Looking for opportunity on a big scale? Rio Tinto Alcan is the aluminium product group of Rio Tinto, headquartered in Montreal, Canada. The company’s BC Operations is based in Kitimat, British Columbia and is one of the largest industrial complexes in the province. Rio Tinto Alcan is seeking to fill the following role at our Kitimat Operations with a successful candidate who will reside in the Kitimat/Terrace area. For further information on these positions visit: XXXXXX.com/careers Potline Operator – Transition Rio Tinto Alcan is accepting applications for qualified candidates to work as Transition Operators in the current Kitimat aluminium smelter (Lines 3 – 4). The transition term of employment will be from April to September 18, 2015. Employees will be assigned to a training program which will provide the skills necessary to work safely and efficiently in the smelter. All positions will be based on 12-hour rotating shifts. The starting rate will be $37.78/hour plus shift and other premiums as applicable. BC medical plan premiums will be paid by the company. Applicants must have as a minimum, the following qualifications: • Grade 12 graduation • Ministry of Education transcript of Grade 11 and 12 results (this must be included with the application form) showing: a) Grade 12 English or Communication 12 b) Grade 11 math c) Grade 11 science (physics preferred) • A total of two years of work experience (industrial preferred). This requirement will be waived if the applicant is in possession of a diploma from a recognized two-year technical program. • Current BC driver’s license (a legible copy must be included with the application) • Employees are represented by UNIFOR Local 2301. To apply your skills and experience with a global leader in aluminium production, please pick up an employment application form at RTA’s Community Information office at 254 City Centre, Kitimat, BC or at the Work BC Employment Services Centre, 562 Mountainview Square. Completed applications should be mailed to Rio Tinto Alcan, Recruitment Coordinator, PO Box 1800, Kitimat, BC V8C 2H2. Applications must be received no later than Friday, April 24, 2015. Rio Tinto Alcan would like to thank all applicants, however only those shortlisted will be contacted.
© Copyright 2024