ABBREVIATIONS ADB AWIS CDTA CWA DMF IIASA ICID – – – – – – – IWRM PATA PPTA RDTA RETA WFPF WFP – – – – – – – Asian Development Bank Asian Water Information System capacity development technical assistance country water assessment design and monitoring framework International Institute for Applied Systems Analysis International Commission on Irrigation and Drainage integrated water resources management policy advisory technical assistance project preparatory technical assistance research and development technical assistance regional technical assistance Water Financing Partnership Facility Water Financing Program NOTES (i) In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgment as to the legal or other status of any territory or area. (ii) In this document, "$" refers to US dollars. WFPF Steering Committee Chair Ma. Carmela D. Locsin, Director, Regional and Sustainable Development Department (RSDD) WFPF Steering Committee Members Klaus Gerhaeusser, Director General, Central and West Asia Department (CWRD) Ayumi Konishi, Director General, East Asia Department (EARD) Xianbin Yao, Director General, Pacific Department (PARD) Todd Freeland, Director General, Private Sector Operations Department (PSOD) Hun Kim, Director General, South Asia Department (SARD) James Nugent, Director General, Southeast Asia Department (SERD) Water Committee Chair and CoChairs Amy Leung, Deputy Director General, EARD Gil-Hong Kim, Senior Director, Sector Advisory Service Division, RSDD Michael Peter Barrow, Deputy Director General, PSOD Water Committee Members Akhtar Ali, Water Resources Specialist, CWRD Lu Shen, Senior Urban Development Specialist, CWRD Thomas Panella, Country Director, Afghanistan Resident Mission, CWRD Satoshi Ishii, Senior Urban Development Specialist, EARD Yoshiaki Kobayashi, Senior Water Resources Specialist, EARD Maria Theresa Villareal, Principal Portfolio Management Specialist , EARD Steven Blaik, Senior Urban Development Specialist, PARD Siddharta Shah, Senior Investment Specialist, PSOD Frederic Thomas, Senior Investment Specialist, PSOD Lazeena Rahman, Investment Specialist, PSOD Yasmin Siddiqi, Principal Water Resources Specialist, RSDD Alan Baird, Senior Water Supply and Sanitation Specialist, RSDD Jingmin Huang, Senior Urban Development Specialist, RSDD Natsuko Totsuka, Senior Water Resources Specialist, SARD Mingyuan Fan, Urban Development Specialist, SARD Vijay Padmanbhan, Senior Urban Development Specialist, SARD Rudolf Frauendorfer, Lead Urban Development Specialist, SERD Hubert Jenny, Principal Urban Development Specialist, SERD Eric Quincieu, Water Resources Specialist, SERD Raza Farrukh, Water Resources Specialist, SERD Facility Manager Gil-Hong Kim, Senior Director, Sector Advisory Service Division, RSDD Secretariat Ellen Pascua, Consultant, RSDD Francisco Roble, Consultant, RSDD Office of Cofinancing Operations (OCO) Rune Stroem, Head Sujata Gupta, Director Toshimasa Dojima, Principal Financing Partnerships Specialist Kyung Nam (Kevin) Shin, Principal Financing Partnerships Specialist Heeyoung Hong, Financing Partnerships Specialist Ilaria Caetani, Senior Financing Partnerships Specialist Rikard Elfving, Senior Financing Partnerships Specialist CONTENTS I. INTRODUCTION ............................................................................................................. 1 II. 2015 PROJECTED DEMAND FOR RESOURCES .......................................................... 1 III. 2015 AVAILABLE RESOURCES ..................................................................................... 5 IV. PROJECT SELECTION AND PRIORITIZATION ............................................................. 6 V. 2015 ACTIVITIES ............................................................................................................ 6 APPENDIX 1. 2. 3. 4. 2015 Programmed Water Lending 2015 Programmed Project Preparatory Technical Assistance 2015 Programmed Technical Assistance on Policy Advisory, Capacity Development and Research and Development List of 2015 Priority Projects/Activities Received from Regional Departments 11 14 15 17 I. INTRODUCTION 1. This annual work program presents the program of priorities and activities for the Water Financing Partnership Facility (WFPF or "Facility"), as administered by the Asian Development Bank (ADB) on behalf of its financing partners contributing to the Facility, covering the period January to December 2015. Activities are to be financed from the contributions to the Facility’s three trust funds: (i) the Multi-Donor Trust Fund, with contributions from the governments of Australia, Austria, Norway, Spain, and Switzerland; (ii) the Netherlands Trust Fund; and (iii) the Sanitation Financing Partnership Trust Fund1. 2. The operation of the Facility in 2015 and beyond will continue to be guided by the Water Operational Plan 2011-2020, and by the revised Design and Monitoring Framework (DMF) for the Facility as approved by financing partners in March 2014. II. 2015 PROJECTED DEMAND FOR RESOURCES Direct Project Support Window 3. About 70% of the Facility’s resources is intended for direct project support to allow WFPF to facilitate and influence the development of investment projects. There are two ways by which direct project support is provided: Support to investment projects through grant component of investments and technical assistance (TA) attached to loans. Support to project preparation through cofinancing of project preparation technical assistance (PPTAs) or financing of other project development activities through the direct charge modality. 4. The Water Financing Program is well on track towards meeting the investment targets for Phase 2 (2011-2020) at $2.0-$2.5 billion annually or a total of $20-$25 billion by 2020, building on the achievement under Phase 1 (2006-2010). Table 1 presents the summary of approved lending to date covering Phases 1 and 2. Table 1: 2014 Approved Water Lending (in Billion) Water Financing Program Investment Areas Water Supply, Sanitation and Wastewater Management Irrigation and Drainage Flood Management Water Resources Management, Wetlands, and Watershed Protection Hydropower Generation Total 1 Phase 1 (2006-2010) 6.56 2011 1.35 2012 0.95 1.57 0.71 0.86 0.18 0.28 0.10 0.39 0.02 0.35 1.74 11.44 0.42 2.33 0.00 1.71 Financing partner: Bill & Melinda Gates Foundation Phase 2 2013 1.38 2014 1.43 Total 5.11 0.32 0.09 0.21 0.42 0.41 0.15 1.31 0.80 0.81 0.21 2.21 0.47 2.88 1.10 9.13 2 5. The programmed water lending for 2015 currently stands at $3.9 billion. Tables 2 and 3 below summarize the breakdown by sector and by region and details are presented in Appendix 1. Assuming a 65% approval ratio2, around $2.5 billion total approved lending for 2015 can be expected, thus allowing the Water Financing Program to remain on target. 6. This $3.9 billion programmed lending provides an indication of possible requirement for additional resources from WFPF to support loan projects through grant component of investments or TA attached to loans. Table 2: 2015 Programmed Water Lending by Sector (in Billion) Water Financing Program Investment Areas Water Supply, Sanitation and Wastewater Management Irrigation and Drainage Flood Management Water Resources Management, Wetlands, and Watershed Protection Hydropower Generation Total Amount 1,393 792 144 1,124 455 3,908 Table 3: 2015 Programmed Water Lending by Region (in Billion) Region Central and West Asia East Asia Pacific South Asia Southeast Asia Total Amount 698 924 38 949 1,299 3,908 7. In terms of project preparation, a total of $ 18.1 million in PPTAs is programmed for 2015. The breakdown is summarized by sector and by region in Tables 4 and 5 below and detailed in Appendix 2. 8. The programmed PPTAs provide an indication of likely demand for additional funding for PPTAs and other project development support that can be financed through direct charge modality. Table 4: 2015 Programmed PPTA by Sector Water Financing Program Investment Areas Water Supply, Sanitation and Wastewater Management Irrigation and Drainage Flood Management Water Resources Management, Wetlands, and Watershed Protection Hydropower Generation Total 2 65% is the average approval ratio for the past 4 years (2011-2014) Amount 2,090,000 2,885,000 600,000 9,640,000 2,850,000 18,065,000 3 Table 5: 2015 Programmed PPTA by Region Region Amount 8,640,000 2,350,000 0 3,350,000 3,725,000 18,065,000 Central and West Asia East Asia Pacific South Asia Southeast Asia Total Program Quality Support Window 9. About 30% of the Facility’s resources are intended for program quality support. WFPF will continue to support reforms and capacity development through policy advisory TA (PATA), capacity development TA (CDTA), and research and development TA (RDTA). Tables 6 and 7 below summarize the 2015 programmed PATAs and CDTAs by sector and by region and detailed in Appendix 3. At the time that this Annual Work Program was being prepared, information on programmed RDTAs was not yet available. Table 6: 2015 Programmed TAs Supporting Program Quality by Sector Water Financing Program Investment Areas Water Supply, Sanitation and Wastewater Management Irrigation and Drainage Flood Management Water Resources Management, Wetlands, and Watershed Protection Hydropower Generation Total PATA CDTA RDTA Total 500,000 5,155,000 0 5,655,000 0 0 670,000 860,000 3,000,000 10,700,000 0 0 0 860,000 3,000,000 11,370,000 0 1,170,000 0 19,715,000 0 0 0 20,885,000 Table 7: 2015 Programmed TAs Supporting Program Quality by Region Region Central and West Asia East Asia Pacific South Asia Southeast Asia Regional Total PATA 0 670,000 0 500,000 0 0 1,170,000 CDTA 3,500,000 1,840,000 500,000 1,440,000 6,835,000 5,600,000 19,715,000 RDTA 0 0 0 0 0 0 0 Total 3,500,000 2,510,000 500,000 1,940,000 6,835,000 5,600,000 20,885,000 10. The programmed PATAs and CDTAs shown in Tables 6 and 7 above provide an indication of likely demand for additional resources from the Facility to push implementation of reform measures and capacity development interventions as well as further development and sharing of sector knowledge. In terms of subsector focus, Table 6 above shows water resources management getting the highest share of TA funding. This is not surprising considering the increasing focus on water security. 4 Demand for Funding from User Departments 11. The user departments provided the Facility Secretariat with their expected demand for WFPF resources in 2015 which sums up to $9.79 million as summarized in Table 8 below and detailed in Appendix 4. To manage user departments expectations, they have been kept informed by the Secretariat about the limited resources available for allocation. Their expected demand was therefore prepared with full knowledge that the capacity of the Facility to finance their applications would be limited. Table 8: 2015 Expected Demand for Funding from User Departments Regional Department Central and West Asia Department East Asia Department Pacific Department South Asia Department Southeast Asia Department Inter-Regional Total Project Support 600,000 700,000 0 3,260,000 3,050,000 350,000 7,930,000 Amount Program Quality 300,000 0 50,000 225,000 605,700 650,000 2,055,700 Total 900,000 700,000 50,000 3,485,000 3,655,700 1,000,000 9,790,700 12. This level of expected demand is not far from the last three years which were as follows: $9.5 million in 2012, $14 million in 2013, and $10 million in 2014. 13. In detailing the information on expected demand in Appendix 4, the Secretariat included the proposed source of fund to allow a quick assessment of demand versus available resources in each trust fund. The distribution of projected demand per trust fund is summarized in Table 9 below. Table 9: Distribution Per Trust Fund of 2015 Expected Demand for Funding WFPF Trust Fund Multidonor Trust Fund Netherlands Trust Fund Sanitation Financing Partnership Trust Fund Total Expected Demand 1,510,000 3,237,500 5,043,200 9,790,700 14. At the time of preparation of this Annual Work Program, a total of $443,200 was already approved for allocation to four projects, representing the first set of approvals for 2015. These approved allocations are to be financed from the Netherlands Trust Fund ($350,000) and the Sanitation Financing Partnership Trust Fund ($93,200). 15. In addition, several other proposals amounting to a little less than a million are under discussion between user departments and the Secretariat. 16. The actual allocation in 2014 was 64% of the expected demand. The allocation in 2015 is expected to be around the same level. 5 III. 2015 AVAILABLE RESOURCES 17. As of 31 December 2014, the balance available for new allocation is $12.204 million, as summarized in Table 9 based on the WFPF Secretariat tabulation. Table 9: Summary Available Resources as Tabulated by the WFPF Secretariat (in $ Million) Item Multidonor Trust Fund Australia Austria Norway Spain Switzerland Netherlands Trust Fund Sanitation Trust Fund Total a Resources Available Committed Interests Total Amount and Other Incomes 52.049 0.674 52.723 Utilization Service Projects Fees and Chargesb 48.820 2.141 Total Balance Available 50.961 1.762 24.209 8.468 4.669 9.500a 5.203 34.753 0.190 34.943 29.463 1.307 30.770 4.173 15.000 0.008 15.008 8.341 0.398 8.739 6.269 101.802 0.872 102.674 86.624 3.846 90.915 12.204 nd Net of the $0.5 million earmarked from the 2 contribution for a water expert Includes amount reserved for administration cost of TAs and Grants already approved for allocation by WFPF Steering Committee but not yet approved by ADB management b 18. The $4.173 million available under the Netherlands Trust Fund are earmarked for specific countries3, while the $6.269 million under the Sanitation Financing Partnership Trust Fund are only intended for non-sewered sanitation and septage management. For all other proposals not eligible under those two trust funds, the $1.762 million balance under the multidonor trust fund may be used. 19. Based on the available balance to date, the expected demand for resources can be supported and if the total demand will translate into approved allocations, the resources will almost be fully allocated by the end of 2015, particularly in the case of the Multidonor Trust Fund and the Netherlands Trust Fund as shown in Table 10 below. Table 10: Expected Demand Versus Available Resources WFPF Trust Fund Multidonor Trust Fund Netherlands Trust Fund Sanitation Financing Partnership Trust Fund Total 3 Available Resources 1.762 4.173 6.269 Expected Demand 1.510 3.238 5.043 Balance by end 2015 0.252 0.935 1.226 12.204 9.791 2.413 Afghanistan, Bangladesh, Indonesia, Myanmar, and Viet Nam 6 IV. PROJECT SELECTION AND PRIORITIZATION 20. The ceiling for each of the modalities as set by the Water Committee shall remain as follows: Country-specific technical assistance PPTA Regional TA Grant Component of Investment Direct charges $300,0004 $500,000 $1,000,000 $1,000,0005 $225,000 21. The allocation ratio of about 70% for project support and about 30% for program quality will continue to guide the allocation of resources in 2015 although it has been made clear to user departments as decided by the Water Committee that direct project support will be given priority. Approved allocations to date show direct project support getting a share of 71% and program quality with a share of 29%. 22. Selection and prioritization of projects will continue to be guided by the revised DMF for the Facility, the specific priorities of financing partners, and the specific priority thrusts set out in the Water Operational Plan as follows: water use efficiencies across the range of users; expanded wastewater management and reuse, including sanitation; embedded IWRM, including improved risk management to mitigate floods, droughts, and other water-related disasters; expanded knowledge and capacity development that uses technology and innovation more directly; and enhanced partnerships with the private sector. V. 2015 ACTIVITIES 23. Midterm Review of ADB’s Water Operational Plan 2011-2020. Approved in October 2011, the Water Operational Plan 2011-2020 is now into its fourth year of implementation and a mid-term review is planned around June 2015. The review will focus on assessing the progress of the Plan implementation and the progress towards the target outputs and outcomes. The mechanics for undertaking this review is to be drawn up soon. 24. External Evaluation of WFPF. An external evaluation of WFPF, along with Clean Energy Financing Partnership Facility and Urban Financing Partnership Facility was agreed with financing partners during the 2014 annual consultation meeting. The evaluation is being carried out by external consultants engaged for each facility and financed from existing contributions with ADB’s Independent Evaluation Department providing oversight support by way of review of approach and methodology and draft reports. The evaluation is expected to 4 Except in the case of countries for which TA resources have been earmarked from the Netherlands Trust Fund 5 Except under the Sanitation Financing Partnership Trust Fund where grant may exceed the $1.0 million ceiling depending on the nature and scope of the project 7 be completed in May 2015. 25. ADB-Financing Partners 8th Annual Consultation Meeting. The 8th Annual Consultation Meeting between ADB and financing partners is scheduled at the ADB Headquarters on 2-3 March 2015. As in previous consultation meetings, the Facility’s progress and achievements to date and strategic direction for 2015 and beyond will be the main focus of the discussion. In addition, there will be a session on the progress of the external review of the three financing partnership facilities referred to in para 24 above. 26. 7th World Water Forum. Scheduled on 12-17 April 2015 in Daegu and Gyeongbuk, Korea, this triennial water event will focus on the implementation of the solutions that were identified during the 6th World Water Forum in Marseilles in 2012 in line with its three primary objectives as follows: (i) moving from solutions to implementation, (ii) bridging the platform of science and technology to water issues, and (iii) contributing to the sustainable development goals (SDGs). ADB is acting as design group coordinator for the thematic session on Economics and Financing for Innovative Investments and will also be contributing to several other thematic sessions including Integrated Sanitation for All, Water for Food, Water and Cities, and Green Growth. In addition, ADB is also playing an active role in the regional process which will include presentation of initial reports on: (i) Asian Water Development Outlook 3rd edition, (ii) country water information systems in Bhutan and Mongolia, and (iii) integrated modeling for water-food-energy nexus. 27. Asian Irrigation Forum 2015. The first Asian Irrigation Forum was convened by ADB in April 2012 which prompted the International Commission on Irrigation and Drainage (ICID) to convene the very first World Irrigation Forum one year after. It has now been agreed between ADB and ICID that both Forums will be held every three years with World Irrigation Forum being convened one year after the Asian Irrigation Forum. The Asian Irrigation Forum 2015 is now planned for the week of 16-20 November 2015 at the ADB Headquarters. 28. Preparation of Asian Water Development Outlook 3rd Edition. The Asian Water Development Outlook 2nd edition released in 2013 provided the first quantitative and comprehensive view of water security in the countries of Asia and the Pacific. The third edition which is planned for release in 2016 will be an update of the second edition, through the refined indicators for the following key dimensions of water security: (i) urban water security - to develop vibrant, livable cities and towns, (ii) environmental water security – to restore healthy rivers and ecosystems, and (iii) economic water security – to support productive economies in agriculture, industry and energy. An inception workshop is scheduled on 25-27 February 2015 at ADB Headquarters. A progress report is to be presented at the 7 th World Water Forum in April 2015. 29. Asia-Pacific Water 2050 Study. This was formerly referred to in the Water Operational Plan 2011-2020 as Future of Water in Asia Study. It is intended as a forwardlooking study of the critical water issues in the Asia-Pacific Region. In 2013, this was agreed to be changed to Asia-Pacific Water 2050 Study. As an initial step, ADB is partnering with the International Institute for Applied Systems Analysis (IIASA) to undertake an integrated modeling of water-food-energy nexus issues in the region and to use the model outputs as basis for consultations with key stakeholders to refine sector scenarios. The demonstration of integrated modeling approach and the initial round of stakeholder consultations will enable more detailed analysis of selected scenarios as inputs to the Asia-Pacific Water 2050 publication. An initial report is to be presented at the 7th World Water Forum. 8 30. Establishment of Asian Water Information System. This was conceived in the Water Operational Plan 2011-2020 as a first step in putting in place an accessible body of knowledge for the water sector in Asia-Pacific region, building on the concept of “open-data” and emerging standards for data exchange. During a consultation workshop held in November 2013 with development partners involved in similar undertaking, one of the agreements reached was to start with the development of country water information system for one or two pilot countries. Bhutan and Mongolia agreed and work began in 2014. A progress report on what has been achieved in these two pilot countries will also be presented at the 7th World Water Forum. 31. Preparation of country water assessments. The new breed of country water assessments (CWAs) which is aimed at providing the foundation for better understanding of water issues at country level is at various stages of development in several countries guided by the template and guidance note prepared in 2012. The status per country is summarized in Table 10 below. Table 10: Status of Country Water Assessments Region Central and West Asia Countries Azerbaijan, Kyrgyz Republic and Tajikistan East Asia PRC Mongolia South Asia Bhutan Southeast Asia Indonesia Viet Nam Status Water resources assessments covering irrigation and flood management were completed and presented to the respective governments in 2014. Those for Kyrgyz Republic and Tajikistan have already been agreed and finalized with the respective governments while that for Azerbaijan is expected to be finalized by June 2015 Work has commenced in June 2014 which includes preparation of thematic papers guided by the five key dimensions of water security as reflected in the Asian Water Development Outlook 2 released in 2013. A dedicated TA to support its preparation has also been approved and expected to commence in April 2015. A dedicated TA to support its preparation has been approved. Work will commence also in April 2015 The on-going water resources inventory is intended to serve as a prelude to eventual CWA preparation A draft was completed in December 2014 and expected to be finalized by end-February 2015 following peer review between late January to early February. A first draft was completed in end-2013 mainly on water resources (irrigation and flood) assessment. Additional work was carried out in 2014 to cover water supply. Further work is set to commence in early 2015 focusing on water accounting. 32. Discussion is in progress to prepare CWAs for Nepal, Bangladesh, and India. In the case of Bangladesh, a dedicated TA is included in the 2015 TA program. In Nepal, the initial work may focus on water resources assessment while in India, considering its size, doing the 9 assessment at state level might be considered as a more appropriate (and approach. manageable) 33. While there is a CWA template developed which seeks to promote a comprehensive assessment encompassing all water uses, the actual assessments done to date vary from country to country depending on the priority of the countries. In the case of countries in Central and West Asia, the assessments have focused mainly on water use for irrigation and flood management. Water for domestic and energy use will be undertaken as needed and will be closely linked with the sector assessments carried out during the country partnership strategy (CPS) preparation. 34. 2015 Detailed Activities on WFPF Operation. The detailed activities in 2015 with respect to the operation of the Facility are presented in Table 11 below. The outputs and outcomes were set based on the targets indicated in the Facility’s DMF. Table 11: Detailed Activities on WFPF Operation in 2015 Facility Activity 1. Screening and evaluation of applications for funding Finance at least $4.9 million in PPTAs, grant component of investment, TAs attached to loans, and direct charges that support project development Output $2.0 M allocation – minimum of 4 PPTAs with a maximum amount of $500K per project $0.5 million allocation – minimum of 1 TA attached to loan with a maximum amount of $500K Outcome At least 6 million additional people are leveraged from WFPFsupported investment projects. $1.0 million allocation – minimum of 1 grant component of loan with an estimated amount of $1.0 million $1.4 million allocation – minimum of 6 direct charges with a maximum amount of $225K per project Finance at least $2.1 million in TAs and direct charges supporting reforms and knowledge and capacity development $1.0 million allocation – minimum of 1 regional TA with a maximum amount of $1.0 M Policy and institutional reform measures set in motion $0.6 million allocation – minimum of 2 country-specific TAs with a maximum amount of $300K per TA Improved capacity of sector organizations $0.5 million allocation – minimum of 2 direct charges with a maximum amount of $225K per project 10 Facility Activity Note: Programmed allocations are based on the 70%-30% ratio 2. Approval of eligible applications 3. Implementation and Monitoring Output Outcome Applications for TAs approved by WFPF Steering Committee within a maximum period of 5 weeks Timely approval of WFPF allocations that meet the overall project processing timetable Application for direct charges approved by the Facility Manager within 7 working days Notice of approval released to proponents within 2 working days after Steering Committee or Facility Manager approval WFPF efficiently managed and client responsiveness sustained Disbursements monitored and disbursement schedule updated regularly in coordination with project officers and Controllers Department Compliance with 70%-30% ratio between project support and program quality support tracked Closure of accounts for direct charges facilitated after release of final payments 4. Continuing knowledge sharing and information dissemination on WFPF results Progress reports and work program submitted to financing partners based on agreed timetable Updates on the Facility disseminated to user departments regularly WFPF progress disseminated and results shared WFPF marketing material updated as needed Increase in number of financing partners 11 Appendix 1 2015 PROGRAMMED WATER LENDING (Amount in $ Million) Country Project Number Project Name CENTRAL AND WEST ASIA Afghanistan 48042-001 Kyrgyz Republic 47020-01 Pakistan Pakistan Pakistan Tajikistan Tajikistan Uzbekistan Uzbekistan Uzbekistan EAST ASIA Mongolia Mongolia PRC PRC PRC PRC PRC PRC PRC PRC PRC PACIFIC Federated State Panj-Amu Basin Project Rural Water Supply and Sanitation Project 45314-002 Diamer Basha Dam 46528-002 Punjab Irrigation 47024-004 Khyber Pakhtunkhwa Water Resources Project 47181-002 Water Resources Management in Pyanj River Basin 48449-001 Water Resources Development Project 45437-002 Water Resources Management 46135-002 Djizzak Sanitation System Development Project 46135-004 Tashkent Province Water Supply Development Project Total Central and West Asia 47179-004 G48216001 46080-002 Tuul River Rehabilitation Project Khuvshgul Lake Protection Jiangxi Zhelin Lake Water Resources Integrated Utilization Project 47047-002 Shandong Groundwater Allocation and Protection Project 47048-002 Hubei Enshi Qing River Upstream Environment Rehabilitation Project 46063-002 Xinjiang Tacheng Border Cities and Counties Development 46049-002 Xinjiang Akesu Integrated Urban Development and Environment Improvement Project 47070-002 Hunan Dongjiang Lake Environmental Protection and Integrated Utilization Project 48274-002 Shanxi Urban-Rural Water Source Protection and Environmental Demonstration 48443-002 Hunan Xiangjiang River Watershed Existing Solid Waste Comprehensive Treatment 47030-002 Jiangxi Pingxiang Integrated RuralUrban Infrastructure Development Total East Asia G47003-01 Kosrae Water Supply Rehabilitation Estimated Total Loan Amount Estimated Water Component 13.00 20.00 13.00 20.00 15.00 150.00 100.00 15.00 150,00 100.00 25.00 25.00 25.00 150.00 80.00 25.00 150.00 80.00 120.00 120.00 698.00 698.00 20.00 2.50 20.00 2.50 100.00 100.00 150.00 150.00 100.00 100.00 150.00 35.00 150.00 36.30 130.00 110.00 100.00 100.00 150.00 150.00 150.00 120.00 1,202.50 923.80 2.00 2.00 12 Country of Micronesia Republic of Marshall Islands Timor Leste Vanuatu SOUTH ASIA Bangladesh Bangladesh Bhutan India India Nepal Nepal Nepal Sri Lanka Sri Lanka Sri Lanka Project Number Project Name Project Ebeye Water Supply and Sanitation Project 47364-002 Urban Services Improvement Sector Project 42391-033 Port Vila Urban Development Project (Additional Financing) Total Pacific 46346-002 34418-023 Southwest Area Integrated Water Resources Planning and Management (additional financing) 47254-002 Dhaka Urban Environmental Improvement Project (Project Design Advance) 42229-014 Improved Urban Environmental Infrastructure Project (Project Design Advance) 44429-012 MFF-Climate Adaptation Through SubBasin Development 48434-001 Vizag-Chennai Industrial Corridor Sector Development Program 34304-044 Kathmandu Valley Water Supply Improvement (Additional Financing) 47252-003 Integrated Development for Bigger Municipalities 48360-001 Hydroelectricity Financing Facility 44309-024 Trincomalee Integrated Urban Development Project (Project Design Advance) 44309-024 Trincomalee Integrated Urban Development Project 47381-001 Water Resources Development Investment Program Total South Asia SOUTHEAST ASIA Cambodia 44328-013 Indonesia 35182-043 Indonesia 43220-013 Indonesia Indonesia Myanmar 461650002 46380-008 47127-002 Myanmar 47152-002 Uplands Irrigation and Water Resources Management Sector Project Flood Management in Selected River Basins Sector Project Integrated Participatory Development and Management of Irrigation Project for Western Indonesia Phase 1 and Integrated Participatory Development and Management of Irrigation Project for Eastern Indonesia Scaling Up Hydropower Development Project IKK Water Supply Sector Project Mandalay City Urban Services Improvement Irrigation Command Area Development Estimated Total Loan Amount Estimated Water Component 3.00 3.00 27.00 27.00 5.75 5.75 37.75 37.75 50.00 50,00 5.00 3.50 3.00 3.00 210.00 157.50 400.00 120.00 70.00 70.00 2.00 0.60 80.00 9.00 80.00 9.00 3.00 3.00 453.00 453.00 1,285.00 949.60 35.00 35.00 108.70 108.70 100.00 100.00 360.00 360.00 50.00 80.00 50.00 80.00 75.00 75.00 13 Country Philippines Regional Viet Nam Viet Nam Project Number Project Name Project Metro Manila Water and Sanitation Development Project 46293-002 Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth 47274-002 Secondary Cities Development Program (Green Cities) 47276-001 Green Cities Project (Secondary Cities Development Project II) Total Southeast Asia 2015 TOTAL PROGRAMMED LENDING 48173-003 Estimated Total Loan Amount Estimated Water Component 100.00 100.00 192.00 130.00 170.00 140.00 120.00 120.00 1,390.70 4,613.95 1,298.70 3,907.85 14 Appendix 2 2015 PROGRAMMED PPTAs (Amount in $’000) Country Project Name CENTRAL AND WEST ASIA Afghanistan Preparing the Helmand River Basin Project Afghanistan Kabul River Basin and Recharge Studies (Formerly Groundwater Recharging Project) Total Central and West Asia EAST ASIA PRC Heilongjiang Jiamusi Irrigation and Drainage System Modernization PRC Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement PRC Hunan Xiangjiang River Watershed Existing Solid Waste Comprehensive Treatment PRC Guizhou High Efficiency Water Utilization Demonstration in Rocky Desertification Area PRC Xinjiang Changji Integrated Urban-Rural Infrastructure Demonstration Total East Asia SOUTH ASIA Bangladesh Preparing Urban Environment in City Corporations Project Bangladesh Dhaka Urban Environmental Improvement Bangladesh Second Irrigation Management Improvement Project Bhutan South Asia Subregional Economic Cooperation Green Energy Project India Agribusiness Infrastructure Development Project II India National Water Use Efficiency Project Nepal Rural Infrastructure Development Total South Asia SOUTHEAST ASIA Cambodia Provincial Cities Water Supply Sector Project Indonesia Sumatra Pump Storage Hydro Power Project Lao Northern Rural Infrastructure Development Project Total Southeast Asia TOTAL PROGRAMMED PPTAs Total TA Amount Amount (Water Component) 800.00 7,840.00 800.00 7,840.00 8,640.00 8,640.00 600.00 600.00 600.00 600.00 500.00 500.00 500.00 500.00 500.00 150.00 2,700.00 2,350.00 400.00 280.00 800.00 700.00 1,500.00 560.00 700.00 450.00 1,450.00 1,000.00 500.00 6,350.00 210.00 1,000.00 150.00 3,350.00 1,100.00 2,400.00 225.00 3,725.00 21,415.00 1,100.00 2,400.00 225.00 3,725.00 18,065.00 15 Appendix 3 2015 PROGRAMMED CDTAs and PATAs (Amount in $’000) Country TA Title CENTRAL AND WEST ASIA Regional CDTA: Mainstreaming Climate Change in Central and West Asia Total Central and West Asia EAST ASIA MON CDTA: Urban Services Capacity Development MON CDTA: Tuul River Improvement Project PRC PATA: Gross Ecosystem Production Accounting for Eco-compensation PRC PATA: Research on the Construction Strategic Planning of Resources-based Regional Ecological Civilization (green transformation) and Model Demonstration PRC PATA: Han River Source of Drinking Water Ecological Environment Protection Strategy Research in the Hubei Xiangyang City Central Area Total East Asia PACIFIC Palau CDTA: Water and Sanitation Sector Management Total Pacific SOUTH ASIA India CDTA: Capacity Building for Sub-basin Development India PATA: Utility Benchmarking Nepal CDTA: Institutional Strengthening of Water Operators Sri Lanka CDTA: Capacity Development of EA & IA of Integrated Urban Dev't Project (earlier Capacity Development for Environmentally Sustainable Urban Development Project) Total South Asia SOUTHEAST ASIA Cambodia CDTA: Mainstreaming Climate Resilience into Development Planning (Supplementary) Cambodia CDTA: Collaborative Management for Watershed and Ecoystem Indonesia CDTA: Strengthening Water Enterprise (PDAM's) Technical and Financial Performance Indonesia CDTA: Enhanced Water Resources and Food Security Infrastructure and Investment Program Myanmar CDTA: Support for Capacity Development to Implement Projects Philippines CDTA: Local Government Water and Sanitation Sector Project Regional CDTA: Greater Mekong Subregion: Cross Border Economic Zones Development Total TA Amount Amount (Water Component) 5,000.00 3,500.00 5,000.00 3,500.00 1,200.00 1,000.00 500.00 840.00 1,000.00 150.00 400.00 120.00 400.00 400.00 3,500.00 2,510.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 700.00 500.00 700.00 800.00 240.00 2,500.00 1,940.00 3,000.00 900.00 1,200.00 1,200.00 1,300.00 1,300.00 2,000.00 1,000.00 1,000.00 500.00 225.00 225.00 1,000.00 300.00 16 Country Viet Nam Viet Nam REGIONAL Regional TA Title CDTA: Sustainable Urban Development in Viet Nam: Green Cities CDTA: Supporting Agriculture Restructuring in Viet Nam (Verify if with Water) Total Southeast Asia CDTA: Embedding Integrated Water Resources Management in River Basins Regional CDTA: Promoting Urban Climate Change Resilience in Selected Asian Cities Regional CDTA” Applying Space-based Technology and Information and Communication Technology to Strengthen Disaster Resilience Total Regional TOTAL PROGRAMMED CDTAs, PATAs, RDTAs Total TA Amount 3,500.00 Amount (Water Component) 1,050.00 1,200.00 360.00 14,425.00 6,835.00 2,000.00 2,000.00 15,000.00 3,000.00 2,000.00 600.00 19,000.00 44,925.00 5,600.00 20,885.00 17 Appendix 4 LIST OF 2015 PRIORITY PROJECTS/ACTIVITIES RECEIVED FROM USER DEPARTMENTS FOR WFPF FUNDING Regional Department Central and West Asia Country Project/Activity Modality Afghanistan Support to water resources management – investments and reforms Support to implementation of rural water supply and sanitation projects TBD 850,000 Direct Charge 50,000 Kyrgyz Republic East Asia Mongolia PRC Total Central and West Asia Preparing additional financing for Southeast Gobi Urban and Border Towns Development Project Jiangxi Pingxiang Integrated Urban– Rural Infrastructure Development PRC PRC PRC Pacific Pacific Countries South Asia Bangladesh Bangladesh Bangladesh Bangladesh Bangladesh Bangladesh India Hunan Xianjian River Watershed Existing Solid Waste Comprehensive Treatment Project Xinjiang Changji Integrated Urban– Rural Infrastructure Demonstration Gansu Baiyin Urban Development II Project Total East Asia Pacific Water Conference and Expo Total Pacific Implementing PPP Start Up Program under the Irrigation Management Improvement Project Social Analysis of Water Management in the Ganges Kobadak and Teesta Barrage Irrigation Projects Assisting Resettlement Plan Preparation and Initial Implementation of Flood and Water Resources subprojects under Southwest project, and Flood and Riverbank erosion MFF Project-1 Preparing a Summary Report on the Progress and Outputs of Existing and Planned Water Resources Projects and Programs Country Water Assessment Urban Environmental Improvement Project Support to the implementation of national sanitation program Direct Charge Amount 900,000 150,000 Source of Fund Netherlands Trust Fund Multidonor Trust Fund Multidonor Trust Fund Grant Component of Loan/TA Attached to Loan PPTA 170,000 Multidonor Trust Fund 150,000 Multidonor Trust Fund PPTA 150,000 PPTA 80,000 Multidonor Trust Fund Multidonor Trust Fund Direct Charge Direct Charge 700,000 50,000 50,000 125,000 Multidonor Trust Fund Netherlands Trust Fund Direct Charge 225,000 Netherlands Trust Fund Direct Charge 80,000 Netherlands Trust Fund Direct Charge 120,000 Netherlands Trust Fund Direct Charge PPTA 225,000 CDTA 2,000,000 Netherlands Trust Fund Netherlands Trust Fund Sanitation Trust Fund 275,000 18 Regional Department Country India India Sri Lanka Southeast Asia Indonesia Indonesia Indonesia Indonesia Myanmar Myanmar Philippines Viet Nam Viet Nam Viet Nam Viet Nam InterRegional Various Countries Various Countries Project/Activity (Swachch Bharat Mission) Support to Swachch Bharat Misssion – establishment of project management Assessing the Implementation Status of Riverbank and Flood Embankment Structures under L2684-IND: Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program Project 1 Supporting desalination transaction advisory Total South Asia Scoping Water Security Program Support to preparation of basin and rural water investments Support to the upgrading of the asset management system for irrigated agriculture Support to the development of sanitation code for Massakar Support to feasibility studies for the development of irrigation project in the dry zone Support for sector assessment and IWRM Preparation of sanitation code for the City Government of Manila Scoping sanitation and septage management component for the proposed sanitation and wastewater multitranche financing facility (MFF) Implementing innovative sanitation and septage management options under the sanitation and wastewater management MFF Support to policy dialogue on water/irrigation reforms Scoping water resources management projects Total Southeast Asia Topping up RETA 8060 (Promoting Innovations in Wastewater Management in Asia and the Pacific) Replenishment of RETA 6498 (Knowledge and Innovation Support for ADB’s Water Financing Program) Total Inter-Regional Total CDTA = Capacity Development TA, PPTA = Project Preparation TA Modality Amount Source of Fund Direct Charge 225,000 Sanitation Trust Fund Direct Charge 10,000 Multidonor Trust Fund Direct Charge 200,000 Multidonor Trust Fund Direct Charge Direct Charge Direct Charge Direct Charge Direct Charge 3,485,000 150,000 225,000 62,500 47,000 225,000 Netherlands Trust Fund Netherlands Trust Fund Netherlands Trust Fund Sanitation Trust Fund Netherlands Trust Fund Direct Charge Direct Charge Direct Charge 225,000 Grant Component of Investment Direct Charge Direct Charge 2,000,000 Sanitation Trust Fund 225,000 Netherlands Trust Fund Netherlands Trust Fund 46,200 225,000 225,000 TA 3,655,700 500,000 TA 500,000 1,000,000 9,790,700 Netherlands Trust Fund Sanitation Trust Fund Sanitation Trust Fund Sanitation Trust Fund Multidonor Trust Fund
© Copyright 2024