Composting and Biodrying of MSW and SOW with the Gore Cover System Franz Vogel UTV AG 1 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential UTV AG UTV AG 1996 1998 2000 2002 2007 Establishment of UTV, first project in Bremen for MSW stabilization First project with 10.000tpy 25 project in operation 17. September, commissioning of the first plant in North America more than 50 plant in operation worldwide 2011 Largest MSW facility started operation with 2.000to / day 2012 Largest Facility with 1,0 Mio tons treatment capacity is under construction 2014 Over 120 plants in operation treating 15.000to per day 2 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover System 1996 to Present 3 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential Biological treatment process The GORE® Cover System ePTFE expanded polytetrafluoroethylene 4 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover 160.000tpy 64 heaps 50m x 8m, 8 weeks treatment time 5 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential KATJA CHRISTOF GORE® Cover Waste input and output Separated Waste Biosolids Municipal Solid Waste 6 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential Typical layout of a GORE® Cover MBT (Mechanical Biological Treatment Plant) Step 1 Reception Pre treat Separation Step 2 Step 3 e.g.21 days Additional 3 weeks for e.g. CLO or higher stabilisation Step 4 Sorting Aearation and controle Post treatment collection tank Compost like output (CLO) Leachate collection Further treatment (RDF) or landfill 7 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential A few out of 150 + installation with GORE® COVER Spain, 190.000 tpy MSW plant America, 210.000 tpy compost plant America, 160.000 tpy compost plant Plants: Waste to Energy Composting Recycling Parks MBA Parks Sorting, Recycling Hungary, 160.000 tpy total MSW plant © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential Hungary, 150.000 tpy MSW plant 8 GORE® Cover Reduction of MSW towards landfill by meeting national or international legislation 100% …. Mio tons per year MSW (Municipal Solid Waste) (initially) EU landfill directive (1999/31/EC) Recyclables (Paper, Cardboard, Plastic, Metal, Textile…) to be reused in the industry (potential income stream) Revenue to the plant owner Stabilization of the organic matter Production of Compost RDF (Refuse Derived Fuel) to be used e.g. cement industry as alternative fuel) Energetic use (CLO (Compost Like Output)) Landfills <… Mio ton per year (more < 25- 35 % efficient compactable material -> expansion of life time of existing landfills factor 5-10) 9 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential Stabilization and Drying process with the GORE® Cover technology 10 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Definition Stabilization Bio drying only part of stabilizing MSW before landfill Mechanical Treatment (Separation of sources) Biological Treatment – hygienisation, stabilisation, drying Fraction < 80 mm, <60 mm or < 40 mm Duration 21- 77 days (!) Separate approach fraction > 80 mm in order to generate RDF (Bio drying) with its characteristics (size, humidity, Calorific Value) Land filling of stabilized organic (AT4, AT7, IR1000, BMW100, GP21 etc. Process of composting biodegradable waste – Heat – by forced aeration Evaporate Surface Water and humidity of the biomass (loss of humidity – reduction of weight) Average 5 - 21 days (size !!!) Increasement of Calorific Value RDF accord. To Dir. 2000/76 CE Short time process No stabilization 11 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE Fabrics Division Solid Waste Treatment Biodrying or drying history with Partners 1994 2001 2003 2004 Frist Drying of waste BioE, Italy Portoguaro, RDF production Hungary, Baja 12 kta Largest WTE Plant 200.000 tpy, Neumünster, Germany, Biodegma production 150 kta of RDF, 14,5 MJ 2004 2010 2011 2012 2013 Miscolcz Study on RDF USING Laminates Plants in Hungary starting RDF production Cement Industry request in Poland (3 plants) Catania plant started operation, production of CDR Additional Plant established in Poland 12 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential ŚLADEM ODPADÓW Z EQUIPO BOA Bailing Overscreen fraction > 80 mm Collection of MSW Sorting Vecoplan Biodrying RDF Vecoplan Drum dryer Cement plant < 80 mm Underscreen fraction 0/80 mm Biostabilisation Landfilling 0/80 mm AT4 <10 mg 13 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Definition RDF and legal background 14 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Warszawa approx. 180.000 tpy Material size 0/300 mm Input humidity 55 - 60 % Pre treatment sorting, separation fraction 0/80 mm Treatment time: 63 days Turning two times Output humidity: 25 – 30 % AT4 <10 mg O2 kg/DM Further treatment Land filling 0/80 mm fraction Construction time: 4 months for the biological process Owner Community Price: tipping approx 50 €/t Landfill tax 4-5 €/t 20/80 mm stabilized fraction 15 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Warszawa 34 heaps 40 x 8 x 2,7 16 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Warszawa – stabilizing the 0/80 mm fraction AT4 17 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Biodrying of the 80/300 mm fraction Material size 80/300 mm Input humidity ~ 40 % Treatment time: 14 days Turning none Output humidity: < 20 % Further treatment Post grinding < 30 mm fraction Burning value: 15/18 MJ (due to sep collection) Construction time of the plant: 4 months Owner private Customer CEMEX / Kujawy Price: 8-10 €/t of dried material 18 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Biodrying Separate installation, Poland 19 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Biodrying 20 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Drying steps 21 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Biodrying Poland Material size 80/300 mm ?? Input humidity ~45 % Treatment time: 21 days Turning none Output humidity: < 20 % Further treatment Screen <20 mm to be used as landfill recovery Post grinding < 30 mm fraction Burning value: 15/18 MJ (due to sep collection) Owner private Customer KUJAWY (end-user of the bio dried material) Price: 7-11 €/t of dried material 22 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Recycling Park 150.000 tons per year MSW + SOW Total input at the front gate: 150.000 tpy , Hungary, Zohid ~300.000 inhabitants Input: MSW Municipal Solid Waste and SOW Waste from separate collection Pre treatment (Recyclables): 75.000 tpy Separation of PET, Plastic, Glass, Paper/Cardboard, FE/NE in total > 50% – sold to the recycling market RDF (Refuse Derived Fuel): 20.000 tpy energetic use, cement industry Mass reduction MSW: SOW: 10.000 tpy 10.000 tpy Landfilled at the end of process 35.000 tpy Construction time: weight reduction during biological process Production of high end quality compost 1,3 t/m³ of material (!) 11 months for two plants (Mechanical Pre Treatment, biological part and post treatment, two landfills) 23 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover GORE® Cover MSW application Recycling Park, MSW at the tipping floor © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential 24 GORE® Cover Recycling Park 160.000 tons per year MSW + SOW Reception, pre treatment building Fraction < 100 mm forwarded to GORE® Cover 25 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Recycling Park 160.000 tons per year MSW + SOW Fraction < 100 mm after GORE® Cover Fraction 30 - 100 mm after screening Post grinding < 30 mm fraction RDF < 30 mm RDF 26 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential Zöld Hid Regio Kft, Municipal Solid Waste (separate collection included) Start of Operation: July 2010 MSW 150.000 t/year Pre-treatment: Shreddering /Screening < 100 mm Humidity: 45 - 55 % Calorific Value: 5 - 6 MJ/kg > 100 mm Humidity 15-30% Calorific Value: 17 MJ/kg Treatment GORE® Cover: 21 days Humidity: Calorific value: < 30 mm < 25% <7 MJ/kg Landfill Treatment GORE® Cover: 8-10 days 30 – 100 mm Humidity: 18-22 % Calorific Value: 16-17 MJ/kg RDF sold to Cement Industry Humidity: 10-20% Calorific Value: 22 MJ/kg RDF sold to Cement Industry 27 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Recycling Park 620.000 tons per year MSW Total input at the front gate: Input: 620.000 tpy , Italy, Sicily MSW (no separate collection) Pre treatment: Separation of PET, Plastic, Glass, Paper/Cardboard, FE/NE in total > 50% of the input material – sold to the recycling market Input towards Biological treatment: ~310.000 tpy Mass reduction MSW: ~90.000 tpy weight reduction during biological process RDF (Refuse Derived Fuel): ~70.000 tpy energetic use, cement industry Input towards landfill at the end ~150.000 tpy (> 25 mm fraction) Construction time: 20 months – not finished yet (incl. Mechanical Pre Treatment, biological part and post treatment) Surface (Receptioin, Meachanical pre treatment area) Surface biological treatment area (GORE® Cover) Surface post treatment - 1.000 m² Invest mechanical pre treatment Invest biological part - 10.000 m² - 14.400 m² - 21,0 M € - 11,7 M € 28 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential Typical layout of a GORE® Cover MBT Reception encapsulated Reception Pre treat Separation Sorting 29 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential Typical layout of a GORE® Cover MBT Encapsulated pre treatment Reception Pre treat Separation Sorting 30 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential Typical layout of a GORE® Cover MBT Recycables and pre treatment Reception Pre treat Separation Sorting 31 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential Typical layout of a GORE® Cover MBT Organic fraction after pre treatment towards drying, stabilizing Reception Pre treat Separation Sorting 32 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential BioE - GORE® Cover 1.200 tpd = 375.000 ton per year Biological Treatment Stabilizing, Drying 33 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential BioE - GORE® Cover 1.200 tpd = 375.000 ton per year Biological Treatment Stabilizing, Drying 34 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential BioE - GORE® Cover 1.200 tpd = 375.000 ton per year Biological Treatment Stabilizing, Drying 35 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover UBA – Umweltbundesamt Case Study 2009 • Carbon Credits • CO2 equivalent from single production facilities in reference to the used composting technology • NH3, CH4, Laughing Gas considered for CO2 • Reception, Mechanical treatment, Intensive Rot, Maturation, Storage etc. according to the specifics fo the systems • Tunnel, Container, Building, Membrane, open windrow • Cycle from Reception to final compost 36 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover system • Tunnel, Container, Building, open windrow, Membrane • Cycle from Reception to final compost 37 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential CO2 Equivalent from single production facilities in reference to the used composting technology 150 Anl.+MA Rec.+ Mech. VFermentation (Gärprod) HR- Fresh (FrischK) IR Compost Maturation NR (FertigK) - Finished Compost Storage ZwLager phases CO2-Äquivalente, kg/Mg 125 16-20 weeks 100 16-20 weeks 8 weeks 75 8 weeks 50 3 weeks 25 0 KOA g, tg (Bio+Grün) (FrischK) Building, Tunnel KOA g, tg (Bio+Grün) (FertigK) Building, Tunnel KOA sM (Bio+Grün) Membrane KOA o (Bio+Grün) KOA o (Grün) Open Windrow Open Windrow KOA V+NR (Bio+Grün) Fermentation 38 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover UBA – Umweltbundesamt Case Study 2009 • It clearly indicates that static composting with positive aeration using the semi permeable membrane has the lowest possible emission rate compared to the other technologies. In this case study, windrows at different age stages of the decomposing process were taken into consideration. • The study demonstrated that use of membrane technology reduced emissions from an industry average of 47kg per tonne to 12 kg per ton. 39 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Recycling Park 160.000 tons per year MSW + SOW Total input at the front gate: 160.000 tpy , Hungary, Györ ~270.000 inhabitants Input: MSW Municipal Solid Waste and SOW Waste from separate collection Pre treatment (Recyclables): 55.000 tpy Separation of PET, Plastic, Glass, Paper/Cardboard, FE/NE in total > 50% – sold to the recycling market RDF (Refuse Derived Fuel): 27.000 tpy energetic use, cement industry Mass reduction MSW: SOW: 28.000 tpy 20.000 tpy weight reduction during biological process Production of high end quality compost Landfilled at the end of process <30.000 tpy 1,3 t/m³/m² of material (!) Construction time: 20 months (incl. Mechanical Pre Treatment, biological part and post treatment, 7 ha landfill) Surface (Receptioin, Meachanical pre treatment area) Surface biological treatment area (GORE® Cover) Surface post treatment Invest total plant incl. Landfill - 5.000 m² - 6.300 m² - 700 m² - 20,3 M € 40 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential Typical layout of a GORE® Cover MBT After biological treatment Reception Pre treat Separation Sorting Overscreen – landfill or further separation Fraction <12 mm Compost Like Output (CLO) High Calorific Fraction (RDF material) © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential 41 GORE® Cover MSW after drying process 42 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover MSW – example LANDFILL REMEDIATION Capacity: 110.000 tpy Started: 2000 - 2007 Aim: Stabilisation of the organic – usage of the calorific fraction for incineration • Landfill remediation due to contamination of the ground water in the adjacency of Venetia 43 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover 110.000 tpy Landfill remediation in Italy Potential future application … 44 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Landfill polluting the ground water at basis Potential future application … 45 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Excavating of the MSW from the landfill – grinding at site and Potential future application … 46 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover Biological process under GORE® Cover Potential future application … 47 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover After the treatment separation into fine organic fraction that is stabilized 48 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover And light fraction for the energetic use 49 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential MSW – Waste To Energy (WTE) Plattform Germany: 210.000 tpy Requirement: 14,5 MJ/t, 150 kta max 1% chlorine < 80 mm Goal: WTE Time: 28 days Supplying 17.000 homes with energy and heat Start: May 2004 50 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential Neumünster Operating since: May 2004 Mechanical biological waste treatment – Process Waste receiving Shredding Screening Fraction > 80 mm: Combustible treatment Screening, Shredding, Metal separation Fraction < 80 mm Metal separation, Mixing and Moisturizing PROCESS Intensive rot (3-4 weeks) Controlled, aerated Fine / medium fraction with high energy TEV © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential After treatment Screening, air separation, density separation Sand, Glass, Stones, Hard Materia Light fraction – ~10 mj Deposition 51 WTE GORE® Cover MSW experience drying / stabilization Main advantages of Gore® Cover technology • Odour reduction greater 90% - high efficiency - VOC reduction • Sustainability in the market for 15+ years and growing strongly long lasting time of the GORE Cover – • Reputation excellent – no failure in plants • Treatment time shortest, most secure and sustainable • Space reduction 40.000 tpy, 3 weeks treatment time, <4.000 m² pure treatment area • Operational cost Investment cost e.g. 40.000 tpy plant, 3 weeks, 2 (4) workers, little energy consumption 3,00 – 5,00 €/t on the GORE technology on a 10 y basis on GORE® Cover system Solid track record MSW (landfill, energetic use), SOW, BS, LR... • Encapsulated System approval in more than 20 countries, BAT • Diversity from on-floor to total encapsulation... 52 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential GORE® Cover GORE® Cover system Limitation – GORE® Cover technology treatment Throughput > 2.000 tons per day on one single plant Volume per module 150 m³ - 1.000 m³ of input material Dimensions: max 9 m in the width max 50,0 m in length and max 3,5 m in height Climate - 25°C on a permanent level requires higher performing system (cost) Drying from 7 to 21/28 days depending on input humidity (< 20% output humidity e.g. 4 weeks if input humidity is > 50%) And no miracles – waste treatment takes time! (RG, AT4, IR1000, BMW100...) 53 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential www.kompostanlagen.de Franz Vogel UTV AG Tel: +49 7223 8001505 [email protected] 54 © UTV AG Am Alten Römerpfad 2 76534 Baden-Baden /// Company Confidential
© Copyright 2024