COMPANY`S PROFILE Martin Turaz Chief Executive Officer May 2015 Short history The year 2011 Private independent company’s FOUNDATION BAT Engineering a.s. began its activity on 1 July 2011 as independent private company operating in the area of project services and engineering activities. 2 The year 2015 BAT Engineering a.s. became subsidiary company of VÍTKOVICE POWER ENGINEERING a.s. BAT Engineering a.s. has widen its services including suplying activity from 1 January 2015. Company`s seat Sídlo spoločnosti Sídlo spoločnosti 3 Company`s profile The company ensures investment turn key projects realization (EPC contract) in various industrial areas. Our company provides investors with complex project and engineering services in construction new as well as modernization of existing producing facilities from the previous project preparation, all stages of project and engineering services to setting the work into operation. The company employs qualified and skilled project designers, whose practise ensures quality engineering and advisory activity. The company employs project designers licenced by: • SKSI – the Slovak Chamber of Civil Engineers • SKA – the Slovak Chamber of Architects The company has obtained the following certificates from the certification body of TÜV SÜD Slovakia s.r.o.: • STN EN ISO 9001:2009 – Quality management systems • STN EN ISO 14001:2005 – Environmental management system • STN OHSAS 18001:2009 – Occupational health and safety management systems 4 Activities` areas Crude oil and gas Energetics processing • Gas processing • Terminals • Gas treatment • Refinery • Petrochemistry • Power plants (Utilities and off site facilities) • Nuclear power plants (Utilities) • Combined Heat and Power Systems (CHP) Waste Chemical Other Smelting processing industry industry industry • Waste to energy program Municipal Waste Incinerators • Renewable energy • Biomass processing plants • Off- gas processing • Rubber and • Steel plastics structures manufacturing processing and • Building processing material • Bioethanol production production • Secondary production (automotive production, glass production, ... ) • Pyrometallurgy (copper production) • Electrometallurgy (copper cathode production) • Copper production`s final stage • Lead production (from waste) • Metal waste processing • Ferro-alloy production 5 Scope of activity Technological processes: Natural gas treatment and processing Atmospheric distillation unit of Crude oil Vacuum distillation unit of Crude oil Bitumen production unit Heavy crude oil refinery – straight run bitumen production Hydrocarbon gases splitting from refining processes Hydrocarbon gases desulphurization from refining processes Acid waters stripping from refinery plants Off gas collection and processing from refinery and petrochemical plants, off gas removal on flare and re-compression units for off- gases Crude oil product blending units (gasoline,diesel,oils) Water removal technology from crude oil products (including trace ammount) Refinery units revamp (distillation, hydrogenation and other units ) Flue gas treatment and cleaning from combustion processes – DESOX & DENOX (SCR and SNCR) 6 Scope of activity Utilities and Off-site Facilities: Water treatment plants for industrial purposes Boiler water and softened water production, treatment and distribution Utilities production and distribution Cooling water circulation centers (treatment, cooling, pumping stations, distribution) Liquid crude oil products import, storage and expedition Automotive, railway storage tanks and tankers loading and unloading stations - (liquid crude oil products as well LPG, LNG) Chemicals and auxiliary substances storage Storage silos for granulated products PE, PP and other products Production technology of CNG, LNG, LPG Terminals for liquid crude oil products as well CNG, LNG,LPG Cogeneration system (CHP) Municipal waste and biomass processing to energy 7 BAT Engineering & VÍTKOVICE POWER ENGINEERING In co-operation with VÍTKOVICE POWER ENGINEERING BAT Engineering company ensures: Equipment delivery Comprehensive services in the area of supplying customers with the following equipment: columns, reactors, absorbers, separators, tube exchangers, filters, pressure/non-pressure storage tanks, containers and piping. Equipment is supplied from the stage of its designing, basic design up to production documentation. The most used production standards are harmonized European standards and ASME code. Own production base, long term skills and experience in the area of material research enable us to supply storage tanks for ammonia, chlorine, nitrogen, ethylene as well as other dangerous liquids and gases storage. Transport services Installation work for technology and steel structures 8 Services provided BAT Engineering company provides complete scope of services in all investment projects preparation and realization stages: Consultancies, advisory, investor`s technical supervision, process safety engineering services Representation of customer during negotiation with public institutions and organizations Feasibility studies of investment project Project documentation in all performance stages • Conceptual Design • Project for Building Permission • Detailed design and As-built documentation • Vendor documentation Project - Vendor Engineering Document Management and Archiving Unlicensed EPC projects` management Procurement (in co-operation with VÍTKOVICE POWER ENGINEERING) Production (in co-operation with VÍTKOVICE POWER ENGINEERING) Realization (in co-operation with VÍTKOVICE POWER ENGINEERING) 9 Software used Piping department Intergraph (COADE) CAESARII Intergraph SmartPlant P&ID PCC - Pipe Class Component SST Systems CAEPIPE Pipe Flow Expert Civil department Allplan Reinforcement plus ATIR STRAP AutoPEN fine GEO5 Protech SCIA Engineer Svoboda Software – Construction physics CENKROS 10 General Autodesk 3ds Max Design Autodesk AutoCAD Autodesk Inventor Autodesk Navisworks Manage / Simulate / Freedom AVEVA PDMS Microsoft Office Microsoft Project PTC Mathcad Tekla Structures Detailing VENDOM – documentation management Integrated Management System 11 References 12 Our references review Vítkovice Power Engineering, CZ Power Plant – Yunus Emre 2x145MWe CFPP Vítkovice Power Engineering, CZ Offer Elaboration JE Temelín - Nuclear Power Plant - 3rd & 4th Block 2012 Vítkovice Power Engineering, CZ Yunus Emre 2x145 MWe, Turkey, Coordination 2013 Vítkovice Power Engineering, CZ Yunus Emre 2x145 MWe, Turkey, 3D Model 2013 Vítkovice Power Engineering, CZ Yunus Emre 2x145 MWe, Turkey, Documentation management and administration 2013 Vítkovice Power Engineering, CZ Yunus Emre 2x145 MWe, Turkey, Coordination drawing 2013 Vítkovice Power Engineering, CZ Yunus Emre 2x145 MWe, Turkey, Environment determination records 2013 Vítkovice Power Engineering, CZ Yunus Emre 2x145 MWe, Turkey, piping distribution strength calculations 2013 13 2011 - 2012 Our references review Vítkovice Power Engineering, CZ Yunus Emre 2x145 MWe, Turkey, PU18 – Compressor plant 2013 Vítkovice Power Engineering, CZ Yunus Emre 2x145 MWe, Turkey, PU35.04 Compressor plant 2013 Vítkovice Power Engineering, CZ Yunus Emre 2x145 MWe, Turkey, CO101 – Coal Transport and conveyor tower 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO102 – Coal grinding 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO109.01 – Foundations for fly ash transport 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO118 – Oil tapping and storage 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO119 - Diesel-generator foundations 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO120 – Piping bridges 2013 14 Our references review Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO129 – Rain water exterior distribution 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO130 – Exterior distribution of sanitary waste water drainage system 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO131 – Waste waters exterior distribution 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO132 - Drainage 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO135 – Fire water exterior distribution 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO136 – Service water exterior distribution 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO140 – Oily waters drain pits 2013 15 Our references review Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO142 – Exterior grounding network 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO152 – Site enclosure 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO156 – Limestone preparation 2013 - 2014 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, CO157 – Construction site draining 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, steel structures workshop drawings 2013 Vítkovice Power Engineering, CZ Adularya, Yunus Emre 2x145 MWe, Turkey, PU20 – Exterior piping distribution 2013 Vítkovice Power Engineering, CZ Hall No. 5 & 6 reconstruction 2013 16 Our references review Vítkovice Power Engineering, CZ Power Plant EPRU II, OB61, Prunéřov, Piping mounting documentation ECM Global GmbH, Germany MOLYB - Mejillones Chile, Gases cleaning 2013 Slovnaft, a.s. Bratislava Off-sites of LDPE-4, Chemicals tapping & distribution 2013 - 2014 Slovnaft, a.s. Bratislava Off-sites of LDPE-4, Exterior piping distributions 2013 - 2014 Slovnaft, a.s. Bratislava Off-sites of LDPE-4, Building & engineering objects 2013 - 2014 PMP Montex s.r.o., Bratislava Swedspan Malacky, PS609.4 Piping distribution of heating oil 2013 PMP Montex s.r.o., Bratislava Swedspan Malacky, PS617 Piping distribution of hot and cooling water 2013 Vítkovice Power Engineering, CZ 17 Khersonskij Refinery Plant Kherson, Ukraine, Feasibility study + technical assistance 2013 - 2014 2013 Our references review Duslo a.s., Šaľa Heating renovation in Duslo a.s. Duslo a.s., Šaľa Operation study of current ammonia storehouse 2015 - Vítkovice Power Engineering, CZ Tubes cast house & rolling mill, Saudi Arabia 2015 - 18 2014 - 2015 Our representative references Adularya, Yunus Emre 2x145 MWe Building`s place: Eskisehir, Turkey Design phase: 3D model, co-ordination, projects, documentation management, author`s supervision Purpose of the building: thermal power station Type of the building: new building Client: VÍTKOVICE POWER ENGINEERING a.s. Duration of construction: Number of design hours: 2011 - 2014 100 000 19 Our representative references Reconstruction of production halls No. 5 and 6 Building`s place: Vítkovice-Ostrava, CZ Design phase: Study, Detailed Design, author`s supervision Purpose of the building: Energy saving achievement in current industrial halls Type of the building: reconstruction Investor: VÍTKOVICE POWER ENGINEERING a.s. Duration of construction: Number of design hours: 2012 - 2014 1600 20 Our representative references Kherson Refinery Revamp Project Building`s place: Refinery in Kherson, Ukraine Design phase: EIA & Feasibility Study control, financing ensuring Type of the building: reconstruction and building of new units Client: VÍTKOVICE POWER ENGINEERING a.s. Duration of construction: 2013 - 2014 Number of design hours: 6 000 21 Our representative references Power plant Prunéřov II, 3x250 Mwe comprehensive renovation Building`s place: ČEZ, a.s., Power plants Prunéřov, Kadaň Design phase: Installing documentaion of piping distribution Type of the building: reconstruction Implementor: ŠKODA PRAHA Invest, a.s. Duration of construction: 2013 - 2015 Number of design hours: 10 500 22 Our representative references Thermal oil, hot/cooling water piping installation in Swedspan Building`s place: Malacky, Slovakia Design phase: Detailed Design Purpose of the building: building of new chipboards plant Type of the building: new building Investor: SWEDSPAN SLOVAKIA, s.r.o. Implementor: PMP Montex, BA Duration of construction: May – October 2013 Number of design hours: 1000 23 Our representative references CODELCO Molyb Chile – Gas Cleaning Plant Building`s place: Mejillones, Chile Design phase: detailed design (3D-PDMS) Purpose of the building: building of Gas Cleaning Plant in metallurgical plant Type of the building: new building Investor: Corporation Nacional del Cobre de Chile – CODELCO Chile Client: ECM Global GmbH pre GEA Bischoff, Germany Data: ground plan, technical equipment datasheets Duration of construction: July - December 2013 24 Our representative references Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 (RDK 8) Building`s place: Karlsruhe, Germany Design phase: As-built documentation for piping distribution Purpose of the building: steam power plant Type of the building: new building Client: ALSTOM POWER SYSTEMS GmbH, Mannheim Duration of construction: June 2014 25 Our representative references Project documentation and permissions for off-site projects LDPE4 Building`s place: Bratislava, Slovakia Design phase: project for building permission, tender documentation, detailed design, field co-ordination, author`s supervision Purpose of the building: additional facilities building Type of the building: new building Investor: SLOVNAFT, a.s. Implementor: SAM Metalchem STAVEKO Duration of construction: August 2014 – May 2015 Number of design hours: 21 000 26 Our representative references Heating reconstruction in Duslo a.s. Building`s place: Šaľa, Slovakia Design phase: Detailed Design Type of the building: reconstruction Investor: Duslo, a.s. Duration of construction: October 2014 - January 2015 Number of design hours: 3 000 27 Our representative references Tubes cast house & rolling mill, Saudi Arabia Building`s place: Ras Al-Khair, Saudi Arabia Design phase: front and engineering design Type of the building: new building Investor: Gulf Tubing Company, Saudi Arabia Implementor: VÍTKOVICE POWER ENGINEERING a.s. Duration of construction: 2015 - 28 Thank you for your attention Martin Turaz BAT Engineering a.s. [email protected]
© Copyright 2024