RTA Recruiting April 24

Looking for opportunity
on a big scale?
Rio Tinto Alcan is the aluminium
product group of Rio Tinto,
headquartered in Montreal, Canada.
The company’s BC Operations is based
in Kitimat, British Columbia and is one
of the largest industrial complexes in
the province.
Rio Tinto Alcan is seeking to fill the
following role at our Kitimat Operations
with a successful candidate who will
reside in the Kitimat/Terrace area.
For further information on these
positions visit:
XXXXXX.com/careers
Potline Operator – Transition
Rio Tinto Alcan is accepting applications for qualified candidates to work as
Transition Operators in the current Kitimat aluminium smelter (Lines 3 – 4). The
transition term of employment will be from April to September 18, 2015. Employees
will be assigned to a training program which will provide the skills necessary to work
safely and efficiently in the smelter. All positions will be based on 12-hour rotating
shifts. The starting rate will be $37.78/hour plus shift and other premiums as
applicable. BC medical plan premiums will be paid by the company. Applicants must
have as a minimum, the following qualifications:
• Grade 12 graduation
• Ministry of Education transcript of Grade 11 and 12 results (this must be
included with the application form) showing:
a) Grade 12 English or Communication 12
b) Grade 11 math
c) Grade 11 science (physics preferred)
• A total of two years of work experience (industrial preferred). This requirement
will be waived if the applicant is in possession of a diploma from a recognized
two-year technical program.
• Current BC driver’s license (a legible copy must be included with the
application)
• Employees are represented by UNIFOR Local 2301.
To apply your skills and experience with a global leader in aluminium production,
please pick up an employment application form at RTA’s Community Information
office at 254 City Centre, Kitimat, BC or at the Work BC Employment Services
Centre, 562 Mountainview Square.
Completed applications should be mailed to Rio Tinto Alcan, Recruitment
Coordinator, PO Box 1800, Kitimat, BC V8C 2H2.
Applications must be received no later than Friday, April 24, 2015.
Rio Tinto Alcan would like to thank all applicants, however only those shortlisted will
be contacted.