Ohio Department of Transportation • Construction Update DISTRICT 5 • DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road • Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District 5 Weekly Traffic Advisory For the week of October 10, 2014 The following traffic advisory includes road construction and major maintenance projects requiring lane restrictions and/or closures along the state and federal highway system within ODOT District 5, which includes the counties of Coshocton, Fairfield, Guernsey, Knox, Licking, Muskingum, and Perry. All work is weather permitting. For statewide information regarding road conditions affected by construction, maintenance, weather or accidents, visit www.Ohgo.com. COSHOCTON COUNTY Ongoing The Lake Park Pedestrian Bridge: The closure of this structure is schedule for October 20, 2014. Crews will work between Roscoe Village and Lake Park on the pedestrian foot bridge. Pedestrian and bike traffic will be detoured to White Woman street, Chestnut Street, 2nd Street, and to Bridge Street. The estimated completion date is June 30, 2015. Twp. Rd. 90: The road closed September 2nd and will remain closed for 45 days for the replacement of the existing bridge structure. This closure will occur just east of Twp. Rd. 205. It is expected to reopen October 13th, weather permitting. SR 60: Crews will continue to perform a bridge replacement in Metham, between CR 24 and CR 49. The road closed July 21 and will remain closed until approximately Oct. 31, weather permitting. Detour: Northbound traffic should follow SR 36 west to SR 206 north to US 62 east, and reverse for southbound. As of 10/8 the road is open to traffic. Contractor will continue working on the bridge painting item without interfering with the traffic. FAIRFIELD COUNTY October 13 *New US 22: The road will close between Columbus Street and Memorial Drive while the contractor performs corrective work on concrete pavement. The road will be closed for 6 days. All work is weather permitting. Detour: Traveling West on US-22: Main Street to High Street to Wheeling to Memorial Drive. Traveling East on US-22: Memorial Drive to Chestnut to High Street. GUERNSEY COUNTY October 14 *New SR 265: Crews will work to replace a culvert just west of Frankfort Road as part of a larger culvert replacement project. This is the last of three replacements. The road will be closed for 10 days beginning 10/14/14. Detour: SR 265 to SR 285 to IR 70 to SR 513 to SR 265 and reverse. October 14 & October 15 *New Annual bridge inspections will occur in the City of Cambridge. Work will occur on the US 22 viaduct bridge 10/14 from 8am to 1pm and 10/15 from 8am to 3pm on the SR 209 Southgate Parkway Bridge. October 15*New SR 209: Will be closed from the Cambridge City limits to Coshocton Ave beginning October 15th for 30 days for slip repair. Detour: SR 209 to SR 83 to US 22 and reverse. Ongoing SR 209: The southbound lanes will close while Shelly and Sands Inc. work to improve lighting and signals, perform sidewalk construction, and asphalt resurfacing for the City of Cambridge. Detour: For SR209 southbound traffic traveling east on US22/40: US40 ↔ IR77 ↔ IR70 ↔ SR209. For traffic traveling west on US22/40 desiring to turn on SR209 SB: US40 ↔ SR723 ↔ IR70 ↔ SR209 I-70 and SR 265: All project work is complete except for a few final clean-up items. SR 513 and SR 761: All resurfacing is now complete. Storm sewer installation work in the Village of Quaker City is also complete. Work will continue to install raised pavement markers and place all pavement markings. US 22: Guardrail upgrades continue from I-77 to Harrison County. Traffic will be maintained with flaggers as needed. Crews will be moving to Perry County SR 188 at High Point Rd mid next week. I-70: The culvert pipe under IR 70, just west of Arrowhead Road is now complete and the other, beneath Arrowhead Road, just north of and parallel to IR 70, is currently having a new liner pipe installed. There should be little to no impact on traffic, except occasional flagging on Arrowhead Road. Scheduled completion is October 15th. KNOX COUNTY October 8 *New SR 229: The road is closed at the 1.70 mile marker in Knox County (between Dunham and Tucker Roads) for an emergency culvert replacement. The closure will begin Wednesday, October 8, 2014 at 7:30 AM and weather permitting the road will be open to traffic by Friday, October 10, 2014 at 5:00 PM. Detour: US 36 W to SR 314 N and reverse. Ongoing Pavement Resurfacing will continue on US 62 between the Licking County line and the Holmes County line. One lane of traffic will remain open and maintained with flaggers. Contractor will be placing the surface course between SR 229 and Holmes county line. Work will take place 7:30 a.m. - 6:00 p.m. Estimated completion is Oct. 31. LICKING COUNTY Ongoing TJ Evans Trail: Work will continue on constructing a new bikeway bridge in the Village of Granville. The bridge will connect TJ Evans Trail to Raccoon Valley Park. The estimated completion date for the project is May 31, 2015. Licking Trail Road: Will be closed over I-70 until mid-fall while crews repair the bridge. Two lanes traffic on I-70 will be maintained during the daytime. Detour: Christland Hill Rd to Lancer Rd to US 40 and reverse. Refugee/York Road Intersection: Work will continue on a bridge replacement and improvement project, without affecting traffic. Contractor working on the bridge abutments and piers. Road closures will occur in the spring of 2015. Estimated completion of the project is fall of 2015. CR 539 (Broadway/Granville-Newark Rd.): The project is complete except for adjustments to be made to manholes and catch basins to bring them to new pavement grades. Crews will be on site periodically to complete this work prior to the completion date Oct 31st. Daily short lane closures will be in place when crews are working. SR 37: Crews are working on paving intersections and driveways between US 40 intersection and SR 16 interchange. Contractor will be installing rumble stripes and pavement marking. During the project, one lane will be closed and traffic will be maintained with flaggers. Work will take place between 7:30 a.m. and 6:00 p.m. The target completion date for this project is October 31, 2014. CR 315(Stadden Bridge Road): A bridge replacement project between Claylick road and Colling road. Crews working on backfilling on both sides of the new structure. The road is expected to reopen at the end of October weather permitting. Traffic detoured to CR 283, CR 668, SR 16 and East Main St. MUSKINGUM COUNTY Ongoing SR 60: Just over a mile south of Duncan Falls, crews have removed rock and completed the installation of steel mesh slope protection. Construction continues on a cellular retaining wall to ensure the safety of drivers and prevent potential rock falls from entering into the roadway. Detour: Northbound traffic via SR 60 to SR 78 in McConnelsville, to SR 284 in Bristol, to SR 146 in Chandlersville, back to SR 60 in Zanesville, and reverse for southbound. NOTE: The road will remain closed longer than anticipated, and will not re-open until early October, Weather Permitting. The road opened 10/8. There is still some paving and guardrail work to be completed, but flaggers will be used to maintain 2-way traffic. Interstate 70: The eastbound State Route 93 access ramp to I-70 East remains closed. Crews will continue to work on a mine grouting project on I-70 under the existing eastbound pavement and shoulders. Access to the closed ramp will again be available in the near future, when all IR 70 traffic is shifted to the eastbound pavement. Detour: SR 93 to east US 22/40, to Airport Road, and then onto IR 70 eastbound. Detour: SR 93 to east US 22/40, to Airport Road, and then onto IR 70 eastbound. PERRY COUNTY September 29 *New SR.668: Crews will be cutting brush from SR204 to the Somerset Village limits. The road will be closed from 7:00AM until 4:00PM October 8 thru October 9 and will again be closed during the same hours October 14, thru October 16. Ongoing On 10/11 Crew will be working on resurfacing over 3 structures on SR37, SR13 and SR37 east of New Lexington. One lane of traffic will be maintained using flaggers. DISTRICT WIDE Ongoing Drivers can expect to see crews throughout the entire district marking pavement. The workers will work either as a moving operation or close one lane of a four way highway as needed. Work will start in Muskingum county and continue until May 2015 as part of a safety project to improve visibility of pavement markers to drivers. Various bridge repairs will continue this summer throughout Fairfield and Licking County. Workers are currently resurfacing bridges and any lane closures will take place at night. Guardrail repair will be taking place this summer and into April 2015. Crews may close lanes and use flaggers to maintain traffic for short periods of time as needed. Various traffic signal upgrades are being performed throughout the district. Workers are installing new poles, cables, signal heads and up-to-date controller equipment. Spot paving on various routes in various county – Contractor currently performing full depth repair as shown below: Coshocton county – SR 715 between the Knox county line and us 36. Licking county - SR 13 in Utica Knox county - October 13, 2014 the contractor will start the full depth repair on SR 229 between US 62 and the Coshocton county line. Guernsey county - SR 285 between IR 70 and SR 265 One lane of traffic will remain open and maintained with flaggers. Anticipated completion date is November 30, 2014. For additional information, please contact: Ericka Pfeifer, Public Information Officer at (740) 323-5204, or email [email protected]
© Copyright 2024