Available Agenda & Hotel Book Info

2nd Powerplant Working Group Meeting Agenda
February 23rd to 27th
Hartford, Connecticut – United States
This information is property of Embraer and cannot be used or reproduced without written permission.
E‐Jets E2 – 2nd PWG Meeting Agenda
Monday
February 23rd
Tuesday
February 24th
Wednesday
February 25th
Welcome
1st PWG Action Item Closure
Review
MTBF Development Review (RMS)
Task interval Definition Review
MSI 7215 Fan Drive Gear System (FDGS)
MSI 72‐52 Turbine Intermediate Case (TIC)
10:00
Break
Break
Break
10:15
MSI 72‐22 Fan Intermediate Case (FIC)
12:00
Lunch
13:00
MSI 72‐31 Low Pressure Compressor (LPC)
14:30
Break
PW1900G Engine Display (PW CTC)
8:00
14:45
17:00
18:30
Thursday
February 26th
MSI 73‐31 Fuel Indicating System
Friday
February 27th
MSI 75‐26 Engine Bearing Cooling System
MSI 79‐11 Oil Storage System
PWG Minutes and Action Items Wrap Up
Break
Break
MSI 79‐30 Oil Indicating System
Operator/ Regulator Caucus
MSI 79‐20 Oil Distribution System
Operator/ Regulator Caucus Report Out
Lunch
Lunch
Adjournment
MSI 72‐54 Turbine Exhaust Case (TEC)
MSI 79‐20 Oil Distribution System
Break
Break
Break
MSI 72‐51 High Pressure Turbine (HPT)
MSI 73‐11 Fuel Distribution System
Day 1 Minutes and Action Items
Day 2 Minutes and Action Items
Day 3 Minutes and Action Items
Day 4 Minutes and Action Items
Adjournment
Adjournment
Adjournment
Adjournment
MSI 7215 Fan Drive Gear System (FDGS)
MSI 7235 High Pressure Compressor (HPC)
Lunch
MSI 7235 High Pressure Compressor (HPC)
MSI 72‐51 High Pressure Turbine (HPT)
MSI 72‐53 Low Pressure Turbine (LPT)
MSI 80‐11 Engine Starting System
Group Dinner hosted by PW
This information is property of Embraer and cannot be used or reproduced without written permission.
The hotel information will be
available by January, 2015
This information is property of Embraer and cannot be used or reproduced without written permission.