2014 RTP July 22, 2014 ERCOT PUBLIC 5/20/2014 1 Outline Updates to 2014 RTP RTP Next steps ERCOT PUBLIC 5/20/2014 2 2014 RTP update N-1 SCOPF reliability analysis is complete N-1 secure case and list of placeholder projects are posted for review Currently working on Generator and Transformer outage (G-1+N-1 and X-1+N-1) reliability analysis ERCOT PUBLIC 5/20/2014 3 Transmission equipment upgrades based on N-1 SCOPF Upgrade needs identified by kV 69 138 345 2014 RTP Previously Identified* Line Addition 1 6 2 9 5 Line Upgrade 11 21 - 32 17 Transformer Addition - 3 4 7 7 Transformer upgrade - 5 - 5 4 Terminal equipment upgrade - 6 - 6 4 * Projects identified in previous RTP or the 2013 west Texas study which were needed in 2014 RTP ERCOT PUBLIC 5/20/2014 4 Project Description 2014 RTP N-1 Projects 1) Firewheel - Wylie Switch 138-kV line upgrade 2) Northwest Carrollton - Lake Pointe 138-kV line upgrade 3) Dickinson - League City 138-kV line upgrade 4) South Shore - Hidden Lakes 138-kV line upgrade 5) Loop Roans Prairie - King 345-kV line into Rothwood 6) Switched shunt at Stewart 7) Switched shunt at PH Robinson 8) Arena Tap - Andrew County South 138-kV line upgrade 9) Big Lake - Stiles new 138-kV line Flat Top TNP - Barilla Tap 138-kV tie 1. Tap existing Barilla - Musquiz138-kV line 10) 2. New 138-kV line from the tap to Flat Top 3. New 138/69-kV transformer at Flat Top TNP 4. Upgrade Barilla Draw Tap TNP - Flat Top TNP 345-kV new project additions 138-kV new project additions 138-kV project upgrades 69-kV projects and terminal equipment upgrade projects not shown ERCOT PUBLIC 5/20/2014 *Projects identified in previous RTP/West Texas Study 5 Project Description 2014 RTP N-1 Projects McDonald - Spraberry 138-kV line 1. Upgrade McDonald Road 138-kV switching station 2. Install McDonald Road Sw Station - Garden City East 138-kV line on new double circuit 11) structures and operate both 69 kV and 138 kV 3. Upgrade Spraberry 138-kV Switching Station 4. Install Spraberry Switching Station - Garden City East 138-kV line on new double circuit structures and operate both 69 kV and 138 kV 12) Midland East - Stanton East 138-kV line upgrade 13) (a) Mason - Sand Bend POI 138-kV line upgrade (b) Mason - Culberson 138-kV line upgrade (a) Add a new 345/138-kV autotransformer at Twin Buttes 14) (b) Upgrade San Angelo Red Creek - San Angelo Coke Street 138-kV line 15) Ferguson - Sandy Creek - Pittsburg 138-kV line upgrade 16) Dermott - Ennis Creek 138-kV line upgrade 17) Morgan Creek - Cosden 138-kV line upgrade Northeast Switchyard project with new auto at 18) Highway 46 and tie to LCRA terminating at Clear Springs 19) Hutto Switch - Round Rock Northeast - Round Rock 138-kV line upgrade ERCOT PUBLIC 5/20/2014 345-kV new project additions 138-kV new project additions 138-kV project upgrades 69-kV projects and terminal equipment upgrade projects not shown *Projects identified in previous RTP/West Texas Study 6 Project Description 2014 RTP N-1 Projects Tap the 138-kV LCRA line between Shiner and 20) Moulton and add a 69/138-kV auto at the GVEC Moulton substation 21) Zorn - York - Seguin 138-kV line upgrade 22) Lockhart auto and Lockhart - Seawillow - Luling 138-kV line upgrade 23) Marion - Cibolo second circuit addition 24) Pearsall - Paloduro 138-kV line upgrade 25) Fowlerton 345/138-kV auto addition 26) Lobo 345/138-kV auto addition and close San Diego tie between AEP and STEC 27) Cross Valley Project tap at South McAllen 28) Build 138-kV line between Escondido and West Batesville 29) Stewart Road - Weslaco Unit 138-kV line upgrade 30) Escondido - Eagle Pass 138-kV line upgrade 31) Bethel 138/69-kV autotransformer upgrade 32) Olsen 138/69-kV autotransformer upgrade 33) George West 138/69-kV auto upgrade* 34) Pleasanton 138/69-kV transformer upgrade* 345-kV new project additions 138-kV new project additions 138-kV project upgrades Stewart 138/69-kV transformer upgrade, Stewart 69-kV projects and terminal 35) Rio Rico and La Palma - Rangerville 69-kV line equipment upgrade projects not upgrades shown ERCOT PUBLIC 5/20/2014 *Projects identified in previous RTP/West Texas Study 7 Next steps Case conditioning Reliability analysis complete with all reliability issues resolved Economic case preparation Initial start cases, contingency list and list of overloads ready X-1 screening followed by X-1+N-1 analysis Economic analysis N-1 SCOPF analysis G-1 screening followed by G-1+N-1 analysis Prepare the final RTP report ERCOT PUBLIC 5/20/2014 8
© Copyright 2024