Date, Location, Host and Scope Date: 17 – 27 March 2014 Location: Automotive Campus, Helmond, Netherlands Host: TASS International Supported by EC Organized with ERTICO Event is open for : ITS vendors, test tool vendors and OEMs Any OEM, road operator or public authorities is invited to attend as test session chair Main Scope • Interoperability Testing of CAM, DENM, GN and Security • Protocol Conformance Testing of CAM, DENM, GN and Security • C2C-CC Compliance Assessment • Compass4eD Certification Framework 1 Registration, Mailing list Register at http://webapp.etsi.org/plugtests/Register.asp?EventID=215 Registration closes 30 January 2015 Each participant needs to register (exact dates of each participant’s presence need to be communicated later on – see slide ‘Plugtest Presence’) Upon registration you will automatically • be added to plugtest mailing list [email protected] • get access to WIKI • receive a NDA which you need to sign Early registration is recommended • Only companies who have registered participants, can attend the conf 2 call and access the WIKI • Names of attending engineers can still be modified until late Conf Calls & WIKI Conference calls will be held every second week on Thursdays from 1600 – 1700 CET Starting on Thursday 15 January 2015 WIKI will be online by 15 Jan 2015 at https://services.plugtests.net/wiki/ITSCMS4/index.php/Main_Page 3 © ETSI 2014. All rights reserved Plugtest Presence ITS CMS 4 Plugtest offers an extended time frame of 9 test days • Experience from past events has shown that 2 hour conformance sessions are • • too short More test activities can be handled with a longer period More than 20 companies will attend this time Companies are free to choose how many days they want to attend • Companies must declare their exact presence schedule by early March Each participant pays the same fee regardless of the number of test days he will be present • Registered participants of week one may be replaced at no additional cost by another participant of the same company for the second week of testing. In this case, only one participation fee will be due to cover both weeks. 4 © ETSI 2014. All rights reserved Handling of C2C-CC Compliance Assessment and Compass 4D Certification Framework There are altogether 5 conformance test systems available 3 conformance test systems are dedicated for CAM, DENM, GN protocol tests • Each conformance test system can run the full ETSI test suite and the C2C-CC test suite • At the start of the test session the company needs to indicate whether it wants to run the C2C-CC test suite or the full ETSI test suite ( applicable to Compass 4D certification) 2 conformance test systems are dedicated to Security protocol tests • not applicable to C2C-CC Compliance Assessment, but nevertheless of interest to all companies It is recommended to all companies who want to run the C2CCC test suite to attend at least two 4-hour-test-sessions 5 © ETSI 2014. All rights reserved Provisional Agenda Week 1 ITS CMS 4 Agenda WEEK 1 (17 - 20 MARCH 2015) Time Tuesday 17 Wednesday 18 Thursday 19 Friday 20 08:30 Room Opening Room Opening Room Opening Room Opening 09:00 13:00 SET-UP TEST SESSION #2 TEST SESSION #4 TEST SESSION #6 LUNCH BREAK LUNCH BREAK LUNCH BREAK 13:00 14:00 6 LUNCH BREAK 14:00 18:00 TEST SESSION #1 TEST SESSION #3 TEST SESSION #5 TEST SESSION #7 18:00 19:00 WRAP UP WRAP UP WRAP UP WRAP UP © ETSI 2014. All rights reserved Saturday 21 Sunday 22 Provisional Agenda Week 2 ITS CMS 4 Agenda WEEK 2 (23 - 27 MARCH 2015) Time Monday 23 Tuesday 24 Wednesday 25 Thursday 26 Friday 27 08:30 Room Opening Room Opening Room Opening Room Opening Room Opening 09:00 11:00 SET-UP / TEST SESSION #1 TEST SESSION #5 TEST SESSION #9 break break break TEST SESSION #2 TEST SESSION #6 TEST SESSION #10 11:15 13:15 7 TEST SESSION #13 TEST SESSION #17 break break TEST SESSION #14 TEST SESSION #18 13:15 14:00 LUNCH BREAK LUNCH BREAK LUNCH BREAK LUNCH BREAK LUNCH BREAK 14:00 16:00 TEST SESSION #3 TEST SESSION #7 TEST SESSION #11 TEST SESSION #15 WRAP UP break break break break break 16:15 18:15 TEST SESSION #4 TEST SESSION #8 TEST SESSION #12 TEST SESSION #16 TEAR DOWN 18:15 19:00 WRAP UP WRAP UP WRAP UP WRAP UP Social Event © ETSI 2014. All rights reserved Saturday 28 Networking coktail Automotive Week joint outdoor demonstration Base Specifications Hyperlinks are active in presentation mode CAM EN 302 637-2 v1.3.2 DENM EN 302 637-3 v1.2.2 CDD TS 102 894-2 v1.2.1 GN EN 302 636-4-1 v1.2.1 GN6 EN 302 636-6-1 v1.2.1 BTP EN 302 636-5-1 v1.2.1 Security TS 103 097 v1.2.1 (draft v1.1.15) – available upon email request SAE J2735 SPAT/MAP and ISO19091 (Region-D) – availability announced for early January 8 © ETSI 2014. All rights reserved ASN.1 modules and Wireshark Plugins Hyperlinks are active in presentation mode The CAM, DENM ASN.1 modules applicable for the Plugtest are defined in the annexes of the appropriate base specifications, and they are downloadable from the ETSI Testing Library at https://forge.etsi.org/svn/ITS_ASN1/releases/ The SPAT, MAP ASN.1 modules are only a snapshot of the ballot base spec version, and are downloadable at https://forge.etsi.org/svn/ITS_ASN1/tags/ The CAM, DENM, GN and secured GN, SPAT, MAP binaries of the wireshark plugins are downloadable from the ETSI Testing Library at https://forge.etsi.org/svn/WIRESHARK_ITS_PLUGINS/releases/ • Updates will be communicated via the Plugtest mailing list Username: svnusers Password: svnusers 9 © ETSI 2014. All rights reserved Status Interop Test Plans The IOP test plan from Plugtest 2013 will be reused • CAM, DENM, GN as well as Security Updated of the IOP test plan according to ITS Release 1 base specs by end of January 10 © ETSI 2014. All rights reserved Status Conformance Tests Update of Conformance Test Suites to ITS Release 1 completed Development of Security conformance test suite completed Test Suite Validation (CAM, DENM, GN as well as Security) against some devices planned for January Release of Conformance Test Suites once validation completed 11 © ETSI 2014. All rights reserved
© Copyright 2024