FW: Makenzie Valley Fibre Link - Water License MV2014L1-0011 : Land Use Permit
MV2014X0027 - Notice of Commencement of Work
MVFO-Notice of Commencement of Works FINAL.PDF
Notification of work T From: Cheryl Katnick [mailto:[email protected]] Sent: January 6, 2015 12:43 PM To: [email protected] Cc: Sean Craig ([email protected]) ([email protected]); Tyree Mullaney ([email protected]); Marcus Van Zyl; Vince Miller; Wesley Tse; mvfl.ltsdoccontrol Subject: Makenzie Valley Fibre Link ‐ Water License MV2014L1‐0011 : Land Use Permit MV2014X0027 ‐ Notice of Commencement of Work Bruce: As required under Water License # MV2014L1-0011 (Part E. Section 2) and Land Use Permit # MV2014X0027 (Part C,
Item 6) I am pleased to submit notification that work on the Mackenzie Valley Fibre Link project is commencing on or
shortly after January 6th.
The details of the locations, timing and field contacts can be found in the attached letter. If you have any questions with regards to this notice please do not hesitate to contact me. With warm regards, Cheryl Cheryl Katnick Manager – Permitting and GIS Ledcor Technical Services Suite 1500-1055 Hastings St W, Vancouver, BC V6E 2E9 p 604-699-2593 | c 604-862-9051 www.ledcor.com FORWARD. TOGETHER. 1
Ledcor Technical Services
1500 , 1055 West Hastings Street ,
Va ncouver, British Columbia , Canada
V6E 2E9
NOTICE OF COMMENCEMENT OF WORKS
Makenzie Valley Fibre Link
Water License MV2014L 1-0011
Land Use Permit MV2014X0027
On behalf of the Government of the Northwest Territories please accept this letter of notification that work
on the Mackenzie Valley Fibre Optic Project is commencing in the following areas:
•
•
•
•
Dempster Highway south towards Fort Good Hope (Crew #4)
Fort Good Hope south towards Norman Wells (Crew #3)
Norman Wells north to Fort Good Hope (Crew #2)
Norman Wells south to Tulita (Crew #1)
Brushing of the 6m working area, establishment of temporary work areas and equipment mobilization will
commence for all crews on or shortly after January 5th with the cable installation to follow by January 12th.
In addition to the above works preparation will start for the Horizontal Directional Drilling across the Great
Bear River. Site brushing and set up of the drill pad will start on January 5th with drilling planned to
commence on January 151h .
A second Horizontal Directional Drill is planned for the Rabbitskin River for January/February 2015. We
will provide written notice when we have a confirmed start date.
All start dates are subject to our ability to mobilise equipment via ice bridges and winter road.
If you have any questions please do not hesitate to contact the Ledcor Technical Services Site personnel
directly. Their contact details have been provided below.·
The site inspectors will be contacted immediately to coordinate an on-site kick off meeting. The Ledcor
Technical Services field contacts are listed below.
Field Operations
Manager
Vince Miller
Mobile phone: 250-257-0107
email: [email protected]
Contact for:
General Field Operations &
CREW4
Field Operations
Coordinator
Wesley Tse
Mobile phone: 778-887-1796
Email: [email protected]
Contact for:
CREWS 1, 2&3
Project Manager
Marcus van Zyl
Mobile phone: 778-877-4395
Email: [email protected]
Sincerely,
s van Zyl
Senior Project Manager
Ledcor Technical Services
Suite 1500-1055 Hastings St W, Vancouver, BC V6E 2E9
p 604-699-2974 I c 778-877-4394
www.ledcor.com
COPY TO: Sean Craig, Government of Northwest Territories, Nick Lawson, Stantec