Solar 2015 Ivor Frischknecht Chief Executive Officer 14 May 2015 Source: Source:http://www.lyberty.com/encyc/articles/siliconvalley/ http://www.lyberty.com/encyc/articles/siliconvalley/ Source: http://reneweconomy.com.au/2014/china-now-worlds-largest-solar-pv-market-91139 Mount Bischoff Mine (1883) Tasmania’s first hydro electric generating plant Source: http://www.bonzle.com/c/a?a=featuredpics&yr=1912&pg=0&or=3&sz=4 The last remaining turbine from the Salmon Beach Wind Farm Australia’s first large scale 10 MW solar farm Greenough River Solar Farm , WA Source: http://www.abc.net.au/news/2014-04-09/solar-farm-panels-sarahjpg/5376774 ARENA’s objectives OBJECTIVES HOW FUNDING 1. Improve 1. Improve the $2.5 billion to 2022 2. Increase supply 2. Address current competitiveness of renewable energy technologies of renewable energy Knowledge technical and commercial readiness of technologies in Australia energy issues through renewable energy (nearly $1.5 billion still available): • Projects • R&D • Knowledge Capture & Sharing Mandated obligation to collect, store & disseminate knowledge & learning from renewable energy projects & initiatives that ARENA funds Large solar costs more than wind Australia is leading the residential rooftop solar revolution Augusta, WA 60% of residential PV costs are local and in your control $AUD/W $2.5 $2.40/W Installation Labour PII ^ $2.0 $1.5 25% Customer Acquisition Other * Balance of Systems 21% 14% $1.0 Inverter $0.5 Module 40% non-controllable, coming down globally $0.0 ^ Permitting, Inspection and Interconnection * Other includes sales tax, fees, margins, other administrative and indirect costs. Source: Rocky Mountain Institute, July 2014, based on 2013 data Germany has lower installation labour and hardware costs $AUD/W Australia vs Germany - Local Costs Only $1.6 $1.4 30c/W $1.2 Installation Labour PII ^ $1.0 Customer Acquisition $0.8 $0.6 Other * $0.4 $0.2 Balance of Systems $0.0 Germany Australia ^ Permitting, Inspection and Interconnection * Other includes sales tax, fees, margins, other administrative and indirect costs. Source: Rocky Mountain Institute, July 2014, based on 2013 data Potential for efficiency gains in installation processes $AUD/W Australia vs Germany: Installation Labour Costs $0.40 $0.35 Pre-installation $0.30 Racking Prep & Install $0.25 Module Prep & Install $0.20 Electrical: On Roof $0.15 Electrical: Off Roof $0.10 $0.05 Non-Production* $0.00 Germany Australia • Off-roof electrical costs driven by connecting inverters to electrical panels • Potential for more automation, less labour intensive installation, and using modern rail-less racking systems could drive down costs even further * Non-Production includes clean-up time, breaks, and other tasks Source: Rocky Mountain Institute, July 2014, based on 2013 data 5kW in Perth = 4kW in Canberra Relative Solar PV Prices Across States 130 120 110 100 90 1.5 kW System Perth Brisbane Sydney 5 kW System Adelaide Source: SolarChoice, May 2015 PV Prices, adjusted for REC rebates. Melbourne Hobart Canberra At the Powerwall launch and beyond, Tesla has managed to generate serious interest in something that really isn’t all that sexy – a backup household battery system. Want to know more? Arena.gov.au ARENA at LinkedIn @ARENA_aus on Twitter Subscribe to updates: arena.gov.au/subscribe
© Copyright 2024