Information flyer Gas-insulated switchgear Factory Acceptance Test and Remote Factory Acceptance Test Factory Acceptance Test (FAT) Bringing you the best customer experience at our factory 1. Contact customer The project manager contacts the customer with FAT information and clarifies any questions regarding the procedure. 14. Safe trip home ABB wishes the customer a safe trip home. 2. Fix date for FAT Decide on a date for FAT according to production schedule. Choose one of the FAT programs and agree on general program such as factory tour, meetings etc. 13. Discussion of next steps After the FAT is completed, topics regarding shipping, installation, service or others can be discussed. 3. Make travel arrangements The project manager provides the customer with an invitation letter for visa application (where necessary). Travel information such as hotel recommendations is provided. 12. Signing of protocols The final step of the FAT process is the elaboration of the testing protocol which capture all test results of the FAT. Signed by the project manager and the customer, the protocols confirm a successful FAT. 4. Welcome at ABB Pick-up usually takes place at ABB lobby. However, individual pick-up locations such as from the hotel/airport can be arranged together with the project manager. 11. Control panel test The functional test on the switching devices will be performed via the local cubicle control (LCC). Interlocking, blockings, alarms and events present in the local cubicle panel (LCP) are reviewed. 5. Go to customer lounge The complete FAT takes place in our dedicated customer lounge through customized tools which stream all tests live from the testing areas. 10. High-voltage and partial discharge test One of the most important tests in GIS. High-voltage test and partial discharge test are performed together. 6. Introduction to the FAT An introduction about the FAT program with detailed explanations about the testing procedure will be given, and provides possibility to clarify open questions. 9. Mechanical operation test Disconectors, earthing switches and fast acting earthing switches are tested in the first sequence. Next, tests on switching operations of the circuit-breaker, operating times and travel curves are conducted. 7. Go to testing areas Customer views his product in its actual testing environment. 8. Factory tour (optional) The customer is welcomed to tour our stateof-the-art manufacturing facility. 2 Factory Acceptance Test and Remote Factory Acceptance Test | ABB Remote Factory Acceptance Test (RFAT) If you can’t come to us, we‘ll bring bring the FAT to you 1. Contact customer The project manager contacts the customer with FAT information and clarifies any questions regarding the procedure. 12. Discussion of next steps After the RFAT is completed, topics regarding shipping, installation, service or others can be discussed. 2. Fix date for RFAT Decide on a date for RFAT according to production schedule. 11. Sending of protocols The final step of the RFAT process is the elaboration of the testing protocol wich captures all test results of the RFAT. The testing protocols will be sent by e-mail to the customer. 3. Testing of connectivity The project manager provides the customer with an invitation e-mail including instructions to test the internet speed wich is essential for the success of the RFAT. 10. Control panel test The functional test on the switching devices will be performed via the local cubicle control (LCC). Interlocking, blockings, alarms and events present in the local cubicle panel (LCP) are reviewed. 4. Dial-in Project manager, test engineer and customer dial-in to the telephone conference before the RFAT starts. This ensures a stable audio connection. 9. High-voltage and partial discharge test One of the most important tests in GIS. High-voltage test and partial discharge test are performed together. 5. Login Everyone log into the tool. At the start, the customer will have time to explore and familiarize with all functionalities of the tool. 8. Mechanical operation test Disconectors, earthing switches and fast acting earthing switches are tested in the first sequence. Next, tests on switching operations of the circuit-breaker, operating times and travel curves are conducted. 6. Introduction to the RFAT An introduction about the RFAT program with detailed explanations about the testing procedure will be given, and provides possibility to clarify open questions. 7. Connect to testing areas The complete RFAT can be viewed online through our custom-made tool which will stream all tests live from the testing areas. ABB | Factory Acceptance Test and Remote Factory Acceptance Test 3 ABB Switzerland Ltd High Voltage Products Brown-Boveri-Strasse 5 CH-8050 Zurich / Switzerland Phone: +41 844 845 845 ABB AG High Voltage Products Brown-Boveri-Strasse 30 D-63457 Hanau / Germany Phone: +49 6181 50 90 ABB High Voltage Switchgear (Xiamen) Co., Ltd. Guanghui Building, 6# Chuangxin 3rd Road Torch Hi-Tech Development Zone, Xiamen 361006 Fujan, P.R.China Phone: +86 592 5710330 ABB India Ltd. Plot No. 25 & 26 (Alindra) Savli GIDC Industrial Estate, Taluka Savli 391775 Vadodara / India Phone: +91 26 67676609 ABB Electrical Industries Co. Ltd. Plot no. 005VS00040, Street No. 39 31433 Dammam / Saudi Arabia Phone: +966 920010301 www.abb.com/highvoltage Note: We reserve the right to make technical changes or modify the contents of this document without prior notice. With regard to purchase orders, the agreed particulars shall prevail. ABB Ltd does not accept any responsibility whatsoever for potential errors or possible lack of information in this document. We reserve all rights in this document and in the subject matter and illustrations contained therein. Any reproduction, disclosure to third parties or utilization of its content – in whole or parts – is forbidden without prior written consent of ABB Ltd. Copyright© 2015 ABB All rights reserved © Copyright ABB. 1HC0108222 E01 / AA15 Contact us
© Copyright 2024