will include the building preparation and relocation coordination of all affected tenants in the South Field area. These improvements can
range from minor modifications of the existing spaces to more extensive work towards mechanical, electrical, plumbing, utilities, ITT/communications, special
security systems and fire and life safety systems. The Project will also include hazardous material abatement and any site remediation.
Farrah Young, Contracts Manager, @ 650-821-5568
2:00 PM
Santa Rosa
Inclusion Letter for Contractors, Sonoma County Junior College
District Formly Santa Rosa Junior College
The College District is requesting interested parties to submit their firm information for inclusion in the College District's list of bidders for the upcoming year.
Page 2 of 43
N/A
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
12/19/2014 2:30 PM
Pavement Renovation, Sewer Replacement and Hot Water
Installation-Haight Street and Hayes Street
12/4 @ 1:30PM at 1680 Mission St., 3rd Fl, San Francisco
San
Francisco
$13000000
ONLINE
Demolition, pavement renovation, curb ram construction, sewer replacement & drainage work, watermain installation, AWSS relocation, traffic signal conduits,
audible pedestrian signal installation, traffic control & all associated work.
Ramon Kong, Proj Mgr, @ 415-554-8280
3:00 PM
San Jose
4:00 PM
Carmichael
4:00 PM
Carmichael
4:00 PM
San
Francisco
4:00 PM
San
Francisco
SCVMC Ancillary Building Project
Recommended 11/13 @ 10AM
A.The Project comprises construction of multiple related projects located at the Ancillary Building of the Old Main Hospital in San Jose, California. The Project
consists of (1) changes to the MEP systems (Change Order 4), (2) new link and stairwell (Change Order 5), and (3) ancillary basement and second floor tenant
improvements, all with a $20M construction budget. This target scope and cost is preliminary and subject to adjustment during design.
B.The pre-construction phase portion of the Work (Phase I) shall be completed within ninety (90) calendar Days from the date when pre-construction phase
Contract Time commences to run, and the construction phase portion of the Work (Phase II) shall be completed within four hundred eighty six (486) calendar
Days from the date when construction phase Contract Time commences to run, all as provided in Contract Documents
Fire Station 109-Apparatus Shop Remediation and Demolition
MAND 12/10 @ 10AM
Remediate & demolish the apparatus shop building in the rear of Fire Station 109
Fire Station 109-Apparatus Shop Remediation and Remodel
MAND 12/10 @ 11AM
Remediate & remodel the existing structure by altering the interior to serve the new purpose
RFQ-Construction Management Support Services for the San
11/14/14 @ 2:00 pm at 30 Van Ness Ave, Suite 4100, San $4000000
Francisco Police Department's Traffic Company and Forensic
Francisco
ONLINE
ONLINE
ONLINE
ONLINE
Division Facility
The City & County of San Francisco announces a RFQ seeking qualified consultants to provide construction management support services for the Traffic
Company & Forensic Services Division Projects.
RFQ for Park Tower @ Transbay (Block 5, Transbay Project Area):
12/5 @ 1PM at 1 South Van Ness, 2nd Fl, San Francisco
ONLINE
High Rise Office Development, including Retail and Basement
Parking: Professional Services
Developer is seeking firms interested in providing professional services, including engineering and related services, for the design and construction of Transbay
Block 5. The Project is a 42-floor class-A multi-tenant office building comprised of approximately 700,000 rentable square feet. The base of the office tower will
have an outdoor landscaped public space, retail tenants and a multi-story lobby. Park Tower at Transbay is located on Transbay Block 5 at the corner of Howard
and Beale Streets. The Class A+ building is anticipated to be a 45-story tower with a basement for parking and loading dock and a large outdoor public space at
the base along Beale Street. The project will be environmentally focused being designed to achieve LEED Gold certification and incorporate numerous
sustainable design strategies and highly-efficient building systems. This approach to design of Park Tower will provide a healthy work environment for
occupants, contribute to the community with an environmentally sensitive building and provide lower operating expenses to the tenants. Small Business
Enterprises (SBEs), LBEs, MBEs and WBEs are encouraged to submit qualifications.
Monica Wilson @ 415-748-2301
4:00 PM
San Rafael
RFP for San Rafael Rock Quarry Air Quality Monitoring
The County of Marin is requesting proposals from qualified air quality consulting firms to assist in reviewing the air quality aspects of the San Rafael Rock
Quarry's conforming amended reclamation plant, set up & conduct an air quality monitoring & reporting program & oversee the installation of air monitoring
equipment in compliance with condition of approval #69 of the Marin County Surface Mining & Quarrying Permit#Q-72-03, Amendment #1
Page 3 of 43
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
12/19/2014 4:00 PM
CG Alameda Replace Mechanical System, Bldg 1 Infirmary
Alameda
Prebid Information
Engineers # of
Plan
Estimate Addenda #
11/18 @ 10AM-Please call General if you will attend the
site visit. Deadline is 11/13 by 5PM
Design & construction services to replace HVAC & controls system in the Building 1 Infirmary
ONLINE
Those who want to attend the site visit on 11/18 @ 10AM should let General Contactor or owner know by 11/13 @ 5PM. Send you information to Jason Dugan
@ [email protected]
5:00 PM
San Bruno
RFP Surveying Services for the Shelter Creek Condominiums Water
Main Replacement Project
ONLINE
The purpose of this RFP is to facilitate the selection of a qualified surveying firm to assist with developing base maooing for the future Shelter Creek
Condominium Water Main Replacement Project
5:00 PM
Turlock
RFQ-Retainer for Airport Engineering/Architectural Services &
Planning/Environmental Services at the Turlock Municopal Airport
ONLINE
The City of Turlock is requesting qualifications for the performance of consulting aviation professional services at the Turlock Municipal Airport to perform
planning/environmental and/or engineering/architectural airport consulting services within a multi-year contract
12/22/2014 10:00 AM
10:00 AM
12:00 PM
Concord
Elevator Maintenance Services
Optional 12/16 @ 2PM at 1455 Gasoline Alley, Concord
The elevator maintenance personnel shall operate under these specifications and under directions given by the City of Concord personnel listed in this section.
Provide complete elevator maintenance service on eight (8) elevators at the locations listed below.
• Location #1: Concord Police Department, Main Headquarters, 1350 Galindo Street:
• Main lobby
• Property/evidence freight elevator
• Rear exit
• Location #2: Salvio Street Parking Structure, 2255 Salvio Street:
• Public elevator at the Salvio Street entrance
• Public elevator at the Colfax Street entrance
• Location #3: Todos Santos Parking Center, 2051 Salvio Street:
• Public elevator at the Galindo Street side
• Location #4: Baldwin Park, Senior Center, 2727 Parkside Circle:
• Wheelchair Lift
• Location #5: Concord Library, 2900 Salvio Street:
• Interior employee elevator
ONLINE
West
Sacramento
RFP for Design Services of the West Sacramento Sycamore Trail
and Bryte Bicycle Boulevard Projects
ONLINE
Oakland
The City of West Sacramento is seeking proposals from qualified landscape architecture or rngineering firms to design & prepare construction plans & bid
documents to build the Sycamore Trail & Bryte Bicycle Boulevards projects
RFP Design of Maritime Security Expansion to Oakland Army Base
12/5 @ 9AM at 530 Water St., Exhibit Rm, Oakland
The Port of Oakland (“Port”) is soliciting proposals from qualified consultants to provide professional services for the design of Maritime Security System
Expansion to Oakland Army Base (OAB) Project.
Page 4 of 43
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
12/22/2014 2:00 PM
Truck Yard and CNG Fueling Facility
Marina
Prebid Information
Engineers # of
Plan
Estimate Addenda #
MAND 11/3 @ 10AM
Work involves construction of, but not limited to one (1) approximately 11.58 acres of grading including two large retention ponds and a bioswale with small
retention pond , (2) construction of three buildings 7,200 SF Administration Building; 11,300 SF Service Bay Building; 5,500 SF Truck/Bin Wash Building), (3) a
fire storage tank and associated piping to connect to the existing fire water storage tank system to supply fire hydrants throughout proposed site, (4) connection
of domestic water to existing well including a water storage tank and associated support equipment, (5) installation of landfill gas monitoring under all three
proposed buildings, (6) approximately 6 acres of asphalt and hard surfacing with supported storm drainage system, (7) perimeter security fencing and rolling
gates, (8) CNG fueling island with access drive, and (9) coordination of CNG fueling stations, both fast and slow fill systems with supporting equipment. The
work also includes excavation of native clay soils, subgrade preparation, and placement of engineered fill.
ONLINE
Kyle Eausch, Proj Mgr, @ 714-524-2870
2:00 PM
Oakland
UCSF Benioff Children's Hospital Oakland-Outpatient Clinic 2 - Bid
Package 1B-Curtain Wall & Elevators
12/15/14 @ 9:00 am
ONLINE
Turner Construction has been awarded the construction of a new, 6-story, steel-frame, medical clinic, approximately 88,000 gsf, with associated landscaping,
site utility work and existing parking garage modifications.
Project Schedule: Construction to begin in July 2015 with a 23-month duration. Refer to construction bid schedule for more information.
Prequalification: All subcontractors must be pre-qualified to submit a proposal. Pre-qualification information may be requested from Sylvia Strowe
([email protected]).
Proposal Format: A Turner Bid Form is provided. Proposals are to be submitted via the SmartBidNet link above or e-mailed to Shirley San Diego
([email protected]).
Project Labor Agreement: This project will have a Project Labor Agreement in effect.
Pre-Bid Requests for Information (RFIs) – Pre-bid RFIs are to be submitted to Shirley San Diego ([email protected]) no later than two (2) weeks before the
bid due date .
2:00 PM
Oakland
2:00 PM
San Jose
DeFremery Park Recreation Center Exterior Rehabilitation
MAND 12/2 @ 11AM at 250 Frank Ogawa Plaza, Oakland
The proposed work, in general, consists of exterior rehabilitation of the DeFremery Recreation Center including, but not limited to, repair of subgrade drainage,
add subgrade venting, repair existing downspouts, repair and replace damaged subgrade wood components, termite and fungus damage repair, wood trim and
siding repair, window repair and replacement, miscellaneous repairs, lead based paint handling and abatement, exterior painting and related work.
ONLINE
Woojae Kim, Proj Mgr, @ 510-238-3389
Miller Middle School Modernization
MAND 11/17 @ 3:30PM & 11/20 @ 3:30 PM at 6151
Rainbow Dr., San Jose
Maintenance and finish upgrades to flooring, painting, trim, casework repair, wall, and casework cleaning, damaged ceiling tile replacement, and AC repair,
upgrades to path of travel at door thresholds (some concrete landing replacement and threshold replacement), as well as restroom upgrades including finishes,
some fixtures & fixture relocation, toilet partitions, and accessories. This project also includes painting exterior trim and colors, replacing existing fire alarm
system, as well as, adding wireless access points throughout the campus.
Page 5 of 43
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
12/22/2014 2:00 PM
Sebastopol Rd Sewer and Water Replacement - Dutton Ave to Olive
St
12/2 @ 10AM at 69 Stony Circle, Santa Rosa
Santa Rosa
Engineers # of
Plan
Estimate Addenda #
ONLINE
Dust control, traffic control, clearing & grubbing, earthwork, aggregate base, asphalt concrete, asphalt concrete trench paving, signs, soil & groundwater
disposal, sanitary sewer system, concrete curbs & sidewalks, monuments, traffic stripes & pavement markings, raised pavement markers, curb ramps, water
system, adjust manholes to grade, adjust existing valve boxes, main line cleanouts & monuments to grade, material recycling
Greg Dwyer @ 707-543-3838
2:00 PM
Tracy
4:00 PM
San
Francisco
5:00 PM
Napa
County
5:00 PM
Richmond
ONLINE
Library Entrance Doors Replacement
Replace existing 7' x 14' automatic soliding entrance doors at the Tracy Public Library
$8000000
RFQ for a New Neighborhood Fire Station 16 Under the 2010
SECOND - 12/10/14 @ 11AM at 30 Van Ness Ave, San
Earthquake Safety and Emergency Response Bond
Francisco
The scope of work includes demolition of an existing 2-story fire station structure, a hose tower & removal of underground fuel tanks along Greenwich St, two
appartus bays, associated equipment storage, living & dining areas & a fitness room.
$11400000
Contractor Prequalification for Napa County South Campus
Improvement Project
ONLINE
ONLINE
South campus improvements project prequalification's
ONLINE
RFP for Nevin Avenue Pedestrian and Bicycle Improvements 19th to MAND 12/12 @ 2PM
27th Project
The Successor Agency to the Richmond Community Redevelopment Agency (“Agency”) is seeking qualified consultants to provide construction management
services for the Nevin Avenue Pedestrian and Bicycle Improvements 19th-27th Project (“Project”). The Project is a pedestrian and bicycle-focused streetscape
project that seeks to encourage walking and bicycling by residents and Civic Center-area workers to and from the Richmond Intermodal Transit Station. In order
to accomplish this, the Project includes a complete redesign and reconstruction of Nevin Avenue between 19th Street (adjacent to the transit village) and 27th
Street (adjacent to the Richmond Civic Center) to improve pedestrian and bicyclist safety and comfort. Project elements include widened sidewalks, sidewalk
bulb-outs, a traffic circle, enhanced crosswalks, pedestrian-scaled LED lighting, ADA compliant curb ramps, pavement markings to delineate bicycle use,
wayfinding and bicycle route signage and landscaping improvements.
12/23/2014 11:00 AM
San
Andreas &
Murphy
Phase III Bus Stop Improvement Project
12/10 @ 3PM
$150000
The County of Calaveras will receive sealed bids for construction of the Phase III Bus Stop Improvement Project. The project consists of furnishing all
coordination, labor and materials for the construction of three bus stop improvements in San Andreas and two in Murphys. The project will include installation of
all appurtenances necessary for complete and in place bus shelters and/or benches, including earthwork, forming and pouring concrete, concrete finish work,
curb ramps, truncated dome panels, assembly and installation of pre-manufactured shelters and benches. The project also includes demolition, replacement,
and disposal of existing improvements including but not limited to asphalt concrete sidewalk pavement.
The improvements to be constructed in San Andreas are located on existing sidewalks within the State Route 49 right-of-way adjacent to Golden State Credit
Union, the Post Office, and Treat’s General Store. Work includes surface improvements and the assembly and installation of County-provided bus shelters and
benches.
The improvements to be constructed in Murphys are located on State Route 4. One site is adjacent to Murphys Suites and the other is at the intersection with
Tom Bell Road. The Murphys bus stop improvements consist of concrete pads, drainage facilities, and the installation of County-provided benches.
Page 6 of 43
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
12/23/2014 2:00 PM
Pittsburg
Delta Hawaii Waterline Project
2:00 PM
Rio Linda
Site preparation, trench excavation & backfill, shoring, fire hydrants, piping, PVC pipe, surface restoration, traffic stripes & pavement markings
Front Street and Rio Linda Boulevard Pipelines
12/5/14 @ 10AM - 730 L St., Rio Linda
Protective pipe coatings, pavement repair & restoration, piping systems, disinfection
ONLINE
2:00 PM
San
Francisco
Specialty's Cafe and Bakery-San Francisco
ONLINE
Prebid Information
$800000
E352B/1
THIS IS A UNION ONLY JOB
DO NOT CONTACT OWNER/ARCHITECT/CONSULTANTS
2:00 PM
San
Francisco
Remodel of an existing cafe restaurant, including Demo, Striping, Concrete, Finish Carpentry, Cabinets & Tops, Sealing & Caulking, Doors, Drywall, Tile,
Flooring, Paint, T-Bar, FRP/Marlite, Wallcovering, Epoxy Floor, Furniture Install, Fire Sprinklers, Plumbing, HVAC, Electrical.
$340000
Superbay Store Room Fire Sprinkler Replacement
12/16 @ 10AM
ONLINE
This project will replace the non-functioning fire sprinkler system in the Superbay Store Rooms. Contractor shall furnish all labor and materials as well as all
hydraulic calculations and new pipe support and bracing to make the new fire sprinkler system function as is required by NFPA 13 and Airport Fire Marshal. The
work also include the removal of asbestos that is above the ceiling, removal of the existing non-functioning sprinkler system, repair; patch; and paint the entire
ceiling, air monitoring the project site and installation of new additional access panels on the ceiling.
Jenna Castro, Contract Mgr, @ 650-821-5305
2:00 PM
San
Francisco
ONLINE
Courtroom Door Restoration Ronald M. George State Office Building MAND 12/2 @ 10AM at 455 Golden Gate Ave, San
#402
Francisco
The Contractor shall provide all labor, equipment and materials required to remove and install four (4) new ninety (90) minute fire rated wood doors. Install new
Panic Hardware, stain doors to match existing courtroom doors
2:30 PM
Pittsburg
Leland Road and Railroad Avenue Drainage Improvement Project
$500000
E355B/0
Pipe installation, placement & compaction of backfill materials, trench surfacing, landscaping & irrigation restoration, sidewalk construction, pavement markings
& traffic striping, removal of existing storm drain pipes & furnishing of all other products & construction of all other improvment work.
2:30 PM
San
Francisco
NEW 19th Avenue Median Improvement Project Phase 2
$300000
ONLINE
Demolition/removal of existing concrete paving & soil; providing & amending import topsoil; landscaoe planting & maintenance; traffic control & all appurtenant
work.
3:00 PM
Michael Rieger, Proj Mgr, @ 415-558-4492
Sacramento NEW LED Traffic Light and Controllers
This RFB is for the acquisition of street light luminaires and photocell controllers. This is not a Purchase Order. See the specification documents for a complete
description of items needed.
Page 7 of 43
ONLINE
Bid Date Bid Time Location
12/23/2014 3:00 PM
3:00 PM
San Bruno
Palo Alto
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Closed-Circuit Television Inspection of Sanitary Sewer Laterals
12/12 @ 2PM
The City of San Bruno, through the Public Services Department, is soliciting proposals to perform closed-circuit television (CCTV) inspection of approximately
305 sewer laterals within the Sharp Park basin. The work includes, but is not limited to: furnishing all labor, materials and equipment, and performing all work
necessary and incidental to successfully complete the inspection of sanitary sewer laterals (from where lateral exists from home to main line) and provide closedcircuit television inspection in digital format; providing accurate information of the condition, and the location and measurement of sewer lateral. Proposal
Documents contain the full description of the work.
Water Main Replacement 25 Project
MAND 12/4 @ 10AM at 1007 Elwell Ct., Rm 1, Palo Alto
$3500000 $4000000
ONLINE
Installation of water mains, services, fire hydrant assemblies, reconnection of the existing fire services, installation of linestoppers, and performance system tieins, performance of required testing and disinfection, and excavation, recycling, and surface restoration as required by Construction Documents herein (Project).
3:00 PM
Palo Alto
3:00 PM
Palo Alto
4:00 PM
San
Francisco
$216361
NEW Embarcadero Road Improvements Traffic Signal Modification
The City of Palo Alto is seeking bids to provide traffic signal modification, asphalt concrete saw cutting and removal; placing asphalt concrete pavement;
removal and replacement of sidewalk, curb, gutter and driveways; installing curb ramps; installing truncated domes; tree trimming; traffic control; roadway
markings & signage; and site preparation., subject to the qualification and evaluation provisions, and terms and conditions, including all incidental and related
work as required by PART III, Technical Specifications, herein
$475000
Electric Underground Rebuild and Re-Conductor Project Phase III
MAND 12/9 @ 9AM at 1007 Elwell Ct., Pal Alto
Replace existing underground electric primary (12kV) and secondary circuits with new cables. The scope includes, but is not limited to, removing existing
primary and secondary cables out of conduit, installing new cable and equipment to replace the old, and making up cable terminations ready for electrical
equipment
NOTE: The contractor will be working in and out of high voltage underground vaults. The contractor must be trained in confined space training, and carry any
licenses or permits required. Traffic control plans will be required for certain project locations. Any required Traffic control plans must be approved by City of
Palo Alto Transportation Division or appropriate agency. Contractor shall provide references of similar projects completed within the last 3 years.
Purchase And Installation of A Unified Communications And Call
11/24 @ 1PM
ONLINE
ONLINE
ONLINE
Center Solution
Provide a unified communications and customer service (contact center) solution for all district locations
4:00 PM
9:30 AM
Vallejo
Tracy
RFP for Preliminary Engineering And Right of Way Phase for
Sacramento St. Bridge
This Request for Proposal (RFP) provides for the engagement of professional engineering consultant services to obtain all necessary permits for the
construction, perform all requisite tests, samplings & surveys, and to prepare contract documents to enable the City to go out to bid for the bridge work.
Brine Concentrator System (BCS) Tube De-Scaling
MAND 12/16 @ 10AM
Contractor shall provide all material, labor, tools, travel and per diem, non consumable supplies, transportation, equipment and every other item of expense
necessary to clean the vertical Brine Evaporator at Deuel Vocational Institution’s (DVI) Reverse Osmosis (RO) Water Plant, Department of Corrections and
Rehabilitation, Deuel Vocational Institution (DVI), 23500 Kasson Road, Tracy, CA 95376.
The Contractor shall provide services to clean the Brine Evaporator used to produce potable water (drinking water) every six months or on an as needed basis.
All equipment used to clean the evaporator must be free of biological and chemical residue. Contactor shall provide personnel trained and certified in proper us
of the equipment required. Services shall be performed every six (6) months or on an “as needed basis” during normal business hours of the 8:00 a.m. to 3:00
p.m., Monday through Friday, excluding State holidays.
Page 8 of 43
ONLINE
ONLINE
Bid Date Bid Time Location
12/24/2014 12:00 PM
Redwood
City
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
NEW Footlocker-Redwood City
Trades to complete this project are as follows (but not limited to): DEMO; CARPENTRY; MILLWORK; FIXTURE; DOORS; DRYWALL; PAINTING &
WALLCOVERING; CEILING; FLOOR COVERING; TILE; TOILET ACCESSORIES; HVAC; PLUMBING; ELECTRICAL.
12/29/2014 2:00 PM
2:00 PM
NEW CHP Santa Rosa Area Office and Golden Gate Division, Parking Lot MAND 12/18 @ 9AM
Rohnert
Repair, Seal and Striping Services
Park/Vallejo
Parking lot repair, seal & striping services
Specialty's Cafe and Bakery-Sacramento
Sacramento
TI for new restaurant, including Demo/Concrete Cutting, Concrete, Finish Carpenty, Cabinets & Tops, Insulation, Doors, Storefront, Drywall, Tile, Flooring, Paint,
T-Bar, FRP/Marlite, Wallcovering, Epoxy Flooring, Restroom, Decor Install, Fire Sprinkler, Plumbing, HVAC. Electrical.
ONLINE
ONLINE
NOTE:DO NOT CONTACT OWNER/ARCHITECT/CONSULTANTS
5:00 PM
Various
Cities
RFP-Solar PV Energy California Department of Corrections and
Rehabilitation
MAND 9/4 @ 5PM
ONLINE
A qualified pool members are invited to review & respond to this Request for Proposal for the installation & operation of solar photovoltaic energy generation
systems under a third party ownership power purchase agreement business model
12/30/2014 1:00 PM
2:00 PM
Galt
Napa
$150000
MAND 12/16 @ 10AM
The Contractor shall provide all labor, including travel and per diem, supplies, materials, tools, equipment, licenses and bond(s) necessary to perform
miscellaneous roof repair and/or replacement onan as-needed and emergency basis to various buildings for the California Department of Corrections and
Rehabilitation (CDCR), R.A McGee Correctional Training Center (CTC) located at 9850 Twin Cities Road, Galt, CA 95632.
CHP Napa Air OPS - Hanger Door Maintenance and Repairs
MAND 12/18 @ 11AM at 3500 Airport Blvd., Napa
CHP is seeking to contract for hanger door maintenance & repair services
Roof Repair and Replacement Services
Page 9 of 43
ONLINE
ONLINE
Bid Date Bid Time Location
12/30/2014 2:00 PM
Oakland
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Greenleaf at Whittier School:Modernization and New Construction
MAND 12/18 @ 3:45 Job Walk is Mandatory for demo &
abatement trades & is voluntary for all others
This project is an expansion & renovation of the Greenleaf Elementary School at Whiitier to be completed in multiple phases. This bid only includes Phase 1
scope at this time. All other phases will be bid out during the 1st quarter of 2015.
ONLINE
Phase 1 scope inludes:
-Demolition of the existing multi-purpose building & nine existing portable classrooms including all associated ramps, foundations, stairways, etc.
-Site utility & site work, including selective demolition/removal of existing.
-Selective demolition & associated infill/replacement of east elevation of Building A including walls, slab, roof, footings, doors, plaster, brick, cladding, etc.
-Construction of two new one-story modular buildings, D (2,600 sf) and E (2,950 sf), to be used as classrooms. Modular buildings fabricated & shipped to the
site by Project Frog in separate pieces of field assembly.
-Connections to seven new protables (six portables at 960 sf & 1920 sf for one portable) to be used as classrooms. Portables furnished by others.
-Prep work in basement & 1st floor of Building A for future new fire alarm system & new data connections
-Demolition of existing play structure & soft paving. Installation of new play structure.
THIS IS AN OAKLAND UNIFIED SCHOOL DISTRICT PROJECT WITH PREVAILING WAGES, S/SL/SLBRE & LOCAL WORKFORCE PARTICIPATION GOALS
2:00 PM
$230000
Berkeley
Sanitary Sewer Rehabilitation - MH Rehab FY 15
2:30 PM
Daly City
The work to be done consists of, but not limited to, complete removal existing manholes and construction of new manholes, rehabilitation of existing manholes,
and related work.
$8114
Daly City DMV Field Office Non-Chemical Landscaping
MAND 12/10 @ 10AM at 1500 Sullivan Ave, Daly City
Contractor agrees to provide the Department of Motor Vehicles (DMV) all labor, tools, materials, equipment, and travel necessary to perform non-chemical
landscape maintenance services at the Daly City DMV field office for the term of this Agreement.
3:00 PM
Palo Alto
2015 FY Power Line Clearing Project
3:00 PM
Palo Alto
ONLINE
ONLINE
Shanna Kloberdanz @ 916-657-8561
12/18 @ 10AM at 3201 East Bayshore Rd., Palo Alto
The City of Palo Alto is seeking quotes from qualified companies to provide power line clearing services for a period of up to five years. The selected vendor will
clear trees and other vegetation from electrical conductors, poles, substations, fiber optic, traffic signals and street lights throughout the City in order to ensure
safe, reliable power to the City’s utility customers. The required work and required performance conditions are described in the Scope of Work/Specifications.
Underground District No. 47
MAND 12/2 @ 9AM at 1007 Elwell Ct., Palo Alto
The City of Palo Alto is seeking bids to provide the necessary work and furnish various specified materials for the installation of underground electric duct
systems for the City of Palo Alto Underground District No. 47.
Page 10 of 43
ONLINE
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
12/30/2014 5:00 PM
Sacramento
Grid Assets Civil Site Design Engineering Services
$500000
12/15 @ 10AM
The selected firm(s) shall provide professional civil site design services for SMUD on an “as needed” basis. The firm(s) providing professional civil site design
services shall have civil engineering and surveying staff meeting the experience requirements of this Request for Proposal. The Contractor will have access to
SMUD’s existing drawings and calculations located at its Sacramento office. The Contractor will be required to prepare drawings in accordance with SMUD’s
drawing standards unless submittals required by approval agencies require differing drawing standards.
ONLINE
12/31/2014 12:00 PM
San Luis
Obispo
Inclusion Letters for Contractors, City of San Luis Obispo
N/A
Prebid Information
The City is requesting interested parties to submit their firm information for inclusion in the City's list of bidders for the upcoming year.
12:00 PM
San Rafael
N/A
Inclusion Letters for Contractors, Central Marin Sanitation Agency
The Central Marin Sanitation Agency is requesting interested parties to submit their firm information for inclusion in the Agency's list of bidders for the upcoming
year.
12:00 PM
Walnut
Creek
12:00 PM
Cupertino
N/A
Inclusion Letters for Contractors, Walnut Creek School District
Walnut Creek School District is requesting interested parties to submit their firm information for inclusion in the District's list of bidders for the upcoming year.
N/A
Inclusion Letters for Contractors, city of Cupertino
The City is requesting interested parties to submit their firm information for inclusion in the City's list of bidders for the upcoming year.
12:00 PM
North
Highlands
N/A
Inclusion Letters for Contractors, Twin Rivers Unified School District
The School District is requesting interested parties to submit their firm information for inclusion in the School District's list of bidders for the upcoming year.
12:00 PM
Fremont
Inclusion Letters for Contractors, City of Fremont
2:00 PM
Novato
The City is requesting interested parties to submit their firm information for inclusion in the City's list of bidders for the upcoming year.
Novato Housing Maintenance & Repair Electrical System
8/15 @ 10AM at 227 South Oakwood Dr., Novato
N/A
$1000000 $5000000
ONLINE
Maintenance & repair electrical system
5:00 PM
Cupertino
Inclusion Letters for Contractors, Cupertino Unified School District
N/A
The District is inviting all licensed contractors to submit the name of their firm to the Cupertino Union School District’s Purchasing Department for inclusion on
our bidders list. This notice requires contractors provide the following information on the pre-qualification application
Form attached.
5:00 PM
Richmond
5:00 PM
Rocklin
Inclusion Letters for Contractors, West Contra Costa Unified School
District
N/A
The School District is requesting interested parties to submit their firm information for inclusion in the School District's list of bidders for the upcoming year.
Inclusion Letters for Contractors, Sierra Community College District
The College District is requesting interested parties to submit their firm information for inclusion in the College District's list of bidders for the upcoming year.
Page 11 of 43
N/A
Bid Date Bid Time Location
Plan Name / Scope of Work
12/31/2014 5:00 PM
Inclusion Letters for Contractors, San Joaquin County
San
Joaquin
County
Prebid Information
Engineers # of
Plan
Estimate Addenda #
N/A
The County is requesting interested parties to submit their firm information for inclusion in the County's list of bidders for the upcoming year.
5:00 PM
San Ramon
Inclusion Letters for Contractors, San Ramon Valley Unified School
District
N/A
The San Ramon Valley Unified School District is updating its lists of contractors which may be interested in performing public works projects for the year 2015.
5:00 PM
Saratoga
5:00 PM
Turlock
Inclusion Letters for Contractors, city of Saratoga
N/A
The City is requesting interested parties to submit their firm information for inclusion in the City's list of bidders for the upcoming year.
Inclusion Letters for Contractors, City of Turlock
N/A
The City is requesting interested parties to submit their firm information for inclusion in the City's list of bidders for the upcoming year.
5:00 PM
Ukiah
5:00 PM
Ukiah
Inclusion Letters for Contractors, City of Ukiah
N/A
The City is requesting interested parties to submit their firm information for inclusion in the City's list of bidders for the upcoming year.
Inclusion Letters for Contractors, Mendocino County
N/A
The County is requesting interested parties to submit their firm information for inclusion in the County's list of bidders for the upcoming year.
5:00 PM
Vacaville
Inclusion Letters for Contractors, Solano, County Water Agency
N/A
The Solano County Water Agency is requesting interested parties to submit their firm information for inclusion in the Agency's list of bidders for the upcoming
year.
5:00 PM
Placerville
Inclusion Letters for Contractors, County of El Dorado
N/A
The County of El Dorado is compiling a list of qualified contractors to be notified of opportunities to bid on public works projects. In order to be placed on the list,
please visit the Procurement and Contracts website (link below) and complete the web form. All bid opportunities are posted on our website (link below) and any
qualified contractor is eligible to bid, even if you are not on the list; however, we recommend getting on the list to ensure that you don't miss any opportunities.
If you have any questions, contact Linda Silacci-Smith at (530) 621-5417.
http://www.edcgov.us/Government/Contracts/Webforms/Public_Works_Bidders_List_Application.aspx
5:00 PM
Saratoga
5:00 PM
Moraga
Inclusion Letters for Contractors, West Valley-Mission Community
College District
N/A
The College District is requesting interested parties to submit their firm information for inclusion in the College District list of bidders for the upcoming year.
Inclusion Letters for Contractors, Moraga School District
N/A
The School District is requesting interested parties to submit their firm information for inclusion in the School District's list of bidders for the upcoming year.
5:00 PM
Milpitas
5:00 PM
Martinez
Inclusion Letters for Contractors, Milpitas Unified School District
N/A
The School District is requesting interested parties to submit their firm information for inclusion in the School District's list of bidders for the upcoming year.
Inclusion Letter for Contractors, Martinez Unified School District
N/A
The School District is requesting interested parties to submit their firm information for inclusion in the School District's list of bidders for the upcoming year.
5:00 PM
Hayward
Inclusion Letters for Contractors, Hayward Unified School District
The School District is requesting interested parties to submit their firm information for inclusion in the School District's list of bidders for the upcoming year.
Page 12 of 43
N/A
Bid Date Bid Time Location
Plan Name / Scope of Work
12/31/2014 5:00 PM
Inclusion Letters for Contractors, Ohlone Community College
Fremont
Prebid Information
Engineers # of
Plan
Estimate Addenda #
N/A
The Ohlone Community College District is inviting all licensed contractors to register on Ohlone’s Planetbids website for inclusion on the District’s list of qualified
bidders for informal bidding for calendar year 2013-2014.
Form attached
5:00 PM
Fremont
Inclusion Letter for Contractors, Fremont Unified School District
N/A
Contractors must provide the name and address to which a Notice to Contractors or proposal should be mailed, a phone number at which the contractor may be
reached, their business fax number, the type of work in which the contractor is interested and currently licensed to do (earthwork, pipelines, electrical, painting,
general building, etc.) together with the class of contractor’s license(s) held and contractor license number(s), proof of general liability insurance and maximum
project bonding capacity. Contractors that were previously included on the list will need to resubmit to be included on the list for the current calendar year.
5:00 PM
Fairfield
Inclusion Letters for Contractors, Solano County
N/A
The County is requesting interested parties to submit their firm information for inclusion in the County's list of bidders for the upcoming year.
5:00 PM
Davis
5:00 PM
Dublin
Inclusion Letters for Contractors, City of Davis
N/A
The City is requesting interested parties to submit their firm information for inclusion in the City's list of bidders for the upcoming year.
Inclusion Letters for Contractors, Las Positas Community College
District
N/A
The College District is requesting interested parties to submit their firm information for inclusion in the Colleg District's list of bidders for the upcoming year.
5:00 PM
Clearlake
5:00 PM
Napa
Inclusion Letters for Contractors, Yuba Community College District
N/A
The College District is requesting interested parties to submit their firm information for inclusion in the College District's list of bidders for the upcoming year.
Inclusion Letters for Contractors, Napa County
N/A
The County is requesting interested parties to submit their firm information for inclusion in the County's list of bidders for the upcoming year.
ONLINE
1/1/2015
5:00 PM
San Jose
1/2/2015
10:00 AM
Napa
HHSA-TI 650 Imperial Way Remodel Project
$530185
MAND 12/9 @ 10AM & 12/18 @ 10AM at 650 Imperial
Waym Napa
Div_02-selective demolition; Div_05-cold formed metal framing; Div_06-plastic paneling; Div_07-thermal insulation, joint sealants; Div_08-hollow metal frames,
flush wood doors, foor hardware, glazing; Div_09-gypsum board, ceramic tiling, acoustical panel ceilings, water moisture vapor control for flooring, reselinet
base & accessories, resilient tile flooring, tile carpeting, sound barrier mullion trim cap, painting; Div_10-signage, toilet & bath accessories; Div_21-fire
suppression-water based (delegated design); Div_22-plumbing; Div_23-HVAC; Div_26-electrical; Div_27-sound masking systems; Div_28-fire protection & alarm
(delegated design)
ONLINE
12:00 PM
Sacramento
Saks Off 5th - Roseville Creekside Town Center - Tenant
Improvements
ONLINE
NEW S. 1st Street Apartments
Apartment renovation
Construct tenant improvements, including demolition, saw cutting, concrete, masonry, structural steel, metals, carpentry, rough carpentry, millwork, roofing,
insulation, doors and frames, glass and glazing, drywall, ceilings, painting, wallcovering, flooring, overhead doors, plumbing, fire sprinklers, HVAC, electrical and
fire alarm.
Page 13 of 43
For a complete list of projects out to bid in the Builders Exchange Online Plan Room, sign up for our E-Bulletin published weekly by
sending a subscription request to [email protected] or call Martha at 510-483-8880.
How to Avoid Affordable Care Act
AUDITS & PENALTIES! My name is Don Beaton, past President of the Builders Exchange of Alameda County and 40 years a California Contractor. During the time I was on the Board of Directors and Past President of the Builders Exchange, I remember OSHA becoming a federally mandated law. The reason I mention this is because there is now another federally mandated law, called the Affordable Care Act (ACA). A business owner’s obligation to the Affordable Care Act (ACA) is of the utmost importance at this time. Non-­‐compliance to this federally mandated Law can cost you hundreds, if not thousands of dollars. In an effort to help your business, I am working with a company who has designed a Reference Guide, Obamacare Compliance Kit, to get you through this maze. In all my years in business, this is by far “the best” tool and “a must have” for business owners to stay in compliance and navigate the new ACA law. The ERguide is part of an annual subscription and includes the following: Ø ERguide –Binder format (270 pages) Ø Webinar Series – Tutorials on how to use the ERguide Ø Email Call Center – Info@Healthcare-­‐Compliance-­‐Inc.com Ø Legislative Update – Includes recent changes, additions and deletions to the ACA Ø CD – Includes rules, regulations & notices from DOL, HHS & IRS Ø Periodic Newsletters & Bulletin Emails Ø Workshop Series – Live presentations on a variety of ACA topics You would pay, a number of experts, hundreds, if not thousands, of dollars to compile this much pertinent information. The annual subscription for the Basic ERguide -­‐ $360.00. * Please note, if your company is over 50 employees, you would choose the Advanced ERguide -­‐ $1,250. Healthcare Compliance Inc. (HCI) was created by Janet Mlynar, MBA, CFP®, in 2010, and incorporated in 2013, to address the problems faced by business owners and employers who now must comply with ever-­‐changing mandates created by the implementation of the Affordable Care Act (ACA). Janet is an innovator and leader in both Insurance and Financial Planning. She is considered a foremost expert on the Affordable Care Act and it is my pleasure to work with the HCI team to bring you the most up-­‐to-­‐
date information on the ACA – especially as it relates to business owners. To receive your copy of the ERguide Subscription today, Call Don Beaton: (541)-­‐997-­‐8849 E-­‐mail: [email protected] The Affordable Care Act – Where Healthcare Meets Compliance www.Healthcare-­‐Compliance-­‐Inc.com Executive Office Space for Lease
Small Private Offices Available: TWO LOCATIONS
110 - 300 square feet
San Leandro
Concord
Ideal space for satellite office, estimators, sales &
service representatives
Amenities include:
GREAT LOCATIONS
Free WiFi
FREE PARKING
UPS SERVICE DAILY
SECURITY SYSTEM
ACCESS TO KITCHEN
JANITORIAL SERVICE
ALL UTILITIES
24 HOUR ACCESS
CONFERENCE | BOARD ROOMS
MAIL PICKUP AND DELIVERY
FAX / COPY Machines Available
San Leandro
Concord
3055 Alvarado Street
San Leandro, CA 94577
510.483.8880
2440 Stanwell Drive
Concord, CA 94520
925.685.8630
For more information call Scott Leary at 510.483.8880 (San Leandro)
or Denice McDavid at 925.685.8630 (Concord)
Misc.: Leases are month to month. 1st month and security deposit to start lease.
Credit Check. Telephone / upgraded cable internet service not included.
Advertising Rates
Weekly Bulletin
Our Bulletin runs weekly in 8 1/2 " X 11 " Size Format, Black & White
Member
(Total cost)
NonMember
(Total cost)
$100
$150
$150
$200
$75
$110
$115
$150
$35
$60
$50
$80
$30
$50
$50
$75
Full Page:
One or two weeks
Three or four weeks
1/2 PAGE:
One or two weeks
Three or four weeks
1/4 PAGE:
One or two weeks
Three or four weeks
Business Card &
MBE/WBE/SBE
Sub Bid Requests:
One or two weeks
Three or four weeks
CLASSIFIED:
Up to 7 lines
One or two weeks
$25
Three or four weeks
$35
(Each additional line)
$2.50
Note: A line is 30 Character / spaces.
$40
$55
$4.50
Please fax a typed written sample of your ad to 510-352-1509 or email copy text to
[email protected] and indicate the number of Weekly Bulletin issues the ad is to run.
Ad deadline is 12:00 P.M. Thursdays, the Weekly Bulletin is published every Friday.