Lauenburg: demountable flood protection with the TKR aluminium stop log system. Huge numbers of people, huge quantities of materials, high costs – that was the flood protection of the past, with sandbags. These days, demountable protective walls, which can be erected in a day, ensure dependable safety and good economics. Lauenburg at the height of the summer. A few hundred metres away, the River Elbe flows harmlessly past the old Palm Lock. But this river can become a monster: normally 5 m deep, it can rise to 8.70 or even 9.12 m, as the floods of 2002 and 2006 proved. It was only thanks to the time-consuming and costly intervention of the fire brigade that the historic timber-frame building adjacent to Palm Lock and the “Shun Lam” Chinese restaurant within could be saved during those floods. Traditionally, temporary protection against flooding is achieved with piles of sandbags. However, when we consider the total cost, such protection is often uneconomical because besides the production, transport and placing of the sandbags, the high cost of their later disposal as special waste must also be considered. The TKR aluminium stop log system from ThyssenKrupp GfT Bautechnik therefore represents an ideal solution. A reinforced concrete plinth and a demountable flood protection wall will prevent flood-waters from threatening the building in future. In June the protective wall was erected for the first time by workers from the local water board – as a test. “If we're not interrupted, then the wall can be set up in a day,” explains Andreas Sassenhagen, the managing director of the water board. “It's a great system,” says foreman Wolfgang Genczik enthusiastically. In total, the water board has spent one million euros on securing the area between the Palm Lock and the railway tracks adjacent to the ElbeLübeck Canal. PROJECT For further interesting projects go to: www.thyssenkrupp-bautechnik.de ThyssenKrupp GfT Bautechnik System features. Simple design, few components Robust construction, high reliability Easy installation No special tools required Long life Low repair, maintenance and storage requirements Resistant EPDM seal TKR 2 aluminum stop log system Stop logs and columns made of corrosion-resistant aluminum Stainless steel connecting elements Optimum storage systems Demountable flood protection in the form of a TKR aluminium stop log system has been provided over a length of 80.50 m around a tourist restaurant where the edge of the terrace for guests coincides with the flood protection line. The 90 stop log elements can be erected on the wall to the terrace to create a barrier 1.30 m high as temporary protection against floods. The stop log elements are kept in stores specially constructed for the purpose in a roll-off container with side doors. Foundations. The TKR aluminium stop log system is preferably founded on a sheet pile wall. Such a wall ensures that the forces are reliably transferred into the ground and prevents percolation and undermining. The flood protection wall is connected to the foundation via anchor plates and concrete beams or directly to the top of the sheet pile wall by means of a patented HOESCH system. We can design individual flood protection schemes, including transport and storage requirements, for every situation, to suit the local circumstances. Facts & figures. The TKR aluminium stop log system has proved itself as a temporary flood protection system in many situations – in terms of economy and ecology. One stop log panel, 2 m long, protective height 1 m, corresponds to approx. 320 sandbags! The system consists of just a few aluminium elements that can be assembled to provide protective walls of various heights. Client: Delvenau-Strecknitzniederung Water Board, Ratzeburg Planning: Böger & Jäckle, Gesellschaft Beratender Ingenieure mbH und Co KG, Henstedt-Ulzburg Fabrication: RSW Rosslauer shipyards, Rosslau Scope of supply: TKR aluminium stop log system, 90 pcs. Contractor: Herrmann Koth Bauunternehmen, Schieren Contact: Sigfried Steins, Bremen Branch Phone: +49 (0)4202 5197-1 E-mail: [email protected] The height can be increased later, meaning that it is possible to react flexibly and at short notice to changing conditions. Erection is quickly completed with a small workforce. And easy handling means that such a wall can even be built by unskilled labour. Dipl.-Ing. Winfried Just specialist consultant for flood defences, Berlin Branch Phone: +49 (0)3375 9217-22 Mobile: +49 (0)172 3008961 E-mail: [email protected] PROJECT For further interesting projects go to: www.thyssenkrupp-bautechnik.de ThyssenKrupp GfT Bautechnik
© Copyright 2024