2nd Powerplant Working Group Meeting Agenda February 23rd to 27th Hartford, Connecticut – United States This information is property of Embraer and cannot be used or reproduced without written permission. E‐Jets E2 – 2nd PWG Meeting Agenda Monday February 23rd Tuesday February 24th Wednesday February 25th Welcome 1st PWG Action Item Closure Review MTBF Development Review (RMS) Task interval Definition Review MSI 7215 Fan Drive Gear System (FDGS) MSI 72‐52 Turbine Intermediate Case (TIC) 10:00 Break Break Break 10:15 MSI 72‐22 Fan Intermediate Case (FIC) 12:00 Lunch 13:00 MSI 72‐31 Low Pressure Compressor (LPC) 14:30 Break PW1900G Engine Display (PW CTC) 8:00 14:45 17:00 18:30 Thursday February 26th MSI 73‐31 Fuel Indicating System Friday February 27th MSI 75‐26 Engine Bearing Cooling System MSI 79‐11 Oil Storage System PWG Minutes and Action Items Wrap Up Break Break MSI 79‐30 Oil Indicating System Operator/ Regulator Caucus MSI 79‐20 Oil Distribution System Operator/ Regulator Caucus Report Out Lunch Lunch Adjournment MSI 72‐54 Turbine Exhaust Case (TEC) MSI 79‐20 Oil Distribution System Break Break Break MSI 72‐51 High Pressure Turbine (HPT) MSI 73‐11 Fuel Distribution System Day 1 Minutes and Action Items Day 2 Minutes and Action Items Day 3 Minutes and Action Items Day 4 Minutes and Action Items Adjournment Adjournment Adjournment Adjournment MSI 7215 Fan Drive Gear System (FDGS) MSI 7235 High Pressure Compressor (HPC) Lunch MSI 7235 High Pressure Compressor (HPC) MSI 72‐51 High Pressure Turbine (HPT) MSI 72‐53 Low Pressure Turbine (LPT) MSI 80‐11 Engine Starting System Group Dinner hosted by PW This information is property of Embraer and cannot be used or reproduced without written permission. The hotel information will be available by January, 2015 This information is property of Embraer and cannot be used or reproduced without written permission.
© Copyright 2024