The Weekly Bulletin Serving the Construction Industry and Bay Area Community since 1932 2015 BOARD OF DIRECTORS March 27, 2015 OFFICERS Contractors & Insurance Lydia Roze, President Vista Universal, Inc. Eric Kavert, Vice President Pacific Coast General Engineering, Inc. Greg Adams, Secretary Shimmick Construction Co., Inc. Forrest Towe, Treasurer Anvil Builders Nancy Brinkerhoff, Immediate Past President, Ir onwood Commer cial Builders, Inc. DIRECTORS Thom Miles TMA Construction Services. John Parker Janus Corporation Ken Regevig K. Regevig Roofing John C. Roeber, Past President J. Roeber & Associates EXECUTIVE DIRECTOR Scott P Leary DIRECTOR OF OPERATIONS Denice McDavid The Weekly Bulletin (USP3 3633) is published every Week by the BAY AREA BUILDERS EXCHANGE, 3055 Alvarado Street, San Leandro, CA 94577-5711. Subscription rate for non-members is $525 per year. POSTMASTER: Send address changes to BAY AREA Builders Exchange , 3055 Alvarado Street, San Leandro, CA 94577-5711.. Tel.: 510.483.8880. Fax 510.352.1509. www.bayareabx.com By Kenneth S. Grossbart, Abdulaziz, Grossbart & Rudman Insurance is defined as coverage by contract whereby one party undertakes to indemnify or guarantee another against loss by a specified contingency or peril; a means of guaranteeing protection or safety. Some insurance is optional and some is required. Contractors have many options and we thought that we would take the time to highlight some of the insurance that is required and other available options in the construction industry - keep in mind this does not cover everything. Workers' compensation is the insurance to pay the lost wages and medical expenses of an employee injured on the job. It is required for contractors before they are even licensed and all through their licensure unless exempt - meaning there are no employees. There is no exemption for C-39 roofing contractors. Contractors are required to disclose within their contract documents whether they carry workers' compensation or if they are exempt. In California, failure to maintain workers' compensation coverage when required can result in licensure suspension. Disciplinary action can be taken against the uninsured contractor during the licensure suspension for any work that is done because the contractor is considered unlicensed. Licensees in the state of California are required to have a surety bond in the amount of $12,500.00 in order to protect the consumer in case of defective construction or a violation of the Contractors' License Law - this is commonly known as a Contractor's Bond. There may be a Bond of Qualifying Individual required if the responsible managing officer does not own 10% or more of the voting stock of a corporation/LLC or there is a responsible managing employee qualifying the license. Cash deposits may be an alternative to these bonds but are not released for three years after the expiration of the license. Just as with workers' compensation, license suspension will occur if the bond is no longer valid. Outside of a contractor not paying for the bond and it being canceled or the surety canceling it for another reason, other reasons for a bond to no longer be valid and thereby the license suspended are: (1) judgment or payment of claim which reduces the amount; (2) the surety company is no longer Continued on the next page ... Insurance continued from front page … authorized through the California Department of Insurance; and (3) The responsible managing officer no longer owns at least 10% of the voting stock of the corporation/LLC. Note that the bonds listed above should not be confused with a Disciplinary Bond. Also note that a license bond is not in the true sense an insurance contract. The license bond does not protect you like an insurance policy. Commercial General Liability Insurance ("CGLI") is to protect against third-party bodily injury and accidental property damage. It is not required (unless the contractor is a Limited Liability Company) but contractors are required to disclose in their contract and bid documents whether they carry CGLI. A CGLI policy will usually cover bodily injury and property damage caused by unforeseeable events or accidents and injury or damage due to defective work. Keep in mind all policies differ and coverage is subject to specific exclusions and various endorsements. It is important for contractors to determine if a homeowner or business owner would contract with a contractor that does not carry CGLI before contractors decide not to carry it. CGLI is not intended to cover the contractors work product but rather damages caused as a result of the contractor's work product. The owner should still have their own property insurance. Many contracts even require the owner to purchase additional property insurance in order to protect the construction project - often called builder's risk insurance. The purpose of this type of policy or endorsement is to protect for direct physical loss or damage to the covered property during the construction project. It protects the work during construction damages caused by vandalism, theft, fire, acts of god, etc; loss to equipment or materials that are meant to be incorporated into the work; and losses made possible by defective design or construction; as well as causing an injury to a person or property; so long as they are not subject to exclusion. Consequential damages such as delay damages and acceleration costs are usually excluded from builders risk policies. As a contractor, it is important to determine what type of protection is necessary on the project and make sure that the owner complies with it. Professional Liability Insurance is defined as a policy that pays damages for negligence of professionals, such as architects, engineers, or other design professionals. These policies generally cover the wrongful act or professional negligence of an architect or engineer on a construction project. Insurance, legally required or not, provides a way for contractors to limit their risk - to a certain degree. It is a good idea to consult with legal counsel and insurance professionals in order to gain a better understanding of the above insurance types as well as what else may be available in order to limit risk. *** Kenneth Grossbart is recognized as one of the foremost authorities in California construction law. Over the past 30 years, Ken has become a respected speaker on Mechanic's Liens and other construction related issues. Abdulaziz, Grossbart & Rudman provides this information as a service to its friends & clients and it does not establish an attorney-client relationship with the reader. This document is of a general nature and is not a substitute for legal advice. Since laws change frequently, contact an attorney before using this information. Ken Grossbart can be reached at Abdulaziz, Grossbart & Rudman: (818) 760-2000 or by E-Mail at [email protected], or at www.agrlaw.com Estimator – Full-time Santa Rosa masonry subcontractor is seeking a full-time Assistant Estimator. Position reports to the Sr. Estimator. The Assistant Estimator will assist with masonry plan take-offs, scope and spec review, drafting proposals, calculating material quantities and other responsibilities as requested by the Sr. Estimator and/or Owner. Occasional site visits, pre-bid meetings and job-walks may be necessary. Qualified candidates must possess the following skills: ■ ■ ■ ■ ■ ■ Proficient in reading plans Strong Microsoft Excel skills Education and/or work experience in plan take-offs Attention to detail Strong mathematical skills Ability to meet deadlines and multi-task Field experience a plus but not required. We are small, 4-person office. Team-work and strong communication skills required. Interested candidates should forward resume along with wage expectations to [email protected]. *** NOW HIRING ELECTRICIANS *** Top notch electrical contracting firm seeking qualified electricians at all levels. Busch Electric, Inc. focuses on quality and integrity as we meet the electrical needs of our clients in the areas of residential and commercial, our specialty being high-end custom homes. Projects in the SF bay area. HOW TO APPLY: Submit resume and cover letter in PDF or Word format to [email protected] with “Electrician” in the subject of the email. Tell us 1) why you are the right person for the position and 2) desired salary. HELP WANTED Permit and Resource Management Engineering Division Manager $101,100 - $122,868/ yr. The County of Sonoma seeks a highly experienced Engineering Division Manager! 1 full-time vacancy. Related education & experience required. Apply by 3/25/15. For more information about this exciting opportunity and to apply online, visit: www.yourpath2sonomacounty.org or call Sonoma County HR, 707-565-2331. EOE. Attract and keep top employees Offering a retirement plan is a smart way to make your company more competitive when it comes to attracting and retaining the best employees. A good retirement plan can help you: Attract talented people in today's challenging job market. Retain valuable employees who want retirement options in their benefits package. Enjoy tax advantages that may be available to you as an employer offering the plan. Garner Financial Management has the experience and knowledge to help you to determine what type of retirement plan is right for your company and how to get it established. Please contact us to discuss starting a plan for your company or the suitability of your current plan. (925) 282-5500. www.garnerfm.com [email protected] www. thebluebook .com GROW YOUR BUSINESS We’ve got a great opportunity for quality contractors. Become an Authorized Installer for TUFF SHED and you’ll add an additional revenue source to your business On-Time, Weekly Settlements TUFF SHED is well-known for selling and fabricating the industry’s best sheds and garages. We’re looking for talented contractors to deliver and install these buildings Get paid weekly for completed for our customers. installations. Automatic deposits are also available. You provide product transport, tools, and building expertise. We pre-fabricate and bundle each building to make installation simple and efficient for you. Flexible Projects Based on Your Business Needs Consistent work is available. You choose the amount of work based on your business commitments. Focus on What You Do Best We handle all the advertising, sales, permits, and pre-fabrication so you can focus on installing more jobs and generating more revenue. Partner with an Industry Leader TUFF SHED has more than 30 years of experience selling and pre-fabricating buildings. Our aggressive marketing efforts and professional sales staff have generated consistent annual sales growth. Our 42 local factories serve customers across 31 states, creating more revenue opportunities for you. 800-369-8833 ext. 5687 │ [email protected] │ www.TuffShed.com 98625 ©2014 TUFF SHED, Inc. All rights reserved. TUFF SHED® logo is a registered trademark of TUFF SHED, Inc. BAY AREA BUILDERS EXCHANGE - TELEPHONE (510) 483-8880. FAX (510) 352-1509 WEEKLY PLAN LIST - Friday, March 27, 2015 To view plans online go to: www.beac.com Bid Date Bid Time Location Plan Name / Scope of Work 3/27/2015 1:00 PM USCGC WAESCHE (WMSL 751) Dockside Repairs FQ3 FY15 Alameda Prebid Information Engineers # of Plan Estimate Addenda # ONLINE This requirement is for dockside repairs aboard the USCGC WAESCHE (WMSL 751) consisting of items in accordance with the attached specification (ATTACHMENT 1). The Contractor shall furnish all the necessary labor, material services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, to perform dockside repairs, and alterations to the vessel, in accordance with the solicitation and attached specifications. Failure to read the specifications in their entirety will not relieve the offeror from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the offerors risk. All proposals submitted in response to this solicitation shall stand firm for 90 calendar days from the response date of this solicitation. NOTE: The Government will not pay for costs incurred in the preparation and submission of proposals or other costs incurred in response to this announcement. Wilma Estrada @ 510.637.5981 ONLINE 11:00 AM Modesto 12:00 PM Foster City 2:00 PM Dublin East County Hall of Justice BP4 ONLINE 2:00 PM Palo Alto The Project involves the construction of a new complex of buildings on a 20-acre site in the northeastern part of Dublin. The buildings will include a new 5-story Courthouse Building containing 13 criminal courtrooms and associated support spaces and facilities (a total of approximately 146,000 GSF); a new 2-story County Building providing space for the Public Defender, District Attorney, and Probation Department (approximately 42,000 GSF); and a central lobby/security screening entrance area connecting the two main building elements. Power/Data for Bldg. 101 (A2-120 & A2-200) 3/16 @ 10AM at 3801 Miranda Ave, Bldg 101, Palo Alto Contractor shall provide all disposal, equipment, labor, materials, tools, supervision, transportation, safety measures and professional services required, but not necessarily limited to the installation of power and data cables to 38 workstations in building 101, rooms A2-120 and A2-200, Palo Alto Health Care System, Palo Alto, CA 94304. This project shall be completed in 90 days from Notice to Proceed (NTP) and in accordance with all terms, conditions, drawings, and specifications set forth in this solicitation ONLINE 2:00 PM San Francisco Walk-In Cooler/Freezer Replacement at Modesto High School MAND 3/20 @ 10AM at 18 H Street, Modesto Div_02-demolirion; Div_03-concrete; Div_06-rough carpentry; Div_07-underslab vapor retarder, insulation, sealants & caulking; Div_09-gypsum board, painting, interior concrete floor sealer, FRP wall finsih; Div_11-food service equipment; Div_15-HVAC NEW Pieology Foster City -Conversion Interior renovation, including flooring, painting, doors & hardware, signage, wood panels, metal panels ONLINE ONLINE NEW Airport On-Ramp Signage Replacement Removal and replacement of overhead signs at four locations along the Highway 101 off ramps to San Francisco International Airport. Work for this project is performed at night between hours of 12:00 AM to 5:00 AM. All construction will be coordinated with Airport Duty Managers a week in advance of the activity Page 1 of 65 Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 3/27/2015 2:00 PM Full Elevator Preventive Maintenance and Related Services 2/19 @ 10AM at 2451 Sacramento St., San Francisco San Francisco Engineers # of Plan Estimate Addenda # ONLINE This Project is to provide Full Elevator Preventive Maintenance and Related Services for a period of one (1) year for elevators located at the Authority Senior and Family Developments, the Administration Office and the Maintenance Building, all within the City and County of San Francisco, California. Services provided are to include all labor, materials, equipment, tools, services and supervision required for full maintenance of the elevators and lifts. Andrew Passell @ 415-715-3213 2:00 PM San Leandro 2:30 PM San Francisco RFP for Fairmont Campus Concrete Walkway Repair Joint Scope Meeting 3/13 @ 10AM Remove and replace approximately 210 linear feet of concrete sidewalk as marked on site Grind down, approximately 80 Linear feet of concrete sidewalk lines as marked on site Work to be performed between 8 AM and 5PM weekdays. NOTE: Specifications will be supplied at the joint scope meeting or available from Agbayani Construction there after. Clement Street Pavement Renovation and Sewer Replacement 2/19 @ 1:30PM at 1680 MIssion St., 3rd Fl, San Francisco ONLINE $1700000 ONLINE Demolition, pavement renovation, sewer replacement & drainage work, curb ramp construction, traffic control Ramon Kong, Project Manager, @ 415-554-8280 3:00 PM Tracy Construction of an ATM Island and Kiosk Redcommended 3/12 @ 9AM at 25600 S. Chrisman Rd., Tracy Construct Concrete Island for an Automated Teller Machine; Provide and Install an ATM Kiosk/Surround; Provide and Install Electrical Circuits $25000 $100000 ONLINE 3:00 PM San Jose SOQ Student Recreation and Aquatic Center Design & Construction Services $82721 ONLINE 3/12 @ 10AM The Trustees of The California State University (Trustees) are requesting Statements of Qualifications (SOQ) from interested and qualified Design-Builders (Respondents) to provide design & construction services for the project referenced above (Project). The proposed project will build a new recreation and aquatic center, demolish existing structures, and upgrade utility lines. The new Student Recreation and Aquatic Center (SRAC) consist of additional gymnasium, weight and fitness center, exercise rooms, rock climbing wall, facilities for sports club organizations, and competition and recreation pools with support spaces. The project site is located at south east corner of 7th Street and San Carlos across from the existing Event Center. As part of the project, two existing Residence Halls (Hoover and Royce) and the existing Aquatic Center will be demolished to create space for the new building and the surrounding utility infrastructures will be upgraded 4:00 PM Turlock ONLINE RFQ Retainer for Traffic Engineering Services The City of Turlock is accepting proposals from qualified firms to provide professional traffic engineering services upon request from the City of Turlock on an as needed basis. The City will enter into an agreement with the individuals or firms selected to provide these services. All interested parties are required to submit proposals in accordance with the conditions and dates outlined in this Request for Qualifications (RFQ). 4:00 PM Turlock RFQ Retainer for Materials Testing and Inspection Services The City of Turlock is accepting proposals from qualified firms to provide professional materials testing and inspection services upon request from the City of Turlock on an as needed basis. The City will enter into an agreement with the individuals or firms selected to provide these services. All interested parties are required to submit proposals in accordance with the conditions and dates outlined in this Request for Qualifications (RFQ). Page 2 of 65 ONLINE Engineers # of Plan Estimate Addenda # Bid Date Bid Time Location Plan Name / Scope of Work 3/27/2015 4:00 PM San Martin Harvey Bear Ranch Park Parking Lot MAND 3/18 @ 10AM at 1965 E. San Martin Ave., San Martin Work will consist of minor grading of an area of 22,000 square feet, compacting the subbase and installing a 6” section of compacted Class II base rock, installation of (9)-15 gal trees w/irrigation, 80’ split rail fencing, relocation of 145’ of split rail fencing, and installation of 640’ of car bumper logs. ONLINE Turlock RFQ Retainer for Landscape Architectural Services ONLINE 4:00 PM Prebid Information The City of Turlock is accepting proposals from qualified firms to provide professional landscape architectural services upon request from the City of Turlock on an as needed basis. The City will enter into an agreement with the individuals or firms selected to provide these services. All interested parties are required to submit proposals in accordance with the conditions and dates outlined in this Request for Qualifications (RFQ). 5:00 PM 3/30/2015 1:00 PM Alameda Sacramento ONLINE NEW Carl's Jr. TI Alameda Floor finishes, ceiling finishes, fixtures & lighting, exterior facade changes, new stucco finish, painting & miscellaneous items $9500000 RFQ SESP FD&C Intraoperative MRI ONLINE This project will construct a MRI and connected surgical suite, patient recovery bays and support spaces in the existing hospital at the University of California, Davis Medical Center. The construction budget is estimated at $9,500,000 not including furnishings and equipment. The project is under the regulatory jurisdiction of the Office of Statewide Health Planning and Development (OSHPD). Initial services of the selected consultant will be preparation of preliminary design documents for the project. Once approved by the University, and at the University’s discretion, the selected consultant may be asked to provide full Basic Services for preparation of construction documents and construction administration. Sub-consulting services for mechanical, plumbing, electrical, structural and all other sub-consulting disciplines will be negotiated following selection of the executive design professional firm. The selected firm will be expected to sign an Executive Design Professional Agreement that will include lump sum fees for provision of all basic services up to Design Development. Upon completion of Design Development and at the University’s option, authorizations will be issued for the completion of Construction Documents, bidding documents and construction services. 10:00 AM Redwood City ONLINE Dollar Tree Retail Store A retail tenant improvement project in a previous tenant space. New work includes, but is not limited to, door & glazing in existing storefront; new ceiling system; mechanical ductwork, lighting & electrical, structural framing for new rooftop unit; existing restrooms to remain 12:00 PM Merced 12:00 PM Sacramento 2:00 PM Newark ONLINE NEW Rite Aid #6007 Remodel of Rite Aid Store ONLINE The Container Store Ground up 23,875 sf concrete tilt-up building including Tenant improvement work to include but not limited to: surveying, soil treatment, concrete reinforcement, concrete, masonry, structural steel, rough carpentry, millwork/finish carpentry, FRP, waterproofing, insulation, roofing, metal panels/composite panels, stimulated wood siding, sheet metal, joint sealant, doors & hardware, overhead doors, storefront, automatic entrances, skylights, metal stud/drywall, tile, polished concrete floor, acoustical ceiling, resilient flooring, wall coverings, painting, toilet partitions/accessories, load dock equipment, fire protection, plumbing, HVAC, electrical, fire alarm, communication cabling, fixturing NEW RFP for Clock, Bell and Public Address System Replacement MAND 3/19 @ 10AM Clock, bell & public address system replacement at ten (10) school sites. Page 3 of 65 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 3/30/2015 2:00 PM Forest Theater Renovation 3/11 @ 10AM Carmel By The Sea Engineers # of Plan Estimate Addenda # $1200000 ONLINE The work consists of renovating of an existing facility including, demolition of various components; mitigation of hazardous building materials; site grading; new asphalt access road; new concrete & asphalt pedestrian walkways-incorporating ramps, landings, stairs, handrails, etc.; structural improvements; new light/sound towers; new electrical lighting; restrooms remodeling; masonry, structural steel; metal fabrications; rough carpentry; finish carpentry; arch woodwork; fiberglass-reinforced plastic panels; self-adhering sheet waterproofing; blanket insulation; below-grade vapor retarders; flashing & sheet metal; flexible flashing; firestopping; joint sealants; hollow metal doors & frames; dlush wood doors; access doors; gypsum board, painting; concrete floor sealing; stage flooring; Div_10signage; commercial toilet accessories; fire protection specialties; plumbing, landscape site concrete; parking bumpers; pavement markings; tactile warning surfacing; wood fenced & gates, planting 2:00 PM Fremont 2:30 PM Modesto 2:30 PM Ceres 3:00 PM San Jose 5:00 PM Placerville Patterson Ranch Structural Plan Check and Inspection Svcs for Proposed Bridges The City has prepared an outline of services (which includes a description of the City’s Project Objectives) attached as Exhibit “1” to the Request For Proposals (“RFP”), and generally includes: independent plan check of the structural plans and inspections related to two single span bridges proposed at Patterson Ranch Boiler Project for County’s Health Services Agency MAND 3/12 @ 1PM at 830 Senic Dr., Modesto This bid contemplates issuing one Agreement for barication and furnishing of all labor, material and equipment to install BOILER BURNER REPLACEMENT and LOW NOx UPGRADE / HIGH PRESSURE BOILER RE-TUBE. Ceres Library Tenant Imporvements MAND 3/16 @ 9AM at 2250 Magnolia St., Ceres The County of Stanislaus (County) is seeking proposals from qualified, experienced and licensed Contractors for general contracting services including, but not limited to, painting, carpet, electrical & associated work at the Ceres Library RFP Landscape Management and Maintenance Services MAND 3/9 @ 9AM at 1404 Mabury Rd., San Jose The City of San José (hereinafter “City") is soliciting proposals from qualified Contractors to provide all labor, materials, equipment, and vehicles for Landscape Management and Maintenance Services in areas within the public right-of-way managed by the Department of Transportation (DOT). RFP for Re-Use Strategy for the Downtown Placerville Main Street Pre-Proposal teleconference 3/13 @ 3PM . Toll free 1-877Courthouse 820-7831; Participant Cods:326556 The Judicial Council of California (JCC) has proposed to build a new courthouse for the El Dorado Superior Court. If the new courthouse project is approved, the existing Main Street courthouse in downtown Placerville will be vacated and the County will retain ownership of the building. In an effort to assist with the re-use of the courthouse building, the JCC is partnering with the City of Placerville and the County of El Dorado to develop a realistic adaptive re-use strategy. This RFP is for a re-use strategy that the city and county may use for future planning and decision making. ONLINE ONLINE ONLINE ONLINE ONLINE Questions or requests for clarifications must be submitted to: [email protected] 3/31/2015 10:00 AM Sacramento Pioneer Elementary School Hardcourt Improvements MAND 3/20 @ 10AM at 5816 Pioneer Way, Sacramento Earthwork, trenching & backfilling, soil treatment, erosion control, site drainage, pavement sealer & striping, asphalt paving, irrigation, chain link fences & gates, planting, site concrete Page 4 of 65 ONLINE Engineers # of Plan Estimate Addenda # Bid Date Bid Time Location Plan Name / Scope of Work 3/31/2015 10:00 AM Verizon Wireless ONLINE Barricades, Construction cleaning, Demolition, Concrete saw cut and pour back, Rough and Finish Carpentry-Mil-work, Store Fixture Install, Miscellaneous Steel and Structural Steel, Framing & Drywall, Acoustical ceiling, Painting, Tile, Vinyl, and Wood flooring Doors frames hardware, FRP, Toilet accessories, ADA Signage, Glass & Glazing, Stone counter tops, Fire protection, Plumbing, HVAC, Electrical, & Fire Alarm RFQ for General Contractors, Landscaping Contractors Evergreen MAND 3/19 @ 10AM at 3095 Yera Buena Rd., San Jose ONLINE 10:00 AM San Francisco San Jose Prebid Information Valley College Central Green/Arts Plaza 10:15 AM Sacramento 10:30 PM Sacramento 11:00 AM North Highlands 11:00 AM Rio Vista 12:00 PM Fremont Notice is hereby given that the San José/Evergreen Community College District (DISTRICT) has determined that all General Contractors bidding on the Evergreen Valley College – Central Green /Arts Plaza, Project #223 to be undertaken by the DISTRICT, must be prequalified before submitting a bid on the PROJECT. Notice is further given that due to the significant amount of primary landscape work involved in the project, all Landscape Subcontractors intending to submit sub-bids and be listed by a General Contractor, must also be prequalified. It is mandatory that all General Contractors, Landscape subcontractors (CONTRACTOR) who intend to submit a bid or a sub-bid for the PROJECT, fully complete pertinent parts of the Prequalification Questionnaire, provide all materials requested herein, and be approved by the DISTRICT to be on the final prequalified bidders/sub-bidders list. No bid will be accepted from a CONTRACTOR that has failed to comply with these requirements. If two or more business entities submit a bid as part of a Joint Venture, or expect to submit a bid as part of a Joint Venture, each entity within the Joint Venture must be separately qualified to bid. Smythe Academy Hard Court and Play Field Improvements MAND 3/20 @ 1PM at 700 Dos Rios St., Sacramento Earthwork, trenching & backfilling, soil treatment, erosion control, site drainage, pavement sealer & striping, asphalt paving, irrigation, chain link fences & gates, planting, site concrete Rio Tierra Junior High School Parking Lot and Hardcourt MAND 3/20 @ 11:30AM at 3201 Northstead Dr., Improvements Sacramento Earthwork, trenching & backfilling, soil treatment, erosion control, site drainage, pavement sealer & striping, asphalt paving, irrigation, chain link fences & gates, planting, site concrete Futures High School Parking Lot and Hardcourt Improvements MAND 3/20 @ 9AM at 3701 Stephen Dr., North Higlands Earthwork, trenching & backfilling, soil treatment, erosion control, site drainage, pavement sealer & striping, asphalt paving, irrigation, chain link fences & gates, planting, site concrete Waterfront Promenade Extension 3/24 @ 10AM at One Main St., Rio Vista The scope of work consists of saw cut and removal of existing asphalt paving, grinding down of welding pads/bands on existing concrete, and removal of miscellaneous items. Construction of concrete walks, chain link fencing, post and chain fencing, concrete edge band, decomposed granite paving, and associated improvements. Also, base work, grading, drainage and various site improvements as associated with above mentioned work. Installation of new benches, trash receptacles, lighting, irrigation and planting in accordance with the Drawings and Specifications. Additive Alternative 1 may be added, which shall consist of the construction of an arbor on existing concrete pad NEW Bennigans Restaurant The interior work in this interior improvement project includes, but not limited to, installation of wrought iron fence & gate around exterior patio areas; demolition; roof support for new roof mounted equipment; construction of new interior walls & interior partitions, new wall, floor & ceiling finishes; installation of plumbing fixtures, replacement of restroom fixtures; HVAC; lighting & electrical work, landscape system, fire suppression system Page 5 of 65 ONLINE ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location 3/31/2015 12:00 PM Walnut Creek Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE NEW Flywheel Sports Studio Tenant improvements, including but not limited to plumbing, HVAC, doors & windows, roofing, ceiling, concrete DO NOT CONTACT OWNER/ARCHITECT/CONSULTANTS 2:00 PM Richmond Giaramita Street Sidewalk Replacement Project $280000 Recommended 3/16 @ 10AM Water pollutuion cintrol, clearing & grubbing, landscape, aggregate bases, bituminous seals, hot-mix asphalt, concrete structures, concrete curbs & sidewalks, traffic stripes & pavement markings, median, curb & HMA dike details, driveway ramp details, doweling details for curb & sidewalk, signing & striping standards ONLINE 2:00 PM Yolo County Design and Oversee Installation of Arsenic Treatment for Domestic Water System ONLINE The Yolo County Planning, Public Works, and Environmental Services Department is seeking a qualified Engineering Consultant for design of a treatment system to be installed in the domestic water supply at the Yolo County Central Landfill Site. The scope of services is described in the attached Description of Requirements. The selected Consultant’s proposal will become a part of the contract agreement for Professional Services. Please see the 2015 Arsenic Control Design document a the end of this request for complete project details and information. John Borrego @ 530-666-8854 2:00 PM San Joaquin County 2:00 PM San Francisco 2:00 PM San Francisco Solar PV – Power Purchase Agreement ONLINE MAND 3/10 @ 9:30AM San Joaquin County Public Works is seeking proposals from interested and suitably qualified firms for a Solar Power Purchase Agreement. CVS #10330 - GEARY SF 3/19/15 @ 9:30am Online This is an all Union Contractor Project. Remodel of existing building for a NEW CVS Pharmacy. Work includes Interior/Exterior Demolition, Concrete Patch, Misc Steel (roof curbs), Rough Carpentry (roof curbs), Insulation, Roof Patch, Doors/Hardwares, Interior/Exterior Finishes, Fire Protection, Plumbing, HVAC and Electrical + Low Voltage. Job walk 3/19/15 from 9:30 AM to 11:00 AM. Please contact James Morefield at 916-408-6950 ext 109 or [email protected] with any SCOPE QUESTIONS. Please contact B Austin at 916-408-6950 or [email protected] with an PLAN DISTRIBUTION NEEDS. Thanks in advance, James Morefield $80000 ADA Taxi AVM Pedestrian Access 3/19 @ 10AM ONLINE Demolish existing partial concrete sidewalk and prepare existing concrete slabe on grade to receive new concrete cast-in-place curbside and pedestrian ramps with galvanized pipe handrails, non-slip surface applied coating and tactile warning pad for ADA Taxi AVM Pedestrian Access Also included are two existing ground wires with new conduits and ground box to be relocated Jorge Garcia, Contract Manager, @ 650-821-5515 2:00 PM Sacramento American River College Chiller Replacement Recommended 3/18 @ 10AM at 4700 College Oak Dr. Sacramento Replacement of existing trane chiller at the Boiler Plant, including HVAC, testing, adjusting & balancing & electrical system Page 6 of 65 $300000 ONLINE Bid Date Bid Time Location 3/31/2015 2:00 PM 2:00 PM 2:00 PM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $2600000 Recommended 3/17 @ 11:30AM at 6201 S Street, Sacramento The scope of work includes the contractor providing, installing, maintaining, and removal of 42 modular buildings at SMUD's Field Reporting Facility Sacramento, Ca. The contractor will be responsible for site demolition and extending existing site utilities to the modular buildings and the restoration of the sites back to their original state after the modular buildings have been removed. The total contract duration is for approx. 2 1/2 years which includes approximately 2 years after the modular buildings have been assembled and occupants moved in, where the contractor will be responsible for ongoing equipment maintenance, any warranty work, and site restoration $490000 Inclement Weather Cover - East Campus Operations Center Recommended 3/17 @ 10AM at 4401 Bradshaw Rd., Sacramento Sacramento The project will entail a new cover on the West side of the Warehouse. This cover will be 230’ long and will project 76’ from the face of building. The cover will provide workers and area of shade and rain cover while maintaining the building’s ongoing operations and function. While this is not a LEED project energy efficiency and sustainability improvements are also a goal of the cover. Scope includes energy efficient LED lighting and skylights as part of the design. Project scope summary in Section 2.3 will serve as a guideline for the IWC project. $1800000 Sacramento NEW Thomas Edison Language Institute New Classroom Buildings L & M, 3/19 @ 3PM Sacramento Furnish and Install Modular Buildings ONLINE ONLINE ONLINE Increments No. 1 & 2 (Lease - Leaseback) (NO GC OPENINGS) Construct site and infrastructure improvements for a new modular classroom and modifications to existing classrooms, including demolition, site utilities, excavation, grading, AC paving, concrete paving, curbs and gutters, striping, ADA upgrades and signage, landscaping, irrigation, fence modifications, modular building, plumbing, HVAC, electrical and low voltage systems. ONLINE 2:00 PM Sacramento 2:00 PM San Pablo 2:00 PM Fairfield 2015 Citywide Concrete Replacement Project Richmond Replacement of concrete curb, gutter, sidewalk, driveway, median paving & ADA ramps throughout the city, including asphalt cutting to re-contour roadways, fribeway approaches, pedestrian & bike pathways to the new concrete facilities $1000000 R Line P-377 to P-380 Structure Upgrade 3/11 @ 10AM at 300 Lakeside Dr., Oakland 2:00 PM Henry HE094 - CalSeal Crack Sealer Purchase of 113,750 pounds of Henry HE094 - CalSeal Crack Sealer, in 35 lb. boxes. Lake Elementary School Fire Alarm Modernization MAND 3/12 @ 10AM at 2700-11th St., San Pablo Upgrading the existing fire alarm system for the child care portable building and connecting it to the main school system, and removing the existing child care building alarm system after the new system is activated. Scope also includes associated Hazardous Materials Abatement. $185000 ONLINE ONLINE ONLINE $1500000 Structural upgrade NOTE: The exchange may or may not get addenda for this project per BART. 2:00 PM Ceres $1725000 Blaker-Richland Water Main Project The work involves the installation of approximately 10,502 lf of 16” water main, 65 lf of 10” water main, Bore and Jack 330 lf of 24” steel casing, rehab 39 sewer lateral crossings, install 2 drop manholes,(1) 8” gate valve, (5) 10” gate valves, (23) 16” gate valves, (1) 18” gate valve, (11) air relief valve assemblies, (4) fire hydrant assemblies, 10, 165 lf of AC trench patch, (9) traffic loops, and 10,165 lf of 4” SCH 80 conduit Page 7 of 65 ONLINE Engineers # of Plan Estimate Addenda # Bid Date Bid Time Location Plan Name / Scope of Work 3/31/2015 2:00 PM Berkeley Multi-Space Parking Meter Upgrades ONLINE 2:00 PM Dublin The City of Berkeley is soliciting written proposals from qualified firms or individuals that provide multi-space parking meters capable of integrated upgrades with the City’s existing multi-space parking. As a Request for Proposal (RFP) this is not an invitation to bid and although price is very important, other factors will be taken into consideration $11080856 Fallon Sports Park-Phase II MAND 3/6 @ 10AM at 4605 Lockhart St., Dublin Work includes:one bnatural grass baseball field; two synthetic turf soccer field; group picnic area; play area; restroom/concession building; scorekeepers booth; bocce courts; concrete terraced seating; concrete steps; concrete walkways; pathway lighting, sports field lighting; site furnishings; trellises; widescreens; shade structures; trash enclosure; planting; site grading & drainage ONLINE 2:00 PM Fairfield 2015 Citywide Signing and Striping Replacement Project Hayward Placement of paint and thermoplastic materials for the purpose of traffic and bike lane striping, roadway legends, pedestrian crosswalks and other transportation related markings. The work further includes placement of raised markers, roadside signs, and removal of roadway striping, legends, raised markers, and signs. $85000000 Construction of Hayward Maintenance Complex Project Maintenance 3/5 @ 10AM at 1029 Whipple Rd., Hayward 2:00 PM Prebid Information $600000 ONLINE B001/T0 $100000000 Facilities Construction of two maintenance facilities:1) Hayward Main Shop Modifications and 2) Component repair Shop. 2:00 PM Los Altos 065C El Monte Road Preservation Traffic control, replacement/construction of concrete curb ramps, replacement of concrete curb & gutter, 2-inch full road width grind, 6-inch AC digout base repairs, traffic detector loop replacement, adjustment of utility covers/frames to finish grade 2:00 PM Monterey Eddie Burns Lane Drainage Improvement Project The work, in general, consists of construction of concrete v-gutters and associated conform paving. The work shall include but not be limited to demolition of existing pavement, AC and concrete paving, construction of concrete valley gutter, and replacement of catch basins and grates. Page 8 of 65 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 3/31/2015 2:00 PM Newark Newark Backyard Sanitary Sewer Relocation Phase 2 2:00 PM Novato Prebid Information $2550000 MAND 3/19 @ 9AM at 5072 Benson Rd., Union City The project scope consists, in general, of the following type of work: •Construction of approximately 3,175 linear feet of 8-inch diameter SDR-26 PVC sanitary sewer by open-cut method. •Construction of approximately 230 linear feet of 8-inch diameter C-900 DR-14 PVC sanitary sewer by open-cut method. •Removal and replacement of existing concrete encased sewer with approximately 450 linear feet of 8-inch diameter SDR-26 PVC sanitary sewer by open-cut method. •Installation of 4-inch diameter DR-17 HDPE sanitary sewer laterals by horizontal directional drilling (HDD) for 88 residences. •Installation of 4-inch diameter C-900 DR-14 PVC sanitary sewer laterals by open cut construction for 5 residences. •Connection of existing concrete encased front yard sanitary sewer laterals to new sanitary sewer mains for 10 residences. •Connection of sewer laterals to existing sewer laterals in backyard. Cap existing backyard sewer laterals. •Removal of approximately 475 linear feet of existing 6-inch diameter sanitary sewer. •Abandonment of approximately 3,535 linear feet of existing 6-inch diameter sanitary sewer. •Connection to and modification of one existing sanitary sewer manholes. •Construction of 12 standard sanitary sewer manholes. •Removal of 11 sanitary sewer manholes/risers and abandonment of 8 sanitary sewer manholes/risers in place. •Removal and replacement of approximately 90 linear feet of 15-inch diameter Class III RCP storm drain by open cut method. •Connection to and modification of 2 storm drain inlets. •Locate existing sanitary sewer laterals on private properties. •Site restoration •Sewage flow control •Traffic control ONLINE $350000 $400000 ONLINE NEW Measure A Group 7 Pavement Rehabilitation Contract 1 - Roadway Preparation and Concrete Work 2:00 PM Davis Engineers # of Plan Estimate Addenda # The work to be done includes, but is not limited to: removal and replacement of street tree-damaged concrete curb, gutter and sidewalk, removal and replacement of street trees, construction of ADA compliant access ramps, pavement rehabilitation consisting of asphalt concrete dig-out and patches, roadway preparation for future scrub seal and micro-surfacing, and other items or details not mentioned above that are required by the plans, standard specifications, or the special provisions to be performed, placed, constructed, or installed. $3032000 Earth and Planetary Sciences Shockwave Lab MAND 3/17 @ 1:30PM at 255 Cousteau Place, Davis Provide all labor, materials, equipment, tools, transportation, insurance, and services to construct a 3,411 gross square foot, “H2” Occupancy, Research Laboratory facility of Type 1A construction, as well as renovation to the existing Physics Building. The Physics Building will remain occupied for the entire duration of the Project’s construction. The work includes, but is not limited to demolition, renovation and construction and consist of civil utilities, civil grading, landscape, structural, architectural, fire protection, plumbing, mechanical, and electrical construction. The Work of this Contract is divided into 2 Phases. Phase 1: Approximately 860 square foot area of the existing Physics Building basement level breezeway walls will be renovated to 1 hour fire rated construction. Phase 2: Removal of the existing modular buildings from the project site; construction of a new 3,411 square foot one level addition to the existing Physics Building of a H2 occupancy research laboratory with special consideration for blast protection. The Laboratory consists of a large Main Laboratory, Control Room, Sample Laboratory, Magazine Room and exterior equipment yard. Work also includes 400 square foot renovation of the existing Physics Building ground level restrooms to meet current Accessibility Code and includes replacement of finishes, openings, plumbing fixtures, and lights; fire alarm strobes will also be added; replacement of the existing basement level corridor door hardware and signage so that doors and signage meet current Accessibility Cod Page 9 of 65 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 3/31/2015 2:30 PM San Juan Avenue Street Improvements Walnut Creek Prebid Information Engineers # of Plan Estimate Addenda # $550000 $600000 Online O The Project includes, but is not limited to, performing the following Work: • Clearing and Grubbing • Drainage Improvements • Concrete Curb, Gutter, Sidewalk, and Curb Ramps. • HMA Paving • Traffic Striping • Utility Adjustment • Traffic Control • Signage .....This Project is on San Juan Avenue from Gabriel Court to Alvarado Avenue in the City of Walnut Creek Construction to begin June 15, 2015 2:30 PM Livermore 3:00 PM Fairfield 3:00 PM Saint Helena 3:00 PM Elk Grove 3:00 PM Davis 4:00 PM Los Altos $195000 Centralized Irrigation System The Work comprises the replacement and upgrade of existing irrigation controllers to web based controllers. The project consists of furnishing all labor, materials, and incidentals for the installation of new EGi Series Irrigation Controllers with communication kit and steel cabinet enclosure, including demolition, earthwork, concrete surface improvements & irrigation systems $1400000 City Parks Lighting Project-Phase 3 (Allan Witt Community Park) MAND 3/17 @ 10AM at 1741 West Texas, Fairfield Meter service enclosure, pathway and parking lot lighting, loitering deterrent system, electrical equipment and devices, associated electrical infrastructure, and demolition of light fixtures not owned and removed by PG&E. Hennessy WTP Buldings Painting Project-2015 MAND 3/19 @ 10AM at 1100 Sage Canyon Rd., St Helena $50000 Painting of various structures at Hennessy Water Treatment Plant $27000 9200 Meadow Grove Improvements 3/16 @ 10AM The proposed Work shall be performed in accordance with the plans, specifications and other contract documents and shall include but not be limited to the following: general rehabilitation, installation of kitchen cabinetry and countertops, and plumbing, gas, and electrical work to support the improvements at a residential property. RFQ North Davis Meadows Water System Consolidated MAND 3/19 @ 9AM at 24439 Fairway Dr., Davis The water supply for North Davis Meadows development located on Country Road 29 in Yolo County (Attachment #2), has been from local water wells. There is an interest within that community and the Yolo County Board of Supervisors to take the domestic water off of the well system and receive water from the City of Davis. The City of Davis would route transmission and distribution pipes to the development. Subsequently, each of the 95 services would be switched from the unmetered local well water mains to the City of Davis water mains and metered. Some of the services have unique plumbing configurations. $693000 RFP-Repair Maintenance Problem Areas E388B/0 ONLINE E391B/0 ONLINE ONLINE ONLINE The City of Los Altos is soliciting proposals from qualified engineering firms to provide design and construction services for a project on the city’s sanitary sewer system. The work includes the preparation of plans, specifications, construction cost estimate and other contract bid documents, bid period support and construction services for the construction project. 4:00 PM Gilroy ONLINE RFP City of Gilroy Wayfinding Signage Phase II Furnish all labor and materials associated with the manufacturing, installation, maintenance and storage of all Wayfinding Signage Project Phase II signs. Incidental tree trimming associated with sign installation must also be included in the proposal. The business must also be able to, lock in the unit price for each sign type for a three year period. 4/1/2015 1:30 PM Ione Pardee Recreation Area Recreational Vehicle Park Improvements 3/10 @ 9AM $3500000 $4500000 Work includes demolition of existing 3.4 acre Recreational Vehicle (RV) park infrastructure, including paving and utilities, and construction of a new RV park at the same location. Construction will include grading, paving, striping, construction of all utilities, and landscaping. Page 10 of 65 007C/E3 Bid Date Bid Time Location 4/1/2015 1:30 PM 1:30 PM Oakland Oakland Plan Name / Scope of Work Prebid Information MWWTP Primary Sedimentation Tanks and Channels Rehabilitation, Phase 3 3/10 @ 10:30AM at 2020 Wake Ave, Oakland Engineers # of Plan Estimate Addenda # $4300000 $5400000 Work generally includes the concrete rehabilitation of primary influent channels at a wastewater treatment plant and other related modifications including: temporary bulkheads and shoring; dewatering and sludge removal; replacement of concrete roof slab and beams; concrete repairs, resurfacing and coating; temporary centrate piping; concrete floor fill and sloping; concrete divider wall construction; installation of slide gates; construction of new sump discharge line; re-coating existing butterfly gates and piping; replacement of two large channel control butterfly valves with new owner furnished valves; removal of abandoned mechanical piping and valves; replacement of existing of mechanical equipment including centrate, air and wash down water piping, valves and other utility piping, and installation of new valves, piping, and fabricated and manufactured pipe supports; rerouting HVAC ductwork; replacement of electrical equipment including control panels and conduits; demolition of two boilers/steam generators and associated components, and performing related work all as described in these Drawings and Specifications. $230000 MWWTP Administration Building UPS Replacement 3/17 @ 10:30AM at 2020 Wake Ave., Oakland ONLINE ONLINE $270000 Work includes replacement of the existing 30 kVA, 480V, 3 Phase UPS with new 30 kVA, 480V, 3 Phase UPS system including UPS, external maintenance bypass switch, and batteries. Related work includes the installation of structural braces, placement of concrete equipment pads, electrical conduit work, installation of sensors and switches, and rerouting equipment. 1:30 PM San Ramon San Ramon Valley Recycled Water Pipeline-Bishop Ranch Encouraged 3/17 @ 10AM $4500000 $5000000 E387B Work includes furnishing and installing 3,060 feet 6-inch, 4,225 feet of 8-inch, 3,975 feet of 12- inch and 6,705 feet of 16-inch diameter PVC pipe; 135 feet of 6inch, 95 feet of 8-inch, 630 feet of 12-inch, and 625 feet of 16-inch diameter Mortar Lined and tape wrapped or Plastic Coated Steel (ML&PCS) pipe; and perform related required work located in the City of San Ramon and the Town of Danville, as specified and as shown on the contract drawings. 10:00 AM Dublin 2014-2015 Annual Sidewalk Safety Repair Program and Curb Ramp Installation (G15015 and C15015) $81321 ONLINE The Project is more specifically defined in the Contract Documents, but generally includes: furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of the following: curb and gutter, sidewalk, asphalt concrete pavement, pedestrian curb ramps, and doing all appurtenant work in place and ready for use, all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as shown above, now on file in the office of the Public Works Director, to which reference is hereby made for further particulars. San Rafael ADA-DOJ Curb Ramps 2014-2015 E390B/0 10:00 AM Sacramento ONLINE 10:00 AM San Carlos Excavation, removal of existing concrete sidewalk, curb, gutter & catch basin & construction of new sidewalk, curb, gutter, curb ramps, storm drain improvements & roadway markings Hazel Strauch Painting Project MAND 3/24 @ 10AM at 3141 Northstead Dr., Sacramento Painting work $250000 City Hall and Adult Community Center Elevator Rehabilitation Project 3/24 @ 10AM 10:00 AM 10:15 PM Sacramento E394B $300000 Removal and installation of a new interior elevator cab with new controls, doors, fixtures, panels and equipment, hallway push buttons, reconditioned entrance doors, and new or reconditioned elevator pit equipment such as the hydraulic jack assembly and feed lines. Norwood Junior High Painting Project MAND 3/24 @ 11:15 at 4601 Norwood Ave., Sacramento Painting work Page 11 of 65 ONLINE Bid Date Bid Time Location 4/1/2015 10:30 AM Rio Linda Plan Name / Scope of Work Prebid Information Rio Linda Preparatory Academy Painting Project Engineers # of Plan Estimate Addenda # MAND 3/24 @ 12:30PM at 1101 G St, Rio Linda ONLINE MAND 3/9 @ 9AM ONLINE Painting work 11:00 AM 2:00 PM Napa County Clayton Oakville Crossroad Bridge Replacement The proposed project replaces the existing bridge which is 23 feet wide by 92 feet long with a new structure which will be approximately 32.67 feet wide by 120 feet long. The new bridge will be a 2-span, cast in place conventionally reinforced concrete box-girder bridge structure requiring the construction of two abutments with retaining walls and one pier. The new structure will carry two lanes of traffic on approximately the same horizontal alignment. The bridge will pass over the Napa River at a higher elevation (approximately 3 feet higher) to meet current hydraulic design standards. In addition to the new bridge the road approaches to the bridge will be widened and raised to meet the new bridge elevation and width. The westerly road approach will be about 293 feet long and the easterly approach will be about 261 feet long. $350000 Mount Diablo State Park Mary Bowerman Trail Accessibility MAND 3/17 @ 10AM 2:00 PM Santa Rosa 2:00 PM San Jose 2:00 PM Various 2:00 PM 2:00 PM Citrus Heights Berkeley ONLINE $525000 Improvements Selective Structure Demolition, Unit Paving (Truncated Dome Concrete, Paver), Cast-In-Place Concrete, Exterior Rough Carpentry, Site Furnishings, WSLPP, Earth Moving, Asphalt Paving, Concrete Paving, Concrete staining, Landscape Rock, Parking Bumpers, Pavement Markings $2200000 High Strength Waste Receiving Facility MAND 3/19 @ 9AM at 4300 Llano Rd., Santa Rosa Div_03-concrete; Div_05-metal flashings; Div_07-joint fillers, joint sealants; Div_10-signage; Div_22-plumbing; Div_26-electrical; Div_31-excavation & fill; Div_32asphalt paving; Div_40-process integration; Div_43-process gas & liquid handling, purification Relocatable Building Installation at Blackford CACE MAND 3/12 @ 2PM at 3800 Blackford Ave, San Jose Div_02-general site preparation, grading, trench backfill, general demolition, site drainage, asphaltic concrete paving, portland cement concrete paving, decomposed granite paving, aggregate base, chain link fencing & gates, irrigation, planting; Div_16-fire alarm, PA/intercom & clock system, intrusion alarm system, electrical $5500000 California Aqueduct Reverse Flow Project MAND 3/18 @ 9AM at 25001 Pole Line Road, Los Banos ONLINE ONLINE ONLINE $6500000 The work to be completed under this Contact shall consist of furnishing all tools, equipment, materials, supplies and manufactured articles and furnishing all labor, transportation and services, including fuel, power, water, security and essential communications, and performing all work, or other operations required to construct the CALIFORNIA AQUEDUCT REVERSE FLOW PROJECT as shown on the Drawings and detailed in these Specifications. The work includes, but is not limited to, construction, operation and maintenance of the temporary facilities, generally described below, and related electrical and control equipment; piping; and grading work associated with these facilities for a complete operating installation RFQ-Lease-Leaseback Construction Services for CarriageMAND 3/19 @ 3PM at 7519 Carriage Dr., Citrus Heights ONLINE Concrete/Paving Replacement The Board of Trustees of the San Juan Unified School District (“SJUSD” or “District”) is seeking qualified providers of lease-leaseback construction services (“LLB Entity”) to provide preconstruction and construction related services for the Carriage Concrete/Paving Replacement Project Willard MIddle School Modernization MAND 3/19 @ 2:30 PM at 2425 Stuart St., Berkeley Remodel of existing multipurpose room including the kitechen area; remodel the gymnasium girls restroom; re-roofing two buildings; replacement of the boiler; painting the exterior; replace door hardware; window replacement; new public address system; ventilation & electrical modifications; site accessibility improvements Page 12 of 65 ONLINE Bid Date Bid Time Location 4/1/2015 2:00 PM Sacramento Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $900000 Freeport Boulevard Sewer Replacement, Weller Way to 8th Avenue ONLINE The work to be performed consists ofreplacing approximately 1,130 lineal feet of sewer pipeline, manholes, drain inlets,sewer services, and associated work during the school summer break of 2015. TheContractor shall provide all labor, materials, tools and equipment, and shall perform allwork necessary to complete the subject project in place and make all requiredconnections to the existing combined sewer system as shown on the Plans and asspecified. 2:00 PM Patterson Sonia Lopez @ 916-808-1456 NEW Crows Landing Road at West Main Street Intersection Upgrade $3450000 ONLINE Project Intersection widening in all directions including; left turn lanes, approach tapers, decelerations lanes, and lane transitions. Construction of traffic signals. Installation of striping and signage. Upgrade road drainage and storm drain system. Construct new storm drain pump station.. Denis Bayzuk @ 209-541-2509 2:30 PM San Francisco As-Needed Curb Ramp Construction for Paving Program No. 3 3/16 @ 1PM at 1680 Mission St., 3rd Fl, San Francisco $1300000 ONLINE The Work is on an as-needed basis and located at various throughout San Francisco, California and consists of curb ramp construction, sewer and drainage work, traffic routing and all associated work Ramon Kong, Project Manager, @ 415-554-8280 2:30 PM San Francisco Golden Gate Parking Garage Ventilation Improvements 3/19 @ 10:30AM at 30 Van Ness Ave, 5th Fl, San Francisco $2100000 ONLINE Work consists of exhaust fans and supply fans replacement, furnish and install carbon monoxide detection systems, energy management system, damaged ductwork replacement, duct cleaning, storm drainage system, electrical work and all appurtenant work in accordance with specifications and drawings. 3:00 PM 3:00 PM Douglas Ullman, Project Mgr, @ 415-557-4722 $75000 RFP for Bracher Park Playground Improvement Project NEW MAND 3/19 @ 11AM Santa Clara The City of Santa Clara is seeking proposals from qualified firms to provide playground equipment for Bracher Park. All equipment shall meet American Disabilities Act (ADA), United States Consumer Products Safety Commission (USCPSC) standards and American Society for Testing and Materials (ASTM) guidelines. In addition, proposals must comply with any other California, federal and local requirements for play equipment. Tarffic Signal Modification-Sunnyvale-Saratoga Road at Fremont Optional 3/17 @ 2PM at 456 W.Olive Ave, Sunnyvale Sunnyvale Avenue Furnishing all labor, materials, and equipment and performing all work necessary and incidental to the completion of the project known as "Traffic Signal Modification – Sunnyvale-Saratoga at Fremont Avenue, Project No. TR-13/05-14" consisting of modification of traffic signal equipment at – Sunnyvale-Saratoga at Fremont Avenue, installation of accessible pedestrian signal, push buttons, yellow reflective backplates, and LED safety lighting fixtures, installing two changeable message signs on a new pole and removing and salvaging two street light poles, according to plans and specifications prepared by the City of Sunnyvale and according to the contract documents. Page 13 of 65 ONLINE ONLINE Bid Date Bid Time Location 4/1/2015 3:00 PM Santa Clara 3:00 PM San Jose Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # Serra-Brokaw Re-Conductoring Project Voluntary 3/9 @ 9:30AM at 1500 Warburton Ave, Santa Clara Site demolition, erosion control, earthwork, water system, asphalt concrete paving, utility poles, site grounding, subdrainage, storm drainage system, signage, stripping & marking, irrigation, landscaping, landscape maintenance, electrical ONLINE Rocco Colicchia, Project Manager, @ 925-348-1098 SJCC & EVC Proposition 39, Year 2, LED Lighting Upgrade Project Materials Only ONLINE 3/25 @ 2PM at 3095 Yera Buena Rd,, San Jose The contractor shall be responsible for coordinating with the lighting fixture manufacturers and Enlighted to determine if either company shall pre-install the Enlighted components in the lighting fixtures. For any lighting fixtures that do not contain pre-installed Enlighted components, the contractor shall install the required Enlighted components. For any non-linear suspended lighting fixtures that do not have an integral Enlighted sensor, the contractor shall be responsible for installing the low voltage cable and sensors. For any lighting fixtures that have remote Enlighted control units and remote sensors and low voltage cables, the contractor shall be responsible for providing the labor to install all the required Enlighted components. 3:00 PM Sunnyvale 4:00 PM San Jose The contractor shall be responsible for providing a complete and operational lighting and control system. This will require coordination with the lighting manufacturers and Enlighted to determine on a fixture by fixture basis if additional labor is required. Traffic Signal Modification-Mathilda Avenue at Maude Avenue Optional 3/17 @ 2PM at 456 W. Olive Ave, Sunnyvale Modification of traffic signal equipment at Mathilda Avenue and Maude Avenue, installation of accessible pedestrian signal, push buttons, yellow reflective backplates, and LED safety lighting fixtures, installing two changeable message signs on a new pole and removing and salvaging two street light poles, according to plans and specifications prepared by the City of Sunnyvale and according to the contract documents $26000000 RFQ Berryessa Station Campus Area And Roadways ONLINE ONLINE The C742 Berryessa Station Campus Areas and Roadways Contract at the Berryessa Campus is a design bid build contract that includes the construction of approximately 2700-foot long Berryessa Station Way Street located between Berryessa Road and Mabury Road, roadway improvements, 330-space surface parking lot, BART Police Zone Facility and VTA Ancillary Building. The scope of work includes: • Demolition, clearing, earthwork, paving and pavement delineation, site utilities and utility relocation, storm water treatment basins, landscaping, irrigation sleeves, signing, signals, lighting, electrical work and related appurtenances to construct a new city street, sidewalks and islands, Bus Transit Center, pedestrian plaza and parking lot for the proposed Berryessa Transits Center Campus, BART Police Zone Facility and VTA Ancillary Building with related services including Mechanical, Electrical, Plumbing, Security. The approximate limits of work identified in the Site Plan is included at the end of this Request for Pre-Qualification package. 4/2/2015 1:30 PM Hayward Multipurpose Room and Restroom Renovation at Sorensdale Recreation Center MAND 3/19 @ 9AM at 275 Goodwin St., Hayward $580000 ADA improvements still need to be completed in the main student restrooms in the south hallway. In addition, since the multipurpose room is now available for rent, refurbishments are required in this room, which will include new flooring, roof, ceiling and wall applications. Page 14 of 65 ONLINE Bid Date Bid Time Location 4/2/2015 10:00 AM Orangevale/ Fair Oaks Plan Name / Scope of Work Prebid Information Refurbishing Athletic Fields at Bella Vista HS and Casa Robles HS MAND 3/23 @ 9AM at 9151 Oak Ave, Orangevale Engineers # of Plan Estimate Addenda # $118000 Docs Pe The project consists of, but is not limited to the following scope(s) of work: Remove, grade, and plant approximately 281,572 square feet of athletic turf surfaces at Bella Vista HS – Soccer and Football fields and Casa Roble HS Football field Complete documents will be posted once available 10:00 AM Dublin ONLINE 2015 Annual Street Overlay Program 15-01 The work to be done consists of furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of the following: asphalt concrete pavement repair, striping removal, crack sealing, 1½” overlay, traffic signal detector loops, striping, pavement markings, utility cover adjustments, traffic control, and other items not specifically mentioned herein, and doing all appurtenant work in place and ready for use, all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as shown above, now on file in the office of the Public Works Director, to which reference is hereby made for further particulars. 10:00 AM 10:00 AM Dublin Fremont ONLINE 2015 Annual Street Overlay Program 15-03 Asphalt concrete pavement repair, striping removal, crack sealing, 1½” overlay, traffic signal detector loops, striping, pavement markings, utility cover adjustments, traffic control, and other items not specifically mentioned herein, and doing all appurtenant work in place and ready for use, all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as shown above, now on file in the office of the Public Works Director, to which reference is hereby made for further particulars. Building 22 Roof Replacement Project Second - 3/16 @ 10:30 AM in front of the tower at Bldg 22 The project consists of: ONLINE A. Demolish and dispose existing roofing system including including but not limited to roofing membranes, base flashing, parapet flashing, cant strips, insulation, sealant, down to existing concrete roof substrate. B. Provide and install adhered thermoplastic membrane roof system including but not limited to, membrane, adhesive, coverboard, insulation, membrane flashing, and accessories. C. Install tapered insulation system, provide roof hatch ladder extension and fall protection cage. D. Provide membrane flashing at pipes vents, stanchions, and post. Provide Kynar coated coping system and all necessary component including but not limited to custom cleats for slope, butt plates, fasteners, etc. E. Roof deck coating of exterior elevator. 11:00 AM Modesto Site Paving at Grace Davis High School and Enslen Elementary School MAND 3/25 @ 11AM at 1200 Rumble Rd., Modesto $955000 Div_02-demolition, asphalt concrete paving, portland cement concrete paving, paving marking paint, parking appurtenances; Div_04-concrete unit masonry; Div_16-electrical Page 15 of 65 ONLINE Bid Date Bid Time Location 4/2/2015 2:00 PM Stockton Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE RFP Construction Management for City Hall Relocation for the City of Stockton The City is interested in retaining the services of a Construction Project Manager to oversee the construction of the needed tenant improvements in the building. Those improvements range from construction of a few offices to complete improvements including electrical, interior walls, plumbing and HVAC. Janice Miller @ 209-937-8862 2:00 PM Sacramento 2:00 PM Sacramento 2:00 PM Sacramento $1268000 MAND 3/12 @ 11AM at 9300 Premier Way, Sacramento Div_03-concrete; Div_04-reinforced concrete block masonry; Div_05-welding, miscellaneous metalwork, anchor bolts, extruded aluminum louvers; Div_06-rough carpentry; Div_07-metal roofing, flashing & sheet metal, sealants; Div_08-steel doors & frames, finish hardware; Div_09-arch painting, exterior painting, protective coating; Div_11-mech bar screen; Div_26-instrumentation, electrical; Div_32-asphalt paving, chain link fences & gates $20000 Fire Pump Replacement MAND 3/17 @ 9AM at 1220 N. St., Sacramento The Contractor shall provide all labor, equipment and materials required to replace existing fire pump and fire pump motor with new packaged fire pump & motor. Contractor shall make modifications to existing fire pump piping and install two (2) each hose connections. Work shall include the three (3) year pump testing, inspection and Certification of Buildings Fire Pump System. All work shall be performed in accordance of State Fire Code Regulation, Sacramento Fire Departments requirements. The testing shall also be in accordance with all applicable standards and regulations established by OSHA, NFPA, UL, ANSI, California Code of Regulations, and all other jurisdictional authorities including local, State, and Federal regulation D09 Mayhew Storm Drain Pump Station Rehabilitation Project ONLINE ONLINE Armando Soliz @ 916-552-9036 2:00 PM Sacramento Re-Roofing and Rehabilitating Roofs at Sacramento International Airport and Sacramento Executive Airport 3/18 @ 8AM $210000 Asbestos abatement, sheathing, metal roof & wall panels, metal roof panels for wooden T-hangar bldgs at executive airport, TPO roofing for bldgs at Sacramento International Airport, sheet metal flashing & trim $9615000 Interim NSA Water T-Main Installation & WTP Facilities Improvement MAND 3/19 @ 10AM at 10151 Florin Rd., Sacramento ONLINE ONLINE Project 2:00 PM San Francisco Div_03-concrete; Div_05-miscellaneous metalwork; Div_09-protective coating, pipe mortar lining & coating (NSA pipeline), pipe Polyethylene protective sleeves (NSA pipeline); Div_22-plumbing; Div_26-electrical; Div_31-pipeline & utility work; Div_33-utilities; Div_40-process interconnections; Div_43-process gas & liquid handling, purification & storage equipment; Div_46-water & wastewater equipment $2450340 Airport-Wide Lighting Retrofit 3/19 @ 10AM ONLINE This contract will remove, replace, upgrade, and/or retrofit inefficient fluorescent light fixtures and lamps at various facilities outside of the Airport terminals Ben Cruz, Contract Mgr, @ 650-821-7823 2:00 PM San Jose Replacement of Stevens Creek Bridges on Stevens Canyon Road 3/23 @ 10AM at 101 Skyport Dr., San Jose Removal of existing single span steel girder bridge on steel piles with wooden deck, three stage construction of 60 & 70.5 foot single span cast-in-place prestressed concrete bridge deck supported on reinforced concrete abutments & spread footing foundations, consruction of reinforced concrete cantilever & CIDH retaining walls. Complete documents will be posted once availabel Page 16 of 65 061C Bid Date Bid Time Location 4/2/2015 2:00 PM Union City 2:00 PM South San Francisco 2:00 PM Tracy Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $450500 11th Street Traffic Signal Improvements Paving, sealing, sawcutting, grooving & grinding; thermoplastic striping & pavement markers; pile driving; concrete curing; concrete finishing; sweeping, dewatering; portland cement concrete; welding; construction staking; maintaining traffic; construction area signs; thermoplastic pavement marking; construction area traffic control devices; signals & lighting; cast-in-drilled-hole concrete pile foundations; standards, steel pedestals & posts; conduit, traffic pull boxes, conductors, cables & wiring; light emitting diode signals moduke $40000 Pump Station No. 4 Jib Crane Repair MAND 3/18 @ 2PM at 249 Harbor Way, South San $50000 Francisco This project consists of concrete removal and replacement of the existing JIB crane pad, install and load test the JIB crane, cleaning and coating existing wet wells and channels, etc. ONLINE ONLINE ONLINE City Hall Automatic Entry Door Installation The Project is more specifically defined in the Contract Documents, but generally includes the following work to be performed: Design-build installation of low energy power door openers for three existing City Hall double swing doors, including all required electrical wiring and conduit. The Engineer’s estimate will not be released until the bids are publicly opened. 2:00 PM Turlock 2:00 PM Berkeley 2:00 PM Turlock 2:00 PM Turlock 2:00 PM Riverbank $659398 East Main Street Waterline Replacement Mobilization and demobilization, traffic control, construction project signs, implementation of swppp, saw cutting, remove existing improvements, remove and salvage existing improvements, grinding (cold plane method), connection to existing water main, installation of water main pipe, installation of water valves, installation of water fittings, installation of fire hydrants, water service reconnections, earthwork, aggregate base, hot mix asphalt, installation of survey monument wells, minor concrete, thermoplastic striping, pavement markers Donahue Gym Modernization MAND 3/18 @ 4PM at 1980 Allston Way, Berkeley Remodel of team dressing rooms and restrooms, new entry vestibule, structural upgrades, new solar panels on roof, exterior painting and porcelain cladding. $150000 Cafeteria Transformer Replacement Project MAND 3/17 @ 10AM The work consists of replacing the existing vaulted transformer with a utility style pad mounted transformer, including demolishing the existing electrical infrastructure at the cafeteria & disposing of the existing equipment, furnish & install new tarnsformer, feeders & related equipmentfor a complete operable system Library Switchgear Replacement Project MAND 3/17 @ 10AM The work consists of the replacement of the existing substation with a utility style pad mounted transformer & new distribution, including demolishing the existing electrical infrastructure at the library & disposing of the existing equipment. Riverbank High School-All-Weather Track MAND 3/20 @ 9AM at 6200 Claud Rd., Riverbank Lease Leaseback Project. Briefly and without force and effect upon the contract documents, the work of the contract can be summarized to include the following. • Demolition of existing track, track and field events, concrete curbs and concrete walks indicated on the drawings. • Construction of a 9 lane all-weather track, track and field events, and associated improvements. • Base work, drainage and various site improvements as associated with above mentioned work. • Construction of new fencing Page 17 of 65 ONLINE ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location 4/2/2015 2:00 PM San Mateo County 2:00 PM El Sobrante 2:00 PM Alameda Plan Name / Scope of Work Prebid Information Peninsula Vegetation Removal 03/17/15 @ 10:00 am at 1000 El Camino Real, Millbrea Engineers # of Plan Estimate Addenda # $6900000 The objective of the project is to remove non-native trees from approximately 48 acres and restore approximately 0.5 acre of wetlands within the SFPUC Watershed located in unincorporated San Mateo County. The work is to be performed in San Mateo County, California. This contract requires bidder prequalification by the SFPUC. Only contractors who have successfully completed the pre-qualification process for the category of work titled: “Habitat Development Projects”, as posted at http://sfwater.org/pre-qualify, will be allowed to submit bids for this contract. $60000 Kennedy Grove Trail Repairs MAND 3/19 @ 10AM at 6531 San Pablo Dam Rd., El Sobrante Trail: Grind in place 6 inches of AC compact to 95% install 1/2" AC at 3 inches. Provide and install 2FT wide AB shoulder. Restrooms: Remove existing AC paths ans curbs and replace to meet current ADA standards. ONLINE E393B NOTE:Only those prospective Bidders who have purchased BID DOCUMENTS directly from the District may bid on this contract. Alameda Police Department Restroom Upgrades $74000 ONLINE The work involves, but is not limited to, upgrading the existing floor plan to an ADA compliant fully functional locker space with shared use of the adjoining restroom. Demolition of existing floor plan involves the removal of existing toilets and associated partitions, non-load bearing secondary walls, all existing tile, lavatory and drywall ceiling along with light fixtures and plumbing. Remedial installation involves relocating the existing plumbing; doorway; lighting; preparation for new lockers; minor electrical; adding a new doorway; insulating and sheet rock all demolished surfaces; and retiling flooring and new shower area with appropriate pitch and drain. Installation of new shower with retractable bench, and all associated finish work as per the plans and specification Jesse Barajas or Bob Zonfrello @ 510-747-7900 $140000 2:00 PM Oroville 2:00 PM Calistoga 2:00 PM Elk Grove Wayfinding Signage Project (WCE006) Folsom The proposed work shall be performed in accordance with the plans, specifications, and other contract documents and shall consist of the following: furnish and install new wayfinding signs and posts. All materials, equipment, and labor necessary to complete the work shall be provided by the Contractor (Work). $40000 Folsom Lake College Athletic Complex Audio Recommended 3/25 @ 10AM at 10 College parkway, Folsom Procurement & installation of DSA compliant audio systems at Folsom College Baseball & Softball fields 2:00 PM DESS Adoptions & Eligibility Unit Expansion - Demoltion & Remodel 3/10 @ 10AM Interior Demolish and remodel the interior and supply / install Category 5e voice and Category 6 data communication cabling to designated outlet locations. NEW Calistoga Elementary and Jr/Sr High School Modernizations 3/18 @ 1:45PM & 3/25 @ 1:45PM Div_2-selective demolition; Div_03-concrete; Div_05-structural steel, miscellaneous metals; Div_06-rough carpentry, finish carpentry, arch woodwork; Div_07insulation, mineral fiber cement siding, modified bituminous membrane roofing, flashing & sheet metal, joint sealers; Div_08-steel doors & frames, wood doors, entrances & storefronts, finish hardware, glass & glazing; Div_09-tile backer board, gypsum drywall, tiling, acoustical ceilings, resilient flooring, sheet carpeting, fabric wrapped panels, painting; Div_10-signage & graphics, toilet & restroom accessories, fire extinguishers, cabinets & accessories; Div_12-window shades; Div_22-plumbing; Div_23-HVAC; Div_26-lighting, electrical; Div_27-communications; Div_28-fire detection & alarm; Div_31-earth moving; Div_32-asphalt concrete paving, chain link fencing & gates $212000 $344000 Page 18 of 65 ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location 4/2/2015 2:00 PM Fremont Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Fire Station Landscape Maintenance Services This work shall include all supervisors, labor, materials, equipment, tools, supplies and services to maintain in a superior condition all landscape areas, irrigation and drainage systems and other related work. All work shall be performed in a workmanlike manner, using quality equipment, and Bay-Friendly methods and materials. $170000 Madison Expansion Interim Housing P-11 & P-12 MAND 3/12 @ 2PM Div_05-metal fabrication; Div_06-rough carpentry, finish carpentry, arch wood casework; Div_07-sheet metal flashing & trim, sealants; Div_08-door hardware; Div_09-painting; Div_10-signage; Div_11-Plumbing; Div_26-lighting, intrusion alarm, fire alarm, electrical; Div_32-asphaltic paving, chain link fences 2:00 PM Oakland* 2:00 PM Martinez 2:00 PM Mather Abatement and Demolition of Buildings 3382 and 4302 Mather Airport 3/19 @ 1AM Modesto The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary for abatement and demolition of Buildings 3382 and 4302 at Mather Airport $826000 Site Paving at Roosevelt Junior High School and John Fremont MAND 3/25 @ 2PM at 1330 College Ave., Modesto 003C/R0 Eric Scheuermann, Proj Mgr, @ 510-908-3303 RFQ-Repair Furnace # 2 Refractory-2015 Optional 3/5 @ 9AM at 5019 Imhoff Place, Martinez The District is requesting quotations from licensed, qualified, experienced and reputable contractors for RFQ No. 15-16-01 Repair Furnace #2 Refractory 2015. Contractor shall furnish and use at his own expense, all materials, labor, tools, scaffolding, equipment and supplies to provide turnkey multi-hearth refractory repair. ONLINE Chris Newkirk & 925-229-7352 2:00 PM $100000 ONLINE ONLINE Elementary School 2:00 PM Carmel Demolition, asphalt concrete paving, portland cement concrete paving, paving marking paint, parking appurtenance Wastewater Treatment Plant Rehabilitation Project-Phase 1 MAND 3/3 @ 11AM at 3945 Rio Road, Carmel ? New aeration blower, ? New RAS and Was Pumping systems, ? New sodium hypochlorite/sodium bisulfite storage and feed facility, ? Improvement/rehabilitation of existing dissolved air flotation thickener, ? New digester and digester control building, ? New waste gas burner, ? New screw press sludge dewatering equipment, ? Overhaul of main and standby power system, ? Standby generator cooling improvements, ? New potable water pumping system, ? Improvements to existing plant water pump station, ? New storm water pump station and force main, ? And all other associated work as described in the bid documents. Complete documents will be posted once available Page 19 of 65 $15000000 ONLINE Bid Date Bid Time Location 4/2/2015 2:00 PM 2:00 PM Mountain View Oakland Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $80000 $100000 Well No. 9 Abandonment Abandon City-owned Well No. 9 including removing pump equipment, video inspection of the well, knife perforation, removal of pipe and appurtenances, removal of concrete, disposal of removed material including mercury seal, abandonment of existing piping, installation of sidewalk and concrete pad and site restoration. San Pablo Avenue Streetscape Project (from 17th Street to Castro Voluntary 3/3 @ 10AM at 250 Frank Ogawa Plaza, Oakland $1075000 ONLINE ONLINE Street) The proposed work consists, in general, of landscaping (including furnishing and installing street and median trees); repair of existing irrigation line; furnishing and installing new irrigation line and equipment; sidewalk replacement; bulb-out construction; median reconstruction; removing of striping; furnishing and installing new striping; furnishing and installing asphalt concrete overlay; updating ADA ramps; relocation of traffic equipment and street light; storm drain construction; design and installation of stormwater bioretention filtration system, and other work specially shown in the project documents. $1100000 NEW Austin Center Demolition Project Prequalification Comprehensive & extensive demolition including hazmat removal of the Austin Center on Kentfield campus of the College of Marin, an elevated one story over parking 60,000 square foot building consisting of office, classrooms, a large lecture hall, storage spaces, computer labs, an atrium & other building elements Site Wide Low Voltage Upgrades at Fair Oaks Elem School MAND 3/19 @ 2:30PM at 10700 Fair Oaks Blvd, Fair Oaks $175000 Project will replace and upgrade the existing fire, intrusion, intercom, bell, and clock systems throughout the entire site. The project will also include upgrades to the existing CATV and CCTV systems. ONLINE 2:00 PM Kentfield 2:30 PM Fair Oaks 3:00 PM San Jose Autumn Parkway Extension Project-Phase 1C ONLINE San Jose Dust control, mobilization, construction area traffic control devices, water pollution prevention, clearing & grubbing, tree removal or trimming, watering, earthwork, landscaping, subgrade preparation, finishing roadway, aggregate subbases, deep lift asphalt base, bituminous seals, asphalt concrete, groove & grind pavement, concrete structures, reinforcement, signage, concrete curbs & sidewalks, fences, traffic stripes & pavement markings, pavement markers, signals, lighting & electrical systems, asphaltic emulsions, pipes & structures, trench excavation, bedding & backfill, pipe installation, pipeline structures, acceptance tests for sewers, cleaning pipelines SJCC & EVC Prop 39 Year 2 LED Lighting Upgrade Project Labor MAND 3/11 @ 10AM at 4750 San Felipe Rd., San Jose ONLINE 3:00 PM ONLINE Only 3:00 PM Seaside 3:00 PM Sebastopol 3:00 PM Snelling The project entails demo, removal, and disposal of identified fixtures, and furnishes and installs new LED fixtures on (E) poles, interior lighting and controls. Electrical scope of work involved. Contractor must coordinate its work with a scheduled power shut-down, as well as ongoing day-to-day operations of an active school site Durant Park Accessibility Improvements 3/25 @ 2PM at 440 harcourt Ave, Seaside The construction of ADA accessible ramps and pathways, installation of barbecue and picnic table, relocation of swing set, fence relocation and concrete picnic area Analy High School Band Room MAND 3/17 @ 3:30 PM at 6950 Analy Ave, Sebastopol Band Room Renovation Henderson Park Club House Re-Roof with Alternate #1 Snelling Branch Library Re-Roof MAND 3/19 @ 10AM Bulding paper, composition shingle roofing, built-up roofing, flashing & sheet metal, painting, hazmat remediation, mechanical & electrical work Page 20 of 65 ONLINE ONLINE ONLINE Bid Date Bid Time Location 4/2/2015 Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE 3:00 PM $67500 MAND 3/20 @ 10AM The Work consists of demolishing the existing pump pads/footings and reconstructing/replacing them at the Mare Island Dom 2, 3 & 6 Pump Stations complete and in place. There are 3 pads/footings at DOM 2, and 2 pads/footings each at DOM 3 & 6 for a total of seven MAND 3/25 @ 10AM at 3738 Walnut Ave, Carmichael Carmichael NEW UPS Replacement Project at District Office/Tech Services Project will replace and install the owner-furnished UPS equipment as outlined on plans. References reflecting prior UPS install experience within the last 3-5 years for units larger than 20KVA and shutdowns of critical load equipment is to be submitted with contract documents 4:00 PM Los Altos ONLINE 3:00 PM Vallejo DOM 2, 3 & 6 Pump Pad/Footing Replacement Project Structural Reach Replacement PCR (a)-S1-2011 CAR A Sewer Replacement Phase 1 ONLINE The City of Los Altos is soliciting proposals from qualified engineering firms to provide design & construction services for a project on the City's sanitary sewer system. 4/3/2015 10:00 AM Dixon 12:00 PM San Bruno 2:00 PM Brentwood NEW Dutch Bros Coffee Dixon Construction of a new Dutch Bros Coffee Kiosk building, drive through, walk up window outdoor paved area, paved parking areas & new landscape NEW Carl's Jr. SanTI Bruno New work is primarily an interior design tenant improvement to the public accessible areas of the building. The existing floor finishes, wall finishes, ceiling finishes, furnitures, fixtures & lighting are to be removed & replaced or reinstalled as shown & are included in the scope of work. Restroom facilities are to be made compliant as shown; new interior lighting; exterior facade changes; new stucco finish; painting & miscellaneous items Exterior Repaint Marsh Creek Elementary School (informal Bid) MAND 3/16 @ 10AM at 601 Grant St., Brentwood Prep, prime, and paint all exterior surfaces on site. ONLINE ONLINE ONLINE NOTE: Project specifications and details will be distributed at bid walk 2:00 PM San Francisco 706 Mission Street-The Mexican Museum 3/19 @ 2PM at 125 3rd St., San Francisco $305000000 ONLINE Millennium Partners and Webcor Builders are seeking qualified contractors in the construction of 706 Mission Street. This construction project is located at Third and Mission Streets, adjacent to Jessie Square Plaza and Yerba Buena Gardens. The approximately 700,000 gross square foot development will include the rehabilitation and integration of the approximately 120,000 square foot historic Aronson Building, a national register eligible, Article 11 Category I Significant building, construction of an adjacent new approximately 43 story, 480 foot tall residential tower (480 feet to top of roof, plus a 30 foot elevator/ mechanical penthouse) and the approximately 48,000 net square foot core and shell for the new home of The Mexican Museum on floors one through four with basement storage areas. Multitude trades are being sought (see bid specs for listing). SBE/LBE/MEB/WBEs are encouraged to submit bids. 3:00 PM Discovery Bay ONLINE Fire Pump Inspection Services The contractor shall inspect the fire pump system on a weekly basis with a fire pump operation test with no flow condition as required by the State Fire Marhall. testing & maintenance shall be performed by a qualified person, on an as-needed basis, for a time period of two years. Page 21 of 65 Bid Date Bid Time Location 4/3/2015 3:30 PM Redwood City Plan Name / Scope of Work Prebid Information NEW Multispace Meter System Upgrade Engineers # of Plan Estimate Addenda # ONLINE Optional 3/24 @ 10AM The City of Redwood City ("the City") is soliciting proposals from interested and qualified firms, vendors and/or contractors to furnish multi-space meters and a web-based centralized parking management system for its downtown. The Downtown study area is broken out into the Premium and Value Zones are shown in the map on the following page. The system will include the replacement of multi-space meters (MSMs) for the Premium Zone with new MSMs, and an option to upgrade the single head meters (SH Ms) in the Value Zone, with modern smart parking equipment.1 Please note that equipment upgrades for the Marshall and Century Theater Garages are not included in this RFP. Christian Hammack @ 650-780-7378 4:00 PM Half Moon Bay ONLINE Project/Construction Management Services Half Moon Bay Library Project Project/Construction Management Services Half Moon Bay Library Project 5:00 PM Sacramento $100000 $5000000 Architectural Services for Medical and Research Renovation Projects ONLINE Architectural services of the selected consultants will include programming, site planning, cost estimating, design development and construction administration services for a variety of project types. The majority of the projects will be renovation work in a healthcare or research environment 5:00 PM San Jose ONLINE RFQ-Public/Private Partnership High Density Urban Mixed-Use Development Opportunity The purpose of this RFQ is to request expressions of interest that demonstrate a development firm’s qualifications to enter into a collaborative public/private partnership ith the City of San Jose, leading to the development of a high-quality, high-rise, urban mixed-use project, which shall include the demolition, redesign, and replacement of the City-owned property known as Parkside Hall. The City will evaluate expressions of interest based on the criteria in Attachment B. Responses to this RFQ will enable the City to evaluate and determine the firm that best fits the evaluation criteria listed within this document. The City’s intent is to enter into an Exclusive Negotiation Agreement with the winning respondent. 5:00 PM Sunnyvale ONLINE Classics at Noriega The project consists of 10 Townhomes / 1 accessible lot, 1 BMR lot 8, with associated on site and off site work. The project will be constructed in one phase. Construction will begin April, 2015. Mechanical, Electrical & Plumbing systems at all building types are "Design-Build" by the Contractor. Schematic Mechanical, Electrical and Plumbing plans are included in the construction documents, but are not fully designed systems. 4/6/2015 1:00 PM Brisbane 2015-2016 Brisbane Marina and Entrance Channel Maintenance Dredging Surveying & positioning control; dredging, transport & disposal Randy Breault @ 415-508-2130 Page 22 of 65 MAND 3/20 @ 9AM at 400 Sierra Point Pkwy, Brisbane ONLINE Bid Date Bid Time Location 4/6/2015 1:00 PM Berkeley 10:00 AM Modesto/Pat terson Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Whittier Elementary School (BAM) Ground Improvements MAND 3/19 @ 10AM at 2015 Virginia St., Berkeley The Project consists of: a) SELECTIVE REMOVAL OF EXISTING PAVING AND PLANTING. REMOVAL OF EXISTING PLAY EQUIPMENT. SALVAGE OF EXISTING LOGS, BOULDERS, TABLES, PLANTING AREA MULCH AND SOIL, EQUIPMENT & FURNISHINGS RETURNED TO THE SCHOOL DISTRICT FOR RE-USE. b) ASPHALT PAVING, AC PATCHING, CONCRETE PATCHING. c) NON-INFILL SYNTHETIC TURF SURFACING AND RUBBER EDGING AT EXISTING AC PAVING d) PLAY EQUIPMENT, ENTRY RAMP, AND ENGINEERED WOOD FIBER PLAY AREA SURFACING. e) PLANTING AND IRRIGATION IMPROVEMENTS. f) DRAINAGE IMPROVEMENTS. g) ASPHALT PLAY YARD PAINTING. h) DRINKING FOUNTAIN, WATER LINE, DRY WELL, ASSOCIATED PAVING, BENCH, AND PLANTING Landscaping for Housing Authority of the Stanislaus Properties Bid 3/23 @ 10AM at 1701 Roberston Rd., Modesto ONLINE #150-15 A-E Landscaping at several at five locations. Mary Ramirez @ 209-557-2007 2:00 PM 4/7/2015 Palo Alto 2:00 PM Sacramento 2:00 PM Berkeley 10:00 AM Turlock Renovate Fast Track for Staff Lockers Bldg 100 Emergency Department Project 640-15-112 3/19 @ 8AM at 3801 Miranda Ave., Palo Alto $500000 $1000000 Div_02-demolition; Div_05-steel decking, cold-formed metal framing, metal fabrications; Div_06-rough carpentry, millwork: Div_07-firestopping, joint sealants; Div_08-hollow metal doors & frames, interior wood doors, access doors & frames, door hardware, automatic door operators, glazing; Div_09-non-structural metal framing, gypsum board, porcelain tiling, acoustical ceilings, resilient base & accessories, resilient sheet flooring, resilient tile flooring, painting; Div_10-signage, cubicle curtain tracks, wall & door proetction, toilet & laundry accessories, fire extinguisher cabinets, metal lockers; Div_11-refrigerators, healthcare equioment; Div_13-seismic restraint requirements for non-structural components; Div_21-wet-pipe sprinklers; Div_22-plumbing; Div_23-HVAC; Div_26-interior lighting, electrical; Div_27-communications; Div_28-fire detection & alarm Fencing at Parkway Elementary School MAND 3/17 @ 9AM at 4720 Forest Parkway, Sacramento $280000 Fencing Berkeley High School Building H Floor and Paint MAND 3/23 @ 8AM removal & replacement of existing flooring & interior & exterior paint $515000 MAND 3/24 @ 10AM at 156 S. Broadway, Turlock The work consists, in general, of: audio/visual system removal, demolition, structural and architectural improvements, electrical power, low voltage system, audio/visual system and furnishing all necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place. Council Chamber Improvements Page 23 of 65 ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location 4/7/2015 2:00 PM 2:00 PM 2:00 PM Fremont San Francisco San Francisco Plan Name / Scope of Work Prebid Information The Improvements of a Portion of Ardenwood Creek (Line P) in the Vicinity of Paseo Padre Parkway to Tupelo Street Engineers # of Plan Estimate Addenda # 028C/T0 MAND 3/25 @ 10AM Concrete removal, milling, clearing & grubbing, disposal of materials, dewatering, earthwork, remove sediment, trench & excavation protection, pipe abandonement, reinforced concrete pipe removal, asphalt concrete, aggregate base, reinforced concrete pipe, automatic drainage gates, reinforced concrete box culvert, structural concrete, slurry cement backfil, storm drain outfall reconstruction, rock slope protection, sidewalk, driveway, curb & gutter replacement, cobblestone paving, traffic stripes, pavement markings & pavement markers, chain link fence & gates & barbed wire fence, mulch, erosion control fabric, planting, hydroseed, metal steps & fall arrest, installation of special funding signs, anti-grafitti coating, asbestos cement pipe handling & disposal, fabricated steel pipe, cleaning site & miscellaneous things TG13.2-Roofing/Waterproofing 9/18 @ 2PM at 175 Beale St., San Francisco ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with PVC roofing, sheet waterproofing, and fluid applied waterproofing on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems. $3250000 Moffitt/Long Domestic Hot Water Upgrade Project: Electrical MAND 3/11 @ 12PM ONLINE The scope of the project involves replacing major portions of the Moffitt/Long domestic hot water piping and valves systems including generating station equipment in four different mechanical rooms from the basement to the roof penthouses. The Moffitt/Long hot water equipment is powered by low and medium pressure steam delivered from an offsite Central Plant. In addition, the scope of work involves removing large legacy equipment in cramped mechanical rooms, upgrading electrical services, seismically bracing equipment and installing electronic monitoring equipment, pipe labeling, valve tagging and integration with existing hospital building automation system. Scope of work also includes installation of new balancing valves/control sensors throughout Moffitt/Long for the Domestic Hot Water Return line and a new structural platform to be constructed off of an existing third floor platform. The new platform will be utilized for a new Mechanical Room. 2:00 PM 2:00 PM Brentwood San Francisco 2:00 PM Seaside 2:00 PM Pleasanton $664000 2015 Pavement Management Program (Slurry Seal) and Trail Pavement Management Removal of existing striping, placing a type II slurry seal, asphalt pavement overcoat & restriping various streets. Moffitt/Long Hospital Domestic Hot Water Upgrade: HVAC MAND 3/11 @ 10AM ONLINE ONLINE The work of the Prime Trade Contract includes, but is not limited to, all work in Mechanical Rooms, including HVAC equipment and HVAC Piping at the Mechanical Rooms. $170000 CSUMB Pool Repair Optional 3/12 @ 11AM at 2061 Inter-Garrison Rd, Bldg 84A, Seaside In general the work will consist of stripping pool plaster coat down to shotcrete, replace lane tiles and re-plaster. Various other repairs as delineated in the technical specifications. ONLINE Reyola Carlisle @ 831-582-3506 Water and Recycled Water SCADA Improvements Electrical, power distribution & motor control Page 24 of 65 MAND 3/12 @ 8:00AM to 2:00pm at 7399 Johnson Dr., Pleasanton $4004200 ONLINE Bid Date Bid Time Location 4/7/2015 2:00 PM 2:00 PM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $2885000 Hayward Water Pollution Control Facility-Primary Clarifier Conversion Project MAND 3/17 @ 9AM at 3700 Enterprise Ave, Hayward Fairfield Div_02-asbestos & lead abatement, site preparation, earthwork, sheeting, shoring & bracing, paving; Div_03-concrete; Div_05-structural metals, anchor bolts, miscellaneous metalwork, handrailing, metal grating, stairs, floor plates, safety stair treads & cover plates, hot-dip zinc coating, mechanical zinc coating; Div_07sealants, preformed joint fillers; Div_09-coating systems; Div_11-equipment; Div_13-engineered metal building; Div_15-piping systems; Div_16-lighting, electrical; Div_17-instrumentation $160000 Waterman Water Treatment Plant Chemical Bldg Traffic MAND 3/25 @ 2PM at 2900 Vista Grande, Fairfield 027C/S0 ONLINE Improvements 2:00 PM Dublin 2:00 PM Contra Costa County The Project generally consists of, but is not limited to, filling in an existing drainage ditch, furnishing and installing a 12-inch diameter buried storm drain pipe, with connections to existing storm drain pipe and catch basins (drop inlets) plus widening the asphalt concrete pavement for better chemical delivery truck circulation including new curbs and gutters, vertical curbs and subsurface drain lines and any restoration necessary to provide a complete operating storm drain pipeline and grading of new swales, extension of waterline stub. All equipment and materials shall be installed in accordance with the Manufacturer’s requirements and recommendations. The Contract includes any other work as shown on the Project Plans, as specified in the Contract Documents, and as directed by the City Engineer. $70000 Santa Rita Jail HVAC New Classifications Office MAND 3/12 @ 8:30 AM at 5325 Broder Blvd. Dublin Modifying and retrofitting the existing constant volume ventilation system to convert it to a variable air volume (VAV) system. Work includes decommissioning existing heat pump and modifying the existing ductwork and installing new ductwork to connect a different air handler (existing chilled water air handler 11 (AH11)) to the distribution system. Replacement shall comprise a complete and operational VAV ventilation system and shall include all software, programming, devices, equipment, piping, piping transitions, mounting hardware, and power and control wiring required to provide a complete, fully operational, facilityintegrated system while protecting the operations and facilities. $7256000 Orwood Road Bridge Replacement 3/23 @ 10AM ONLINE ONLINE The work to be done generally consists of replacing the existing bridge structure and reconstructing roadway approaches on Orwood Road at Werner Dredger Cut 2:00 PM Berkeley Rosa Parks Elementary School Floor and Paint ONLINE MAND 3/24 @ 3:30 PM at 920 Allston Way, Berkeley Removal & replacement of flooring, interior & exterior painting 2:00 PM Antioch Marina Boat Launch Facility Third Boarding Float $155000 ONLINE Div_02-demolition & site clearing; Div_03-concrete; Div_05-hot-dip galvanizing, miscellaneous metals, metal fabrications; Div_09-protection from corrosion; Div_11-floating dock system 2:00 PM Cupertino ONLINE 2014 Sidewalk Accessibility Improvements The work to be done is maintenance type work and consists, in general, of the removal and replacement of existing portland cement concrete curb & gutters, sidewalks, driveway approaches, accessible ramps, median curbs, asphalt replacement adjacent to portland cement concrete work, flat work, and tree root barriers, as required. The work may also include the removal and replacement of valley gutters, installation of new accessible curb ramps and median island flatwork as noted. The majority of the work consists of removal and replacement of portland cement concrete curb & gutter and sidewalk where drainage problems exist or where displacements may become a public safety hazard. The improvements will be replaced over existing base material in most cases. When it is necessary to remove pavement adjacent to the lip of the gutter, replacement of asphalt concrete pavement will be completed by the Contractor Page 25 of 65 Bid Date Bid Time Location 4/7/2015 2:00 PM Fremont Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # RFP On-Call Potholing (Utility Locating) Services ONLINE The City of Fremont is seeking a consultant to perform work that generally includes: on-call potholing (utility locating) services associated with the City’s Capital Improvement Program (CIP). Numerous public works projects will be undertaken over the next five years, some of which will require potholing (utility locating) work 2:30 PM 2:30 PM 3:00 PM 3:00 PM $70000 3/26 @ 2PM at 20 Avenue of the Flags, San Rafael San Rafael NEW Marin Center Concession Building Structural Improvements Work includes general constructiom, including associated temporary shoring, for the demolition, replacement & repair of deteriorated structural framing members, beams & associated material, Structural renovations include the installation/replacement of new temporary beams, wall sections & posts supports along the north wall of the Marin Center, Exhibit Hall Concession Building $90000 Replacement Ratainment Wall Project Walnut $100000 Creek Demolish existing retaining wall, construct new soldier pile retaining wall, construct wood landscape fencing, remove & replace asphalt concrete pavement Moffitt/Long Hospital Domestic Hot Water Upgrade: General Building MAND 3/11 @ 12PM San Francisco The work of the Prime Trade Contract includes, but is not limited to, Concrete; Steel, Metal Decking and Misc. Steel; Rough Carpentry/Protection & Infection Control; Spray on Fireproofing; Roofing; Flashing and Sheet Metal; Doors & Hardware; Scaffolding; Metal Stud, Drywall, Lath & Plaster; Floor Patching; and Paint & Epoxy Coating Flooring. On-Call Plan Check and Inspections Services Santa Clara County The County of Santa Clara (County) desires to retain the services of well-qualified On-Call Plan Check and Inspection firm(s) (“Consultant(s)”) to provide professional On-Call Plan Check and Inspection services to augment the services currently provided by Facilities and Fleet staff. The main purpose of this solicitation is to identify and contract with responsible qualified professional firms that may receive future requests for specific projects and services on an asneeded basis in the following areas: 1. Plan check services for different Types of Building Occupancy (A/B/E/F/H/I/M/R/S/U) and different Construction Types (I/II/III/IV/V). Building systems and site design which include but not limited to structural, civil, electrical, plumbing, mechanical, fire protection, Title-24 energy, accessibility code compliance, green building design standards, LEED certification, California Historic Building Code, floodplain, wild land urban interface fire severity zones, hazardous materials and state housing law Title-25 factory built structures etc. (No Public Building Inspection/Permit Counter services required for this RFSOQ). 2. Field Construction inspection and testing services including reports of construction code findings and determinations. 3. Code enforcement activities including inspection and reviews Page 26 of 65 E395B ONLINE ONLINE ONLINE Bid Date Bid Time Location 4/7/2015 3:00 PM Palo Alto Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW RFP-On-Call Engineering Services for the Regional Water Quality Control Plant The individual work assignments may include, but not be limited to, the following: • Perform investigations and develop engineering calculations to determine the material, strength, size, and other elements pertaining to plant equipment and structures; • Prepare final design drawings and specifications; • Review existing facilities and plant processes and recommend process improvements; • Provide emergency response to review and evaluate plant process upsets, equipment failures, public complaints; • Perform studies and prepare engineering reports; • Attend consultation meetings to formulate ideas and concepts for plant modifications and improvements; • Review calculations, design drawings and specifications prepared by City staff or third parties; and • Perform construction observation and construction management for plant modifications and repairs; and • Assist in developing compliance actions to meet emerging regulations. • Review and perform Value Engineering analysis of projects designed by other consultants Page 27 of 65 ONLINE Bid Date Bid Time Location 4/7/2015 3:00 PM Stockton Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE NEW RFQ Environmental Consulting Services for the Soccer Field Relocation Project San Joaquin Delta Community College District (District) invites you to submit a Statement of Qualifications (SOQ) for environmental consulting services related to its Soccer Field Relocation Project, a project funded by Measure L Bond funds. This Request for Qualifications (RFQ) solicits qualifications packages to provide the services necessary to obtain environmental clearance for this project. The Soccer Field Relocation Project-14-15-1 will design and construct a new synthetic turf, competitive soccer field at the current location of the practice field for discus and football. The project will eliminate ten of fifteen existing tennis courts, with the remaining five tennis courts to be refurbished. The major scope elements of the project include: ? Soccer Field ? Lighted Scoreboard ? Public Address System ? five tennis courts (unlighted) Brett Beagley @ 209-954-5754 3:05 PM San Francisco ONLINE Moffitt/Long Hospital Domestic Hot Water Upgrade: Demo/Abatement 3/11 @ 12PM The work of the Prime Trade Contract includes, but is not limited to, all Demolition and Hazardous Materials Abatement. 4/8/2015 1:00 PM Eureka College of the Redwoods Residence Hall Re-Roof and Asbestos Abatement ONLINE MAND 3/4 @ 10:30am Removal of existing roofing material down to the sheathing with asbestos abatement; thre removal of rain gutters & downspouts; the repair & replacement of decking & framing members, complete removal of stone fireplace & chimney as an additive-alternate; installation of new roofing material including waterproofing, flashing & detailing; instllation of new gutter & dsownspits; installation of gravity-flow, non pressurized storm drainage piping 11:00 AM 11:45 AM 2:00 PM Lodi ONLINE Lodi Lake Park-Wading Pool Resurfacing Improvements Removal and disposal of the existing plaster pool finish, preparation of the surface of the existing concrete pool shell, application of new white plaster pool finish, installation of new drain grates covers that meet the Virginia Graeme Baker Pool and Spa Safety Act and current pool requirements put forth by San Joaquin County Health and Safety Department and other incidental and related work, all as shown on the plans and specifications for the above project. Restroom Modernization at Live oak Elementary School MAND 3/25 @ 3:30 PM at 1916 Capitola Rd., Santa Cruz Santa Cruz Interior restroom remodel, including finish hardware, gypsum board, tile, paint & stains, solid plastic toilet compartments, signage, toilet & bath accessories, electrical $750000 NEW Fencing Summer 2015 at Various Sites MAND 3/30 @ 9AM Citrus Heights/Fair Oaks Fencing work at three school siet:Woodside, Skycrest & Thomas Kelly ONLINE Docs Pe Complete doucments will be posted once available 2:00 PM Sacramento Roof Replacement at Sam Brannan Middle School Roof Replacement Page 28 of 65 MAND 3/24 @ 9AM at 5301 Elmer Way, Sacramento $840000 ONLINE Bid Date Bid Time Location 4/8/2015 2:00 PM Santa Rosa 2:00 PM San Pablo 2:00 PM South San Francisco 2:00 PM San Jose Plan Name / Scope of Work Prebid Information Franquette Avenue and Patio Court Sewer and Water Replacement 3/26 @ 10AM at 69 Stony Circle, Santa Rosa Traffic control, water pollution prevention, earthwork, aggregate base, hot mix asphalt, asphalt concrete trench paving, concrete structures, signs, soil & gvround disposal, plastic storm drain pipe, sanitary sewer system, concrete curbs & sidewalks, traffic stripes & pavement markings, pavement markers, water system Seaview Elementary School Campus Demolition MAND 3/17 @ 10AM at 2000 Southwood Dr., San Pablo Demolition and Hazardous Materials Abatement of three (3) one story buildings constructed of a structural steel frame and wood stud shear walls. The buildings are currently unoccupied. Building A is approximately 3,400 square feet. Buildings B and C are approximately 9,000 square feet. The project includes the demolition and removal of all interior finishes, mechanical electrical and plumbing equipment, structural systems, roofing, and vertical site improvements. The scope also includes elective demolition and removal of site improvements, including but not limited to, portable classroom buildings, grade beams, garden planters, and asphalt paving. Site fencing is to be repaired or replaced, and K-rail to be installed along fence line and entrances to parking West Orange Avenue-Centennial Way Pedestrian Crossing MAND 4/2 @ 2PM at 315 Maple Ave, South San Francisco $43100 Oakland ONLINE ONLINE ONLINE Improvements Mobilization & demobilization; traffic control; remove roadside sign, roadway excavation, colored concrete crosswalk; concrete band; furnish single sheet aluminum sign; roadside sign-metal post; pavement delineation; install pedestrian detection sensor; remove & replace in-roadway light system $650000 Silicon Valley Advanced Water Purification Center Potable Water MAND 3/18 @ 10AM at 4190 Zanker Rd., San Jose ONLINE $750000 Line Project 2:00 PM Engineers # of Plan Estimate Addenda # The work to be completed under this Contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles and furnishing all labor, transportation and services, including fuel, power, water, and essential communications, and performing all work, or other operations required to construct the Silicon Valley Advanced Water Purification Center $1525500 Skyline High School Turf Field Replacement MAND 3/19 @ 2pm Removal of existing synthetic turf athletic field and running track, installation of new synthetic turf athletic field and track; expanded concrete walkway with handrail; chain link fencing and gates, rebuild service road, including, but not limited to, off-haul of existing, drainage clearing and or correction, grading, asphalt paving, concrete paving, and concrete swales. Documents will be posted once available! Page 29 of 65 ONLINE Bid Date Bid Time Location 4/8/2015 2:00 PM Los Gatos Plan Name / Scope of Work Prebid Information Rinconada Water Treatment Plant Reliability Improvement Project THIS PROJECT WILL NO BE SCANNED MAND 3/4 @ 10AM Engineers # of Plan Estimate Addenda # $155000000 $190000000 N/A THIS PROJECT WILL NOT BE SCANNED #1 The addition of raw water ozonation facilities and processes. Ozone would be used to provide superior disinfection, enhance the removal of particulates from the water, improve the taste of the water, and accelerate removal of other contaminants that might be present in the water sources treated at the RWTP. The formation of disinfection by products (DBPs) is lower with ozone. Ozone functionally replaces chlorine in the treatment process, although chlorine would continue to be used for providing a disinfection residual in the water distribution system. #2 Replacement of the existing water clarification process/facilities with conventional flocculation and sedimentation processes with plate settlers. The horizontal flow flocculation-sedimentation process is more stable operationally than the existing vertical flow clarifiers and provides greater resiliency for fluctuations in the quality of water treated at the RWTP. In addition, the new basins would be designed to withstand seismic forces during an earthquake. #3 Removal and replacement of the water process filters. The 12 new filters would meet all current seismic standards, allowing for deep bed filter media to be used and providing greater flexibility for washing the filters, as each new filter would be half the size of the current filters. 2:00 PM Aptos 2:00 PM Oakdale 2:00 PM Sacramento #4 Increase the plant capacity from 80 MGD to a maximum of 100 MGD for plant reliability. This increase in plant capacity, while not increasing the amount of water treated annually, provides the flexibility to reliably meet peak summer demands in the water distribution system. The new capacity would enable peak demands to be met reliably and lower potential risk of a water quality violation $275000 2015 Sanitary Sewer Relining Project MAND 3/25 @ 10:30AM at 6500 Soquel Dr., Aptos Div_03-concrete reinforcing, cast-in-place concrete; Div_31-earthwork, site clearing, subgrade preparation, trenching, flowable fill, erosion & sedimrntation controls; Div_32-aggregate base course, asphalt paving; Div_33-utilities South Yosemite Pavement Rehabilitation ONLINE $700000 ONLINE $142891 ONLINE Various pavement treatments, including AC grind & replace, fiber seal, striping, etc. Egret Park Improvements The work to be performed consists of the Egret Park Improvements in Sacramento at 5145 Westlake Parkway. The improvements will consist of 1.53 acres, removal of dead ornamental grasses, weed fabric and bark mulch, irrigation modification, and landscape planting. Tin Wah Wong, Proj Mgr, @ 916-808-5540 2:30 PM San Francisco As-Needed Sidewalk Inspection and Repair Program (SIRP) No. 9 3/18 @ 1:30PM $2100000 The Work is at various locations in San Francisco and includes concrete work for the reconstruction of sidewalks, driveways, curbs and curb ramps; replacement of utility boxes and covers; trimming/pruning of trees and hedges and all appurtenant work in accordance with drawings and specifications. The Work will be given out as work orders packages that include the scope and will specify the time limit for completion. Page 30 of 65 ONLINE Bid Date Bid Time Location 4/8/2015 2:30 PM San Francisco Engineers # of Plan Estimate Addenda # Plan Name / Scope of Work Prebid Information Sutter Stockton Parking Garage Ventilation Improvements 3/25 @ 10:30AM at 30 Van Ness Ave, 4th Fl, San Francisco $1600000 2:30 PM Oakland* Removal and replacement of supply and exhaust fans; carbon monoxide detection systems installation; ductwork and fans replacement, duct cleaning, electrical work and all appurtenant work in accordance with specifications and drawings $2263520 Oakland International High School Turf Field Replacement MAND 3/19 @ 1pm Repurpose gate on 48th Street; install gate & curb cut on 45th Street; relocation of fence between Rickey Henderson field and new field + new fencing; artificial turf for new field; scoreboard; abatement and demolition of one portable; relocation of one portable. 2:30 PM Livermore 2014 Annual Sewer Replacement 3:00 PM Ripon 3:00 PM Stockton 3:00 PM Redwood City $2160000 The project consists of the construction of sanitary sewer, storm drain and pavement rehabilitation in the City of Livermore. The project consists of replacing existing sanitary sewer mains and manholes by the open cut method. Also, a new storm drain line, SDMH, and catch basin will be constructed. In addition, an existing storm drain vault will be converted into an oil separator. NEW Ripona Elementary School Slurry and Striping Project MAND 3/31 @ 3PM at 415 Oregon St., Ripon Demolition, site clearing, excavating, filling & grading, portland cement concrete paving, pavement marking paint, slurry seal NEW Port Road 23 Improvements Project MAND 3/25 @ 10AM at 2201 W. Washingron St., Stockton The project will rehabilitate Port Road 23. The improvements will begin on the south edge of Washington Street and then extend south approximately 1100 feet. Approximately 33,000 square feet of the existing Port Road 23 will be ground down 4” (approximately) with the grindings left in place and compacted. Approximately 9,000 square feet of parking areas adjacent to Port Road 23 will also be rehabilitated. Omega railroad crossing panels will be installed at both sets of railroad tracks at the south end of the project. The proposed road improvements will be 4” of asphalt concrete (2” lifts) placed over the compacted grindings. Storm drains will be extended and new catch basins will be installed. All existing utility covers and catch basins will be raised to the new grade. Centerline striping will be installed. Railroad crossing markings will also be installed. Fair Oaks Community Center HVAC Replacement Project 3/31/15 @ 10am ONLINE 002C/R0 032C/E3 ONLINE ONLINE Online The work of this project consists of: Replacement of ductwork, HVAC units, electrical work, structural work and all other necessary work to install 3 new HVAC units and modify existing zoning within in the building. Work shall be completed within 150 calendar days from the date when contract time commences to run. 4:00 PM San Francisco ONLINE RFQ for Emergency Restoration Services The San Francisco Unified School District Risk Management Department invites statements of qualifications from qualified emergency restoration firms to develop a pool of contractors to provide emergency restoration services when deemed necessary by the District. Work to be assigned on an as-needed basis for emergemcy restortion services including, but not limited tom water extraction; fire, smoke & water damage restoration; debris removal, sewage backup/overflow; mold remediation 4/9/2015 1:00 PM Eureka 1:30 PM Stockton NEW Staple's #0376 Tenant Improvemnt. Trades to include: Sawcut/demolition, concrete, concrete slab staining and sealing, masonry, structural steel, finish carpentry, cabinets/countertops, frp, insulation,EIFS/Plaster, metal panel siding, roofing, sheetmetal, caulking, doors/frames/hardware, overhead doors,storefront/glazing, automatic entrance door, drywall/metal framing, ceramic tile, acoustical ceilings, resilient flooring and carpet, painting, toilet accessories, metal canopy, fire sprinklers, plumbing, HVAC and electrical. Wilson Way and McAllen Road/Newton Road Traffic Signal and 3/31 @ 1:30PM at 1810 E. Hazelton Ave., Stockton Intersection Improvements Page 31 of 65 ONLINE ONLINE Bid Date Bid Time Location 4/9/2015 10:00 AM Emeryville 10:00 AM Corte Madera Plan Name / Scope of Work Prebid Information NEW Sidewalk Rehabilitation Project The work to be performed includes removal and replacement of existing concrete sidewalk, curb ramps, driveways, curbs and gutters, and brickwork at various locations within the City. Work may also include modifications to planter boxes, tree wells, and other concrete work in the vicinity of the sidewalk NEW Forbes Hill Pipeline Replacement Project Engineers # of Plan Estimate Addenda # ONLINE $822500 ONLINE This contract is for furnishing labor and equipment for the installation of 4,700 feet of 12-, 8-, 6- and 4-inch welded and PVC pipe with valves, fittings and appurtenances. 10:30 AM Mill Valley NEW Fire Flow Improvement Program Alto Down Line Pipeline $500000 ONLINE Replacement Project This contract is for furnishing labor and equipment for the installation of 715 feet of welded steel pipe ranging from 22-inch to 8-inch in diameter and pipe bursting 400 feet of 22-inch HDPE pipe with valves, fittings and appurtenances. Jake Miller at (415)945-1580 12:00 PM 2:00 PM 2:00 PM Livermore NEW Forever 21 Tenant Improvement Div_02-selective demolition, temporary barricades; Div_03-concrete; Div_04-thin brick veneer (interior & storefront); Div_05-light gauge framing, storefront support framing, miscellaneous metals, cold rolled channels & tubes, fitting room partition; Div_06-finish carpentry, wood treatment, arch woodwork; Div_07insulation, membrane waterproofing, roof penetration, curbing & flashing, sealants & caulking, spray on fireproofing, roof cutting, roof top equipment waterproofing; Div_08-interior woiod doors, frames & hardware, special doors, hardware & specialties, windows, glazing; Div_09-gypsum wallboard & accessories, suspended gypsum board ceiling & framing system, painting & staining, flooring systems, wood flooring, terrazo tile flooring; Div_10-identifying devices, fire extinguishers, toilet rooms & miscellanous hooks, toilet room accessories; Div_11-audio equipment, speakers; Div_12-cabinets & storage, furniture, all drapery & props, specialty display; Div_15-fire sprinkler, plumbing, HVAC; Div_16-lighting system, fire alarm syhstem, communications, electrical $210000 Windemere Ranch Middle School Fire Sprinkler Addition to Optional 3/26 @ 3:15 at 11611 E. Branch Parkway, San San Ramon NEW Relocatables Ramon Div_03-cast-in-place concrete; Div_09-acoustical panel ceilings, exterior painting; Div_21-fire protection general (M), overhead fire protection(M, underground fire service (M); Div_26-electrical; Div_28-fire alarm system (E); Div-32asphalt paving Construction and Completion of GReen Valley Road Bus Stop Encouraged 3/18 @ 9AM at 110 Vernon St., Santa Cruz Santa Cruz Improvements The Santa Cruz Metropolitan Transit District (Santa Cruz METRO) is requesting sealed bids for a fixed-price contract for The Construction and Completion of Green Valley Road Bus Stop Improvements. This public work shall include the furnishing of all supervision, labor, materials, freight, transportation, equipment, supplies, tools, services and other work as defined in the Invitation For Bid (IFB) No. 15-09 for this Project. Page 32 of 65 ONLINE ONLINE ONLINE Bid Date Bid Time Location 4/9/2015 2:00 PM San Jose Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Lower Explosive Limit Combustible Gas Detection System The City of San Jose is soliciting bids from qualified contractors to provide LEL (Lower Explosive Limit) Combustible Gas Detection System as detailed in Attachment A. Selected contractor to remove, replace & install infrared LEL gas detectors & remote sensors, rack mounted display monitors re-using all of the existing wiring assuming all wiring is intact, operational & does not require any troubleshooting, maintenance, replacement or repair. Cindy Johnson @ 408-794-7465 2:00 PM San Francisco Pedestrian Bridge Improvements at George Washington High School MAND 3/24 @ 10AM at 600-32nd Ave, San Francisco & and Door Landing Repairs at Downtown High School 3/24 @ 11AM at 693 Vermont St., San Francisco $80000 ONLINE Washington High School – improve drainage flow of existing concrete deck of pedestrian bridge by providing new trench drain, rain water leader, with associated concrete deck patch and repair and deck waterproofing coating; remove and replace existing metal doors with new FRP-clad doors and associated door hardware. Work also involves some resilient flooring and accessories. Downtown High School – Saw-cut existing concrete landing for new trench drain and underground storm drain pipe connections. Patch and repair door landing and replace existing door threshold with new threshold 2:00 PM San Francisco Candlestick Point CP-02, 03, 04 - Demolition, Mass Grading and Surcharge ONLINE 3/24 @ 10AM at 101 Horne Ave, Bldg 101, San Francisco The work shall consist of General Conditions, Demolition, Traffic Control, Utility Work, Roadway Sections, Streetscape, Earthwork, Dust Control, Surveying, and Erosion Control. SBE/LBE/MBE/WBES are encouraged to submit bids. 2:00 PM Sacramento Replace Chilled Water Piping @ Library & Courts Annex Building (038) MAND 3/24 @ 10AM at 900 N St., Sacramento $80000 ONLINE Replace chilled water piping, associated fittings, valves and insulation and repair damaged drywall. Joan Armstrong, Building Manager, @ 916-445-2605 MAND 3/17 @ 9AM at 6000 J St., Residence Hall Complex, $462000 Sacramento Div_02-selective demolition; Div_08-flush wood doors, access doors & frames, door hardware; Div_09-interior paints & coatings; Div_10-interior & room identification signage; Div_26-lighting & electrical work $475000 D02 Kadema Storm Drain Pump Station Rehabilitation Project MAND 3/12 @ 9AM at 3108 Kadema Dr., Sacramento Div_03-concrete; Div_04-reinforced concrete block masonry; Div_05-welding, miscellaneous metalwork, anchor bolts, extruded aluminum louvers; Div_06-rough carpentry; Div_07-metal roofing, flashing & sheet metal, sealants; Div_08-steel doors & frames, finish hardware; Div_09-arch painting, exterior painting, protective coating; Div_11-mech bar screen; Div_26-instrumentation, electrical; Div_32-asphalt paving, chain link fences & gates 2:00 PM Sacramento 2:00 PM Sacramento 2:00 PM Sacramento NEW Potuguese Park Playground Improvements The improvements will consist of demolition of the existing playground equipment, removal and replacement of damaged concrete flatwork, installation of play equipment, playground wood fiber, site furniture, sprinkler head relocation and landscape planting Coronado Elementary School FF&E MAND 2/27 @ 3PM Richmond Project consists of providing FF&E for Coronoad Elementary School 2:00 PM Draper Hall Interior Renovations Page 33 of 65 ONLINE ONLINE ONLINE Online Bid Date Bid Time Location 4/9/2015 2:00 PM Napa 2:00 PM Dublin Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $225000 NEW Building Repair For Riesling Hall MAND 4/2 @ 10AM The Base Bid for the Repair of Riesling Hall shall consist of selective demolition and reconstruction of Riesling Hall. The Contractor shall 1) remove existing metal roof, infill and repair roof framing and sheathing, new sheet metal gutters and flashing, reroof with mechanically attached single ply roofing over 2 ½” ridged insulation; 2) repair existing ply and sheet rocked interior walls, tape and texture; 3) install new T-bar ceiling and owner supplied luminaires; 4)install new gas pack HVAC systems; 5) paint inside and out of building; 6) install several new doors and hardware; 7) remove and replace roll-up door. Owner will a) provide lighting fixtures for contractor’s installation; b) make final electrical connections to ceiling lighting; and c) install finish electrical wiring, outlets and switching. NEW Great Harvest Bread Company 3/26 @ 11AM The project consists of interior improvements for the Landlord and partial improvements for the Tenant (Great Harvest Bread Company). The completion of additional Tenant Improvements is part of a separate package that is not being bid at this time. This project is located on the ground floor of a mixed-use complex consisting of vacant commercial/retail space on the first level with multiple stories of apartments above. Docs Pe ONLINE A summary of work is as follows: ?Construction of new demising walls to separate this project space from other vacant areas. ?Exterior storefront revision at a new secondary exit. ?Interior construction for full restrooms, office space, select interior walls and a ceiling over the entire retail space. ?Provision of HVAC and Bakery Mechanical Equipment on the roof of upper level apartments, with refrigeration lines and ducts running between the roof and the project space through an existing rated shaft. (Baking Oven and other kitchen equipment is not a part of this project). ?Lighting and Power distribution and convenience outlets throughout the project space. ?Plumbing work is limited to the installation of toilet rooms. Additional plumbing related to kitchen equipment is not a part of this bid package. 2:00 PM Ukiah 2:00 PM Davis 2:00 PM Moffett Field PLEASE FAX BID PROPOSALS TO FRED PONCE, PROJECT MANAGER, @ [email protected] or JACKSON LAPIN, ASSET MANAGER, @ [email protected] Agriculture Building Exterior Painting 3/31 @ 9AM at 890 N. Bush St., Ukiah Paint the exterior of the Agriculture building. Surface Water Pipelines-Water Quality Improvement Project 3/12 @ 10AM at 1717 5th St., Davis The work includes: construction of approximately 42,000 lineal feet of new water transmission mains from 12-inch to 30-inch diameters by open cut excavation and trenchless methods using auger bore and horizontal directional drilling; flow control and flow meter stations; pressure relief valves at two ground level storage facilities; cathodic protection system; various valves and fittings; SCADA control programming; appurtenances; drainage facilities, grinding and overlaying roadways, abandoning existing pipelines, connections to existing facilities, site restoration, landscaping, and pipeline cleaning, testing, and disinfection including all labor, materials, equipment and incidentals to completely install an operating facility. Refer to Section 01010 for full Summary of Work. Security Forces Facility Addition Building 653 Moffett Field (No GC Openings) Demolition & deconstruction, tree relocation, earthwork, termite treatment, site and building concrete, reinforcing steel, masonry, structural steel & metal deck, insulation, roofing, sheet metal, doors / frames / hardware, glass / glazing, EIFS, gypboard assemblies, acoustic ceilings, floor coating, painting, ceramic tile, signage, etc. Excludes: HVAC, plumbing, electrical, fire alarm, fire sprinkler, and testing / special inspections as design-build subcontractors. Zumwalt Construction is under contract to the USACE to design and construct this building next to the east side of building 653 and connect it to the existing structure. Outside wall of new addition shall match to the existing texture and color to the closest extent to the existing building. NOTE:Subcontracts Already Awarded: HVAC, Plumbing, Electrical, Fire Alarm, Fire Sprinkler, and Testing / Special Inspections as design-build subcontractors. Page 34 of 65 ONLINE ONLINE ONLINE Bid Date Bid Time Location 4/9/2015 Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $23300000 MAND 2/26 @ 1PM at 600 East A St., Dixon Construct improvements, including influent pump station and headworks, two oxidation ditches with anoxic basins and splitter structures, two secondary clarifiers, RAS / WAS pump station, secondary scum pump station, operations building, solids handling facility surface facilities for a potable water well and site water system, disposal basin modifications, standby generators, site grading and paving, yard piping, electrical and instrumentation. Crespi Middle School Restroom Renovation Phase 1 MAND 3/24 @ 3PM at 1121 Allview Ave, El Sobrante Remodeling four existing non-accessible restrooms into fully-accessible restrooms that comply with the 2013 California Building Code and the 2010 ADA Standards for Accessible Design. Two restrooms are located in Building 600. One restroom is for male faculty members and staff and the other restroom is for female faculty members and staff. Currently, each restroom is configured as a multiaccommodation restroom. Upon remodel, each restroom shall become single-accommodation restrooms. In addition, the adjacent hallway that provides access to these restrooms shall require remodel to facilitate accessibility. The total square footage of these two restrooms and the adjoining hallway is 255 square feet. The other two restrooms are located in Building 800. One restroom is for male students and the other restroom is for female students. Each restroom is configured as a multi-accommodation restroom and shall remain in that configuration upon remodel. The total square footage of these two restrooms is 640 square feet. The restroom remodels shall include new floor, wall, and ceiling finishes, new partitions, new exhaust ventilation, new plumbing fixtures and faucets, and new lighting fixtures. Scope also includes Hazardous Material Abatement. $1060000 Firing Range Phase 1 MAND 3/23 @ 10AM at 455 Industrial Dr., Falt The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary to perform the work. The Phase 1 design includes master plan site grading, the construction of backstop berm for three 1 00 yard ranges, ecology block walls for the ranges, all weather road surface for bus turn-outs along the access road and site parking, and concrete "Safety, Ready and Firing line" pads for each range. 2:00 PM Dixon 2:00 PM El Sobrante 2:00 PM Galt 2:00 PM Healdsburg NEW Healdsburg High School Modernization And Site Work Food Service Bid Package 4 Wastewater Treatment Facility Improvements Project ONLINE ONLINE ONLINE ONLINE HVAC & Sheet Metal Bid Package 2 Electrical Bid Package 3 2:00 PM Livermore ONLINE Home 2 Suites New construction of a 67,000 S.F./ 3 story / 108 Room hotel & related site work. First floor includes Meeting, Fitness, Banquette/Business area & Guestrooms. The 2nd & 3rd floor include Guestrooms. Site has existing structures which will be demolished. Work to include, but not limited to the following: Demolition, Grading/paving, Site Utilities, Site Retaining wall, Landscaping, swimming pool, site furnishings, concrete, structural & misc. steel, rough carpentry, casework, waterproofing, insulation, Stucco, fiber cement siding, stone veneer, singly ply roofing system, sheetmetal, caulking, doors/frames/hardware, auto storefront entry, windows, glass/glazing, drywall, sound & fire rated systems, paint, ceramic tile, T-Bar, Flooring, Toilet Accessories, Laundry Chute, Elevators, Plumbing, HVAC, Fire Sprinklers, Electrical, Fire Alarm, etc.. Direct All RFI's to Larry Nelson- [email protected]. DO NOT contact the Architect or Consultants with questions. Page 35 of 65 Bid Date Bid Time Location 4/9/2015 2:00 PM Mill Valley Plan Name / Scope of Work Prebid Information Police Department Lobby Remodel Ballistic Glass Installation Asbestos Abatement Engineers # of Plan Estimate Addenda # ONLINE MAND 3/26 @ 2:30PM at 1 Hamilton Dr., Mill Valley Selective structure demolition & asbestos & lead abatement/remediation 2:00 PM Mill Valley 2:00 PM Citrus Heights Police Department Lobby Remodel Ballistic Glass Installation MAND 3/26 @ 2:30PM at 1 Hamilton Dr., Mill Valley Project consists of Removal and replacement of reception counter, installation of ballistic glazing, replacement of passage doors. Arlington Heights Elementary School, Restroom Upgrades MAND 3/23 @ 2PM at 6401 Trenton Way, Citrus Heights $65000 ONLINE $475000 Docs Pe Restroom upgrade 3:00 PM San Jose 3:00 PM San Jose 4:00 PM Contra Costa County Complete documents will be posted once available NEW Cast Iron Replacement West Water, Sewer and gas Maintenance Repair, Construction, Pipeline, Construction, Sewer and Storm Drain, Construction, Utility/Underground Projects Elevator Maintenance, Repairs and State Compliance for SJECCD Recommended 3/17 @ 9AM The San Jose/Community College District is soliciting bids for qualified contractors to provide maintenance, repair, and State Compliance work necessary to maintain all elevators, wheelchair lifts and stage lifts in proper, safe, and reliable operation. The elevators and associated equipment shall be maintained on a monthly basis in such a manner as to meet the performance requirements of the California Elevator Safety Orders; Title 8; A.N.S.I. A 17.1 Elevator Code and all other applicable laws, statues, regulations and organizations ONLINE ONLINE Peggy Graham @ 408-270-6421 4:00 PM Merced RFQ On-Call Services and Pre-Qualified Shortlist for Airport Grant Projects: Airport Engineering, Design/Architectural & Planning Consulting Services 2015-2020 3/25 @ 2PM Contra Costa County Public Works - Airports Division (Buchanan Field and Byron Airports) invites your firm to submit a Statement of Qualifications (SOQ) to provide On-Call Services and to establish a Pre-Qualified Shortlist for Airport Grant Projects: Airport Engineering, Design/Architectural & Planning Consulting Services. The County is interested in retaining highly qualified and experienced airport engineering, design/architectural and planning consulting firms to assist in engineering, design and planning of airport infrastructure projects as well as other general consulting needs. On-call services agreements and the prequalified shortlist will each be valid for five (5) years. Provide and Install an Access Control System 3/18 @10am Access Control software for server and clients, server and client computer hardware, server and client operating systems, credential database, controllers and sub-controllers, access control hardware for doors. Page 36 of 65 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 4/10/2015 10:00 AM Roberts & Dewey Class Size Reduction Fair Oaks Prebid Information Engineers # of Plan Estimate Addenda # MAND 3/26 @ 10AM Dewey: Addition of one (1) Enviroplex classroom to be put on a wood foundation. Building is being purchased off the approved piggyback contract. Adjacent sitework and building connections to include: New sewer connection and lift station; Re-route 3" irrigation main line; Re-configure ADA compliant parking and path of travel at east side parking lot. Estimate $158,000 ONLINE Roberts: Addition of one (1) Enviroplex classroom to be put on a wood foundation. Building is being purchased off the approved piggyback contract. Adjacent sitework and building connections to include: Re-configure parking and fence areas to accommodate new building; Upgrade landscape and ADA path of travel adjacent to new building. Estimate $120,000 $516000 MAND 3/24 @ 10AM or 3/26 @ 2PM at 100 Gregory Ln., Pleasant Hill The work to be done is located through out the City of Pleasant Hill and includes 45,000 sf of base failure repair, 650 tons of AC overlay, crack sealing, striping, utility adjustment, curb and gutter repair. A schedule of locations will be listed in the bid package. ONLINE $1000000 MAND 3/23 @ 10AM On behalf of PM Realty (representing the Owner, City of Alameda), we invite qualified contractors to submit a proposal for the engineering, design and installation of an above pier sewer line and pump installation at Alameda Point’s Pier 2 located at 1499 Ferry Point, Alameda, CA. ONLINE 10:00 AM Pleasant Hill NEW 2015 Street Resurfacing Project, Phase I 2:00 PM Alameda 2:00 PM Milpitas 2:00 PM San Francisco Transbay Block 7 - Design Build MEPS Bid Package 2:00 PM San Jose RFP Lead and Asbestos Abatement Services (Including Disposal) RFP for Pier 2 Sewage System Installation Ryan Gaughan @ 510-794-0304 NEW Uninterrupted Power Supply Battery Replacement Remove and replace ninety (90) existing Batteries from Liebert Emergency Uninterrupted Power Supply. Certified disposal of old batteries required. ONLINE Chris Schroeder @ 408-687-1639 Voluntary 3/24 @ 11AM at 425 California St., 22nd fl, San Francisco Cahill Contractors is soliciting subcontractor bids for Design-Build Mechanical, Electrical, Plumbing, Fire Sprinklers, Solar Hot Water, and Exterior Building Maintenance Systems. The project is a 123,167 gSF multi-family residential building at 255 Fremont Street, with 120 affordable housing units. Type 1B and V construction over two podiums. Mercy Housing is the project developer. SBE, MBE, WBE, and LBE firms are encouraged to submit bids. The project has a 50% SBE goal with first consideration to Bayview Hunter''s Point area SBEs. $300000 ONLINE ONLINE The City of San Jose (hereinafter "City") is soliciting proposals from qualified Contractors for lead and asbestos abatement services, including disposal. Interested companies should submit proposals by the designated due date and time. Late submissions will not be accepted 4:00 PM San Jose RFP San Jose Municipal Water Master Plan Services The City of San José, Environmental Services Department (“ESD”), Municipal Water System (“SJMWS”) is seeking proposals from qualified consultants (“Consultant”) interested in performing master plan related tasks and analysis. The consulting services will culminate in a final water master plan (“Master Plan”), which includes a long-term implementation strategy(s), capital improvement planning, and development fee calculation and analysis. Consultants shall have relevant expertise, experience and an approach that demonstrates their ability to provide the required services Andrew Hitchkock @ 408-975-2572 Page 37 of 65 ONLINE Bid Date Bid Time Location 4/10/2015 5:00 PM San Bruno Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW RFP Engineering Services for Design of the Avenues 1-1 and 1-2 ONLINE Sewer and Water Main Replacement Project The City completed the Sewer Master Plan and Water Master Plan which identified the sewer capacity improvement projects to address deficiencies and reduce the risk of overflows in the sewer system and improve the reliability of the water system through the rehabilitation and replacement of the distribution system 5:00 PM Stanislaus County RFP for the Pleasant Valley Road Bridge Over South San Joaquin Irrigation District Replacement Project ONLINE The scope of services will consist of the engineering design and preparation of 100% contract documents consisting of plans, specifications, and cost estimates for the construction of this project. The scope of services will also include the necessary environmental studies, right of way services and work scopes to assist the County to obtain required State and Federal environmental permits and authorizations 5:00 PM 4/13/2015 1:00 PM Milpitas Saratoga NEW RFP On-Call Civil and Street Design Services The City of Milpitas (City) is seeking the professional services of a qualified Civil Engineering consultant with civil, street, and utility underground design experience for analysis, design, preparation of construction plans, specifications, and estimate for public bid, construction support services, and other services related to civil engineering, street, and utility underground design services for the City’s Capital Improvement Program (CIP). West Valley-Mission Community College District Pre-Qualification for Mission College Main Building Replacement Phase 2-Bid Package ONLINE Online The project is the construction of a new three story building housing student service functions, classrooms, and administrative offices that is slated for LEED Gold Certification. 10:00 AM Saratoga West Valley-Mission Community College District Pre-Qualification for Mission College Main Building Replacement Phase 2-Bid Package Online The project is the construction of a new three story building housing student service functions, classrooms, and administrative offices that is slated for LEED Gold Certification. 11:00 AM Saratoga West Valley-Mission Community College District Pre-Qualification for Mission College Main Building Replacement Phase 2-Bid Package Online The project is the construction of a new three story building housing student service functions, classrooms, and administrative offices that is slated for LEED Gold Certification. 12:00 PM Saratoga West Valley-Mission Community College District Pre-Qualification for Mission College Main Building Replacement Phase 2-Bid Package The project is the construction of a new three story building housing student service functions, classrooms, and administrative offices that is slated for LEED Gold Certification. Page 38 of 65 Online Bid Date Bid Time Location 4/13/2015 2:00 PM Oakland Plan Name / Scope of Work Prebid Information NEW Havenscourt Middle School Interior Painting Paint interior of Havenscourt Middle School campus MAND 04/02 @ 11:30AM Engineers # of Plan Estimate Addenda # $250000 ONLINE $42200000 ONLINE Robert Strong, Project Mgr, @ 510-277-6563 2:00 PM San Francisco PLEASE NOTE THAT BIDS WILL ONLY BE ACCEPTED FROM PRE-QUALIFIED BIDDERS Design Build Services for Consolidated Administration Campus 3/12 @ 10AM Phase 1 Project at SFO The Phase I Project consists of the programming, design, construction, activation, commissioning, training, close-out, and opening of a multi-level Administrative Building, demolition of two (2) existing buildings, the construction of North Campus Road and East Campus Road to allow full vehicular and pedestrian access around the perimeter of the campus, and restoration of pavement and landscaping at the San Francisco International Airport CAC site on North McDonnell Road at West Field Road at the San Francisco International Airport. Rick Thall @ 650-821-7878 2:00 PM 2:00 PM Saratoga Oakland Online West Valley-Mission Community College District Pre-Qualification for Mission College Main Building Replacement Phase 2-Bid Package The project is the construction of a new three story building housing student service functions, classrooms, and administrative offices that is slated for LEED Gold Certification. $250000 NEW McClymonds High School Exterior Painting MAND 04/02 @ 9:30AM Prime & paint exterior McClymonds High School campus ONLINE Robert Strong, Project Mgr, @ 510-277-6563 PLEASE NOTE THAT BIDS WILL ONLY BE ACCEPTED FROM PRE-QUALIFIED BIDDERS 2:00 PM Cupertino Science Center Painting ONLINE MAND 3/25 @ 10AM at 21250 Stevens Creek Blvd, Cupertino Paints & coatings 2:00 PM Foresthill 2:00 PM Belmont 2:00 PM Aptos NEW Oxbow Powerhouse Fire Alarm & Detection System Project 3/30 @ 10AM Install a complete and code-compliant fire alarm and detection system in the Oxbow Powerhouse Belmont Pavement Reconstruction Project 3/31 @ 10AM at 1 Twin Pines Ln., Belmont $100000 ONLINE $1000000 $2500000 ONLINE Provide traffic control, construction area signs, water pollution control; remove and replace asphalt concrete, AC base repair, subgrade preparation, AC conforms; install bioretention facility, pavement fabric, ADA ramps; remove and replace thermoplastic striping, pavement markers, concrete curb, gutter, valley gutter, and sidewalk; install storm drain inlets, cleaning of the site at the end of the job, and furnishing of all labor, materials, tools, equipment, mechanical workmanship, transportation, and services necessary to be done in order to perform a complete job in all respects as indicated on the plans, and by reference made a part hereof, as specified herein, and as directed by the Engineer (the “Work”). $130000 Upper Campus Security Systems MAND 3/26 @ 10:30AM at 6500 Soquel Dr., Aptos This phase of security system installation will address various buildings on upper campus and will include surveillance cameras and burglar alarms Page 39 of 65 ONLINE Engineers # of Plan Estimate Addenda # Bid Date Bid Time Location Plan Name / Scope of Work 4/13/2015 2:00 PM Saratoga Mcauliffe Elementary School Modernization MAND 3/23 @ 10AM & 3/30 @ 10AM at 12211 Titus Ave. Saratoga Restroom upgrades (fixtures, accessories and partitions, ceramic tile finishes on walls, epoxy flooring, drinking fountains, new stud walls (wood Frame), new sinks, accessible thresholds, casework refurbishing and new casework, replacement of existing finishes, i.e., FRP panels, new flooring (carpet, VCT, epoxy, etc.), partial replacement of ceiling acoustical tiles, tackable panels, wall mounted acoustical panels, interior painting. Other work shall include reinstallation of existing kitchen equipment (warming kitchen), replace of selected roof mounted mechanical equipment, roof patching, new fire alarm system and site distribution, new electrical outlets in classroom. Site work: accessible parking stalls and signage, sidewalk replacement, concrete paving, etc. ONLINE 3:00 PM Saratoga West Valley-Mission Community College District Pre-Qualification for Mission College Main Building Replacement Phase 2-Bid Package Online Prebid Information The project is the construction of a new three story building housing student service functions, classrooms, and administrative offices that is slated for LEED Gold Certification. 4/14/2015 1:00 PM Berkeley John Muir Elementary School Modernization Project MAND 3/12 @ 3:30PM at 2955 Claremont Ave, Berkeley ONLINE Reroofing, improvements to the path of travel, ventilation improvements, electrical improvements, barrier removal and cosmetic improvements to finishes. Additive Alternate # 1 - Classroom Markerboards Additive Alternate #2 - Heating rejecting film at forty ( 40) new and existing glazing on Southern Elevation Additive Alternate #3 - Classroom Lighting Additive Alternate #4 - Removal and replacement of 22 plastic glazing panels in the North Basement windows with glazing. 1:00 PM Saratoga West Valley-Mission Community College District Pre-Qualification for Mission College Main Building Replacement Phase 2-Bid Package Online The project is the construction of a new three story building housing student service functions, classrooms, and administrative offices that is slated for LEED Gold Certification. 1:00 PM Stockton ONLINE Cooling Tower Rental and Installation Service The Contractor shall provide all labor, including travel and per diem, materials, non-consumbale supplies, transportation, equipment, the installation, rental and removal of a trailer mounted 150 ton Cooling Tower which includes electrical cable, supply and return hose, make up water hose, ancillary connection hardware and every other item of expense necessary to perform Cooling Tower Installation and Rental Services specified herein for the California Department of Corrections and Rehabilitation (CDCR), Northern California Youth Correctional Center located at 7650 South New Castle Road, Stockton, CA 95213. 10:00 AM Mill Valley ONLINE Elinor Avenue Tank Replacement Div_02-demolition, site preparation, earthwork, drainage, catch basin, chain link fence, apshalt paving, concrete utility boxes, precast vaults, dig-in protection warning tape, cathodic protection magnesium anodes, distribution piping system; Div_03-concrete; Div_09-field applied coating systems, painting; Div_13-bolted steel tank; Div_15-piping system, welded steel pipe, schedule 40, valves; Div_16-electrical; Div_17-field instrumentation; Div_18-environmental protection 10:00 AM Saratoga West Valley-Mission Community College District Pre-Qualification for Mission College Main Building Replacement Phase 2-Bid Package The project is the construction of a new three story building housing student service functions, classrooms, and administrative offices that is slated for LEED Gold Certification. Page 40 of 65 Online Bid Date Bid Time Location 4/14/2015 10:30 AM Novato Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $315000 NEW Ignacio Pump Station VFD Replacement Project Div_03-concrete reinforcement, structural concrete; Div_09-field applied tape coating systems, painting; Div_16-electrical; Div_17-instrumentation; Div_18environmenatl protection NEW McFarland Avenue Curb and Gutter Rehabilitation Phase 1-2015 Rehabilitate curb & gutter 11:00 AM Saratoga 11:00 AM Saratoga 11:00 AM The project is the construction of a new three story building housing student service functions, classrooms, and administrative offices that is slated for LEED Gold Certification. MAND 3/31 @ 11AM at 4800-2nd Ave, Suite 3010, Sacramento NEW UT3 FDC Refubish Womens Pavilion Sacramento BP-01-General Construction-Estimated Construction $435,000 ONLINE ONLINE Online West Valley-Mission Community College District Pre-Qualification for Mission College Main Building Replacement Phase 2-Bid Package ONLINE BP-02-Flooring-Estimated Construction $115,000 BP-03-Plumbing-Estimated Construction $123,000 BP-04-Electrical - Estimated Construction $120,000 BP-05-Demo & Containment-Estimated Construction $137,000 12:00 PM Saratoga Online West Valley-Mission Community College District Pre-Qualification for Mission College Main Building Replacement Phase 2-Bid Package The project is the construction of a new three story building housing student service functions, classrooms, and administrative offices that is slated for LEED Gold Certification. 2:00 PM ONLINE Healdsburg NEW Healdsburg High School Modernization And Site Work Food Service Bid Package 4 HVAC & Sheet Metal Bid Package 2 2:00 PM South San Francisco 2:00 PM Saratoga Electrical Bid Package 3 NEW Grand Avenue/Magnolia Avenue Traffic Signal MAND 4/7 @ 2PM at 315 Maple Ave., South San Francisco ONLINE Install new traffic signal system West Valley-Mission Community College District Pre-Qualification for Mission College Main Building Replacement Phase 2-Bid Package The project is the construction of a new three story building housing student service functions, classrooms, and administrative offices that is slated for LEED Gold Certification. Page 41 of 65 Online Bid Date Bid Time Location Plan Name / Scope of Work 4/14/2015 2:00 PM 404 Aviation Boulevard Roof Replacement (Rebid) Santa Rosa Prebid Information MAND 3/24 @ 10AM or 3/26 @ 2PM Engineers # of Plan Estimate Addenda # $900000 $1200000 ONLINE The Work consists of roof replacement of a 63,000 square foot, actively occupied office building, located at 404 Aviation Boulevard, Santa Rosa, in an unincorporated area of Sonoma County, California. The Work includes, but is not limited to, the removal and replacement of existing roof, removal and storage of existing photovoltaic panels, and reinstallation of photovoltaic panels in working condition after roof replacement is completed. 2:00 PM 2:00 PM Santa Cruz San Francisco Parking Lot 9 Low-Impact Development Project $188000 The work to be done consists in general of installing bioretention areas (rain gardens), striping, and resurfacing pavement with hot-mix asphalt for Parking Lot 9 located on 120 Elm Street in Santa Cruz. This project will install curbs and cut-off walls for bioretention areas, drainage pipe and inlets, parking lot striping and reinstallation of parking bumpers, educational signage, pay by space concrete pads and plant establishment. Hunters View-Phase 2-Block 10 (Vertical Construction Trades) Voluntary 3/31 @ 10AM ONLINE ONLINE THIS IS A CAHILL/NIBBI JV PROJECT. Project is in Hunters View (Middle Point Rd. & West Point Rd.), San Francisco & divided into 3 main phases. It includes construction of (72) new affordable rental apartment units in (1) 5 story wood framed apartment building over a (1) level podium covering one block. The building above the podium is essentially divided into two parts. The ground level has parking, community spaces & a child care center. This block is part of the 2nd phase of the Hunters View redevelopment. This is a Cahill-Nibbi Joint Venture project. Demolition & Infrastructure work have already been contracted out. Also Mass Excavation and Shoring have already been bid. 2:00 PM 2:00 PM San Francisco San Francisco The project is currently projected to break ground by June 2015 starting with Mass Excavation and Shoring, then vertical construction will start around August 2015 and be completed by February 2017. This project is administered by the Office of Community Investment and Infrastructure (OCII).This is a 50% SBE goal and SBEs, LBEs, MBEs and WBEs are encouraged to submit bids. Refer to the Bid Request Letter for additional information. TG16.3 Terrazzo Optional 3/10 @ 2PM at 175 Beale St., San Francisco ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with terrazzo epoxy crack suppression system and epoxy terrazzo flooring on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems in the following trade: TG16.3 Terrazzo TG17.1 Signage/Graphics/Directory Systems Encouraged 3/24 @ 2PM at 175 Beale St., San Francisco ONLINE Webcor/Obayashi Joint Venture seeks Proposer that have significant experience with signage, graphics, and directory systems on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems in the following trade: TG17.1 Signage/Graphics/Directory Systems 2:00 PM San Francisco ONLINE NEW 2051 Third Street Scope of the work includes the construction of ninety three (93) market rate rental units. This work includes, but not limited to shoring, earthwork, grading and paving, landscaping, concrete, wood framing, windows, doors, roofing, interior and exterior finishes, equipment, plumbing, HVAC and electrical. The abatement and building demolition work & fire sprinkler work on this project has already been bid out and is not to be included in this bid. Page 42 of 65 Bid Date Bid Time Location 4/14/2015 2:00 PM Sacramento 2:00 PM Riverbank 2:00 PM South San Francisco 2:00 PM Oakland Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $750000 MAND 3/19 @ 1:30PM The scope of work includes a collection of detailed repair and construction tasks and specifications that have established unit prices. It is placed with the "Contractor" for the accomplishment of repair, alteration, modernization, maintenance, rehabilitation, demolition, and construction of infrastructure, buildings, structures, or other real property. Work is accomplished by means of issuance of individual orders against the JOC. Under the JOC concept, the Contractor furnishes all management, documentation, labor, materials, and equipment needed to perform the work. The JOC awarded under this solicitation will have a guaranteed minimum value of $50,000 and a maximum value of $750,000 with the option to increase to the State maximum of $3,000,000.00. NEW Exterior Painting at Riverbank High School MAND 4/3 @ 10AM at 6200 Claus Rd., Riverbank Sealantts & caulking, exterior painting NEW Mission Road/Evergreen Drive Traffic Signal and Intersection MAND 4/7 @ 2PM at 315 Maple Ave., South San Francisco Job Order Contract PW150001 ONLINE ONLINE ONLINE Improvements Project Installing new pavement, new storm drain facilities, new traffic signals including foundations, constructruction of new concrete sidewalks, new ADA compliant concrete curb ramps, new concrete curb & gutter RFQ For On-Call Engineering Design Services for Federally Funded 3/31 @ 2PM at 530 Water St., Oakland ONLINE Projects at the Port of Oakland The Port of Oakland (the Port) is soliciting Statements of Qualifications (SOQs) from qualified civil engineering firms/teams (Consultants) to provide as-needed engineering services for design and preparation of plans and specifications for federally-funded development and maintenance projects at the Oakland International Airport, and in the Port’s Maritime and Commercial Real Estate areas. This RFQ is being issued concurrently with the Request for Qualifications (RFQ) for On-Call Engineering Design Services for non-Federally Funded Projects at the Port of Oakland. Qualified consulting firms may submit SOQs for both RFQs. The Port anticipates executing a total of six agreements, three of which are subject to the federal’s Disadvantaged Business Enterprise (DBE) provisions incorporated into this RFQ and the remaining three subject to the Port’s NonDiscrimination and Small/Local Business Utilization Policy. The combined total compensation for all six contracts shall not exceed $6,000,000 over the threeyear term of the contracts. 2:00 PM 2:00 PM American Canyon Marin County $148685 ONLINE Mobilization, storm water pollution prevention, potholing, demolition & site preparation, earthwork, foundation work, construction of pipe chase, installation of piping & installation of caustic & alum chemical storage tank. Storm Water Pump & Motor Maintenance Services MAND 3/19 @ 10AM ONLINE NEW Upgrade Chemical Storage Project The work covered under this Bid includes the year-round storm water pump & motor maintenance services to remove, inspect, maintain, repair, rebuild or replace a total of five (5) pumps at the locations listed below. Vendors proposed price shall include all labor, materials, tools, equipment, transportation and services, as required for each location: 1. Crest Marin Pump Station 2. Shoreline Pump Station 3. Ryan Creek Pump Station 4. Cove Pump Station 5. SV3 Pump Station Page 43 of 65 Bid Date Bid Time Location 4/14/2015 2:00 PM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # Healdsburg NEW Healdsburg High School Modernization And Site Work Food Service Bid Package 4 ONLINE HVAC & Sheet Metal Bid Package 2 Electrical Bid Package 3 2:00 PM Hayward 2:00 PM French Camp 2:00 PM Fremont Floodwall Improvements Along Line D, Phase II, Between Huntwood MAND 3/31 @ 10AM at 951 Turner Ct., Rm 230, Hayward Avenue and Bart Removal of asbestos & hazardous substances, dust control, traffic control, construction area signs, temporary fence & gates, temporary railing, concrete removal, asphalt concrete pavement removal, clearing & grubbing, tree protection, disposal of materials, earthwork, trench & excavation protection, asphalt concrete, aggregate base, automatic drainage gates, concrete structures, cast-in-drilled-hole piles, miscellaneous iron & steel, sidewalk, driveway, curb & gutter replacement; concrete masonry block floodwalls, tree protection retaining wall, chain link fence & gate, guard rail, revegetation, plant establishment & maintenance period, mulch, hydroseeding, installation of special funding signs, cleaning site, water pollution control, street sweeping $900000 San Joaquin General Hospital Wayfinding and Signage Project MAND 3/18/15 @ 9AM at 500 W. Hospital Rd., French Camp Sign Fabricator scope includes: 1. Fabrication & Installation of new signs as detailed in Graphic Drawing sets for Phase 1 (Implementation Area 1) & Phase 2 (Implementation Area 2). NOTE: Removal of all existing signage that is being replaced during the designated Phase is by Fabricator or Subcontractor, electrical lines to sign locations without power is by others for final hook-up by Fabricator, Fabricator to review and coordinate all locations with owner’s rep. $760000 Crandall Creek Play Area Upgrades (PWC 8834) and Play Area Optional 3/25 @ 2PM 031C/R0 ONLINE ONLINE Conversions (PWC 8835) Div_02-demolition, earthwork, geotextile, drainage, synthetic safety surfacing, engineered wood fiber, drain rock, site furnishings, play equipment; Div_03concrete formwork, concrete reinforcement, cast-in-place concrete 2:00 PM Fremont 2:00 PM Fairfield 2:00 PM Fairfield $4000000 NEW 2015 Cape and Slurry Seal Project Furnishing traffic control and maintaining traffic flow during all contractor opeations throughout the period of construction; delivering advance public notifications; preparation of roadways to receive surface treatment including tree pruning, removal of thermoplastic & painted striping and markings & removal of raised pavement markers; placing & removing temporary pavement delineation, applying caspe seals & slurry seals to selected streets & the replacement of raised pavement markers & pavement striping & markings NEW Solano Community College Bldg 1200 Theater Renovation MAND 3/27 @ 4000 Susiun Valley Rd., Fairfield Selective Demolition includes, but not limited to: the removal of the two existing HVAC units, exterior tile mansard, light fixtures and interior ceilings and walls. Demolition, removal, and disposal of all asbestos containing materials 2015 Seal Coat Project Rolling Hills, Woodcreek & Kolob, The Ranch Work is to include but not be limited to temporary construction signage and striping, traffic control, striping and pavement marking removal, and re-striping of AC paved areas in all project locations, as well as the application of a rubberized cape seal, comprised of a rubberized chip seal and a slurry seal on Hilborn Road, the application of a slurry seal with fiber additive within all project areas, and all other items or details not mentioned above that are required by the City of Fairfield Standard Specifications, or the Special Provisions, as specified in the Contract Documents, and as directed by the City Engineer Page 44 of 65 ONLINE ONLINE ONLINE Bid Date Bid Time Location 4/14/2015 2:00 PM Fair Oaks Plan Name / Scope of Work Prebid Information NEW Cameron Ranch Elementary School, Paving, Bid Package #15-136 Engineers # of Plan Estimate Addenda # MAND 3/31 @ 10AM Docs Pe and Del Campo High School, Tennis, BP# 15-146 Paving work Cameron Ranch Engineer's Estimate-$555,000 Del Campo High School Engineer's Estimate-$270,000 Complete documents will be posted once available 2:00 PM Concord Fire System Testing at Mt Diablo Unified School District Sites MAND 3/26 @ 10AM at 1480 Gasoline Alley, Concord The Work of this Bid shall consist of the following at all (see Attachment B) Mt. Diablo Unified School District sites. ONLINE A. Perform complete fire alarm system annual inspection as required by SB575. These inspections include, but are not limited to, all site duct detector, heat detector, smoke detector, strobe devices, fire alarm boxes, electromechanical releasing devices and all fire detection devices. A complete site written report will be required. B. This is a one year (1) fixed contract. 2:00 PM Oakland RFQ for On-Call Engineering Design Services For Non-Federally Funded Projects at the Port of Oakland 3/31 @ 2PM at 530 Water St., Oakland ONLINE The Port of Oakland (the Port) is soliciting Statements of Qualifications (SOQs) from qualified civil engineering firms/teams (Consultants) to provide as-needed engineering services for design and preparation of plans and specifications for non-federally funded development and maintenance projects at the Oakland International Airport, and in the Port’s Maritime and Commercial Real Estate areas. 2:00 PM 3:00 PM 3:00 PM This RFQ is being issued concurrently with the Request for Qualifications (RFQ) for On-Call Engineering Design Services for Federally Funded Projects at the Port of Oakland. Qualified consulting firms may submit SOQs for both RFQs. The Port anticipates executing a total of six agreements, three of which are subject to the Port’s Non-Discrimination and Small/Local Business Utilization Policy incorporated into this RFQ and the remaining three subject to federal’s Disadvantaged Business Enterprise (DBE) provisions. The combined total compensation for all contracts shall not exceed $6,000,000 over the three-year term of the contracts. $1340000 Alhambra Valley Road Safety Improvements East of Bear Creek Road Recommended 3/30 @ 10AM Martinez The work to be done generally consists of approximately 2,500 linear feet of shoulder widening along Alhambra Valley Road near the Bear Creek Road intersection, including curve realignment, slope buttressing, cut and fill, roadside sign modifications, culvert replacement, concrete driveway conforms and ditches, traffic striping and tree planting in the Martinez area. Encouraged 4/1 @ 10AM at 835 E. 14th St., San Leandro San Leandro NEW West Juana Avenue Pedestrian Improvement The work to be done consists of installing sidewalk, curb and gutter, storm drains, and AC pavement, and doing all appurtenant work in place and ready for use, all as shown on the plans and described in the specifications. NEW King Plaza Improvement Plaza 4/7 @ 11AM at 250 Hamilton Ave, Palo Alto Palo Alto The scope of work for the King Plaza Improvement Project Consists of: Irrigation renovation, planting, decomposed granite and header board installation, electrical lighting installation and site furnishing assembly. Page 45 of 65 ONLINE ONLINE ONLINE Bid Date Bid Time Location 4/14/2015 3:00 PM Oakland Plan Name / Scope of Work Prebid Information NEW Fruitvale Elementary School Exterior Painting Prime & paint exterior of Fruitvale Elementary School. Engineers # of Plan Estimate Addenda # MAND 3/20 @ 9:30am $200000 ONLINE Robert Strong, Project Mgr, @ 510-277-6563 3:00 PM Los Altos 4/15/2015 1:00 PM Stockton 12:00 PM San Francisco PLEASE NOTE THAT BIDS WILL ONLY BE ACCEPTED FROM PRE-QUALIFIED BIDDERS Foothill College Campus Center and Bridge Painting and Staining MAND 3/17 @ 10:30AM at 12345 El Monte Rd., Los Altos Project Hills Painting & coating NEW High Voltage Equipment Maintenance, Testing & Repair MAND 4/8 @ 10AM at 7707 S. Austin Rd., Stockton The Contractor shall furnish all labor, materials, services, insurance, equipment and transportation necessary to perform maintenance, testing and repairs on the high voltage equipment for the California Department of Corrections and Rehabilitation (CDCR), California Health Care Facility (CHCF), 7707 South Austin Road, Stockton, CA 95215. NEW RFQ Phase 1 Architectural Services Rebuild Potrero BRIDGE desires to hire an architectural firm to help develop plans for potential development of Block X, which is shown in Exhibit B: Proposed Site Plan Over Existing to this RFQ. Block X is .75 acres. The site is located at the southern end of the site at the South East corner of 25th and Connecticut. It is contemplated that Parcel X will be developed with 100% affordable rental housing. Bridge is seeking proposals from firms for design and development work in accordance with final development decision. BRIDGE desires to hire an architectural firm to help develop plans for potential development of Block X, which is shown in Exhibit B: Proposed Site Plan Over Existing to this RFQ. Block X is .75 acres. The site is located at the southern end of the site at the South East corner of 25th and Connecticut. It is contemplated that Parcel X will be developed with 100% affordable rental housing. Bridge is seeking proposals from firms for design and development work in accordance with final development decision. If an alternative that includes development of Parcel X is selected, BRIDGE desires to be ready to commence construction upon issuance of an Authority to Use Grant Funds from HUD. Firms should provide scheduling information on the proposed time frame for proposed project implementation. The landscape architect under contract to the developer will produce detailed landscape plans with planting and tree selection, pavers and materials. The civil engineer under contract with the developer will provide schematic level grading plans for the building sites and their surroundings. The civil engineer will also provide schematic wet and dry utility plans and typical street cross sections. Architects will coordinate with these consultants and with the developer via monthly meetings, with additional meetings in between as needed to maintain the schedule. Approximately 6-10 coordination meetings are anticipated. The Potrero Annex and Terrace residents and the wider Potrero neighborhood have been engaged in the master planning and design development to date. This involvement will continue with the design of the buildings (and streets and open spaces). Architects will be required to participate in two community design workshops. Local Business Enterprises (LBEs) certified by the San Francisco Contract Monitoring Division (CMD) are strongly encouraged to submit qualifications in response to this RFQ. Certified LBEs are eligible for a maximum of 10% Scoring Bonus (per Attachment 2, Part II, 2.01 B of the CMD documents in Exhibit E. Note: the LBE 10% rating bonus is available only to firms certified as small and/or micro LBE certified by CMD Page 46 of 65 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 4/15/2015 2:00 PM LeConte Elementary School Modernization Project 2:00 PM 2:00 PM Berkeley Prebid Information Engineers # of Plan Estimate Addenda # MAND 2/26 @ 3PM Div_02-selective demolition; Div_03-concrete; Div_04-adhered masonry veneer; Div_05-structural steel, cold-formed metal framing, metal railings; Div_06-rough carpentry; Div_07-blanket insulation, joint sealants; Div_08-door hardware; Div_09-gypsum board assemblies, resilient flooring, acoustical wall treatment, painting; Div_10-signage, phenolic toilet compartments, toilet accessories, fire protection specialties; Div_22-plumbing; Div_26-electrical; Div_27-data networking, IP public address & clock system; Div_28-electronic safety & security (provided by consultant); Div_31-earthwork, drilled concrete piers & shafts Burlingame Police Station Interior Painting Project 2014-2015 MAND 3/26 @ 11AM at 1111 Trosudale Dr., Burlingame Burlingame Perform interior painting at the Burflingame Police station. $77000 NEW Concord Landscape Project Phase 2 (Recycled Water Customer 4/7 @ 10AM at 5019 Imhoff Place, Martinez Concord ONLINE ONLINE ONLINE Connections) 2:00 PM Rohnert Park 2:30 PM Oakland The work generally consists of connecting existing irrigation system to recycled water. Classroom Electrical and Technology Upgrades 2015 Phase 1 Optional 3/25 @ 2PM Selective demolition, electrical. communications NEW Oakland Technical High School Interior Painting MAND 4/03/15 @ 10:30 AM Paint interior classrooms in Main Building at Oakland Technical High School Campus $170000 ONLINE $160000 ONLINE Robert Strong, Project Mgr, @ 510-277-6563 PLEASE NOTE THAT BIDS WILL ONLY BE ACCEPTED FROM PRE-QUALIFIED BIDDERS 2:30 PM San Francisco 3:00 PM Dixon 4:00 PM Novato Earthquake Safety & Emergency (E.S.E.R.) Bond 1 Fire Station No. 16 3/25 @ 1PM at 30 Van Ness Ave, San Francisco. Follow up $6800000 (Preualified Contractors Only) site visit 4/8 @ 10AM at 2251 Greenwich St., San Francisco The Work inlcudes a complete and total demolition of the existing fire station; hazardous material abatement as required; removal of underground fuel tanks; reconstruction of street and sidewalk as identified in the contract documents and as required for new construction. Construction of new two story Fire Station with elevator. Fire Station 16 is pursuing LEED Building Design and Construction v2009 Gold certification. NEW City Hall Re-Roof Project MAND 4/7 @ 10AM at 600 East A St., Dixon Re-roofing City Hall facililty, including the replacement of damaged decking, damaged fascia, priming & painting of all fascia replaced, all new galvanized flashing, installation of underlayment, 30 year dimensional cool roof shingles, all new gutters & down spouts & daily clean up. RFQ & Interest Airport Planning, Architecture/Engineering, Optional 4/1 @ 1PM ONLINE ONLINE ONLINE Environmental, and Consulting Services Tasks involved will include but not be limited to; planning, architecture, airfield civil and electrical engineering, program management, Airport Capital Improvement Plan (ACIP) submittals to the Federal Aviation Administration, environmental evaluation and monitoring, preparation of environmental documents (both NEPA and CEQA) grant applications, grant project management, surveying and on call services 4:00 PM Los Altos NEW RFP for Fremont Avenue Bridge Replacement Project $1100000 $1300000 The City of Los Altos is soliciting proposals from qualified engineering firms to provide construction management services for the replacement of Fremont Avenue Bridge over Permanente Creek. Page 47 of 65 ONLINE Bid Date Bid Time Location 4/16/2015 1:30 PM Lodi Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE NEW Kettleman Lane Resurfacing (Lodi City Limits to State Highway Route 88) Bituminous seals, hot mix asphalt, monuments, survey monument frame & cover, survey monument installation detail, adjusting street utilities to grade, pavement edge treatments 1:30 PM San Joaquin County ONLINE NEW North 99 Frontage Road Interconnection (SR99 Frontage Road, from Tudor Rose Glen Road to Mosher) Temporary traffic control, water pollution control, clearing & grubbing, watering, hot mix asphalt (miscellaneous aareas), domestic water system, vale box, locator wire installation 2:00 PM Sacramento $1591000 Arden Park Water Main ONLINE Dust control, trench backfill & base material, asphalt concrete, curbs, gutters, sidewalks & sidewalk ramps, sewer construction, lower lateral modification, water distribution system installation, water pipe 2:00 PM 2:00 PM 2:00 PM Vallejo San Francisco San Francisco 2015 Miscellaneous Storm Drain Relocation Projects 152326 Old Cement Property Storm Drain Line Relocation Project, Job No. 143227 Reis-Maple Storm Drain Relocation, Job No. 142322 Online 1, Old Cement Property Storm Drain Line Relocation Project, Job No. 143227: The work consists of installing approximately 171 linear feet of new 18" Class V RCP Storm Drain Main, a Storm Drain Manhole, concrete pavement removal & replacement, and abandoning a stretch of existing Storm Drain Main complete and in place. 2, Reis-Maple Storm Drain Relocation, Job No. 142322: The work consists of installing approximately 40 linear feet of new 48" Storm Drain Main, a Storm Drain Manhole, modifying an existing storm drain manhole, removing and installing weir walls, asphalt concrete pavement grinding, removal & replacement, restoration of pavement markings, plugging and abandoning a short segment of existing 36-inch RCP Storm Drain Main complete and in place. TG07.6 Topping Slabs, Bus Crash Rail & Expansion Joints Encouraged 3/11 @ 2PM at 175 Beale St., San Francisco ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with concrete reinforcing, cast-in-place concrete, polished concrete finishing, seismic joint assemblies, and expansion joints on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems in the following trade: TG07.6 Topping Slabs, Bus Crash Rail, & Expansion Joints TG16.0 Interiors/Finishes Construction Services Transbay 3/5 @ 2PM ONLINE Webcor/Obayashi Joint Venture seeks General Contractors that have significant experience with interiors and finishes including but not limited to, concrete masonry units, metal framing, drywall, building insulation, penetration firestopping, toilet accessories, miscellaneous metals for own work, bird deterrent, ballistic resistant panels, acoustic ceiling tiles, acoustic wall treatments, tile, tile carpeting, resilient base, painting, site paints, high performance coatings, doors, frames, hardware, low voltage wiring for own scope of work, interior architectural woodwork, countertops, prefabricated buildings, photo-luminescent exit accessories (PLEA), and final cleaning on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems in the following trade: TG16.0 Interiors/Finishes Page 48 of 65 Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 4/16/2015 2:00 PM Program Management Support Services for Airport Security Infrastructure Program 3/26 @ 10AM San Francisco Engineers # of Plan Estimate Addenda # ONLINE The Airport has contracted with security consultant/contractor, who is currently assisting the Airport with developing an Airport-wide Security Master Implementation Plan for critical aviation security programs throughout the Airport. The implementation of the Implementation Plan is a phased approach in order to update security infrastructure to support existing and future technology. The Contractor will collaborate with the security consultant to develop the specific scopes for multiple projects that will implement the security initiatives through the Airport Security Infrastructure Program. The Contractor will also provide program-level management support services (PMSS) to the Airport for management and oversight of the Program. Norm Del Prado, Contract Manager, @ 650-821-7866 2:00 PM San Francisco 2:00 PM Sacramento 2:00 PM Sacramento 2:00 PM Sacramento 03/20/15 @ 10:00 am at 525 Golden Gate Ave., 3rd Floor - $2247847 Tuolumne Room, San Francisco The objective of the project consists of green infrastructure work (porous concrete, permeable paving and bioretention planters), pavement renovation, sewer drainage work, landscaping work, water main work, street lighting and traffic signal modification , and traffic routing including construction of concrete curb ramps with detectable surface tiles. $75000 Outdoor Theatre/Saigon Bay Reroof MAND 4/2 @ 10AM at 6000 J St., Sacramento Single-ply roofing membrane, metals & flashing $187000 Paving Repair (Crack Fill & Seal Coat) at Seven School Sites MAND 3/31 @ 9AM at 9235 Mirandy Dr., Sacramento Asphalt concrete paving, pavement sealer striping & signage $720000 Sacramento International Airport Sealant on Elevated Roadways and MAND 3/17 @ 10AM at 6850 Airport Blvd., Sacramento Mission and Valencia Streets Green Gateway ONLINE ONLINE ONLINE ONLINE Parking Garage Top Deck Construction area traffic control, earthwork, asphalt concrete, manholes, traffic stripes & pavement markings 2:00 PM 2:00 PM 2:00 PM 2:00 PM $660000 Sacramento NEW ADA Curb Ramp Project-2015 - RE-BID Removing & replacing concrete curb, gutter, and/or sidewalk; constructinh sidewalk curb ramps, removing & replacing asphalt concrete pavement adjacent to replaced curb & gutter $1350000 Cordova Creek Naturalization Project Rancho Cordova The work to be performed under this Contract includes the furnishing of all labor, materials, and equipment to demolish the existing concrete lined channel, construct a new naturally lined channel, and landscape the adjacent area. The naturally lined channel will include cobble bed armor, stone toe protection, Newbury Rock Riffles, and a low water crossing. The new channel corridor will be landscaped as a natural riparian corridor by planting native trees, shrubs, and grasses along the channel banks and surrounding uplands. $440220 NEW Traffic Signal Modifications on Hegenberger Road (at Edes Ave, 73rd MAND 4/2 @ 2PM at 250 Frank Ogawa Plaza, 4th Fl, Oakland Ave-International Blvd, Baldwin Ave, Hamilton St)-Rebid Oakland Proposed work at Edes Avenue and at Baldwin Avenue include traffic signal modifications, advance signals for improved visibility, and speed feedback signs for traffic calming. Proposed work at 73rd Avenue-International Boulevard includes installation of speed feedback signs for traffic calming. Proposed work at Hamilton Street include additional signal standards to improve safety for vehicular traffic and bicycle. Presently, there is no on-street crossing at this location; pedestrian crossings are accommodated by a pedestrian bridge over Hegenberger Road. $357547 NEW Traffic Signal Modifications at San Pablo Ave/West St and San Pablo MAND 4/2 @ 2PM at 250 Frank Ogawa Plaza, 4th Fl, Oakland Ave/West Grand Ave (Rebid) Oakland Bicycle detectionand pedestrian amenities. The signal will improve safety at the intersection for pedestrians, bicyclists, and motorists. Page 49 of 65 ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location 4/16/2015 2:00 PM Oakland Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $377366 MAND 4/2 @ 2PM at 250 Frank Ogawa Plaza, 4th Fl, Oakland The proposed work includes installation of a new traffic signal at the intersection of Bancroft Avenue and 94th Avenue, including bicycle detection, and pedestrian amenities. The signal will improve safety at the intersection for pedestrians, bicyclists, and motorists. ONLINE 2015 Cape Seal Project on Old River Road CR 201 M.P. 0.00 to 6.81 ONLINE NEW New Traffic Signal at the Intersection of Bancroft Avenue and 94th Avenue (Rebid) 2:00 PM Mendocino County 2:00 PM Martinez 2:00 PM Sacramento 2:30 PM Clayton 2:30 PM 3:00 PM Dust control, mobiliztion, construction area signs, seal coat, cold planing asphalt concrete pavement, olblietarte roads, destours & surfacing, earthwork, aggregate base, hot-mix asphalt concrete, warm mix asphalt concrete, adjust utility covers to grade, catch basins, damage repair, underdrains, plastic pipe-PVC, plastic pipe-HDPE, sawcut, painted traffic stripes & pavement markings, roadside sign installation, construction survey, erosion control $75000 ADA Accessibility Improvements at the Veterans Memorial Hall 3/24 @ 10AM Div_08-flush wood doors, stile & rail entrance doors, door hardware; Div_09-laminate flooring, carpeting, paintings & coatings; Div_10-signage, awnings; Div_14vertical wheelchair lifts New Administration Building Alterations of Elevators MAND 3/26 @ 9AM or 3/31 @ 9AM at 700 H St. Sacramento $722000 Alterations of traction & hydraulic elevators $650000 NEW 2015 Neighborhood Street Pavement Rehabilitation Project Maintaining tarffic, remove & replace pedestrain ramps, modify pedestrain ramps, install truncated domes on pedestrian ramps, base failure repair, pavement overlay, striping & pavement markings, pavement markers, c Jenkins Hall Restroom Renovations 2015 3/17 @ 2PM at 6000 J St., Sacramentp Sacramento Selecitive demolition, cast-in-place concrete, firestopping, joint sealnats, gypsum board shaft wall assemblies, gypsum board, ceramic tiling, acoustical panel ceiling, interior paints & coatings, phenolic-core toilet compartments, phenolic-core shower & dressing compartments, toilet, bath & laundry accessories; Div_22plumbing; Div_26-lighting, electrical work $4400000 Richmond Transit Village Phase II:Nevin Avenue BART-19th MAND 3/30 @ 2PM at 440 Civic Center Plaza, Richmond Richmond ONLINE ONLINE ONLINE ONLINE ONLINE Construction Aggregate base, asphalt concrete, construction signs, disposal of materials, removal of asbestos & hazardous substances, watering, saw cutting, site demolition, earthwork & grading, concrete structures, electrical system & lighting, landscape maintenance & plant establishment, irrigation systems, site & street furnishings, fencing, landscape planting, cold-formed metal framing, metal fabrications, metal railings, decorative metal, rough carpentry, self-adhering sheet waterproofing, metal roof panels, composite wall panels, sheet metal flashing & trim, joint sealers, steel doors & frames, translucent wall & roof assemblies, door hardware, fixed metal wall louver & grilles, gypsum board systems, painting, graffiti-resistant coatings, plastic & metal signs, safety specialties, hydraulic elevators, concrete surface textures, common work results for HVAC 3:00 PM 4:00 PM Mendocino County Modesto 2015 A.C. Overlay on Various County Maintained Roads Dust control, mobiliztion, construction area signs, seal coat, cold planing asphalt concrete pavement, olblietarte roads, destours & surfacing, earthwork, aggregate base, hot-mix asphalt concrete, warm mix asphalt concrete, adjust utility covers to grade, catch basins, damage repair, underdrains, plastic pipe-PVC, plastic pipe-HDPE, sawcut, painted traffic stripes & pavement markings, roadside sign installation, construction survey, erosion control $420000 NEW MJC East Campus Roads Project South Drive and Quad Area 4/2 @ 10AM Modifications Scope of work includes but is not limited to: the demolition and replacement of the existing concrete sidewalks, asphalt paving, ADA parking stalls, pedestrian walkways through the quad and removal of bollards. Page 50 of 65 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 4/16/2015 4:00 PM RFP for Architectural and Engineering Design Services for the Petaluma Historical Library and Museum Sesimic Retrofit Project Petaluma Prebid Information Engineers # of Plan Estimate Addenda # ONLINE The City of Petaluma is seeking comprehensive analysis and engineering design services for the Petaluma Historical Library and Museum Seismic Retrofit Project. The consultant team will assess the current, overall physical condition of the building’s interior and exterior, and identify areas vulnerable to seismic damage. This may require the structural engineer to utilize testing results to determine the strength and durability of materials and connections. Preliminary structural calculations may be necessary to understand the building’s inherent strengths and weaknesses 4/17/2015 10:30 AM North Highlands NEW Miles P Richmond Pool Project ONLINE MAND 4/6 @ 10AM at 4330 Keema Ave., North Highlands Demolition, engineered fill & stabilization, hazardous material survey 2:00 PM Sacramento 2:00 PM San Jose Stage Drapes & Rigging at Five School Sites MAND 4/1 @ 9AM at 3500 Florin Rd., Sacramento $369000 ONLINE $420000 ONLINE Theater equipment & stage curtains Asphalt Concrete The City of San Jose is soliciting bids from qualified suppliers to provide asphalt concrete. 5:00 PM Danville ONLINE RFP Front Street Creek Bank Stabilization Civil and/or Geotechnical Engineers The Town of Danville is requesting a proposal from Civil and/or Geotechnical Engineering consultants to assist with the preparation of an environmental document, jurisdictional permit applications, plans, specifications and an estimate for the Front Street Creek Bank Stabilization project. This project is intended to repair a creek bank failure (landslide) within San Ramon Creek that is undermining the east side of Front Street, north of Diablo Road. 4/20/2015 2:00 PM Meno Park 2:00 PM Richmond 2:00 PM Rohnert Park 5:00 PM San Francisco Fire Alarm System Preventative Maintenance at San Francisco Public Housing Developments Oakland Uninterruptible Power Supply Procurement for Training Control Rooms Building 331 Cooling Tower Replacement 3/26 @ 10AM Provide complete construction services to replace the EVAPCO cooling tower located at Building 331. Specifications, product cut sheets, and scope of work will be made available when the solicitation is posted to FBO. The project is located at 795 Willow Road, Menlo Park, CA. 94025, Building 331. NEW Cutting/Carlson Improvement Project - Phase 1 MAND 4/2 @ 2PM at 450 Civic Center Plaza, Richmond In general, the Project involves the installation of an additional traffic signal pole, concrete median extension, roadway striping, and construction of new sidewalk. The new configuration will be coordinated with the railroad signal and traffic signals at other intersections on Cutting Blvd. The project will also install curb ramps and relocate traffic signs Steven Tam, Project Manager, @ 510-307-8091 NEW Eastside Trunk Sewer Phase 3 and Snyder Lane Widening MAND 3/24 @ 10AM ONLINE ONLINE $9500000 ONLINE $225000 ONLINE $650000 $1875000 ONLINE Road widening & underground improvements Fire alarm systems testing, system repairs, tracking, maintenance and general upkeep for SFHA properties. 4/21/2015 2:00 PM 4/8 @ 10AM at 300 Lakeside Dr., 16th Fl, Oakland Providing up to a total of fifty three (53) UPS systems to replace the District's existing train control UPS systems Page 51 of 65 Bid Date Bid Time Location 4/21/2015 2:00 PM 2:00 PM 2:00 PM 2:00 PM 2:00 PM 2:00 PM 2:00 PM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $75000 NEW Tiburon Blvd Crosswalk Improvements The work to be performed under this contract consists of removal of concrete, roadway excavation, hot mix asphalt plugs, mortared brick and reinforced concrete crosswalk, curb ramps, island passageway, roadside signs, pavement markings, irrigation, and related work, including traffic control and water pollution control. The work will require construction area signs, acquiring a Caltrans Encroachment permit, coordination with local utility companies, and other miscellaneous items not mentioned above that are required by the plans, the State Standard Specifications or these Specifications to be performed, placed, constructed or installed. HHW Facility - Restoration of Floor and Sump Areas MAND 3/31 @ 9AM at 7850 R.A. Bridgeport St., Stockton Stockton Restoration of Floor and Sump Areas at the San Joaquin County Permanent Household Hazardous Waste Consolidation Facility consisting of the preparation, repair and restoration of the concrete floor and sump areas of the facility according to the specifications. The bid includes an option to polish the floor areas of the facility at the County's request. $596000 Camino Tassajara Shoulder Widening Recommended 4/2 @ 10AM San Ramon Pavement widening, drainage improvements, relocating roadside obstacles & installing curve advisory solar flashing beacons approaching the s-curve from both directions NEW Arelious Walker Dr. Slope Stabilization DesignBuild Project 4/7 @ 10AM San Francisco To engineer and construct a slope stabilization system (i.e. soil nail wall) located along the future Public Right of Way of Arelious Walker Dr. that will support the new Arelious Walker Dr. and infrastructure improvements, and create a flat building pad for the new retail center. SBE/LBE/MBE/WBES encouraged to submit bids. ONLINE $2100000 Sacramento NEW East Campus Operations Center (ECOC) Parking Expansion Recommended 4/7 @ 2PM The work generally consists of: Parking lot expansion to provide additional employee parking. $300000 2015 On-Call Trucking Services for Aggregate Stockpiling and Recommended 4/6 @ 10AM at 255 Glacier Dr., Martinez Oakley/El Transportation Sobrante/W alnut Creek A contract to provide trucking services consisting of trucks and operators for the transportation of aggregate from the quarry to various stockpile locations throughout the County, and also for the transportation of the chip seal aggregate from the stockpile locations to various roads throughout the County. ONLINE Tiburon Los Altos Maximum On-Call contract amount: $300,000 for a one year period. NEW Biennial Street Slurry Seal $100000 $120000 ONLINE ONLINE ONLINE ONLINE ONLINE The project includes but is not limited to mobilization, removing of strips and markings, temporary striping, slurry seal, traffic control, permanent roadway strips and markings and all other items or details not mentioned above that are required by the Contract Specifications to apply a new slurry seal over existing streets as shown on the plan and specifications. 2:00 PM Ceres $245000 NEW Generator Replacement City of Ceres Police Department The project involves the removal and disposal of the existing 100 KW diesel generator and replacing it with a 175 KW diesel generator, structural modifications to the existing floor, modifications to the existing mechanical, electrical and fuel systems. Page 52 of 65 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 4/21/2015 2:00 PM Concourse B - East & West Exit Lane Technology 2:30 PM 2:30 PM 3:00 PM 5:00 PM Sacramento Los Altos Prebid Information Engineers # of Plan Estimate Addenda # MAND 3/10 @ 10AM to 12PM The Sacramento County Dept. of Airports is seeking a provider of exit lane technology for Concourse B - east & west exit lanes. The Sacramento County Department of Airports (Airports) is seeking Exit Lane Technology that will have a total of six (6) exit lanes – three (3) adjoined exit lanes in the east corridor and three (3) adjoined exit lanes in the west corridor in Concourse B, located at the Sacramento International Airport (SMF). The purpose of this Exit Lane Technology is to stop unauthorized movement of people and objects from the non-sterile to sterile area of Concourse B through an automated system instead of human guards. The Exit Lane Technology will be functional twenty-four (24) hours a day, seven (7) days per week, unless otherwise specified by airport authorities, or during routine scheduled maintenance. The Exit Lane Technology will be capable of operation in proximity to other electronic equipment without creating, or being subject to, signal interference. The Exit Lanes shall allow different modes of operation: free flow, interlock, etc. $90000 $150000 NEW Street Resurfacing Project The project includes but is not limited to mobilization, deep lift asphalt concrete pavement repairs (cut & plug), traffic control, miscellaneous re-striping, and all other items or details not mentioned above that are required by the contract Drawings and Specifications to repair various streets within the City of Los Altos 4/8 @ 2:30 PM San Rafael NEW Relocation of Modular Buildings at the Short Elementary School Demolition, earthwork, asphalt and concrete paving, electrical and associated work. NEW Civic Center Pedestrian Pathway Improvements Project Campbell Asphalt concrete sawcutting; portland cement concrete saw-cutting; demolition; removal & disposal of existing concrete sidewalk, curbs, gutters, existing base material & asphalt concrete pavement; root pruning; preparation of sub-base & base; installation pf PCC accessibility ramp, driveways, sidewalk & curb & gutter; installation of asphalt concrete pavement; retrofit existing accessibility ramps; signing; striping; flow testing; providing & maintaining pedestrian access; traffic control NEW Rockville Terrace Senior Housing (NO GC OPENINGS) Fairfield Construct 148 units of two-story senior living, trades needed include structured post tensioned concrete, rough carpentry, siding, finish carpentry, elevators, mechanical, electrical, plumbing, fire alarm, nurse call, roofing, drywall, stucco, stone veneer, flooring, carpet, tile, paint, window coverings, doors, door hardware, windows, insulation, caulking, sealants, landscape, irrigation, fire sprinkler, gypcrete, fountain, structural steel, miscellaneous steel, cabinets, countertops, granite, appliances, flashing and sheet metal, storefront, acoustical ceilings, fiberglass wall panels, FRP, deck coatings, waterproofing, railing, fireplaces, kitchen equipment, low voltage, patio doors, toilet specialties, fire extinguishers, pavement markings, signage, masonry trash enclosure and concrete flatwork. **EXCLUDES sitework. Page 53 of 65 ONLINE ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 4/22/2015 2:00 PM Senior Center Renovations Emeryville Prebid Information MAND 4/8 @ 10AM at 4321 Salem St., Emeryville Engineers # of Plan Estimate Addenda # $1800000 ONLINE The Emeryville Senior Center Renovations Project consists of but is not limited to: 1.Hazardous Materials Abatement 2.Demolition and replacement of existing built-up roofing 3.Installation of roof mounted solar panels 4.New unisex restroom in the first floor 5.Repairs to existing restrooms on the first floor 6.Miscellaneous improvements to the multipurpose room on first floor •Acoustical Wall Panels •New lighting •Refinish existing wood flooring •New window shades 7.Convert existing storage room adjacent to stage to laundry room 8.Miscellaneous improvements to the exercise room on second floor •New flooring •New lighting 9.New storage room adjacent to exercise room on second floor 10.Replacement of windows on the south side of the building 11.Repair of existing windows as indicated 12.Demo and replacement of entry ramp and handrails 13.Demo and replacement of brick stairs at entry 14.Interior and exterior painting, complete 15.Demo and replacement of the existing steam heating system, and repair and refinishing of surfaces altered by this portion of the work 16.Installation of an HVAC system for the second floor offices (alternate) 17.New interior finishes where designated 18.Repair and refinishing of designated surfaces 19.New doors and hardware as indicated. 20.New electrical distribution as indicated. 21.New lighting as indicated. 22.New fire alarm system detection and signal components as indicated. 2:00 PM $13786000 Sacramento NEW East Sacramento Water Main Replacement Project Phase 2 -Rebid The work to be performed under these Special Provisions generally consists of furnishing and placing 6-inch, 8-inch, 12-inch and 30-inch diameter water mains. Also included is furnishing and installing all required fittings, valves, blow offs, air vacuum and release valves, system ties, fire hydrants and other appurtenances, water services, meter setters, meter boxes, lids, meter valves and water meters at various commercial and residential properties within designated areas of the City of Sacramento as indicated on the plans, and connecting to the existing distribution and transmission systems as indicated on the Plans. This contract also covers connecting city water services to existing residential water services, removing existing fire hydrants and abandoning existing mains and water services as shown on the Plans and in these Special Provisions. Page 54 of 65 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 4/22/2015 2:00 PM Fairfield Police Lobby Accessibility & Main Patrol Lot Security Improvements Fairfield Prebid Information Engineers # of Plan Estimate Addenda # MAND 4/1 @ 10AM at 1000 Webster St., Fairfield $1700000 ONLINE The work consists of tenant improvements to the existing Fairfield PD main police station at 1000 Webster Street, including the Main Patrol Lot, Lobby, Records, Data Room cooling, and re-roofing The work further includes demolition and installation of new walls, windows, doors, storefront systems, carpet tile flooring, conductive flooring, acoustical ceiling systems, metal doors, electrical lighting, electrical distribution and emergency power systems, UPS systems, electronic access control and surveillance, mechanical, plumbing and fire suppression work, pedestrian and vehicular paving, structural wood framing, roofing, landscape planting and irrigation. all as shown on the Project Plans, as specified in the Contract Documents, and as directed by the City Engineer. 2:00 PM Oakland 2:30 PM San Francisco 2:30 PM San Francisco Complete Documents will be posted once available $275000 NEW AOA Security Fence Installation At Cargo Building M-112 4/8 @ 9:30AM The Work of this 90 calendar day project consists, in general, of furnishing all labor, materials, appliances, tools, equipment, transportation, services and supervision required to complete the AOA Security Fence Installation at Cargo Building M-112, including, by not limited to: security fence installation, k-rail placement, installation of vehicle and man gates, security system installation and integration, fixed and PTZ camera installations, new power and communication conduit including trenching, striping, and performing all associated work, including all required temporary work, all in accordance with the Contract Documents. $3700000 NEW Fulton Street Pavement Renovation and Muni Forward Project 4/2 @ 1:30PM at 1680 Mission St., 3rd Fl, San Francisco Pavement renovation, curb ramp & bul-out construction, sewer replacement, water & AWSS work, traffic routing & all associated work. NEW Mountain Lake Park Playground Renovation 4/2 @ 9:30AM at 30 Van Ness Ave, 5th Fl, San Francisco $1850000 ONLINE ONLINE ONLINE Site demolition and tree removal,grading and site drainage, paving and retaining walls, decking, irrigation and landscaping, play equipment and play matting, site furniture and lighting, sewer line replacement, and all appurtenant work in accordance with specifications and drawings. 4/23/2015 2:00 PM 2:00 PM South San Francisco Turlock Mary Hobson, Project Manager, @ 415-581-2575 NEW Fire Station 62 Roof Replacement MAND 4/2 @ 2PM at 249 Harbor Way, South San Francisco $155000 Replace Deteriorated Roof at the Fire Station, including sheet metal waterproofing, thermoplastic membrane roofing & exterior metal painting $2716000 NEW Swimming Pool Renovation Project MAND 4/2 @ 10AM Div_02-swimming pool aggregate base course, selective demolition, asbestos abatement; Div_03-concrete; Div_04-concrete unit masonry; Div_05-guardrails, handrails & rungs; Div_06-rough carpnetry, wood I joists, millwork, plastic paneling; Div_07-concrete slab dampproofing, thermal insulation, single ply roofing, flashing & sheet metal, roof hatch railing system, roof hatches, sealants, swimming pool sealants; Div_08-standard steel doors & frames, metal access doors, overhead coiling doors, finish hardware; Div_09-gypsum wallboard, truncated dome detactable warning surface tile, ceramic tile, swimming pool cermaic tile, resinous flooring, painting; Div_10-indentification devices, swimming pool signage, toilet room accessories, fire extinguishers, cabinets & accessories, miscellaneous specialties; Div_13-swimming pool equipment; Div_22-plumbing; Div_23-HVAC; Div_26-lighting, electrical; Div_27-communications; Div_28intrusion alarm syste, fire alarm system; Div_31-clearing & grubbing, grading; Div_32-asphalt paving, concrete paving, parking bumpers, pavement markings, tactile warning surface, chain link fencing & gates, planting irrigation, turf & grasses, plant; Div_33-utilities Page 55 of 65 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 4/23/2015 2:00 PM TG13.1 Roof Park Landscaping and Irrigation Optional 3/18 @ 2PM at 175 Beale St., San Francisco 2:00 PM San Francisco Engineers # of Plan Estimate Addenda # Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with roof park substructure, hardscape, contract grow and acclimatization, landscaping, maintenance, utility corridor, drainage and irrigation, site furnishings, miscellaneous metals, fountain hardscape, and playground structure on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems in the following trade: TG13.1 Roof Park Landscaping and Irrigation $2300000 Sacramento NEW C.B. Wire Elementary School:Playfield Repairs Including Hudraulic MAND 4/7 @ 9AM at 5100 El Paraiso Ave, Sacramento ONLINE ONLINE Irrigation Replacement; Storm Drainage Improvment and New Fencing 2:00 PM 2:00 PM 2:00 PM Playfield repairs include hydraulic irrigation replacement, storm drainage improbement & new fencing 4/1 @ 10 AM and 4/9 @ 1 PM Sacramento NEW 1725 K Street Exterior Paint Paint the exterior of the building at 1725 K Street, including scaffolding. $15700000 MAND 4/14 @ 9AM or 4/16 @ 3PM Pleasanton NEW Recycled Water Infrastructure Expansion-Phase 1A The work to be done in general shall consist of, but is not limited to, providing and installing : •Approximately 50,600 lineal feet of new 20-inch, 16-inch, 12-inch, 8-inch and 6-inch recycled water mains and 134 recycled water service connections and various related appurtenances in northern Pleasanton including potholing operations, traffic control, providing and implementing water pollution control measures, trenching and backfill, pipeline testing and disinfection, pavement restoration, landscaping restoration and other related work. •Two interconnections with existing recycled water systems (DSRSD and City of Livermore), including piping connections, pipeline flushing, flow control and metering station facilities and related site and appurtenant work. •Approximately 1,400 lineal feet of directionally drilled 16-inch recycled water pipeline beneath the Arroyo Mocho. •Two interconnects of existing pipelines in Dublin Boulevard at Tassajara Road and Fallon Road in Dublin including potholing operations, traffic control, providing and implementing water pollution control measures, trenching and backfill, pipeline flushing and testing, pavement restoration, landscaping restoration and other related work. •Approximately 2,400 lineal feet of 12-inch potable water pipe in Santa Rita Road including potholing operations, traffic control, providing and implementing water pollution control measures, trenching and backfill, pipeline flushing and testing, pavement restoration, landscaping restoration and other related work. •Various abandonments associated with conversion of existing potable water lines to recycled water service. $1700000 W. Cypress Road, Big Break Road and Rose Avenue Pavement Oakley ONLINE 004C/T0 ONLINE Rehabilitation Project 2:00 PM Fairfield/Vac aville Mobilization, traffic control & construction area signs, clearing & grubbing, water pollution control, temporary drainage inlet protection, remove traffic stripe/pavement markings, hot mix asphalt, rubberized hot mix asphalt, cape seal asphalt tack coat, cold planing, miscellaneous concrete, aggregate base, shoulder backing, traffic signals & loop detectors, traffic striping, markings & raised pavement markers, clean-up Paving Project Schools MAND 4/7 @ 1PM at 1895 Woolner Ave, Fairfield TC MacDaniel Early Learning Center:tripping hazard repairs, cut & remove existing concrete ramp & sidewalk, cold pour crack fill, seal coat front parking area, restripe front parking lot Irene Larsen Education Center:remove & replace sidewalk by Room 9, remove & replace failed pavement by Room 10, remove & replace asphalt at double gate, repair bus loop, tripping hazard repairs, crack fill front areas, seal coat, restripe parking lot Page 56 of 65 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 4/23/2015 2:00 PM Dixon Wastewater Treatment Facility Water Supply Well Project Sacramento Ravenwood Ave/Eastern Ave Storm Drain Improvement Project 2:00 PM 4:00 PM 4/24/2015 1:00 PM 1:00 PM 10:00 AM 10:30 AM 10:45 AM 11:00 AM Woodland Prebid Information Engineers # of Plan Estimate Addenda # Pre-bid visits may be arranged by contacting Chris Gioia $249000 @ 707-678-7030 Drilling an approximately 930 foot deep borehole and completing it as a water supply well with an estimated depth of 910 feet. Refer to Technical Specifications 01999-1.2 for more detail. Actual well pump installation and completion of surface facilities to be by others $870000 The project consists of installing approximately 2650 lineal feet of storm drain pipe, 4 drainage inlets, 9 manholes and appurtenant structures, abandoning 1900 linear feet of corrugatted metal pipe, removing and replacing curb gutter and sidewalk, relocating sewer services, and doing all other work specified on the plans and in the specifications. NEW Generator Maintenance & Repair Services (1-Year) MAND 3/25 @ 8AM at 625 Ct St., Rm 106, Woodland The County of Yolo is requesting bids from qualified Suppliers to provide Generator Maintenance & Repair Services countywide per specifications outlined in this Invitation for Bid (IFB). ONLINE ONLINE ONLINE MAND 4/14 @ 1PM at 5761 Brett Dr., Sacramento Sacramento NEW Woodridge Elementary School Roofing Project Replace entire roofing system located at the various mechanical wells at the Multi-purpose Room, remove flashings and existing roof membranes down to the wood substrate, sweep prepared substrate of all debris, mechanically attach / insulation separation board, install polyester reinforced thermoplastic roofing system over the flat / low sloped roof planes, install flashings and accessories and install walkway pads located around all the roof top equipment on all sides. MAND 4/14 @ 9AM Sacramento NEW Foothill Oaks Elementary School Roofing Project Furnish and install roofing step slope roofing and related components. NEW Dry Creek ES, Creative Connections Arts Academy Walegra, Rio MAND 4/6 @ 9AM Rio Linda Prep & Rio Linda HS Roofing Linda/North Highlands Furnish and install specified roofing patch, roof coatings and related components to designated BURM roof area and PVC roof patching to area showing signs of backed out fasteners and spilt cracks at four schools NEW Highlands HS, Harmon Johnson ES & Ridgepoint ES Roofing Project MAND 4/7 @ 9AM North Highlands/S acramento Furnish and install specified roofing patch, roof coatings and related components to designated BURM roof area and PVC roof patching to areas showing signs of backed out fasteners and split cracks at three school locations. MAND 4/8 @ 10AM Sacramento/ NEW Martin Luther King Jr. Technology Academy & Kohler ES Roofing Project North Highlands Furnish and install specified roofing patch, roof coatings and related components to designated BURM roof areas and PVC roof patching to area showing sign of backed out fasteners and split cracks at two school locations. ONLINE Sacramento NEW Norwood Junior HS, Fairbanks ES & Noralto ES Roofing Project Furnish and install specified roofing patch, coatings and related components. ONLINE Page 57 of 65 MAND 4/9 @ 10AM ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location 4/24/2015 11:30 AM 11:45 AM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW Oakdale ES, Foothill HS, Woodlake ES Roofing Projects MAND 4/10 @ 9AM North Highlands/S acramento Furnish and install specified roofing patch, roof coatings and related components to designated BURM roof area and PVC roof patching to areas showing signs of backed out fasteners and split cracks at three school locations. ONLINE Sacramento NEW Rio Tierra Jr. HS, Hagginwood ES, Grant Union HS & Michael J ONLINE MAND 4/13 @ 9AM Castori ES Roofing Project Furnish and install specified roofing patch, roof coatings and related components to designated BURM roof area and PVC roof patching to areas showing signs of backed out fasteners and split cracks at four school locations. 2:00 PM 4/28/2015 1:00 PM 4/8 @ 9AM at 2750 Aacademy Way., Sacramento Sacramento NEW Automate Existing Chain Link Gate Sacramento Regional Transit District (RT) is soliciting bids for Automate Existing Chain Link Gate, which consists of automating an existing manual chain link gate at 2750 Academy Way, Sacramento, CA The gate will be controlled via timed free entry and exit during normal business hours and Radio Frequency Identification (RFID) Card reader and free exit during off hours. Operator must be compatible with RT's existing Access Control System and software. Folsom High Voltage Power Pole Removal, Replacement and Emergency Response MAND 4/14 @ 10AM at 300 Prison Rd., Folsom $110999 ONLINE ONLINE The Contractor shall provide all parts, labor, materials, supplies, tools, equipment, permits and licenses, bonds, transportation and every other item of expense necessary to provide routine and emergency high voltage repairs to the electrical distribution system of the California Department of Corrections and Rehabilitation (CDCR), Folsom State Prison (FSP), located at 300 Prison Road, Folsom, California, 95630. Eddie Nixon @ 916-255-6152 2:00 PM 2:00 PM 2:00 PM 2:00 PM Rohnert Park NEW Verdot Village Balcony Replacement Project @ Sonoma State University 4/16 @ 2PM $300000 Replace the second floor balcony decks on dormitory buildings: Sauterne - Chablis and Chenin Blanc in Verdot Village and all their components. $1900000 Traction Power Substation Replacement RRY Installation 03/27/15 @ 1:00 pm at 300 Lakeside Drive, 17th Floor Richmond $2500000 conference Room The replacement of the DC House and re-termination of 1000dcV traction power cables at the RRY Substation. NEW Byron Airport Pavement Enhancements 4/13 @ 10AM Byron The work to be done generally consists of pavement marking removal, existing surface treatment removal; runway taxiway and apron pavement surface treatment and crack sealing; and runway and taxiway pavement markings. $136000 4/13 @ 2PM El Sobrante NEW May Road Sidewalk Extension Constructing sidewalk, curb and gutter on the east side of May Road, installing three ADA compliant curb ramps and two cross walk rapid repeating flashing beacon device Page 58 of 65 ONLINE 029C/E3 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 4/28/2015 5:00 PM Wireless Communications Consulting Services For Marin Emergency Radio Authority Next Generation Communications System Marin County Prebid Information Engineers # of Plan Estimate Addenda # ONLINE The County is seeking proposals from qualified consultants that have expertise and experience with public safety land mobile radio systems to assist in procurement and implementation of a replacement of the current system. 4/29/2015 2:00 PM 2:30 PM Milpitas San Francisco NEW 2014 Road Rehabilitation Project MAND 4/21 @ 10AM at 455 E. Calaveras Blvd., Milpitas $1800000 $2400000 AC pavement rehabilitation overlay, remove & replace AC pavement, repair AC pavement base failure, miscellaneous concrete work, sidewalk replacement, curb & gutter replacement, ADA ramps installation, pavement delineation & marking & crack sealing. $20000000 NEW Potrero Avenue Roadway Improvements 4/15 @ 10AM at 30 Van Ness Ave., San Francisco ONLINE ONLINE The Work to be done under this contract is located on Potrero Avenue from Alameda to 25th Street, and consists of water, paving and streetscape work. The work includes traffic routing, sewer and drainage, water main installation, streetlight work, traffic striping and traffic signal work, sidewalk construction, landscape and irrigation, overhead contact system and traction power work, and pavement renovation, and all appurtenant work in accordance with specifications and drawings Cristina Olea, Project Manager, @ 415-558-4004 4/30/2015 2:00 PM 2:00 PM 2:00 PM 3:00 PM $240000 NEW 2015 Surface Seal Project Mobilization, traffic control, dust control, clearing & grubbing, tree trimming & protection, aggregate base, pavement repair, crack sealing, seal coats, asphalt berm, temporary pavement delineation, pavement striping, markers & delineation $267000 Sacramento NEW Elk Grove-Florin Road Wholesale Water Meter Station Non-mettalic grout, miscellaneous metal fabrications, special coatings, electrical, instrusion alarm system, utilities, instrumenation $430000 Kentfield Drive-Watt Avenue Storm Drain Improvement Project Sacramento The project consists of installing approximately 1119 lineal feet of storm drain pipe, six (6) manholes, twelve (12) drainage inlets, and doing all other work specified on the plans and in the specifications RFP for 90 North Winchester Boulevard Affaordable Senior Housing 3/13 @ 9AM at 1500 Warburton Ave, Santa Clara Santa Clara Lafayette Project The City of Santa Clara is seeking proposals from qualified housing developers to develop a project that must imclude or facilitate the construction of 165 affordable senior housing units & a minimum of one acre of open space park land on a Santa Clara Housing-owned site. Page 59 of 65 ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location 4/30/2015 3:30 PM Napa Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW South Campus Improvements Project (Prequalified Contractors Only) MAND 3/25 @ 9AM & 3/31 @ 9AM Only general contractors, mechanical/HVAC, and electrical subcontractors who were previously prequalified through the County’s “Contractor Prequalification Packet for Napa County South Campus Improvements Project, PW 15-200” process are eligible to bid on this project. Contractors in other trades shall contact the prequalified general contractors to bid on the project. List of qualified contarctors are listed in spec book. Construct interior tenant improvement for Buildings B1 and B2, including demolition, structural strengthening upgrades, interior reconfiguration of existing spaces, food service equipment at the kitchen, cafeteria remodel, removal of old equipment, salvage of doors and accessories, salvage of suspended acoustical ceiling system components for use in other areas, modifications to automatic fire sprinkler system and automatic fire alarm system, sound masking system, interior signage and wayfinding, etc.; construct exterior improvements, including removal of mechanical equipment with structural infill and roof patching, installation of tubular skylights with associate framing and roof repairs, prefabricated metal entry canopies and new exterior openings with aluminum framed entrances; construct exterior site accessibility improvements, including site monument and wayfinding signage, relocation of existing emergency electric generator on site, play yard with play structure, rubberized play surface and associated infrastructure, related sitework, etc. Page 60 of 65 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 4/30/2015 5:00 PM Super Bowl 50 Business Connect Pre-Qualification Registration Santa Clara Prebid Information Engineers # of Plan Estimate Addenda # Please note that participation in BUSINESS CONNECT does not guarantee Super Bowl 50-related contracts or business, and opportunities will have limited availability due to the volume of interest in the program. The NFL and Host Committee are committed to maximizing local diverse business participation, but registration with BUSINESS CONNECT only facilitates the opportunity for Bay Area businesses to compete for the chance to provide goods and services to Super Bowl 50. BUSINESS CONNECT is open to businesses in the nine-county Bay Area region (Sonoma, Napa, Marin, Solano, Contra Costa, Alameda, San Francisco, San Mateo & Santa Clara Counties) that are certified as one or more of the following: ++ Minority-owned (MBE) ++ Disabled veteran-owned (DVBE) ++ Women-owner (WBE) ++ Lesbian, gay, bisexual and transgender (LGBTBE) The below listed categories have received business over the history of the program. However, as there are changes from year to year, we cannot guarantee opportunities in all categories or number of opportunities per category. ++ Audio Visual ++ Balloons ++ Barricades ++ Building Materials ++ Carpet/Flooring ++ Catering ++ Courier Services ++ Decorations ++ Destination Management ++ Electronics (Wire & Supplies) ++ Employment Agencies ++ Entertainment ++ Equipment Rentals ++ Event Planning ++ Fencing ++ Florist/Flowers ++ Food and Beverage ++ Furniture ++ Generators ++ Gift Baskets ++ Gift Items ++ Golf Carts ++ Hardware Supplies ++ Linens ++ Media/Public Relations ++ Novelties/Promotional Items ++ Office Supplies Page 61 of 65 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ++ Painters ++ Photography/Video ++ Pipe and Drape ++ Port-O-Lets ++ Printing/Graphics ++ Pyrotechnics ++ Scaffolding ++ Security ++ Set Design and Construction ++ Signs and Banners ++ Sound ++ Staff - Temporary Agencies ++ Tables and Chairs ++ Tenting ++ Tour Services ++ Trailers ++ Transportation ++ Vans ++ Video Equipment ++ Waste Removal Categories are subject to change. Go to http://www.sfbaysuperbowl.com/business-connect/ to register 5/1/2015 1:00 PM Carmichael NEW American River Pipeline Conveyance Project 5/5/2015 2:00 PM MAND 4/1 @ 3:30PM Santa Rosa NEW Santa Rosa Charter School For The Arts This project consists of demolition of existing buildings, site clearing, excavation utilities, on-site and off-site improvement work including landscaping and site paving and construction of a new high school campus with one-story and two-story buildings. Total site development area is less than 1 acres in size, total building area approx. 16,000 SF in size. MAND 4/16 @ 10AM at 7837 Fair Oaks Blvd., Carmichael This Project consists of construction of approximately 7,400 feet of water transmission pipeline including a 1,000 foot trenchless American River crossing in accordance with these Contract Documents. The work includes, but is not limited to, constructing approximately 7,400 feet of potable water pipeline including valves, fittings and appurtenances. Related work includes steel conductor casing, HDD trenchless river crossing, pipeline turnout and meter stations, SCADA improvements to existing WTP, demolition of existing structures, storm culvert, grinding and overlaying roadways, abandoning existing pipelines, connections to existing facilities, grading, site restoration, landscaping, startup and testing. Page 62 of 65 ONLINE ONLINE Bid Date Bid Time Location 5/5/2015 2:00 PM Oakland Plan Name / Scope of Work Prebid Information Oakland Emergency Generator (OEG) System THIS PROJECT WILL NOT BE POSTED Engineers # of Plan Estimate Addenda # MAND Only Individuals that have passed the Security Clearance wil be able to participate in the mandatory prebid meeting & site your $4900000 $6100000 N/A THIS PROJECT WILL NOT BE SCANNED The Contract Documents will not be available at public and private plan rooms. A Bidder who has passed the Security Clearance but does not wish to purchase the Contract Documents may view them by arrangement at BART's offices at 300 Lakeside Drive, Oakland. A request for such viewing shall be directed to the Contract Administrator, Steve A. Alva, at (51 0) 464-6383 or by E-Mail to [email protected]. Viewing sessions are limited to two hours in duration. Additional sessions may be available but are not guaranteed. 2:00 PM 2:00 PM 5/6/2015 1:30 PM Provide a turnkey emergency generator system along with all associated electrical, mechanical, and civil/structural facilities. This also shall include a control and monitoring system to operate the generator. 2015 Capital Improvement Project Sewer Replacements 4/9 @ 10AM El Granada The Work will include the furnishing of all labor, materials and equipment for the replacement of gravity sanitary sewer lines by open-cut, trenchless pipe bursting, and/or cured-in-place method. The total length of pipe is approximately 5,000 lineal feet of main line sewer pipe, as well as the replacement of the private sewer laterals from the main line up to and including the property line cleanout for each residence for this area in public streets and easements in El Granada, in unincorporated San Mateo County. The scope of work also potentially includes replacement of manholes. The General Contractor and his subcontractors performing this work shall be competent in performing such type of work and shall demonstrate his competency and ability to perform such work by submitting sufficient documentation of prior similar projects, experiences, references and/or other information and data that, in the sole discretion of the District, constitutes sufficient evidence of the ability of the Contractor and his subcontractors to perform and complete the nature and magnitude of work by the method requested by the District for this project NEW Elevator Maintenance Eldridge MAND 4/14 @ 10AM Contractor agrees to provide complete preventive maintenance services for the elevators identified in the attached Exhibit E, entitled “Facility Elevator Locations.” The work to be performed by the Contractor under these specifications shall be for a minimum of three (3) hours per elevator per month consisting of furnishing all materials, labor, tools, and equipment necessary to provide full maintenance service on the equipment described. Contractor shall examine, adjust, and lubricate the elevators to provide preventive maintenance in accordance with all applicable codes, rules, regulations and laws. Any work not specifically mentioned but which is needed to make the maintenance complete within the intent of these specifications shall be performed without additional cost. In the event of a cylinder failure, Sonoma Developmental Center will prepare a separate Emergency Contract to accomplish the work to be done. Lafayette NEW Diablo Vista Pumping Plant and Leland Rate Control Station Replacement 4/20 @ 9:30AM $9300000 $9800000 Work includes construction of an above ground reinforced concrete structure approximately 43 ft. x 45 ft. x 18 ft. which includes the Diablo Vista Pumping Plant and Leland Rate Control Station; furnishing and installing four 300-HP vertical turbine pumps and motors; construction of site improvements; furnishing and installing approximately 1,275 feet of 30-inch diameter mortar-lined and coated steel (ML&CS) pipeline in Mt. Diablo Boulevard; demolition of the existing Diablo Vista Pumping Plant and existing Leland Rate Control Station; construction of a parking lot at the existing Diablo Vista Pumping Plant site; installation of fencing, landscaping and irrigation, and performing related required work located at the corner of Mt. Diablo Blvd and Mt Diablo Ct in Lafayette, Contra Costa County, California Page 63 of 65 ONLINE ONLINE ONLINE Bid Date Bid Time Location 5/7/2015 2:00 PM Oakland Plan Name / Scope of Work Prebid Information NEW Headquarters Board Room & Finance Department Tenant 4/3 @ 10AM Engineers # of Plan Estimate Addenda # $220000 R005 Improvement Installation of three private office located in the Finance Department, including selective interior demolition, rough carpentry, interior finish carpentry, wood veneer faced arch cabinets, gypsum board, acoustical panel ceilings, interior painting, movable (demountable) wall, modular office partitions NOTE:Only those prospective bidders who have purchased bid documents directly from the District may bid on this contract. 5/13/2015 2:00 PM Milpitas 5/14/2015 2:00 PM Cupertino Campus Drive Phase 1 - De Anza College Prequalifications 5/27/2015 2:00 PM San Francisco NEW TG12.1 Civil/Sitework at Grade/Ground Level Landscaping NEW Lower Berryessa Creek Flood Protection Project Phase 1 MAND 4/16 @ 9:30AM $16000000 $18000000 ONLINE Prfepatory work, earthwork, surfacing & pavements, site utilities, traffic control, miscellaneous items, concrete, special concrete structrues, planting MAND 4/15 @ 10AM at 21250 Stevens Creek Blvd, Cupertino Div_09-paints & applocations, porcelain enamel; Div_10-exterior signs, campus drive project vehicular signage, Div_12-site furnishings; Div_26-electrical; Div_31-earthwork & grading, site preparation, finish grading, trenching, backfilling & compacting; Div_32-demolition, paving & surfacing, existing plants to remain, oedestrian concrete paving & curbs, concrete paving joint sealants, pavement markings, restoration of surfaces, irrigation, soil preparation, planting, landscape maintenance; Div_33-utilities 4/14 @ 2PM at 175 Beale St., San Francisco ONLINE ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with Civil/Sitework at Grade, Landscaping, Interface with Building Control Systems/Security Platforms, and removal of Temporary Bridges on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems in the following trade: TG12.1 CIVIL/SITEWORK AT GRADE/GROUND LEVEL LANDSCAPING 6/30/2015 12:00 PM San Francisco GSA Real Estate Division, Elevator and Escalator Special Services Continuous Solicitation ONLINE General Services Agency, Real Estate Division is seeking specialty-licensed contractors to perform elevator and escalator inspection, maintenance and repair work (Special Services). The work is performed on an “if-and-as-needed” basis in accordance with the San Francisco Administrative Code Section 6.65 requirements. Contractors who can demonstrate experience, expertise and quality of work may be awarded a master agreement for a term not-to-exceed five years. All maintenance and repair services work shall conform to the City’s insurance, bonds, indemnity and prevailing wage requirements for public work.When work is available, at least three special service contractors will be invited to submit a competitive quotation for the work. The contractor submitting the lowest responsive quotation may be awarded the Contract Service Order (CSO) to perform the work. All special services work shall conform to the City’s insurance, bonds, indemnity and prevailing wage requirements. 12:00 PM San Francisco GSA Real Estate Division, Fire Protection, Fire Alarm & Security Systems Special Services - Continuous Solicitation General Services Agency, Real Estate Division is seeking specialty-licensed contractors to perform fire protection, fire alarm or security systems inspection, maintenance and repair work (Special Services). The work is performed on an “if-and-as-needed” basis in accordance with the San Francisco Administrative Code Section 6.65 requirements. Contractors who can demonstrate experience, expertise and quality of work may be awarded a master agreement for a term not-to-exceed five years. All maintenance and repair services work shall conform to the City’s insurance, bonds, indemnity and prevailing wage requirements for public work. When work is available, at least three special service contractors will be invited to submit a competitive quotation for the work. The contractor submitting the lowest responsive quotation may be awarded the Contract Service Order (CSO) to perform the work. All special services work shall conform to the City’s insurance, bonds, indemnity and prevailing wage requirements. Page 64 of 65 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 6/30/2015 6:00 PM Various Public Works Projects-Sonoma State University Rohnert Park Prebid Information Engineers # of Plan Estimate Addenda # Sonoma State University is seeking qualified contractors and service providers to perform various projects and services beginning July 1, 2014 through June 30, 2015. The University shall establish a shortlist of qualified contractors for possible future minor capital projects ranging in value from $5,000.00 up to $634,000.00. Carolyn Faulconer of the Sonoma State University says that from July 1, 2014 through June 30, 2015 the university will be accepting contractors who wish to be added to its list to perform various projects & services for the university. Right now there are no projects yet out to bid. The bid date, June 30, 2015, is the last day the University will be accepting qualified contractors to its list. REMOVE, REPLACE, REPAIR REMODEL, RENOVATE, CONSTRUCT AND/OR MAINTAIN: Includes, but not limited to, demolition, miscellaneous site improvements, flooring, walls, doors, windows, roofing, mechanical and plumbing systems; electrical and telecommunication systems, audio and video systems, radio and communications systems, security and surveillance systems, fire alarm systems and signage; HVAC equipment; water heaters; automatic doors; ADA; pathways; wall coverings Page 65 of 65 ONLINE CITY OF FREMONT NOTICE TO CONTRACTORS The City of Fremont will be receiving sealed bids for the projects listed below upon release of the bid in the Purchasing Division located at 3300 Capitol Avenue, Building B, Fremont, California, 94538. Central Park/Gomes Park Railroad Crossing – (PWC 8381) - The project consists of construction of new bicycle/pedestrian/service vehicle paved pathway at the proposed at-grade railroad crossing signal at the Mission Creek/UPRR junction in the vicinity of Central Park and Gomes Park. The project also involves, grading, minor drainage improvements, installation of new fencing, gates, striping and signing within Union Pacific Railroad (UPRR) right-of way and Alameda County Flood Control levee adjacent to Mission Creek. The Engineer's Estimate is $128,000. Anticipated bid opening is April/May 2015. For more information contact Project Manager: Rene Dalton, phone: 510-494-4535, fax: 510-494-4751, email: [email protected]. Senior Center Restroom Accessibility Upgrades- (PWC 8818) – The project consists of an addition of a new multiple-stall restroom and expansion and accessible upgrades of the existing restrooms. The new restroom, of approximately 217 sf will be for female with 6 water closets and 3 lavatories. The existing male and female restrooms will also be renovated, expanded and upgraded for accessibility. The Engineer’s Estimate is $280,000. Anticipated bid opening is April 2015. For more information contact Project Manager: Martha Martinez, phone: 510-494-4750, email: [email protected]. Crandall Creek Play Area Upgrades (PWC 8834) and Play Area Conversions (PWC 8835) – These two projects are to be bid together, and in total, include the replacement of one (1) playground structure and eight (8) playground resurfacings. The Crandall Creek Play Area Upgrades project (PWC 8834) includes the replacement of existing playground structures and playground surfacing at Crandall Creek Park. Work includes demolition of existing surfacing and playground equipment, installation of new playground equipment, and installation of new poured-in-place rubberized playground surfacing. The Play Area Conversions project (PWC 8835) includes the conversion of play area surfacing at seven (7) separate park sites. The base bid will include three (3) sites to be converted from sand to poured-in-place (PIP) rubberized surfacing, and four (4) sites to be converted from sand to engineered wood fiber surfacing. Alternate bid items will include the conversion of all sites to poured-in-place rubberized surfacing in lieu of engineered wood fiber and site furniture replacement. Work includes demolition of existing sand; demolition of concrete curbs, sidewalks, and other structures; and installation of new rubberized surfacing or engineered wood fiber, concrete curb, sidewalk, and miscellaneous site furniture. Engineer’s estimate for both projects is $760,000. Anticipated bid opening is April 2015. For more information, contact Project Manager: Tara Bhuthimethee, phone: 510-494-4738, fax: 510-494-4721, email: [email protected]. Sidewalk Improvements on Frobisher Drive and Emilia Lane (PWC 8737 and PWC 8798) -- Work includes the installation of curb, gutter and sidewalk, curb ramps, street lighting, AC overlay, signing and striping and other related work on Frobisher Drive and installation of sidewalks, curb ramps, signing and striping, landscaping and other related work on Emilia Lane. Curb ramps will be upgraded to the latest ADA standards. Engineer's estimate is $375,000. Anticipated bid opening is April 2015. More Info, Project Manager: Jeanne Suyeishi, phone: 510-494-4728, fax: 510-494-4751 email: [email protected]. Northgate Community Park Sidewalk Realignment (PWC8830) and Cricket / Baseball Batting Cages Project (PWC8838) – These two projects are to be bid together. The Northgate Community Park Sidewalk Realignment (PWC8830) includes the replacement of an existing concrete paving pathway with a realigned pathway. Work includes the demolition of a portion of existing concrete paving, chain link fencing, rough and finish grading of the area, removal and relocation of four existing pathway luminaires, removal and repair of existing turf and irrigation adjacent to the realigned pathway, improvements to the existing drainage and tree planting. The Cricket / Baseball Batting Cages Project (PWC8838) include the construction of an enclosed chain link perimeter fence batting cage structure. Work includes the demolition of existing turf area, removal and repair of existing turf and irrigation, rough and fine grading of the batting cage area and surrounds, installation of concrete banding and paving, installation of a chain link perimeter fence structure, with chain link roof enclosure and three separate batting areas, installation of cricket grade synthetic turf over concrete pads and aggregate base rock, individual entry gates, magnetic keypad access, cellular system control, panic exit hardware, pole mounted electrical receptacles and internal safety netting hung in each batting area and any other such items that are required by plans, standard specifications and special provisions. Alternate #1 improvement includes concrete paving and Non-infill Synthetic Turf installation on existing Northgate Cricket Field. Engineer’s estimate is $850,000. Anticipated bid opening is April 2015. For more information, contact Project manager: Andrew Mayes, 510-494-4741, fax: 510-494-4721, email: [email protected]. 2015 Cape and Slurry Seal Project (PWC 8195-J) - The improvements to be constructed, in general, consist of: Maintaining traffic and furnishing traffic control throughout construction, providing advance public notification on all project streets; preparation of roadways to receive surface treatment including removal of thermoplastic and painted striping and markings and removal of raised pavement markers, applying asphalt rubber chip seal to selected streets; applying polymer modified slurry seal to selected streets; and applying thermoplastic traffic stripes and pavement markings and placing reflective pavement markers. There may be other items of work not mentioned above that are required by the State Standard Specifications or the Special Provisions. Engineer’s estimate is $4,000,000.00. Anticipated bid opening is April 2015. For more info contact Project Manager: Edward Nakayama, phone: 510-494-4775, fax: 510-494-4751, email: [email protected] Fremont Public Buildings Roof Restorations (PWC 8393) - The project consists of roof replacements on several public buildings. Engineer's Estimate is TBD. Anticipated bid opening is May/June 2015. More Info, Project Manager: Martha S. Martinez, phone: 510-494-4750, email: [email protected]. Fire Alarm Upgrades (Group B) (PWC 8651) - The project consists of upgrading the fire alarm systems in five public buildings. Engineer's Estimate is TBD. Anticipated bid opening is May 2015. More Info, Project Manager: Martha S. Martinez, phone: 510494-4750, email: [email protected]. Centerville Unified Site Full Scale SVE System Improvements (PWC 8812F) – Work includes installation of a full scale soil vapor extraction (SVE) system on the Centerville Unified Site which consists of soil vapor extraction wells and valve boxes connected to a manifold system, soil vapor recovery and treatment system, system enclosure and any other such items or details that are required by the plans, standard specifications and special provisions. Engineer’s estimate is $700,000. Anticipated bid opening is May 2015. More Info, Project Manager: Jeanne Suyeishi, phone: 510-494-4728, fax: 510494-4751 email: [email protected]. Animal Shelter HVAC and Roof Replacement – (PWC8820) – The project consists of the replacement of existing HVAC units and associated work with one main conditioning unit that will be located in the exterior of the building. The engineer’s estimate is TBD. Anticipated bid opening is May 2015. For more information contact Project Manager: Martha S. Martinez, phone: 510-494-4750, e-mail: [email protected]. Grimmer Boulevard High Friction Surface Treatment – (PWC8842) – The project consists of applying a high friction surface treatment along a section of roadway on Grimmer Boulevard. The engineer’s estimate is $75,000. Anticipated bid opening is May 5, 2015. For more information contact Project Manager: Frans van der Meer, phone: 510-494-4796, e-mail: [email protected]. Senior Center New Emergency Power Generator (PWC 8819) – The project consists of adding a new emergency power generator and perform associated work to the existing Fremont Senior Center with capacity to run the center for no less than 72 hours. The Engineer’s Estimate is TBD. Anticipated bid opening is May 2015. For more information contact Project Manager: Martha Martinez, phone: 510-494-4750, email: [email protected]. Central Park Fields 9 & 10 Synthetic Turf Conversion – (PWC8800) - The Project general description for base bid work consists of demolition and excavation of the existing ballfield, fencing removal, surrounding concrete, rough grading, deep concrete bands, mow band, concrete paving and pathway, new chain link fencing and gates, establish subgrade and drainage, import and install permeable rock, performance layer, coordinate and install synthetic turf, fine grading, transplanting existing trees, new landscaping, new irrigation and modifications to existing irrigation system, coordination with PG&E to obtain power to the new facility, install new 600A electrical panel, new electrical conduit and wiring, new sports field lighting and electrical, and other such items or details that are required by Plans, Standard Specifications and these special provisions. The Project general description for base bid work consists of Add Alternate No. 1, which includes the purchase and installation of a pre-fabricated modular CMU storage building with electrical connections and lighting. Architectural drawings are to be provided by the vendor and submitted by the General Contractor to the City Plans and Permits Department, as a separate, deferred submittal; Add Alternate No. 2 which includes the improvements for alternate 2 include re-routing the existing fiber optic line in a new conduit trenched to a depth of 36 inches, and placing a separate dedicated phone line conduit in the same trench. Add Alternate 3 includes a new drinking fountain and related connections to potable water and sewer line connections; Add Alternate 4 includes the installation of additional walkways, planting and irrigation; Add Alternate 5 includes the addition of miscellaneous site furnishings. The Engineer's Estimate for base bid work is $3,225,000. Anticipated bid opening is June 2015. For more information contact Project Manager: Mark Mennucci, phone: 510-494-4530, fax: 510-494-4721, email: [email protected]. Warm Springs Community Park Restroom and Meeting Room Replacement – (PWC8777) – The Project general description for consists of demolition of the existing meeting room and restroom, site grading and utility connections (sewer, potable, electrical, fire) construction and installation of two pre-fabricated structures, new landscaping and new irrigation, and site drainage. The Engineer's Estimate for base bid work is $520,000. Anticipated bid opening is July 2015. For more information contact Project Manager: Mark Mennucci, phone: 510-494-4530, fax: 510-494-4721, email: [email protected]. Central Park “Always Dream” Restroom Replacement at Fabbri Field– (PWC8718) – The Project general description for consists of demolition of the existing restroom, site grading and utility connections (sewer, potable, electrical, fire) construction and installation of a pre-fabricated bathroom structure, new landscaping and new irrigation, and site drainage. The Engineer's Estimate for base bid work is $552,000. Anticipated bid opening is July 2015. For more information contact Project Manager: Mark Mennucci, phone: 510-494-4530, fax: 510-494-4721, email: [email protected]. Reconstruction of Curbs, Gutters, Sidewalks, and Driveways (PWC 8239) -- Work includes the reconstruction of damaged curbs, gutters, sidewalks, driveway approaches, and some private residential driveways, tree and stump removal, root pruning, crown thinning, furnishing and planting street trees, and other related work. Engineer's estimate is $1,300,000. Anticipated bid opening is August 2015. More Info, Project Manager: Edward Nakayama, phone: 510-494-4775, fax: 510-494-4751 email: [email protected]. To obtain plans, special provisions and standard proposal forms when they become available, contact ARC-Milpitas by calling (408)262-3000. For additional information on any of the projects listed above, contact City of Fremont Purchasing Division at (510) 494-4620. LINDA WRIGHT PURCHASING SPECIALIST CITY OF FREMONT Executive Office Space for Lease Small Private Offices Available: TWO LOCATIONS 110 - 300 square feet San Leandro Concord Ideal space for satellite office, estimators, sales & service representatives Amenities include: GREAT LOCATIONS Free WiFi FREE PARKING UPS SERVICE DAILY SECURITY SYSTEM ACCESS TO KITCHEN JANITORIAL SERVICE ALL UTILITIES 24 HOUR ACCESS CONFERENCE | BOARD ROOMS MAIL PICKUP AND DELIVERY FAX / COPY Machines Available San Leandro Concord 3055 Alvarado Street San Leandro, CA 94577 510.483.8880 2440 Stanwell Drive Concord, CA 94520 925.685.8630 For more information call Scott Leary at 510.483.8880 (San Leandro) or Denice McDavid at 925.685.8630 (Concord) Misc.: Leases are month to month. 1st month and security deposit to start lease. Credit Check. Telephone / upgraded cable internet service not included.
© Copyright 2024