Agenda Points for Review Meeting for Replacement / up-gradation of existing SCADA/EMS system of Eastern Region on 28.01.2015 1. Status of RTU installation in Eastern Region:Status as on 11-Jan-15 Utility Total Substation Survey Completed RTU Instalation Completed RTU Interfacing Completed Remote Testing Completed WBSETCL BSPTCL DVC JSEB Sikkim 76 101 41 15 5 70 99 41 15 5 48 20 33 0 1 40 14 14 0 1 9 10 8 0 1 Total 238 230 102 69 28 2. Status of Hardware installation at various Control Centre:Milestones System Despatch ERLDC/WB Site Installation ERLDC/WB Pre SAT ERLDC/WB SAT ERLDC/WB Pre FAT other 4 CCs FAT other 4 CCs System Despatch other 4 CCs Site Installation other 4 CCs Pre SAT other 4 CCs SAT other 4 CCs Dates from MOM dated 24-06-14 Start Finish Status As on 04-11-14 Start Finish 12-11-2014 26-11-2014 01-12-2014 11-12-2014 26-11-2014 30-12-2014 12-12-2014 09-01-2015 01-01-2015 29-01-2015 13-11-2014 10-01-2015 28-01-2015 28-02-2015 10-01-2015 24-01-2015 12-01-2015 02-02-2015 05-12-2014 05-01-2015 30-01-2015 28-02-2015 31-12-2014 23-01-2015 24-01-2015 21-02-2015 28-01-2015 13-02-2015 21-02-2015 21-03-2015 16-02-2015 20-03-2015 22-03-2015 02-05-2015 30-04-2015 31-05-2015 23-03-2015 01-05-2015 30-04-2015 29-05-2015 Present Status ERLDC reached on 22-01-15. 3. Readiness of communication links for Video Conferencing System (VCS) 4. Planning of parallel operation of old as well as new SCADA system: M/s Alstom and M/s Chemtrols / M/s OSI systems have to run in parallel for at least 3 months. 1|6 5. Man power deployment at ERLDC and WB as system installation is going to take place shortly. 6. Status of FAT observation closing plan. 7. Readiness of communication links between control centre for ICCP integration. A. Agenda received from M/s BSPTCL 1. Communication package: (a) OPGW under up-gradation Scheme: (I) Priority link: POWERGRID has assured to take up the priority link by diverting OPGW from other sources. : POWERGRID may update (II) Work on the rest of the link: POWERGRID has informed that OPGW works is expected to be awarded by Dec,14/Jan,15 : POWERGRID may update (b) PLCC, DCPS, Isolation Transformer & related Outdoor equipment: POWERGRID informed that the award for this work is likely to be placed by Feb/Mar, 15. : POWERGRID may update (c) Voice communication to GSS over Fiber & PLCC: Clarification required from POWERGRID regarding coverage of voice communication to GSS over Fiber & PLCC being installed under up-gradation scheme. : POWERGRID may update 2. Control center work under up-gradation Scheme: (a) Testing and commissioning of Software, (b) Implementation of customized application, (c) Remote node for higher authorities, (d) DTS commissioning and (e) Modality for data exchange between SLDC, Patna & ERLDC or other constituents of ER. POWERGRID has informed that the above work shall be completed by Feb, 2015. : POWERGRID may update (f) Construction of trenches 2|6 (g) Making rodent proof of the tranches: M/s Chemtrols asking BSPTCL for construction/extension of cable trenches. POWERGRID has also raised these issue recently vide their latter Ref C-LDC-BSPTCL-08 dated 09-12-2014. However, it may be inferred from the special amendment of the Technical Specification clause, the work is in scope of the contractor. : POWERGRID may update 3. Deployment of Site in-charge from Contractor M/s Chemtrols : Shri Rambabu, Site In-charge form Chemtrols has left the site 09-0112014. Requires deployment of site incharge from Chemtrols Side for smooth sailing of the project. : POWERGRID may update B. Agenda Points received from M/s DVC : 1. Monitoring of Generator side active/reactive power in the upcoming SCADA system 2. Implementation of Remote control of CB: PGCIL to clear the matter whether they are going to implement this or not. 3. Howrah (DVC) – Howrah (WBSETCL) fibre link. WBSETCL to give its consent for implementation of the link 4. Installation & Commissioning of the new VPS should be done immediately. C. Agenda Points received from M/s JUSNL : 1. Associated communication link from RTUs under upgradation project: 15 RTUs are being provided under upgradation project in JSEB sector but it is not clarified whether associated communication link for speech and data communication from these RTU locations to control center are being provided or not. This is not clarified as yet. 2. Installation & Commissioning of VPS & VCS at SLDC, Ranchi control room: Installation of VPS is still pending in control room. SLDC control room at Ranchi has been stacked with erection materials of VPS causing great inconvenience to SLDC operational engineers 3|6 3. Installation of UPS & battery bank at SLDC Ranchi: UPS, battery bank etc. have been delivered at SLDC but not commissioned as yet. Commissioning of same should be ensured. D. Agenda Points received from M/s Chemtrols: 1. Non readiness of WB Back up and DVC Main: Delay in readiness of these control centre sites and hold on manufacturing of the APS equipment (UPS. ACDB and DG set) is adversely impacting the material sourcing as vendors/ suppliers are demanding price escalation due to inordinate delay. WBSETCL/DVC may confirm the Site readiness dates for WBSETCL Backup & DVC Main CCs. Also schedule for FAT of these equipment be indicated so as to tie up the same with the manufactures accordingly. 2. VCS have been installed at Ranchi (JUSNL), Maithon DVC, Howarah WBSETCL, Gangtok Sikkim and POSOCO. Only Sikkim VCS link with ERLDC was made available, the same has been tested, but the Ranchi, Howrah, Maithon could not be tested due to non-availability of the communication link. Recently DVC has confirmed the link availability. Other Constituents are requested to confirm the readiness of the VCS Communication link where VCS has already been installed but could not be tested due to non-availability of communication link. 3. VCS Installation at Patna is held up for long. BSPTCL to provide the front to facilitate the same. Also the communication link. 4. Approval of VCS SAT Procedure is required to facilitate SAT of VCS system of the sites where I&C of VCS system has been completed. 5. POSOCO/DVC/Sikkim/Jharkhand to confirm the Civil work readiness for starting installation of APS system (400 kVA DG, 125 kVA DG, UPS, ACDB & Battery). DG set foundation and availability of earthings is very critical. 4|6 6. DVC to deploy more no. of EMR teams to achieve the interfacing of already installed RTUs. As on date out of 41 RTUs, 34 have been installed but only 14 interfaced. 7. BSPTCL to deploy testing teams to facilitate the interfacing of already installed RTUs and also the testing team should identify the CT/PT and I/O points at each site. Our team is facing difficulty in interfacing in the absence of the same. 8. We are in the process of installation & commissioning of LDMS system at all the locations where RTU has been installed. The End to end test between RTU and LDMS system shall be performed after installation of LDMS. Constituents are requested to advise the concerned officials to sign this reports. 9. Communication Channel plan and readiness of the link between RTU and CC be provided by the constituents 10. Signing of SAT reports of APS and other equipment as and when the same is performed. E. Agenda points received from POWERGRID: a) BSPTCL 1. Signing of SAT reports 2. Room readiness for equipment installation at Fatwah. 3. CT/PT team 4. Trench readiness for RTU installation. 5. VCS installation b) DVC 1. Readiness of main control centre Dvc HQ 2. UPS room readiness for backup SLDC maithon c) WBSETCL 1. Readiness for backup control centre abhikshan Bhawan 5|6 d) JUSNL 1. Partitioning removal for VPS installation 2. Air conditioning of UPS room. e) General 1. Constituents help in getting clearance from local authority for UGFO installation. 2. Foundations for DG installation. ::xx:: 6|6
© Copyright 2024