S P E C I F I C AT I O N S P E C I F I C AT I O N OCCUPANCY (based on NIA) Occupation Density Means of escape: Levels 1-2 - 1 person per 10 sq m Levels 3-6 – 1 person per 8 sq m Internal climate: 1 person per 10 sq m (cooling and fresh air) Lift provision: Levels 1-2 - 1 person per 10 sq m Levels 3-6 – 1 person per 8 sq m Sanitary provision: 1 person per 10 toilet ratio. 120% separate sex facilities to BS6465-1 2006 + A1 2009 PLANNING MODULE Ceiling grid set out on a 1500mm grid STRUCTURAL GRID The office floor plate has a structural grid with perimeter column spacing varies between 3200mm and 7300mm. There are 70 internal columns located in the centre of the floor plate resulting in approximate internal clear spans varying between 3200mm and 7300mm. FLOOR LOADINGS Office floors generally: 3.8 kN/m 2 12th & 13th floors: 2.5 kN/m 2 (1.0 + 0.85 kN/m 2 for partitions, raised floors and ceiling services) Lift lobby & toilet areas: 3.8 kN/m 2 Plant rooms: 7.5 kN/m 2 Areas of roof outside plant areas: 0.75 kN/m 2 Car park and basement: 10 kN/m 2 FLOOR HEIGHTS Reception floor to ceiling: 4m Savoy Place Reception floor to ceiling: 5.4m double height space. Office floor to floor: Varies. Min. height of 3.2m (levels 4 to 11). Office floor to ceiling: Level 1 - 2500mm Levels 2 & 3 - 2700mm Level 4 – 2600mm Levels 5 & 6 - 2440mm 2440mm min. to levels 7 to 13 Raised floor: Levels 1-3 - 90mm (structural slab level to top of tile). Levels 4-6 – 90mm generally, reduced to 60mm in localised areas. Structure: 150mm-178mm slab. TOLERANCES All dimensions/levels are subject to design and construction tolerances. STRUCTURE The building is steel-framed. Floor plates are generally hollow pot with concrete topping with 13th floor being normal weight concrete on metal deck on steel beams. Perimeter beams are supported by perimeter columns spaced at varying centres. Overall building stability is provided by steel moment frames. EXTERNAL FINISHES Façade: John Adam St – Rusticated buff coloured brickwork. Robert St – Portland stone/rusticated buff coloured brickwork. Adam St – Portland stone/rusticated buff coloured brickwork. Adelphi Terrace – Portland stone. Savoy Place – Portland stone. Roof: Asphalt roof finish generally on concrete slab. Hot melt with stone paving applied to terraces at levels 5 & 6. Doors: Fully glazed doors with anodised finish applied to aluminium frames. Main Entrance: Fully glazed doors with anodised finish applied to aluminium frames. Savoy Place: Fully glazed doors with anodised finish applied to aluminium frames. Adelphi Terrace: Fully glazed doors with anodised finish applied to aluminium frames. Windows: Aluminium powder coat frames with clear double glazed panels. INTERNAL FINISHES (OFFICE FLOORS) Walls: Emulsion painted dry lining. Floors: 600mm x 600mm fixed access flooring, medium grade. Columns: Emulsion painted dry lining. Ceilings: Aluminium suspended ceiling tile system to suit 1500mm ( W) planning module. White PPC finish and acoustic perforations. Linear panels to incorporate light fittings, smoke detectors and illuminated signage. Painted plasterboard margins incorporating down lighters to perimeter of building. Blinds: Recess to be provided for Tenants to install blinds where required. RECEPTION Walls: Travertine with decorative artwork in niches. Floors: Travertine. Ceilings: White painted plasterboard. Reception desk: Bespoke high-quality reception desk. LIFT LOBBIES Walls: Travertine to match existing in reception area. Floors: Travertine to match existing in reception area. Ceiling: White painted plasterboard as reception with suspended circular panels in centre at reception level only. Doors: Straight grain European oak stained. TOILETS Walls: High level timber & low level laminate panels behind individual wall mounted handbasins with illuminated mirror cabinet above. Mirror cabinets to contain paper towel & soap dispensers. Laminate access to back of cubicles for access to cisterns with full height tiled wall to cubicles. Tiles/painted plasterboard to washroom area. Laminate panels behind urinals. Floors: Tiled. Ceilings: Plasterboard. Doors/Partitions: Straight grain European oak stained. Sanitaryware: Close coupled WCs with concealed cisterns and automatic flushing, and wall hung basins with polished stainless steel fittings. SHOWERS Level 1/Basement: Cyclist changing facilities provided at level 1, with separate areas for male & female users. Each area comprises 8no. showers and 88no. lockers. Shower facilities to be provided to 1.75 x BREAAM. Office: None provided to office floors. PASSENGER LIFTS Number: 8 No. Machine Room Less (MRL) Passenger Lift serving levels 1-13 inclusive. Passenger lifts consist of 2 banks, each one containing 2 number 19 person / 1450kg lifts and 2 number 26 person / 2000kg lifts. 1 No. Machine Room Less (MRL) Passenger Lift serving levels 1-3 inclusive. 21 person / 1600kg lift. Lifts will be operating with a Hall Call Destination dispatch control system. Lift speed: 2.5m/s passenger MRL lifts serving levels 3-13 and 1.6m/s serving levels 1-3. Internal Lift Finish: High quality bespoke finishes to include stone flooring and full height mirror to back. Concealed high-level perimeter lighting. Passenger lift up peak average interval is less than 25 seconds assuming handling capacities of 15% of the building population arriving in a 5 minute period at level 3 (based on the occupant densities detailed in section 1). GOODS LIFT/OTHER 2 No goods/firefighting lifts serving levels 1 to 13 inclusive. 1 No goods lift between level 0 and level 2 inclusive. MECHANICAL INSTALLATIONS 4-pipe fan coils to Cat A space. Fresh air to the office space is provided by on floor air handling units. Cooling to the office space is provided by water cooled chillers located in the basement. Heating is provided by gas fired boilers. DESIGN PARAMETERS Winter temperature: Outside: -1°C db, saturated Internal offices: Designed to 21ºC ±2ºC, no RH control Toilets: Designed to 21ºC ±3ºC, no RH control Reception: Designed to 21ºC ±3ºC, no RH control Summer temperature: Outside: 28º db, 20ºC wb Internal offices: Designed to 22ºC ±2ºC, no RH control Toilets: Designed to 24ºC ±3ºC, no RH control ADELPHI – SPECIFICATION Reception: Designed to 24ºC ±3ºC, no RH control. The winter and summer conditions in the reception will depend on the usage of the doors. LIGHTING CONTROL A combination of PIR’s, Timeclocks, Dimming and Day light Harvesting shall be used to control the lighting and minimise the energy consumption. FRESH AIR SUPPLY Offices: 13.2 litres/second/person based on 1 person per 10m 2 net office area. Toilet: 6 air changes/hr extract minimum, mechanically ventilated. STANDBY POWER 1 No. 1200kW/1500kVA standby generator to support Landlord and Tenant loads with future provision for a second generator of equal capacity. COOLING LOADS Lighting: 10 W/m 2 Small power: 25 W/m 2 locally, diversified to 15 W/m 2 across the floor. ACOUSTIC LEVELS Office: NR40 Toilets: NR45 Staircases: NR40 Reception area: NR45 Base building will be designed to achieve limiting noise levels from engineering services operating under normal conditions. ELECTRICAL INSTALLATION The electrical installation for base build consists of the following: Incoming: 11kV 3.2mVA supply from two separate power feeds. Landlords’: Arranged as West and East HV switchgear. Main LV switchboards comprise of 3 boards: two in the East and one in the West. Each main switchboard is supplied by two 1mVA transformer in an A & B arrangement. Tenant distribution boards shall be installed on a floor-by-floor basis in both East and West riser. DESIGN CRITERIA Tenant electrical load allowance: Lighting 10 W/m 2 Small power 25 W/m 2 locally, diversified to 15 W/m 2 across the floor. LIGHTING Offices: General purpose lighting comprising recessed modular luminaries selected to comply with the design intent of CIBSE Lighting Guide LG7. Reception: Feature lighting. LIGHTING LEVELS Offices: 400 lux maintained illuminance at working plane dependent on tasks (screen based or paper) Main Staircase: 150 lux maintained illuminance on all treads. Secondary Staircase: 150 lux maintained illuminance on all treads. Toilets: 200 lux maintained illuminance at floor level. Reception: 200 lux maintained illuminance at floor level general areas, 300 lux maintained illuminance over desks and sitting areas. BUILDING MANAGEMENT SYSTEM A BMS system will control the primary mechanical services systems, via a series of networked outstations connecting back to a user interface head end. Intelligent outstation panels will be distributed through the building generally in plantrooms and service risers. Tenants will have the facility to extend and interface with the base build BMS system. PROTECTIVE INSTALLATIONS Fire service: Fire detection and warning system is based upon simultaneous evacuation in line with Building Control requirements. This ‘open protocol’ system serves the landlords areas with tenant interface panels to each individual office tenancy. Refer to latest version of approved Fire Strategy. Note: The life safety systems will comply with the requirements of the Building Regulations. Security system: Access control is provided from the landlord demise to the tenant areas (via control of lifts and stairs) and also controls access at the external entrances (doors and roller shutters) to the building and plant areas. The Landlord’s system can be extended to cover the Tenant demise. CCTV coverage is provided at external entrances. COMMUNICATION INSTALLATION Cable trays are provided in risers to all tenant floors. Communications installation by tenant. Existing data and voice services within the building may be extendable via request to the Landlord. BUILDING MAINTENANCE Window cleaning: Generally via mobile elevated platform for all sash windows. Scaffold access required for casement windows (levels 5 to 10) to northern and southern elevations. Internal atria glazing accessed with removable access gantry suspended from high level. Internal cleaning: Cleaners facilities are provided to both main cores at all levels to serve the office floor plates. ACCESSIBILITY Step free access is provided into the building and into the office accommodation from the internal circulation spaces. CAR & BICYCLE PARKING Car parking spaces: 69no. approx. parking spaces available in the secure basement car park. Accessible car parking spaces to be provided in accordance with WCC min. standards. Bicycle spaces: 245no. spaces to be provided within the secure basement parking area. These are located at basement level and access is via Savoy Place. LOADING BAY The loading bay is located at level 1 off Lower Robert Street and is accessed via the underground roadway leading down from York Buildings to the west of the site. There are 3 No. shared service vehicle bays provided (with 1no. designated waiting area in Lower Robert Street) and a trolley route via goods lift to levels 1 & 2. Access via goods/firefighting lifts is also available from this area to all office floors. Vehicles larger than a 7.5 tonne panel van will access the site via Savoy Place, entered at its eastern end from the Victoria Embankment. REFUSE COMPACTOR To be provided in the new refuse area at level 0. BREEAM and PART L COMPLIANCE BREEAM rating – “Very Good” (targeted) EPC rating – B (targeted). ADELPHIBUILDING.COM
© Copyright 2024