SESI LTHW Building Conversions Construction Update - December 22nd, 2014 (Update for the remaining 2014 SESI work) Sunday's GALE helicopter pick. SESI LTHW Building Conversions Construction Update - December 22nd, 2014 (Update for the remaining 2014 SESI work) Work For The Upcoming Week Construction Impacts • Cubberly: Laying pipe, backfilling trench, boiler pad work, (weather permitting), installing pipe and conduit inside mechanical room. • Cubberly: Walkway bordering Green Library and Cubberly is closed. Crews working throughout the first floor, basement, and crews / heavy equipment outside between Green Library and Cubberly. • Forsythe: Painting enclosure and landscaping (weather permitting). • Forsythe: Crew working intermittently outside of Forsythe by the new skid. • Encina Commons: 12/20 Crane pick, riser insulation, and POC connections to rebuilt skid. Steam Startup 12/29. • Encina Commons: 12/20 Crane pick: Crothers Way closed from 8:00AM-10:00AM, evacuation of offices under crane swing from 8:30-8:45 during pick. • Braun Corner: Punchlist work. • Braun Corner: Crews working intermittently throughout the building. • Wilbur: Mechanical room steam pipe demo. • Wilbur: Crews working in mechanical room. • GALE: Installing pipe and waterproofing roofs. • GALE: Crews working in mechanical rooms and roofs. *Chemical odors from roof waterproofing chemicals* • Main Quad: Punchlist work. • Main Quad: Crews working in the attics. • Hoover Tower: Minor punchlist work. • Hoover Tower: Crews working throughout the building. • TW Art Gallery: Balancing and punchlist work. • TW Art Gallery: Crews working in the mechanical room. • Roble Hall: Punchlist. • Roble Hall: Crews working in the basement. • Branner: Minor work in mechanical room. • Branner: Crews throughout basement. • Lagunita: Steam/condensate work. • Lagunita: Crews working in the basement. • Toyon: Minor work in mechanical room. • Toyon: Crews working in the mechanical room. • Durand: Painting exterior shaft • Durand: Crews working inside the mechanical room. • Mudd Chemistry: HHW piping phase 2. • Mudd Chemistry: Crews working around exterior of the building.
© Copyright 2024