Serge Galant

INNOGRID 2020
31st March 2015
Session: Integrating R&D into the European
Energy System
Serge Galant, CEO TECHNOFI
Coordination of GRID+STORAGE
A service contract for DG ENER (European Commission)
A service contract funded by the
European Commission under
the Horizon 2020 Program
1
Outline
•
•
•
•
•
The overarching objectives of the service contract
The GRID+STRORAGE consortium
The assumptions made for a fast track approach
The roadmapping process
The coming steps in April 2015
A service contract funded by the
European Commission under
the Horizon 2020 Program
INNOGRID 2020 31st March 2015
2
Outline
•
•
•
•
•
The overarching objectives of the service contract
The GRID+STRORAGE consortium
The assumptions made for a fast track approach
The roadmapping process
The coming steps in April 2015
A service contract funded by the
European Commission under
the Horizon 2020 Program
INNOGRID 2020 31st March 2015
3
1
REVISE AND UPDATE ROADMAP INCLUDING STORAGE
OPTIONS
ROADMAP
MONITOR R&D ACTIVITIES
2
.
MONITOR
CONSULT AND MEET with STAKEHOLDERS
3
CONSULT
4
DISSEMINATE AND CONSOLIDATE
KNOWLEDGE using the GRIDINNOVATIONON-LINE.eu platform
INTERACT
A service contract funded by the
European Commission under
the Horizon 2020 Program
4
Outline
•
•
•
•
•
The overarching objectives of the service contract
The GRID+STRORAGE consortium
The assumptions made for a fast track approach
The roadmapping process
The coming steps in April 2015
A service contract funded by the
European Commission under
the Horizon 2020 Program
INNOGRID 2020 31st March 2015
5
The consortium
Support to the European Commission (DG Energy) in defining a European R&D roadmap
integrating energy storage into grid research and innovation activities
Grid+Storage partners:
A service contract funded by the
European Commission under
the Horizon 2020 Program
INNOGRID 2020 31st March 2015
66
Outline
•
•
•
•
•
The overarching objectives of the service contract
The GRID+STRORAGE consortium
The assumptions made for a fast track approach
The roadmapping process
The coming steps in April 2015
A service contract funded by the
European Commission under
the Horizon 2020 Program
INNOGRID 2020 31st March 2015
7
The assumptions
Start from the EEGI and EASE R&I roadmaps
An overarching goal for the
existing EEGI roadmap
“To allow European electricity
networks continuously deliver an
effective flexible capacity to
integrate actions of grid users at
affordable costs”
A service contract funded by the
European Commission under
the Horizon 2020 Program
Four technology
levels covered by
SET Plan research
and innovation
activities
8
The assumptions
Cross-cutting
Issues (energy
efficiency)
Energy
Markets
Energy networks
(Physical market
places)
Energy storage, DSM, flexible
conventional generation
Renewable low carbon generation,
efficient consumption processes
Energy policies
A service contract funded by the
European Commission under
the Horizon 2020 Program
9
The assumptions
Storage integration: the main focus of the integrated
roadmap… to increase system flexibility
Demand-side
management
Electricity consumption
Consumers and prosumers
Electricity
networks
=
System
Backbone
Flexible
conventional
generation
Energy
storage
Electricity generation
Thermal and renewable sources
A service contract funded by the
European Commission under
the Horizon 2020 Program
INNOGRID 2020 31st March 2015
10
The assumptions
FLEXIBILITY
FROM
STORAGEINTEGRATED
SOLUTIONS
Spatial/ environmental integration of storage-based solutions
Fine-tuning of optimal scale, adjustment to local climates and to
specific areas. Aim TRL 9.
Temporal integration of storage-based solutions
R&D activities to shape the life cycle cost of integrated
solutions (reliability, techno-economic performances,
manufacturability).Aim TRL: 6-8
Functional integration of storagebased solutions into the system
Optimal mix, interfaces, experimental
data and simulations to validate endto-end functionalities.
aim TRL (op): 5-7
A service contract funded by the
European Commission under
the Horizon 2020 Program
11
Outline
•
•
•
•
•
The overarching objectives of the service contract
The GRID+STRORAGE consortium
The assumptions made for a fast track approach
The roadmapping process
The coming steps in April 2015
A service contract funded by the
European Commission under
the Horizon 2020 Program
INNOGRID 2020 31st March 2015
12
The roadmapping process
EASE Roadmap
Energy storage solutions
ENTSO-E IP 2016-2018
Energy storage solutions
potentially enriching
topics already identified
by ENTSO-E
Joint T&D topics
Energy storage solutions
potentially enriching
topics already identified
by EDSO
Topic
selection
process
Integrated IP 20162018
•
•
•
•
Transmission
Distribution
Joint transmission &
distribution
Storage
EDSO IP 2016-2018
New topics to be possibly
included in the integrated IP
A service contract funded by the
European Commission under
the Horizon 2020 Program
INNOGRID 2020 31st March 2015
13
Outline
•
•
•
•
•
The overarching objectives of the service contract
The GRID+STRORAGE consortium
The assumptions made for a fast track approach
The roadmapping process
The coming steps in April 2015
A service contract funded by the
European Commission under
the Horizon 2020 Program
INNOGRID 2020 31st March 2015
14
The coming steps
• Public consultation process : April 9-th to April
30th 2015
• Draft Implementation Plan 2016-2018 of the
Integrated R&I roadmap
See
www.gridplusstorage.eu
• The two next consultations
– Draft Implementation Plan 17-19 (spring 2016)
– Full draft Integrated Roadmap (fall 2016)
A service contract funded by the
European Commission under
the Horizon 2020 Program
INNOGRID 2020 31st March 2015
15
Thank you for your attention!
Support to the European Commission (DG Energy) in defining a European R&D roadmap
integrating energy storage into grid research and innovation activities
Grid+Storage partners:
A service contract funded by the
European Commission under
the Horizon 2020 Program
INNOGRID 2020 31st March 2015
16