GAS, PETRULEUM & FUEL

GAS, PETRULEUM & FUEL
SERVICE PROVIDED
CLIENT
YEAR
AMA1 Stakeholder Engagement Plan. In association with ERM
Anadarko
2012
Environmental Impact Assessment for Beira Fuel Terminal
Engen
2012
Environmental Impact Assessment for the Fuel Terminal in Beira.
Galana Terminais
Moçambique S.A
2012
Environmental Impact Assessment for the Fuel Terminal in Matola
Galana Terminais
Moçambique S.A
2012
Implementation of the Addendum to the EIA for Seismic Exploration Onshore
Anadarko
2012
Environmental Impact Study of the Rehabilitation and Expansion of the Diesel Oil Storage
Terminal, in Port of Beira, for Engen Petroleos de Moçambique
NEDA Engineering
2012
ENI East Africa
2012
Sasol Petroleum
Sengala Lda
2012
Petronas
2011
ENI East Africa
2011
Anadarko
2011
Implementation of the Environmental Management Plan for the 3D Seismic Survey
Statoil
2011
Environmental and Social Impact Assessment (ESIA) Study for the proposed Exploration in EPC
Area A, Inhambane, Mozambique
SASOL
2011
Update and review of the Environmental Management Plan, 3 D Seismic survey
Statoil
2011
Exploiter Pte, Ltd.
2011
Anadarko
2010
Re-vegetation project of the oil well pad foot print and old access road in Palma District,
Mozambique.
Anadarko
2010
Implementation of the Environmental Management Plan for the Onshore Exploration Drilling
Operations in the Inhaminga Block, Sofala Province.
DNO
2010
Preparation of an Addendum to the EIA and EMP for Onshore Exploration Drilling Operations in
the Inhaminga BlocK.
DNO
2010
Environmental Performance Report.
DNO
2010
AMEC
2010
Statoil
2010
EIA Study for Block M10 in Mozambique. In association with ERM.
Sasol
2010
EIA Study for Sengala Block, Sofala Province in Mozambique. In association with ERM.
SASOL
2010
Implementation of the Environmental Management Plan for Areas 3 & 6, Rovuma Basin.
Petronas
2010
Mozambique
Environmental Impact Assessment and Implementation of the Environmental Management Plan
Addendum to the Environmental Impact Assessment Report: Deepwater Hydrocarbon exploration
6 at Rovuma Basin.
Areas 2 & 5, Cabo Delgado, Mozambique
SERVICE PROVIDED
CLIENT
YEAR
Eni D´Appolonia
2010
Anadarko Site Surveys, Area 1, Rovuma Basin, Cabo Delgado Province, Mozambique.
Anadarko
2010
Addendum to the EIA for Deep Water Seismic Surveys.
Anadarko
2009
ENI
2009
ENi (D’Appolonia)
2009
Anadarko
2009
Anadarko
2009
DNO
2009
Review of the EIA and elaboration of an addendum to the EMP seismic survey at Inhaminga Block.
DNO
2009
Implementation of the addendum to the EIA and EMP for the Onshore Exploration Drilling
Operations in the Rovuma Onshore Northern Area 1, Mozambique
Anadarko
2009
Environmental Impact Study for Drilling Operations at Area 4 Rovuma Block, Cabo Delgado
Province, Mozambique.
D’Appolonia
2009
Addendum to the EIA and EMP for Onshore Exploration Drilling Operations in the Rovuma
Onshore Northern Area 1, Mozambique
Anadarko
2009
Implementation of the Environmental Management Plan for Onshore Seismic Activities.
DNO
2008
Environmental Management Plan for the 2D Seismic Surveys in Zambezi Delta.
Petronas
2008
Anadarko
2008
Artumas
2008
ENI
2008
CPMZ
2008
Stat Oil Hydro
2008
Anadarko
2008
Anadarko
2007
Environmental Management Plan for Deep Water Seismic Activities, Block 1, Rovuma Basin
Anadarko
2007
Training on environmental issues in hydrocabon prospection.
NORAD
2007
Moz Petroleum
2007
Moz Petroleum
2007
Norsk Hydro
2007
Northern Area 4.
Implementation of the Environmental Management Plan for Shallow Water Seismic Surveys.
Implementation of the Environmental Management Plan: Provision of Services to Provide a
Onshore Seismic Survey in the Inhaminga Block, Sofala Province.
Environmental Impact Assessment for Shallow Water Exploration Seismic Survey and Exploration
Implementation of the Environmental Management Plan of the Artumas Rovuma Block Onshore
Exploration Program at Rovuma Basin.
Basin, Mozambique.
Review of the 3D Seismic Method Statement and Environmental Management Plan.
Basin.
Environmental Impact Assessment for Oil and Gas Drilling in Zambezi Basin, Mozambique
(onshore).
5 Rovuma Basin, Northern Mozambique.
SERVICE PROVIDED
CLIENT
YEAR
EIA for Seismic Prospection project in 3 & 6 blocks, in Rovuma Basin.
Petronas
2007
ENI
2007
Addendum for EIA and EMP for explorations and hydrocarbons prospecting operations in
Inhaminga Block.
DNO
2007
Petrobeira contamination assessment.
Petrobeira
2007
EIS for the construction, Commissioning and Operation of a Liquid Hydrocarbon Fuel Pipeline and
Storage Depot.
Petroline
2007
EIA of the Artumas Rovuma Block Onshore Exploration Program at Rovuma Basin.
Artumas
2006
Petronas
2006
DNO
2006
Artumas
2006
Norsk Hydro.
2006
Petronas Carigali.
2005
Environmental Assessment and Public Awareness of the Transport of Hydrocarbon Condensate
Project from Temane to Maputo.
Petromoc
2004
Environmental Impact Assessment of the Petrobeira Project (Fuel Storage Tanks).
Petromoc
2004
Environmental Impact Assessment of Spilt Hydrocarbon from Fuel Trucks.
Petromoc.
2004
Environmental Audit of the Fuel Storage Area in Munhava, Beira City, Sofala Province.
Petromoc
2004
Environmental Impact Assessment for the Hydrocarbon Prospecting Project in a Sector of the
Inhaminga Block, Sofala Province, Mozambique.
DNO
2004
Environmental Impact Assessment of the Construction, Commissioning and Operation of a HighPressure Transmission Gas Pipeline from Ressano Garcia to the Matola Industrial Area, and a LowPressure Distribution Pipeline Network in the Matola Industrial Area, in Mozambique.
MGC
2003
Sasol
2002
Sasol
2002
Gas Pipeline Environmental Monitoring. In association with Mark Wood Consultants.
Sasol
2002
Environmental Management and Monitoring of the Gas Seismic Prospecting in Southern
Mozambique. In association with Mark Wood Consultants.
Sasol
2001
Environmental Impact Assessment of the SASOL Gas Pipeline from Temane to Ressano Garcia in
southern Mozambique. In association with Mark Wood Consultants.
Sasol
2001
Environmental Impact Assessment of the SASOL Gas Fields in Pande and Temane, Inhambane
Province, in Southern Mozambique. In association with Mark Wood Consultants.
Sasol
2001
Environmental Impact Assessment, Public Consultation Process, for the Gas Supply Project. In
association with Mark Wood Consultants.
Sasol
1999
Rovuma Basin, Mozambique.
Second phase for the Hydrocarbon Prospecting Project at Inhaminga District.
Environmental Impact assessment for an exploration and production concession contract for
Environmental impact assessment (EIA) study for drilling activities at Zambezi Delta Block,
Garcia. In association with Mark Wood Consultants.
association with Mark Wood Consultants.