Past experiences and future needs

Data supply to the Emergency
Management Service
–
Past experiences and future needs
Annett Wania
[email protected]
EC DG Joint Research Centre
Copernicus Data Access Workshop
20-22 April 2015
Outline
• Service Overview
• Needs
• Past experience from RUSH mode/Rapid Mapping
(eGEOS)
CSCDA ESA/ESRIN, 20-22 April 2015
2
Service Overview
• Operational since April 2012
• Support to users in the field of crisis management
• Provides disaster risk management information based on
space data combined with other sources of information
• Addresses natural & man-made disasters globally
• Offered upon activation by authorised users through the
Emergency Response and Coordination Centre (EC DG
ECHO)
• DG JRC role: technical coordination, contract management
• Service delivery is ensured by service providers
(procurement via public tendering)
• Two components: Mapping & Early Warning
CSCDA ESA/ESRIN, 20-22 April 2015
3
Service Overview
Risk & Recovery Mapping
Rapid Mapping
• On demand 24/7
• Standardized products
• Delivery in hours*
(6-12h) or 5 days*
• On demand (office hours)
• Tailored to user needs
• Delivery in 20 days**
Crisis
Reference maps
Pre-disaster situation maps
Reference maps
Delineation maps
Grading maps
Reference maps
Post-disaster situation maps
Mapping validation
•
•
Activated by EC
Delivery in 35 days**
* After satellite data reception
** Number of days after signature of a specific contract (requires 15 days after service request)
CSCDA ESA/ESRIN, 20-22 April 2015
4
Rapid Mapping - examples
Delineation map –
flood extent
Grading map – building
damage assessment
after wind storm
CSCDA ESA/ESRIN, 20-22 April 2015
Grading map – lava extent,
damage assessment
Delineation map –
forest fire
5
Risk & Recovery Mapping - Example
Flood risk assessment &
mitigation in Bolivia
Hazard Exposure
Post-disaster map
Flooded area 16/02/2008
Disaster risk (population)
CSCDA ESA/ESRIN, 20-22 April 2015
Evacuation plan
6
Service Needs
• Timeliness
 For Rapid Mapping as fast as possible (h)
– Ensured through Rapid Emergency Activation Satellite
Tasking (ex-GEST)
 For Risk & Recovery Mapping and Validation contractual
service conditions require fast data availability (<4 days):
• For new acquisition Satellite Tasking lead time SLT+
• Delivery times preferably Fast24h
=> What is the cost?
• Need faster delivery mode for archive imagery
• Availability of an image catalogue search service
 Feasibility check for Risk & Recovery Mapping and
Validation activations (without the need to issue an order)
=> to prepare technical specifications
CSCDA ESA/ESRIN, 20-22 April 2015
7
Service Needs
• Alerting when approaching quota consumption
• Flexible quota management
 Allow revision, shifting across modules and resolution
classes
=> irregular data requirements (time, sensor, resolution)
• Flexible licensing of data usage
 Clarify if EMS-AU = Public Users
 Possibility to extend (case by case)
• Sentinel-1A
 Tasking mechanism?
 Delivery outside working hours
CSCDA ESA/ESRIN, 20-22 April 2015
8
EMS Portal
emergency.copernicus.eu
CSCDA ESA/ESRIN, 20-22 April 2015
9