Our Company & Team Our Future As joint Director David and I are very proud to introduce KD Group. With well over a decade of experience in all aspects of Mechanical & Electrical services, we carry a lot of credentials wherever we go. As a family business together with a professional but friendly approach, we believe we have the right blend to offer to all our Clients. This brochure introduces our Company & Team and gives a small sample of what we have achieved to date. We want to accomplish a great deal more, it is our ambition and vision that we will reach our future objectives and goals and be a leading force throughout this Industry Our Company & Team History KD Group was established in 2003 by David Staunton and Kieran Staunton. Our head office is based in Castlebar, Co.Mayo. The business has steadily expanded over the years which led to us opening an Office in 2011 in Fonthill Business Park, Dublin. We are currently operating on a variety of projects providing high standards of Mechanical Installations. The company’s success is based upon its reputation for building many exclusive developments over the years. We are a rapidly growing company dedicated in exceeding client’s expectations. This has resulted in an impressive client list in the construction services sector. We can guarantee completing projects efficiently, on time and within budget. Over the years the company has developed a highly skilled and professional workforce delivering the highest of standards unparalleled by competitors. Our professional team is strong and loyal, working with other professional teams to ensure all areas have been covered in relation to the projects. They also ensure that we are aware of all direct and indirect costs and any problems that may occur. We have a high priority to Quality and Safety and have incorporated all the latest technologies into our company so that KD can guarantee project delivery again and again. Our People To KD Group our most important asset is our people. We are committed to the continuous training of all our employees. Our training is focused on providing superior customer service and satisfaction. Every member of our team is supported through internal and external training. Our Company & Team Our Services Our Technical Capabilities KD Group is committed to providing the best service and covers all aspects of Mechanical & Electrical Engineering. Our Mechanical Services include: M&E HVAC Plumbing Natural gas & LPG gas installation Gas Proving & Gas Detection systems CHP Installations Air Conditioning systems Air handling systems DX Systems Heat recovery Medical & Process Gases Compressed Air Fire Fighting & Fire suppression Sprinkler systems BMS & Controls Leak detection Dust extraction Fume extraction Chemical waste Installation Water purification systems Water Treatment Boiler Maintenance Close Control Environment systems Solar tubes / panels Biomass heating systems District Heating All forms of Green Energy KD Group Online All KD Group Employees have access to the KD Server where all documentation is stored. eg Projects, Drawings, Specifications, ISO Management, H&S etc. The Server is located in the main Office in Mayo and all site offices can connect to this server via their Laptops using their Internet connection supplied. Each KD Employee has their own Individual username and password and can store their files from site on the server in their own individual folders. Common Data Environment –KD Group has experience using a "Common Data Environment" while working on Portlaoise Hospital last year KD Mechanical used the HSE DMS (Document Management System) throughout the entire project. KD Group has also other methods of Storing and sending Files via Dropbox & Google Drive. These are mainly used for large document sizes that are too large to send via email. Our Company & Team Our Aims & Objectives KD Group aim to maintain accident & Incidents to a minimum on all sites throughout the Country. Give KD Group the distinction that it deserves by seeking improvement at the 2015 NISO Occupational Safety Awards from our commended award at NISO Annual Occupational Awards 2014. To ensure that the company Safety Statement/Procedures remains a working document and meets the needs of the company and legislative requirements. Our Policies Health & Safety The Company is Registered and certified by QAS International for OHSAS 18001. Adherence to Health & Safety Legislation is paramount to our business, our staff, and our client, and we continually strive to improve and exceed standards. Quality The company is registered and certified by QAS International for ISO9001, and is committed to maintaining the highest quality management systems to ensure a consistently high quality product, service and delivery. Environment The Company is registered and certified by QAS International for ISO14001. AS our company we are committed to conserve and protect our environment our employees Our Company & Team Our Achievments Our Accreditation Every project undertaken by KD Group comes with a number of assurances. It will be completed to the highest international quality standards; iet will be fully compliant with all safety, health and environmental legislation. These assurances are back up with International certification. NISO Awards KD Group attended a special Presentation Ceremony and Gala Dinner in the Mullingar Park Hotel, Co Westmeath on the 3rd of October 2015 to pick up their Prestigious Award from the NISO / NISG Twenty Third Annual Occupational Safety Awards. The award is evidence of the high quality of Safety Management in our Company. Certification Approval KD Group. has been certified by Certification Europe to International standard ISO 90001 Quality, ISO 14001 Environmental & OHSAS 18001 Occupational, Health & Safety Management Certificates Please visit Certification Europe’s website for further information on the benefits of; ISO 90001 Quality, IS0 14001 Environmental & OHSAS 18001 Occupational, Health & Safety Management Certificates Projects Our Clients & Consulting Engineers Clients KD Group liaises with some of the most successful engineers in Ireland and throughout Europe to provide an exceptional service to clients. 1. University of Ireland Galway 2. University of Limerick 3. Galway Mayo Institute of Technology 4. Limerick Institute of Technology 5. Sligo Institute of Technology 6. Sisters of Mercy Athlone 7. Baxter Healthcare 8. McWilliam Park Hotel 9. The Rehab Group 10. Croi foundation 11. Dunnes stores 12. Health service executives 13. Office of Public Works 14. Pavement Maintenance services 15. National Rehabilitation Hospital 16. Department of Education & Science 17. Vocational Education Committee 18. Education & Training Board Galway 19. Leopardstown Racecourse 20. Poppel Development 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. Peoples Park IRD Kiltimagh IMAN Casing St Muirdeach’s College Roscommon County Council Mayo County Council Galway County Council Meath County Council Longford County Council Tipperary County Council Donegal County Council Westport Town Council Horse Racing Ireland BMW An Post FAS Western Fisheries Novas Initiatatives Simmons Hospital Udaras Na Gaeltachta Galway Consulting Engineers 1. Delap & Waller Consulting Engineer 2. OLM Consultancy 3. Engineering Environment 4. Callaghan Engineering 5. Michael J.Walsh Consulting Engineers 6. Kyne & Clyne Consulting Engineers 7. EDC – Engineering Design Consultants 8. JVT Consulting Engineers 9. OVERY Consulting Engineers 10. Noel Lawlor Consulting Engineers 11. 12. 13. 14. 15. 16. 17. 18. 19. Homan O’Brien Ethos Engineering ARUP Consulting Engineers Patrick McCaul Environmental Consulting Engineers Varming Consultant Engineers CB Engineering HOH Partnership WYG Engineering Axiseng Engineering Our Projects Education 3rd Level NUIG – Hardiman Library Description This project was the extension of the library which is a protected structure and was carried out in a Live University Campus. We carried out the full mechanical installation on this project which included the heat centre, air handling units, chillers, extract fans, close control units, fan coil units, AC units, natural gas installation, trench heating, domestic water installation, ventilation installation, soils & wastes, and fitting sanitary ware. We also so connected new services into the existing services in the building. NUIG – Life Course Building Description: The project scope includes the provision of the complete mechanical services installation to the New Life Course Institute Facility building for NUIGalway, Upper Newcastle road, Corrib Village, Galway. The work comprises of the installation of heating, chilled water, ventilation, water services, BMS controls, soils and wastes and gas services installations University Limerick – Tierney Building Description: The project comprised of the construction of a new 5 Storey office Building with two Science Laboratories, the services included, Heat Centre, LPHW Heating Installation, Domestic Water Installation, Air Conditioning, Ventilation, Soils & Wastes and Sanitary ware installation. Mechanical Services in the two laboratories include installation of Fume cupboards, Bio Safety Cabinets, Cold Rooms and Lab Gases, water services and fume extract ventilation. Our Projects Education Schools Ballymakenna PPS Description The project comprises the development of a 1000 pupil secondary school. The works Comprises of; Foul Drainage Internal Water services Gas supply & Heat Production Oil supply & Heat Production Heating system Pipework Ventilation Controls. Borrisokane Community College Decription: This project was the extension of the school. We carried the full Mechanical Installation on this project which included natural gas installation, heat centre and space heating, domestic water installation, ventilation, soils & wastes, and the fitting of sanitary ware Carrickpherish Campus Development Description The scope of works include Fire Stopping of Services Installation of Shared Heating Plant Above ground soils & wastes installation Domestic Water Services Gas Services Space heating Installation Protective Services Electrical Wiring Associated with Mechanical Services Controls Installation Our Projects Commercial KPMG- Dockgate Galway Description The project entails the partial fit-out of a section of the Second Floor of the Dockgate Building in Dock Road, Galway The mechanical services contract includes for the strip-out of the existing Daikin VRV air conditioning system. This will involve de gasing and allowing for the safe disposal of same. The internal and external units and any controls are to be stripped out in a careful manner and presented to the Landlord for their possible reuse. The system in the remainder of the 2nd floor is to be left intact and operational. The intent is to reuse where possible any of the existing services Westport Town Hall Description The project consists of concert hall, exhibition space, landlord office area, plantrooms, roof top serviced area, control and tech rooms, meeting rooms, stores. The mechanical services consists of the supply, installation and commissioning of the following: External Mains Water Installation, Gas Pipework Installation, Boiler House Installation, Gas Water Heater & Flue Installation, LTHW Installation Pressurisation Unit Installation, Radiator heating Installation, Gas Detection Installation, Heat Recovery Ventilation System Installation, Concert Hall Ventilation System Installation, Air Conditioning Installation An Post DSU Castlebar Description New sorting office for An Post. Works included Heat Centre with Gas boilers. Space Heating including installing Biddle Unit Heaters. Ventilation including installing Heat Recovery. Domestic water, soils and wastes and fitting sanitary ware. Our Projects Health Care Portlaoise Midlands Regional Hospital Description The project was carried out on a live Hospital while maintaining existing operations. The Mechanical Services on this project were, Removal of existing services, Installation of Ahu's Ventilation & Air Conditioning, Heating Centre (Boiler house), Medical Gasses, Soils and waste, Water Services, Space Heating, Controls installation including BMS upgrade, Fire Extinguishers. St James Hospital Description This Project consists of the Fit out of a Hospital wing of a live Hospital. The Mechanical consisted of Medical Gases installation, Radiant services Domestic Water services and Ventilation, all tying into the existing services. Croi House Galway Description This project was the construction a new research facility. We carried out the full Mechanical Installation on the project which included the heat centre, space heating, domestic water, ventilation, heat recovery units and air conditioning including gas fired heat pumps. Our Projects M&E by KD Group Bord Gais – Chiller Replacement Description The project involves the replacement of an existing air cooled water chiller located on the roof of Bord Gais building at Foley Street, Dublin. The key areas of work are as follows: Removal of the existing chiller from site and safe disposal of same, Installation of permanent chiller including all necessary pipework and electrical modifications, Installation of new primary pumps and pressurisation unit, Testing & Commissioning. Ennis Community College Description New space heating system to include radiators and two pipe heating distribution system · New gas fired boilers and flue header. · New heating controls including frost protection, weather compensation and zone controls · Replacement boiler house control panel and all associated electrical works · Removal and disposal of all redundant services · New gas installation and gas detection services. · Testing & commissioning. · All associated builder’s works and making good and redecoration to match existing building Kells Swimming Pool Description This project was the installation of Energy Improvement measures in the existing Leisure Centre and Swimming Pool. KD Mechanical were the main Contractors and PSCS for this project The Mechanical Installation Included new gas boilers, new gas water heaters and new gas fired cabinet heater, KD converted everything to natural gas. KD also installed solar panels new BMS controls new ventilation ducting and replaced the extract fans Electrical work included new lighting installation to the pool area. Projects Hotel & Leisure Leopardstown Racecourse Hospitality Description Internal fit-out of hospitality and support areas and ancillary works including replacement glazing, external balcony structure and asbestos in Grandstand of c.1750M2 Mechanical Installation comprises of Domestic Water services Installation Ventilation Services Installation LPHW Heating Installation Gas Services Installation Soils & Wastes Building Management System Bunratty Castle Hotel Decription This included the upgrading of two Kitchens. The Mechanical Services included; Strip out of old services Ventilation Installation Domestic Water Gas Services Roscommon Leisure Centre Description This project was the installation of Energy Improvement measures in the existing Leisure Centre and swimming pool. KD Mechanical were the Main Contractor and PSCS for this project. The Mechanical Installation included new rain water harvesting system with 75,000L over ground tank and connecting pipework; Installation of solar panels on pool roof and connection to 800L pre-heat tank. Connecting pipework into existing header in boiler house for connection to Energy Cabin. Projects MEP BIM/REVIT BIM/ REVIT MEP Projects BIM Projects KD Group implementing BIM KD Group has seen an increase in demand for BIM to be implemented on projects by our clients and we have also realised the benefits of BIM. These benefits include reducing the cost, time and uncertainty of design and construction. KD Group has implemented BIM and Revit MEP into the company for all future projects. We employed the services of Amicus Technology to train our Contracts Managers and Project Managers to use BIM and Revit MEP. Our company in the last year has seen the great benefits from this software and our Senior Coordinator Stephen Rogan has shown these benefits in the YouTube link above which is of the University of Cork, The Assert Centre coordinated into a BIM Model Video. Our Managers will be able to meet each week with other parties on the project in order to watch a three dimensional visualisation of all of the site works planned for the following week and can discuss coordination, collaboration and safety management informed by this visualisation of the next week’s activities. Examples of Co-ordinated Projects in BIM/REVIT MEP KD Group Head Office Head Office, Moneen, Castlebar Our Details Head Office | Unit 12 C, 1st Floor, N5 Business Park, Moneen, Castlebar, Co Mayo Email | [email protected] Phone | +353 (0) 9490 30542 Dublin Office | Office 2, Unit 6 – Trinity Court, Fonthill Business Park, Co Dublin Email | [email protected] Phone | +353 1 6215705
© Copyright 2024