OM SAI RAM CENTRAL WAREHOUSING CORPORATION (A Government of India Undertaking) Executive Engineer, Sub-Divisional Office, Regional Office, #9, Mission Road, Bangalore – 560 027 No: CWC/EE-BNG/RV Layout/2014-15/ Dt: 16.01.2015. SHORT NOTICE INVITING QUOTATION Percentage rate quotations are invited from the interested parties/contractors for the work of “Urgent repairs to Godown plastering, Strengthening of approach, Manhole chamber (BWSSB), septic tank wall and damaged AC sheets at CW, RV Layout, Yeshwanthapur, Bengaluru” The quotation forms, at free of cost can be had from the Office of the undersigned on any working day between 10am and 4pm up to 24.01.2015. The duly completed quotations, placed in sealed cover along with EMD of Rs 5,200/- (Rupees Five thousand two hundred only) in the form of Demand Draft/Pay Order, drawn in favor of the Executive Engineer, CWC, Construction Cell, Chennai, payable at Chennai, and super scribing the name of the work on the envelop, should reach the Office of the undersigned at the above address on or before 3 pm on 27.01.2015 and the same will be opened on the same day at 3.30 pm in the presence of the quotationers who are wish to be present. Quotations by courier/registered post/speed post etc. would be received only up to the closing hours, ie up to 3 pm on 27.01.2015. The Corporation reserves the right to accept or reject any quotation in part or full thereof without assigning any reasons. Detailed notice can also be downloaded from the web sites www.tenderhome.com and www.cewacor.nic.in EXECUTIVE ENGINEER TERMS AND CONDITIONS: 1. The work should be carried out as per CPWD/BIS specifications and as directed by the Engineer-in-Charge. 2. The income tax, work contract tax and education cess on tax etc. shall be deducted from the bills as per the statutory requirements. 3. The service tax or any other tax in lieu thereof by the Central Govt. from time to time on the services rendered by the Contractor to CWC shall be paid by CWC to the Contractor over and above the Schedule of rates, subject to the Contractor submitting his bills /invoices therefor in the Format prescribed under Rule 4A (1) of the service Tax rules, 1994 or other relevant laws, as the case may be. 4. The rates quoted to be exclusive of service or any other tax levied by the Central Government in lieu of Service Tax and the same shall be payable by the Corporation over and above the Schedule of rates. :2: 5. Contractor must produce the Copy of service tax registration certificate in case the total turnover for the year is more than Rs.10.00 Lakh and if the same is less than Rs. 10.00 lakh, the Contractor should furnish an affidavit duly signed by Notary. 6. The offer shall open for acceptance for 45 days from the date of opening. The Corporation, without prejudice to any right or remedy, be at liberty to forfeit, 50% of the Earnest Money, if any quotationer withdrawn his quotation before the date or make any modification in the terms and conditions of the quotation, which are not acceptable to the Corporation and to forfeit whole of the Earnest Money, if the quotationer, whose quotation accepted and fails to commence the work as specified in the NIQ (Along with changes in the scope, if any) in the prescribed time or abandons the work before its completion. Further, he/they, himself/ themselves would disqualify from participating in the future tender/quotations of the Corporation for the next 5 years. 7. The work shall be completed on or before 31.03.2015 from the date of issue of the work order. 8. Security deposit @ 10% shall be deducted from the bills and will be refunded after a defect liability period of 6 months from the date of completion of the work. 9. Quantity may vary on plus/minus side, as per the actual site condition. 10. During the course of the work, the contractor should take proper care to avoid any damages to the existing structures. In case of damages to the existing structure, the contractor at his own cost shall make the same good to the original condition. 11. The contractor is responsible for the safety of the workmen during the work in progress. 12. No water and electricity will be supplied from CWC sources. 13. No tools and plants or material shall be issued from the CWC stores. Signature and Address of the Contractor EXECUTIVE ENGINEER ISSUED TO: _________________________________ _________________________________ _________________________________ _________________________________ Signature of issuing authority
© Copyright 2024