Light Industrial Semi-D 9th Mile Kuching (Phase 3)

From the developers of RH Plaza
Light Industrial Semi-D 9th Mile Kuching (Phase 3)
好過定期存款
免律師費,印花稅50%
協助安排貸款
Better return than fixed deposit
Free legal fees, 50% stamp duty
Help arranging bank loan
Price from $967,000 call: 082-571 518
N
人口密集 Ready market
More than 1,000 homes in direct vicinity
Light Industrial Phase 1 all sold out
15 minutes to & from Kuching Airport
20 minutes to & from City Centre
4M
BUFF
ER ZO
1
NE
3
6
8
12
10
13
101
103
105
107
111 112
109
14
6M BUFFER ZONE
S/S
4
36
48
35
18
16
63
91
30
69
83
59
95
34
71
81
32
42
99
62
73
79
41
24
57
97
40
61
61
93
36
25
67
85
38
超旺地點 Strategically located
65
89
87
28
26
6M BUFFER ZONE
20
22
24
49
14
74
55
LD OUT!
PHASE 1 SO
13
75
77
1
53
S/S
46
48
50
51
52
Light Industrial
Phase 1 – Sold Out
3-Storey Shophouses
Phase 2 – Open for Sale
Light industrial
Phase 3 – Open for Sale
M10 Commercial
Giant Hypermarket
Padawan
Municipal Council
Kuching-S
erian Road
44
112 units of light industrial shops & 74 units of shophouses
with busy main road frontage
Easy access – traffic lights at entry/exit, wide lanes designed for
trucks & container trailers
超高回酬 rental exceeds F.D. interest
Rental for nearby 3-storey shophouse approximately $3,000
per month (2014 figure)
堅固石基 Strong rock foundation
Built on rock, not swampy land
Direct turn-in for vehicles
& heavy machinery
N
SITE PLAN & ENTRANCE &
exit traffic flow
NEW
nd
Kuching-Serian Road – kuching bou
150m long dedicated
lane for heavy vehicles
and machinery turning
NEW
From the developers of RH Plaza
Light Industrial Semi-D 9th Mile Kuching (Phase 3)
BUILDING SPECIFICATIONS
Ground Floor
RH Park
facebook.com/kuchingRHPark
Structure
Reinforced concrete/steel structure
Walls
Clay/cement brick walls
Roofing
Metal roof with insulation
Ceiling
Gypsum board
Windows
Aluminium window c/w green tinted
glass
Doors
Roller shutter and solid timber walls
Finishes - ground & first floor
Cement screed
Ceramic floor and wall tiles to toilet
Painting
Emulsion paint (internal)
Weathershield (external)
Fencing
5 ft High brick wall (front)
Chain link (remainder)
Sanitary
Concealed piping & quality sanitary
Electrical
Concealed wiring
Standard lighting and socket points
Distribution box
First Floor
019 886 9873 010 795 1626 012 889 2126 012 212 8892
(Mr Toh)
(Mdm Bong)
(Ms Wong)
SPA Approval No: P/8D/330-14 All illustrations are only artist’s impression and all measurements are approximate. Whilst reasonable care has been
taken in preparation of this brochure, the developer or agent cannot be held responsible for any inaccuracy.
(Mr Lee)
R.H. Vision (Sarawak) Sdn Bhd