Short Specification

OPUS OFFSHORE
TIGER CLASS
CONVENTIONALLY MOORED DRILLSHIP FOR
OPERATIONS IN 5,000ft (1,520m) WATER DEPTH
Opus TIGER 1 (Short Spec)
Graham Buchan, [email protected] Mob: (65) 84828626. Tel: (65) 6643 2005
OPUS OFFSHORE 460 Alexandra Rd #30-03 PSA Building, Singapore 119963. Tel: (65) 6643 2000. Fax (65) 6643 2020.
www.opusoffshore.com 5,000’ (1,520m) Water Depth Conventionally Moored Tiger Class Drillship Brochure – Rev 15 January 2015
Opus Tiger 1
Graham Buchan, [email protected] Mob: (65) 84828626. Tel: (65) 6643 2005
OPUS OFFSHORE 460 Alexandra Rd #30-03 PSA Building, Singapore 119963. Tel: (65) 6643 2000. Fax (65) 6643 2020.
www.opusoffshore.com 5,000’ (1,520m) Water Depth Conventionally Moored Tiger Class Drillship Brochure – Rev 15 January 2015
Opus Tiger 1
REGULATORY COMPLIANCE
IMO MODU 2009, SOLAS 2001, MARPOL 1973/78, ILO 92/133, all with latest amendments
CLASSIFICATION
ABS  A1 Drillship, AMS,
, BWE, HELIDK, CRC, UWILD.
ENVIRONMENTAL OPERATING LIMITS
Year of Construction, Completion 2014.
Operating Wind: 34 knots, Max. wave height: 6.5m
Sign. wave height: 3.5m, Current: 1 knot
Maximum Water Depth
1,525m (5,000ft)
Maximum Heave Compensation
Length Overall (LOA)
Breadth
Draft
Moon Pool dimensions
Length between perpendiculars
Depth to main deck
Max Displacement
Drill Floor Height above base line
PRINCIPAL PARTICULARS
STORAGE CAPACITIES
Bulk Mud (Barite + Bentonite)
Potable Water
Sack Material
Base Oil
Diesel Fuel (MDO)
Variable Load
ACCOMMODATION / OFFICE
170.3m (559ft)
32m (105ft)
10.5m (34ft)
19.6m x 11.8m (64’x39’)
8 x 42m3 (11,800ft3)
1,270m3 (7,988bbls)
10,000 sacks
470m3 (2,960 bbls)
2,550m3 (16,039bbls)
~18,000 tonnes
Maximum Drilling Depth
Bulk Cement
Drill Water
Open Pipe Deck area
Brine
Total Surface Volume Mud
(active)
Liquid Mud (reserve)
7.6m (25ft)
(operating)
10,000m (32,800ft)
151.2m (496ft)
15.6m (51ft)
45,200 tonnes
30.5m (100ft)
8 x 42m3 (11,800ft3)
3,900m3(24,500 bbl)
600m2 (6,500 ft2)
1,050m3 (6,600 bbls)
658m3 (4,145 bbls)
1,260m3 (7,900 bbls)
Max POB - 150. Well Appointed living Quarters with Ample office space for owner, client and 3rd party services.
MATERIALS HANDLING
Pedestal Mounted Deck Cranes
2 x 80 tonnes SWL c/w 15 tonnes whip line. Boom length 43m (140ft)
Main Engine Power
Power Distribution
Propulsion / Service Speed
Mooring System
5 x 2700kW (3600HP) HYUNDAI Diesel Engines driving 2,600kW alternators.
6.6kV / 690v / 480v / 220v / 110v; 60 Hz
2 x Electric Driven Steer Prop Azimuth Thrusters / Transit Speed 9.5 knots
8 point mooring system – each leg comprising - 12t Stevpris Mk6 anchor, up to
3000m (9,840’) of 3½” wire and up to 450m (1,475’) of 3” chain. Suitable for
wire/chain combination and pre-lay systems.
4 x double drum winches – Rated Pull 180t, Brake Capacity 600t
MARINE SYSTEMS
Mooring Winches
DRILLING SYSTEMS
Derrick Capacity
Drilling Rig Capability Offline
Moonpool Offline
Rotary Table
Top Drive
Marine Riser Tensioners
50’ x 45’ Bottleneck Derrick for triple range 2 tubulars / double range 3 tubulars
(90’ stands), 2,000 KIP rated. Max Set Back - 580st.
Equipped for Offline Stand building & Casing racking
Equipped for handling and testing Xmas Trees Offline.
1 x 60 ½” Rotary with hydraulic drive. 750st capacity.
1 x 750st AC top drive with Raised Back Up and Block Retract capability
8 x 200 KIP Marine Riser Tensioners and compressed air APV system
Graham Buchan, [email protected] Mob: (65) 84828626. Tel: (65) 6643 2005
OPUS OFFSHORE 460 Alexandra Rd #30-03 PSA Building, Singapore 119963. Tel: (65) 6643 2000. Fax (65) 6643 2020.
www.opusoffshore.com 5,000’ (1,520m) Water Depth Conventionally Moored Tiger Class Drillship Brochure – Rev 15 January 2015
Opus Tiger 1
Drilling Heave Compensation
1 x Crown-Mounted Drill String Heave Compensator 7.6m (25ft) Stroke, Capacity
Compensating 400 short tons / 800,000lbs. Locked 750 short tons / 1,500,000lbs
15k BOP and 21” Riser
2 x 18 ¾” Annular Preventors, 5 x 18 ¾” Ram Preventors. 15K system.
5,000’ of 21” Marine Riser in 75ft lengths c/w Choke, Kill, Booster Lines and 1 x
Rigid Conduit Hydraulic Line.
2 x 75ft Telescopic Joints with Inner Barrel 59ft stroke.
4,000HP (AC) One Gear Step-less Speed Regulating.
Cameron Multiplex
5-7/8 ” Drill String c/w Subs, Drill Collars and Heavy Weight Drill Pipes
Drawworks
BOP Control System
Drill String
DRILLING FLUID SYSTEMS
Mud Pumps and Treatment
System
MISCELLANEOUS
Helicopter Deck Capacity
Life Saving Equipment
4 x 2,400HP electric quintaplex Mud Pumps-7,500psi maximum working
pressure.
4 x MI-Swaco Linear Motion Shale Shakers.
1 x Mud Gas Separator. 1 x Vacuum Degasser. 2 x 25bbls Trip Tanks
Designed to CAP 437 for MI8, S61 and S92 Helicopters
4 x Lifeboats, 75 persons each. 1 x Fast Rescue Craft. 12 x 25 person life rafts
Graham Buchan, [email protected] Mob: (65) 84828626. Tel: (65) 6643 2005
OPUS OFFSHORE 460 Alexandra Rd #30-03 PSA Building, Singapore 119963. Tel: (65) 6643 2000. Fax (65) 6643 2020.
www.opusoffshore.com 5,000’ (1,520m) Water Depth Conventionally Moored Tiger Class Drillship Brochure – Rev 15 January 2015