Vinyl Deluxe® Collection Moulding Installation Instructions Stairnose & Transition Stairnose Moulding Solutions & Tools for problems that may arise Installationadvice.com Installation on flooring with an overall thickness of up to 19 mm (0.75”). Flooring Step 1 Stair Riser Install the riser flush to the stair. Clean flooring and moulding with a damp cloth (water only) to remove all dust and residue. Let dry before applying adhesive. Sub Floor Step 2 Release Paper Stairnose Surface Roughened up with Sanding Sponge or Sandpaper Adhesive Tape Turn Stairnose over and roughen the inside surface of the Stairnose to increase bond by means of 60 grit sandpaper, sanding sponge, or a metal brush. Then, gently peel the release paper all the way off the adhesive tape. The purpose of the double-sided tape is to secure the moulding firmly in place until the premium polyurethane construction adhesive totally cures. Step 3 Next, apply a generous bead of a Premium Polyurethane Construction Adhesive along the entire inside corner. Be sure to overlap the tape with the adhesive Caulk Gun Adhesive Adhesive Tape Underside of moulding generously covered with adhesive Step 4 Bottom of Stairnose Stair Riser Adhesive Tape Touch the bottom of moulding to the stair riser and carefully roll the Stairnose in place. Make any final adjustments before you push the moulding all the way down. Once it’s in the final position, press down firmly with your hands and make your way down the entire Stairnose. It may take 2 or 3 passes to set it firmly in place. Flooring Adhesive Step 5 Sub Floor For Low Traffic, let the adhesive cure for at least 1 hour before walking on it. For Heavy Traffic, wait 24 to 48 hours. Stair Riser NOTE: Complete cure takes 48 hours. 1.888.DUCHATEAU EUROPEAN WIDE-PLANK FLOORING 1 of 2 DUCHATEAU.COM Stairnose Moulding Solutions & Tools for problems that may arise Installationadvice.com Installation on flooring with an overall thickness of up to 19 mm (0.75”). 2” “ 3/32 1” “ 29/32 Stairnose Applications VersaEdge “Lock-Down” Install (e.g. Stair Treads) “Floating” Install Used where floating of the floor is not required, as with Stair Tread or Glued-Down/Nailed-Down floors. This can be used on floating floors where expansion and contraction will occur on the opposite side of the flooring plane. Laminate / Vinyl / Hardwood / Engineered Wood Flooring (3/32” to 3/4”) Adhesive Tape (Remove Backing to Apply) Adhesive Tape DO NOT REMOVE BACKING! 0.375” Sub Floor Stair Riser Laminate / Engineered Wood Detail 1” Piece of Flooring Nailed & Glued Down Glue Vinyl/LVT Alternative Flush Vinyl/LVT Floor Planks Must Be Glued Down! Adhesive Tape DO NOT REMOVE BACKING! Adhesive Tape (Remove Backing to Apply) 2 of 2 1.888.DUCHATEAU EUROPEAN WIDE-PLANK FLOORING DUCHATEAU.COM Solutions &Moulding Tools for problems that may arise Transition Installationadvice.com SlimTrim as a REDUCER Up to 4 mm Floors Use transition track for up to 4 mm floors. 3/8“ Step 1 *If the flooring manufacturer suggests/permits the use of underlayments, you may need to shim the track to accomodate the increase in overall thickness Install the flooring plank*. Then place the transition track 3/8” from the floor and screw it to the sub-floor using 4 x 3/4” screws. Sub Floor Rubber Mallet Step 2 Transition track This end of the Transition MUST be placed on the lower of the two surfaces. Line the transition moulding up with the transition track and fit one end into the moulding. Using a rubber mallet, tap the moulding until it engages with the track. Use your hand to guide the moulding into the track as you work your way down, tapping it in, similar to how you would close a plastic zip bag. Step 3 Next, go up and down the moulding several times, tapping the transition all the way into the track. You can use a little more force once you are sure it is properly engaged in the track. Use transition and transition shim for 5-6 mm floors. Use the same moulding & track, just add Shim. 5-6 mm Floors 3/8“ Step 1 Sub Floor Install the flooring plank. Then place the transition and shim 3/8” from the floor and screw them to the sub-floor using 4x5/8” screws. Shim Rubber Mallet Step 2 Transition track This end of the Transition MUST be placed on the lower of the two surfaces. Line the transition moulding up with the transition track and fit one end into the moulding. Using a rubber mallet, tap the moulding until it engages with the track. Use your hand to guide the moulding into the track as you work your way down, tapping it in, similar to how you would close a plastic zip bag. Step 3 Next, go up and down the moulding several times, tapping the Transition all the way into the track. You can use a little more force once you are sure it is properly engaged in the track. 1 of 8 1.888.DUCHATEAU EUROPEAN WIDE-PLANK FLOORING DUCHATEAU.COM Transition Solutions &Moulding Tools for problems that may arise Installationadvice.com Up to 3 mm Floors Use transition track for up to 3 mm floors. 1” Step 1 *If the flooring manufacturer suggests/permits the use of underlayments, you may need to shim the track to accomodate the increase in overall thickness Install the flooring planks* by leaving a 1” inch (25mm) gap for the installation of the Transition. Center the TransitionTrack between the two laminate floors and screw it to the sub floor by using 4x3/4” screws. Sub Floor Rubber Mallet Step 2 Transition track Line the transition moulding up with the transition track and fit one end into the moulding. Using a rubber mallet, tap the moulding until it engages with the track. Use your hand to guide the moulding into the track as you work your way down, tapping it in, similar to how you would close a plastic zip bag. Step 3 Next, go up and down the moulding several times, tapping the transition all the way into the track. You can use a little more force once you are sure it is properly engaged in the track. Use transition and transition shim for 4-6 mm floors. Use the same moulding & track, just add Transition Shim. 4-6 mm Floors 1” Step 1 Install the flooring planks by leaving a 1” inch (25mm) gap for the installation of the Transition. Center the transition track and shim between the two laminate floors and screw them to the sub floor by using 4x5/8” screws. Sub Floor Rubber Mallet Step 2 Shim Transition track Line the transition moulding up with the transition track and fit one end into the moulding. Using a rubber mallet, tap the moulding until it engages with the track. Use your hand to guide the moulding into the track as you work your way down, tapping it in, similar to how you would close a plastic zip bag. Step 3 Next, go up and down the moulding several times, tapping the transition track all the way into the track. You can use a little more force once you are sure it is properly engaged in the track. 2 of 8 1.888.DUCHATEAU EUROPEAN WIDE-PLANK FLOORING DUCHATEAU.COM Transition Solutions &Moulding Tools for problems that may arise Installationadvice.com Up to 3 mm Floors UseTransition Transition Track forTrack) up tofor3 up mm Use track (Metal to floors. 3 mm floors. NOTE: Carpet Tap Down trim must be no less than 1/8” from top of track. Use shim as guide, then remove it. 3/4” Sub Floor Carpet Tap Down Trim 1” Rubber Mallet *If the flooring manufacturer suggests/permits the use of underlayments, you may need to shim the track to accomodate the increase in overall thickness Step 1 Install the flooring plank* and carpet (using a carpet tap down trim) by leaving a 1” inch (25mm) gap for the installation of the transition track. Position the track 3/4” from where the of the Tap Down trim meets the carpet and screw it to the sub floor by using 4x5/8” screws. The carpet tap down trim must be no less than 1/8” from top of track. Use shim to make track and tap down trim even, then remove shim. Step 2 Line the transition up with the track and fit one end into the moulding. Using a rubber mallet, tap the moulding until it engages with the track. Use your hand to guide the moulding into the track as you work your way down, tapping it in, similar to how you would close a plastic zip bag. Step 3 Next, go up and down the moulding several times, tapping the Transition all the way into the track. You can use a little more force once you are sure it is properly engaged in the track. Use Transition and Transition Shim for 3-6 mm floors. Use the same moulding & track, just add Transition Shim. NOTE: Carpet Tap Down trim must be even with the top of the track. Step 1 3/4” Sub Floor 1” 3-6 mm Floors Carpet Tap Down Trim Rubber Mallet Install the flooring plank and carpet (using a carpet tap down trim) by leaving a 1” inch (25mm) gap for the installation of the transition. Position the track 3/4” from where the of the Tap Down trim meets the carpet and screw them to the sub floor by using 4x5/8” screws. The carpet tap down trim must be even with the top of the track. Step 2 Line the transition up with the track and fit one end into the moulding. Using a rubber mallet, tap the moulding until it engages with the track. Use your hand to guide the moulding into the track as you work your way down, tapping it in, similar to how you would close a plastic zip bag. Step 3 Next, go up and down the moulding several times, tapping the Transition all the way into the track. You can use a little more force once you are sure it is properly engaged in the track. 3 of 8 1.888.DUCHATEAU EUROPEAN WIDE-PLANK FLOORING DUCHATEAU.COM Solutions & Tools for problems that may arise Transition Moulding Installationadvice.com Transition - OPTIONAL DOWEL INSTALLATION Roughen up surface that comes in contact with glue NOTE: Transition Dowels are sold separately. Please contact your Sales Representative to order. Step 1 Turn the transition over and use a sanding sponge, metal brush or 60 grit sandpaper to roughen up the surface to increase the bond on the side where glue will be applied. Step 2 Each dowel tree (sold separately), contains 8 dowels. Carefully cut or break dowels off of tree. Slide one dowel into moulding groove and position in center of moulding. Insert additional dowels from both ends. Space dowels 11.5” apart and 1.5” from ends. Center one dowel Side View of Transition Moulding 1.5” 11.5” 1.5” Flooring 11.5” 1” 1” Pencil marks 1/4” NOTE: Dowels have to fit tightly for the moulding to function properly. If you find the dowel is too difficult to slide in, take 100/120 grit sandpaper, lay it flat on a surface and sand down the dowel head slightly with a couple of passes. *If the flooring manufacturer suggests/permits the use of underlayments, you may need to shim the track to accomodate the Step 3 increase in overall thickness Install the flooring planks*, by leaving a 1” inch (25mm) gap for the installation of the moulding. Draw a line on the flooring for the placement of the holes. Using a 1/4” drill bit, pre-drill holes into the flooring 2” deep. Be sure to use the same measurements as the dowels, keeping the holes 11.5“ apart. With a pencil, mark on the floor where each dowel is located (You will need these for Step 7). Pencil marks should be about 1” from the pre-drilled holes. Sub Floor 2” NOTE: Be sure to vacuum pre-drilled holes. This end of the transition MUST be placed on the lower of the two surfaces. Pencil marks Flooring Step 4 Sub Floor 1” Carefully line up dowels with pre-drilled holes. Make adjustments to the dowel positions on the moulding if needed. 4 of 8 1.888.DUCHATEAU EUROPEAN WIDE-PLANK FLOORING DUCHATEAU.COM Transition Solutions &Moulding Tools for problems that may arise Installationadvice.com Transition - OPTIONAL DOWEL INSTALLATION Side View of Hand Positions Push down directly over dowel 1/4” at a time NOTE: Do not try to push the entire molding in all at once by just pressing it in from top! This will bend the dowels. Flooring Step 5 Using both hands, start at one end and gently push moulding 1/4”down. Make sure dowel is straight and that you apply pressure directly over dowel. The best position is to hold dowel with pointer and middle fingers and push down with thumbs. Moving down the moulding again, push the dowels in the floor 1/4” at a time. It should take several passes to push the moulding all the way down. First pass (1/4”) Sub Floor Second Pass (1/4”) Third Pass (1/4”) Forth Pass (1/4”) Flooring PUR-Glue adhesive About 3/8” (9.5mm) Step 6 Sub Floor First pass (1/4”) Second Pass (1/4”) Third Pass (1/4”) Forth Pass (1/4”) Fifth Pass (1/4”) Flooring Once moulding is about a finger’s width from the floor (about 3/8” or 9.5 mm), insert the tip of a glue gun under 1 edge of the moulding. Apply Liquid Nails or any polyurethane constructive adhesive along 1 side of the flooring. NOTE: Make sure you apply adhesive to ONLY 1 side of the moulding and that all surfaces that the adhesive touches is dust and debris free. Pencil marks Step 7 Sub Floor When finished applying adhesive, start again at the beginning of the moulding and push dowels all the way in until moulding is secure. Once moulding is in place, use a rubber mallet to tap on the top of each dowel. Use the pencil marks to reference where each dowel is located. 5 of 8 1.888.DUCHATEAU EUROPEAN WIDE-PLANK FLOORING DUCHATEAU.COM Transition Solutions &Moulding Tools for problems that may arise Installationadvice.com Transition track - OPTIONAL DOWEL INSTALLATION: Installation for use on CONCRETE Transition Installation Instructions for Use on Concrete Install flooring planks, leaving 1 inch gap for moulding installation. Draw line on flooring for hole placement. Using a 1/4” concrete drill bit pre-drill 2” deep holes using same measurements as dowels. With pencil, mark on floor the location of each dowel. BE SURE TO VACUUM PRE-DRILLED HOLES. 1” Pencil marks Flooring 1” 2” 1/4” Concrete Concrete Distance Measurement Dowel Cutting Template 2 Distance Measurement Dowel Cutting Template 3 3/4” 5/8” 1/2”” 3/8”” 1/4” 1/8” NO CUT Cut Here C Here Cut C Here Cut Cut Here Cut Here Dowel Cutting Template is located to the right of Installation Instructions 3/4” 5/8” 1/2”” 3/8”” 1/4” 1/8” NO CUT Cut Here Cut Here Cut Cu Cu utt Here Cut Cu ut Here u H Cut ree Cut Here Lay a flat object over flooring and measure from the concrete at the center between the flooring up to the bottom of your object. This will give you the distance to use on the Dowel Cutting Template below. Carefully cut or break dowels from Dowel Tree. Use the Dowel Cutting Template to the right to find your measurement on the template and lay your dowel over the number that matches your distance measurement. With dowel on template, use a utility knife to cut dowel as indicated on Dowel Cutting Template. Repeat with all dowels that are to be used. 4 Roughen up surface that comes in contact with glue 5 3/4” 5/8” 1/2” 3/8” 1/4” 1/8” NO CUT Cut Here Cut Here Cut Here Cut Here Cut Here Slide dowels into groove on bottom of the transition moulding and position them according to template. Line up dowels with pre-drilled holes. Adjust dowels as needed. NOTE: Dowels have to fit tightly for the moulding to function properly. If you find the dowel is too difficult to slide in, take 100/120 grit sandpaper, lay it flat on a surface and sand down the dowel head slightly with a couple of passes (See Detail A at the right). 6 First pass (1/4”) Second Pass (1/4”) Next Passes (1/4”) 7 About 3/8” (9.5mm) Turn the transition over and use a sanding sponge, metal brush or 60 grit sandpaper to roughen up the surface to increase the bond on the side where glue will be applied. Distance Measurement Take Measurement Here Dowel Cutting Template Flat object FOR CONCRETE ONLY! 1/4” Drill bit 1 PUR-Glue adhesive 8 Pencil marks DETAIL A Using both hands, start at one end and gently push moulding 1/4” down at a time. It should take several passes to push moulding all the way down. Best hand position is holding dowel between pointer fingers and pushing down with thumbs directly over dowel. DO NOT TRY TO PUSH ENTIRE MOULDING IN ALL AT ONCE. When moulding is a finger’s width from the floor, insert tip of glue gun under one edge of moulding and apply a polyurethane construction adhesive along one side of the flooring. MAKE SURE YOU APPLY ADHESIVE TO ONLY ONE SIDE OF THE MOLUDING AND THAT ALL SURFACES THAT THE ADHESIVE TOUCHES IS DUST AND DEBRIS FREE. When finished applying adhesive, start again at beginning of moulding and push dowels all the way down until moulding is secure. Use a rubber mallet to gently tap on top of each dowel until molding sits flush. Use pencil marks as reference. 9 6 of 8 1.888.DUCHATEAU EUROPEAN WIDE-PLANK FLOORING DUCHATEAU.COM Transition Solutions Moulding & Tools for problems that may arise Installationadvice.com Transition & New ved o Impr C PV ng di Mol Technical Information — Sizes Transition 2” Our Transition 3 in 1 Moulding functions as a Reducer, T-Moulding, and End Cap. Comes with TransitionTrack and Shim. Surface Material: High Wear Resistant Aluminum Oxide Laminaattee Core Material: PVC Transition To be used with transition track for floors from up to 3mm-4mm thickness including 3/32nd underlayment. Also, used in conjunction with the Shim for 4-6mm* including 3/32nd underlayment. Material: Cold Roll Steel 1/4” 13/64” 3 1 9/16” 1/8” in 7/16” 3/16” 9/16” * For floors thicker than 6mm, use optional dowel installation Dowel (Sold Separately) 2” Optional use with Transition for floors from 0 up to 19mm. Comes as a tree of eight dowels. Material: Polystyrene 1/4” LVT Solution 1 Reducer: Up to 4mm Sub Floor 2 Transition: 5-6mm SlimTrack Up to 3mm 3 End Cap: (Hard Surface to Carpet) 4-6mm Up to 3-6mm Shim Carpet Tap Down Trim Optional Dowel Installation 1 Reducer: Up to 3/4” 2 Transition: Up to 3/4” Dowel (Sold Separately) Glue Laminate to Laminate Vinyl to 3/4 Inch 3 End Cap: (Hard Surface to Carpet) Up to 3/4” A Carpet Tap Down Trim MUST be Used When Installing Transition on Carpet Carpet Tap Down Trim Laminate to Sliding Door Laminate to Ceramic Tile Piece of Laminate Used as Shim Sliding Door NOTE: Transition does not work on radiant heat floors with optional dowel installation method. All mouldings are 94” long (7’ 10”) 7 of 8 1.888.DUCHATEAU EUROPEAN WIDE-PLANK FLOORING DUCHATEAU.COM 2” 2” “ 3/32 1” 1/4” 13/64” “ 29/32 9/16” Vinyl Deluxe T-mold/Reducer Recommended Tools For Installation 2” Stairnose 1/4” Pencil Tape measure 13/64” Miter saw 60 grit sandpaper 9/16” Vinyl Deluxe T-mold/Reducer “ 3/32 Metal brush 2” Caulk gun PUR-glue Damp cloth Tape measure Miter saw Utility knife Rubber mallet Caulk gun 1/4” 13/64” 2“ 9/16” Transition Pencil Screwdriver Damp cloth Drill w/screw & 1/4” drill bit PUR-glue Small screws 4 x 3/4”or 5/8” 8 of 8 1.888.DUCHATEAU EUROPEAN WIDE-PLANK FLOORING DUCHATEAU.COM
© Copyright 2024