Manipur State Power Distribution Company Limited, Manipur, INDIA REQUEST FOR PROPOSAL FOR DETAILED DESIGN & IMPLEMENTATION OF INSTITUTIONAL STRENGTHENING AND CAPACITY BUILDING AT MSPDCL MARCH 2015 1 SELECTION OF CONSULTANTS REQUEST FOR PROPOSALS RFP No.: 25/2/2015 Selection of Professional Services for: DETAILED DESIGN & IMPLEMENTATION OF INSTITUTIONAL STRENGTHENING AND CAPACITY BUILDING AT MSPDCL Issued on: 23rd MARCH 2015 2 Table of Contents Section 1. Instructions to Consultants ...................................................................................... 4 1. Instructions to Consultants – Data Sheet ...................................................................... 11 Section 2. Scope of Work....................................................................................................... 16 1. Context of the Power Sector in Manipur....................................................................... 16 2. Demographics and ethnic profile of Manipur ............................................................... 16 3. Scope of Work............................................................................................................... 18 4. Deliverable Milestones & Payment Schedule ............................................................... 22 Section 3. Technical Proposal Template ................................................................................ 23 Technical Proposal Submission Form ............................................................................... 23 Consultant’s Experience.................................................................................................... 24 Approach and Methodology.............................................................................................. 25 Curriculum Vitae (CV) for Proposed Professional Staff .................................................. 26 Staffing Schedule .............................................................................................................. 28 Work Schedule .................................................................................................................. 29 Section 4: Financial Proposal Template.................................................................................. 30 Financial Proposal Submission Form................................................................................ 30 Financial Bid ..................................................................................................................... 31 3 Section 1: Instructions to Consultants Section 1. I nstr uctions to C onsultants Definitions Client – ‘ Manipur State Power Distribution Company Limited 1. Introduction 1.1 Consultants are invited to submit a Technical Proposal and a Financial Proposal, for professional services required for the assignment named in the Data sheet. The Proposal will be the basis for contract negotiations and ultimately for a signed Contract with the selected Consultant. 1.2 Consultants should familiarize themselves with local conditions and take them into account in preparing their Proposals. The assignment requires significant field exposure in Manipur and the Consultant will have to commit significant part of resources and time to the field. To obtain first-hand information on the assignment and local conditions, Consultants are encouraged to visit the Client site before submitting a proposal and to attend a pre-proposal conference if one is specified in the Data Sheet. Attending the pre-proposal conference is optional. 1.3 Consultants shall bear all costs associated with the preparation and submission of their proposals and contract negotiation. The Client is not bound to accept any proposal, and reserves the right to annul the selection process at any time prior to Contract award, without thereby incurring any liability to the Consultants. Eligibility 1.4 Only professional services meeting the eligibility criteria under section 1.13 of data sheet will be considered for evaluation Only One Proposal 1.5 Consultants may only submit one proposal. If a Consultant submits or participates in more than one proposal, such proposals shall be disqualified. Proposal Validity 1.6 The Data Sheet indicates how long Consultants’ Proposals must remain valid after the submission date. During this period, Consultants shall maintain the availability of Professional staff nominated in the Proposal. The Client will make its best effort to complete negotiations within this period. Should the need arise, however, the Client may request Consultants to extend the validity period of their proposals. Consultants who agree to such extension shall confirm that they maintain the availability of the Professional staff nominated in the Proposal, or in their confirmation of extension of validity of the Proposal, Consultants could submit new staff in replacement, who would be considered in the final evaluation for contract award. Consultants who do not agree have the right to refuse to extend the validity of their Proposals. 4 Section 1: Instructions to Consultants 2. Clarification and Amendment of RFP Documents 2.1 Consultants may request a clarification of any of the RFP documents up to the number of days indicated in the Data Sheet before the proposal submission date. Any request for clarification must be sent in writing, or by standard electronic means to the Client’s address indicated in the Data Sheet. The Client will respond in writing, or by standard electronic means and will send written copies of the response (including an explanation of the query but without identifying the source of inquiry) to all Consultants. Should the Client deem it necessary to amend the RFP as a result of a clarification, it shall do so following the procedure under para. 2.2. 2.2 At any time before the submission of Proposals, the Client may amend the RFP by issuing an addendum in writing or by standard electronic means. The addendum shall be sent to all Consultants and will be binding on them. Consultants shall acknowledge receipt of all amendments. To give Consultants reasonable time in which to take an amendment into account in their Proposals the Client may, if the amendment is substantial, extend the deadline for the submission of Proposals. 3. Preparation of Proposals 3.1 The Proposal, as well as all related correspondence exchanged by the Consultants and the Client, shall be written in the language (s) specified in the Data Sheet. 3.2 In preparing their Proposal, Consultants are expected to examine in detail the documents comprising the RFP. Material deficiencies in providing the information requested may result in rejection of a Proposal. 3.3. While preparing the Technical Proposal, Consultants must give particular attention to the following: Language Documents to be issued by the Consultants as part of this assignment must be in the language(s) specified in the Data Sheet. Technical Proposal Format and Content (a) Full Technical Proposal: A brief description of the Consultants’ organization and an outline of recent experience of the Consultants on assignments of a similar nature is required (Ref: Section 3: Technical Proposal Template ). For each assignment, the outline should indicate the names of Sub-Consultants/ Professional staff who participated, duration of the assignment, contract amount, and Consultant’s involvement. Information should be provided only for those assignments for which the Consultant was legally contracted by the client as a corporation or as one of the major firms within a joint venture. Assignments completed by individual Professional staff working privately or through other consulting firms cannot be claimed as the experience of the Consultant, or that of the Consultant’s associates, but can be claimed by the Professional staff 5 Section 1: Instructions to Consultants themselves in their CVs. Consultants should be prepared to substantiate the claimed experience if so requested by the Client. b) Comments and suggestions on the Terms of Reference including workable suggestions that could improve the quality/ effectiveness of the assignment; and on requirements for counterpart staff and facilities including: administrative support, office space, local transportation, equipment, data, etc. to be provided by the Client (c) A description of the approach, methodology and work plan for performing the assignment covering the following subjects: technical approach and methodology, work plan, and organization and staffing schedule. (d) The list of the proposed Professional staff team by area of expertise, the position that would be assigned to each staff team member, and their tasks (Ref: Section 3: Technical Proposal Template ). (e) Estimates of the staff input needed to carry out the assignment (Ref: Section 3: Technical Proposal Template ). The staff-months input should be indicated separately for home office and field activities. (f) CVs of the Professional staff signed by the staff themselves or by the authorized representative of the Professional Staff (Ref: Section 3: Technical Proposal Template ). (g) A detailed description of the proposed methodology and staffing for training 3.4 The Technical Proposal shall not include any financial information. A Technical Proposal containing financial information may be declared non responsive. Financial Proposals 3.5 The Financial Proposal shall be prepared using the attached Standard Forms (Ref: Section 4: Financial Proposal Template). Taxes 3.6 The Consultant may be subject to taxes as may be applicable on amounts payable by the Client under the Contract.. 4. Submission, Receipt, and Opening of Proposals 4.1 The original proposal (Technical Proposal and Financial Proposal) shall contain no interlineations or overwriting, except as necessary to correct errors made by the Consultants themselves. The person who signed the proposal must initial such corrections. 4.2 The Technical Proposal shall be placed in a sealed envelope clearly marked “TECHNICAL PROPOSAL” Similarly, the Financial Proposal shall be placed in a sealed envelope clearly marked “FINANCIAL PROPOSAL” followed by the name of the assignment, 6 Section 1: Instructions to Consultants and with a warning “DO NOT OPEN WITH THE TECHNICAL PROPOSAL.” The envelopes containing the Technical and Financial Proposals shall be placed into an outer envelope and sealed. This outer envelope shall bear the submission address, reference number and assignment name and be clearly marked “DO NOT OPEN, EXCEPT IN PRESENCE OF THE OFFICIAL APPOINTED, BEFORE [insert the time and date of the submission deadline indicated in the Data Sheet]”. The Client shall not be responsible for misplacement, losing or premature opening if the outer envelope is not sealed and/or marked as stipulated. This circumstance may be case for Proposal rejection. If the Financial Proposal is not submitted in a separate sealed envelope duly marked as indicated above, this will constitute grounds for declaring the Proposal non-responsive. 4.3 The Proposals must be sent to the address/addresses indicated in the Data Sheet and received by the Client no later than the time and the date indicated in the Data Sheet, or any extension to this date in accordance with para. 2.2. Any proposal received by the Client after the deadline for submission shall be returned unopened. 4.4 The Client shall open the Technical Proposal immediately after the deadline for their submission. The envelopes with the Financial Proposal shall remain sealed and securely stored. 5. Proposal Evaluation 5.1 From the time the Proposals are opened to the time the Contract is awarded, the Consultants should not contact the Client on any matter related to its Technical and/or Financial Proposal. Any effort by Consultants to influence the Client in the examination, evaluation, ranking of Proposals, and recommendation for award of Contract may result in the rejection of the Consultants’ Proposal. Evaluators of Technical Proposals shall have no access to the Financial Proposals until the technical evaluation is concluded and the Client issues its “no objection”. 5.2 The client shall evaluate the Technical Proposals on the basis of Evaluation of their responsiveness to the Terms of Reference, applying the Technical Proposals evaluation criteria, sub-criteria, and point system specified in the Data Sheet. Each responsive Proposal will be given a technical score (St). A Proposal shall be rejected at this stage if it does not respond to important aspects of the RFP, and particularly the Terms of Reference or if it fails to achieve the minimum technical score indicated in the Data Sheet. Public Opening and Evaluation of Financial Proposals 5.3 The evaluation criteria will be QCBS; Only the bidders whose technical score is more than 70 out of 100 will be eligible and qualify for the QCBS evaluation. Under QCBS, the lowest 7 Section 1: Instructions to Consultants (For QCBS) evaluated Financial Proposal (Fm) will be given the maximum financial score (Sf) of 100 points. The financial scores (Sf) of the other Financial Proposals will be computed as indicated in the Data Sheet. Proposals will be ranked according to their combined technical (St) and financial (Sf) scores using the weights (T = the weight given to the Technical Proposal; P = the weight given to the Financial Proposal; T + P = 1) indicated in the Data Sheet: S = St x T% + Sf x P%. The firm achieving the highest combined technical and financial score will be invited for negotiations. 5.4 After the technical evaluation is completed, the Client shall inform the Consultants who have submitted proposals the technical scores obtained by their Technical Proposals, and shall notify those Consultants whose Proposals did not meet the minimum qualifying mark or were considered non responsive to the RFP and TOR, that their Financial Proposals will be returned unopened after completing the selection process. The Client shall simultaneously notify in writing Consultants that have secured the minimum qualifying mark, the date, time and location for opening the Financial Proposals. The opening date will allow Consultants sufficient time to make arrangements for attending the opening. Consultants’ attendance at the opening of Financial Proposals is optional. 5.5 Financial Proposals shall be opened publicly in the presence of the Consultants’ representatives who choose to attend. The name of the Consultants, and the technical scores of the Consultants shall be read aloud. The Financial Proposal of the Consultants who met the minimum qualifying mark will then be inspected to confirm that they have remained sealed and unopened. These Financial Proposals shall be then opened, and the total prices read aloud and recorded. Copy of the record shall be sent to all Consultants 5.6 The Client will correct any computational errors. When correcting computational errors, in case of discrepancy between a partial amount and the total amount, or between word and figures the formers will prevail. 6. Negotiations 6.1 Negotiations will be held at the date and address indicated in the Data Sheet. The invited Consultant will, as a pre-requisite for attendance at the negotiations, confirm availability of all Professional staff. Failure in satisfying such requirements may result in the Client proceeding to negotiate with the next-ranked Consultant. Representatives conducting negotiations on behalf of the Consultant must have written authority to negotiate and conclude a Contract. Technical 6.2 Negotiations will include a discussion of the Technical Proposal, 8 Section 1: Instructions to Consultants negotiations the proposed technical approach and methodology, work plan, and organization and staffing, and any suggestions made by the Consultant to improve the Terms of Reference. The Client and the Consultants will finalize the Terms of Reference, staffing schedule, work schedule, logistics, and reporting. These documents will then be incorporated in the Contract as “Description of Services”. Special attention will be paid to clearly defining the inputs and facilities required from the Client to ensure satisfactory implementation of the assignment. The Client shall prepare minutes of negotiations which will be signed by the Client and the Consultant. Financial negotiations 6.3 Unless there are exceptional reasons, the financial negotiations will not involve the price quoted in the Financial Proposal. Availability of Professional staff/experts 6.4 Having selected the Consultant on the basis of, among other things, an evaluation of proposed Professional staff, the Client expects to negotiate a Contract on the basis of the Professional staff named in the Proposal. Before contract negotiations, the Client will require assurances that the Professional staff will be actually available. The Client will not consider substitutions during contract negotiations unless both parties agree that undue delay in the selection process makes such substitution unavoidable or for reasons such as death or medical incapacity. If this is not the case and if it is established that Professional staff were offered in the proposal without confirming their availability, the Consultant may be disqualified. Any proposed substitute shall have equivalent or better qualifications and experience than the original candidate and be submitted by the Consultant within the period of time specified in the letter of invitation to negotiate. Conclusion of the negotiations 6.5 Negotiations will conclude with a review of the draft Contract. To complete negotiations the Client and the Consultant will initial the agreed Contract. If negotiations fail, the Client will invite the Consultant whose Proposal received the second highest score to negotiate a Contract. 7. Award of Contract 7.1 After completing negotiations the Client shall award the Contract to the selected Consultant, publish on its website on line and promptly notify all Consultants who have submitted proposals. After Contract signature, the Client shall return the unopened Financial Proposals to the unsuccessful Consultants. 7.2 The Consultant is expected to commence the assignment on the date and at the location specified in the Data Sheet. 8. Confidentiality 8.1 Information relating to evaluation of Proposals and recommendations concerning awards shall not be disclosed to the Consultants who submitted the Proposals or to other persons not officially concerned with the process, until the publication of the 9 Section 1: Instructions to Consultants award of Contract. The undue use by any Consultant of confidential information related to the process may result in the rejection of its Proposal and may be subject to the provisions of the client’s antifraud and corruption policy. 10 Section 1: Instructions to Consultants 1. Instructions to Consultants – Data Sheet Paragraph Reference 1.1 Name of the Client: Manipur State Power Distribution Company Limited Method of selection: Quality and Cost Based Selection (QCBS) 1.2 Financial Proposal to be submitted together with Technical Proposal: Yes The name of the assignment is: Detailed Design & Implementation of Institutional Strengthening and Capacity building at MSPDCL 1.3 A pre-proposal conference will be held: No 1.4 Proposals must remain valid for 90 days after the submission date, i.e. until: 1.5 Clarifications may be requested not later than 7 days before the submission date. The address for requesting clarifications is: MSPDCL, Electricity Complex Khawi Bazaar, Keishampat District Imphal West Manipur - 795001 1.6 Proposals shall be submitted in English language. 1.7 Whether consortium or any form of association is permitted for the purpose of bidding for this assignment: No 1.8 Training is a specific component of this assignment: Yes 1.9 The price included in Financial proposal will include the below mentioned aspects as well: (1) Cost of accommodation of consultant team, necessary travel, including transportation of the Personnel by the most appropriate means of transport and the most direct practicable route; (2) Cost of office accommodation, investigations and surveys; (3) Cost of applicable international or local communications such as the use of telephone and facsimile required for the purpose of the Services; (4) Cost, rental and freight of any instruments or equipment required to be 11 Section 1: Instructions to Consultants provided by the Consultants for the purposes of the Services; (5) Cost of printing and dispatching of the reports to be produced for the Services; (6) Cost of such further items required for purposes of the Services not covered in the foregoing. Other than the price accepted as part of the Financial proposal of the selected Consultant, the client will not bear any additional expenses such as out of pocket expenses etc. 1.10 Amounts payable by the Client to the Consultant under the contract to be subject to Tax: Yes. Taxes applicable as per prevailing statutes 1.11 Consultant must submit one copy of Technical Proposal, and one copy of the Financial proposal 1.12 The Proposal submission address is: GM (Purchase) MSPDCL, Electricity Complex, Khawi Bazaar, Keishampat, District Imphal West, Manipur – 795001 1.13 Criteria, sub-criteria, and point system for the evaluation of Full Technical Proposals are: Points (i) Specific experience of the Consultant (as a firm) relevant to the Assignment: 20 (ii) Adequacy and quality of the proposed methodology, and work plan in responding to the Terms of Reference (TORs): a) Approach and Methodology including work plan Total points for criterion (i & ii) : 30 50 (iii) Key Experts’ qualifications and competence for the Assignment: a. Project Manager b. Sector Strategy Advisor c. Distribution Expert (Process Re-engineering) 12 10 10 10 Section 1: Instructions to Consultants d. Organizational Restructuring & Manpower Planning Expert e. Institutional Framework Expert Total points for criterion (iii): 10 10 50 The number of points to be assigned to each of the above positions or disciplines shall be determined considering the following three sub-criteria and relevant percentage weights: For (a): Project Manager Sub Criteria Guidelines of scoring / Max Score% evaluation out of 10 Educational Qualification Minimum: Industrial Engineer with post-graduation in HR 20 from premier institutes Total Institutional Strengthening & Capacity building experience in Power Sector > 20 years with at least 10 years industry experience in the Power sector in India with specific industry experience in the power Distribution 50 sector. Experience in working with communitisation/ Panchayat Raj Institutions is essential. Consulting experience with North – east India essential Out of total experience, at least 8 years’ consulting experience in Institutional Strengthening & Capacity 30 Building for State Power Distribution Corporations / Govt. agencies/ PSUs etc. For (b): Sector Strategy Advisor Sub Criteria Guidelines of scoring / evaluation Minimum: Post Graduate Educational Qualification Total Power Sector Consulting Experience > 20 years with at experience in leading multi-year power sector reforms / institutional strengthening assignments in atleast 5 states. Experience in social sector/ community projects with specific reference to power sector reforms is essential. Max Score% out of 10 20 80 For (c): Distribution Expert (Process Re-engineering) Sub Criteria Guidelines of scoring / Max Score% evaluation out of 10 Educational Minimum: Engineering graduate Qualification from premium institutes with 20 Masters / Post Graduation in 13 Section 1: Instructions to Consultants Business Management Total experience in Strategy / Business process reengineering in Power sector > 10 years. Working experience in strategy / Business process aspects of Institutional Strengthening and Capacity building for State electricity corporations/ state distribution corporations in India. Consulting experience with North – east India preferred 50 30 For (d): Organizational Restructuring & Manpower Planning Expert Sub Criteria Guidelines of scoring / Max Score% evaluation out of 10 Educational Minimum: Industrial Engineer Qualification with Post Graduation in 30 Personnel Management / HR Total experience in Organizational Restructuring and Manpower Planning > 20 years with at least 10 years consulting experience in the Power sector in India. 70 Consulting experience with the Distribution sector is essential. Consulting experience with North – east India essential For (e): Institutional Framework Expert Sub Criteria Guidelines of scoring / Max Score% evaluation out of 10 Educational Minimum: Chartered 30 Qualification Accountant/ MBA in Finance Total experience in the Power Sector >15 years with atleast 10 years of experience in areas of Process Re-engineering, 70 ERP and MIS. The expert resources mentioned above are required to spend atleast 50% of their time in the Field owing to the implementation nature of the assignment. Total points for the three criteria: 100 The technical score (St) shall be out of a total of 100. A minimum score of 70 is required to qualify. 1.14 The formula for determining the financial scores is the following : Sf = 100 x Fm / F, in which Sf is the financial score, Fm is the lowest price, and F the price of the proposal under consideration. The weights given to the Technical (T) and Financial (P) Proposals are: T = 0.80 and P = 0.20 14 Section 1: Instructions to Consultants 1.15 Expected date and address for contract negotiations: Date: 25th April 2015 Address: GM (Purchase), MSPDCL, Electricity Complex, Khawi Bazaar, Keishampat, District Imphal West, Manipur – 795001 1.16 Expected date for the commencement of the Services: Date: 30th April 2015 at Manipur, India 15 Section 2: Scope of work Section 2. Scope of W or k 1. Context of the Power Sector in Manipur The Power Sector in Manipur is unique owing to the following factors: • • Demographic, ethnic profile and the role of Manipur in the overall development of the NER Re-structuring & transformation of the Power Sector in the State The discussions on the above factors are provided subsequently. 2. Demographics and ethnic profile of Manipur The State of Manipur is comprised of five hill districts and four valley districts occupying a total geographical area of 22,327sq.km. Over 80% of the State is characterized by hilly terrain & sparse habitation (remote villages / hamlets with as little as 30 to 40 households) and thereby provide significant challenges in operations for a power utility. The state has a population of 21,66,791 grouped into tribal communities. Characterized by tribes and ethnic communities, the role of the Power Sector in the overall community development in the State is critical. A transformation of the community perception towards the power utility through effective engagement is as critical as the transformation of the utility itself. Manipur borders Myanmar in the east, Nagaland state in the north, Assam and Mizoram in the west. With its geographic positioning and with the support from the government on the development of the agricultural and horticultural industries, Manipur is gradually emerging as the gateway for external trade in the region. While lack of investments and insurgency issues have deterred growth in the past, measures are being undertaken to facilitate the development in the state and thereby development of trade in the region. In this context, structured reforms and development of the power sector in the state forms a critical strategic component not just for the development of Manipur but the overall development of the North Eastern Region. 16 Section 2: Scope of work It is important to note that districts / regions within Manipur differ from each other in various aspects. Hence it is critical that considerable time / effort is spent in understanding the current dynamics. It is expected that significant time has to be spent in the field during this assignment to achieve the same. Realising the potential of the region and role of power sector in the development, the state government has taken many restructuring & reformative initiatives with the primary objective to improve the power situation in the state. The key reform initiative was the unbundling of the Electricity Department of Manipur (EDM) into two successor corporate entities: • • Manipur State Power Distribution Company Limited (MSPDCL) – Controls the functions of distribution and retail supply licensee within the state of Manipur; Manipur State Power Company Limited (MSPCL) – Controls the functions of state owned generation and transmission licensee for Manipur as a State Transmission Utility. As part of the unbundling, MSPDCL was tasked with providing reliable power supply, effective revenue realization, and satisfactory consumer service delivery in the Manipur. MSPDCL is at a cusp of transformation and has recently taken many initiatives for its development and intends to take up the detailed design and implementation of Institutional Strengthening and Capacity building as under: The institutional strengthening and the capacity building exercise proposed for MSPDCL needs to take in the context the unique demographic and ethnic profile of the state and should be facilitative to the overall transformation of the sector. Summarising the key observations from the context in Manipur, the design and implementation of Institutional strengthening and Capacity Building exercise should focus on the following: • • • Articulation of the strategy / policy for Power Sector: The Institutional Reforms and the Capacity Building exercise for MSPDCL needs to review and clearly articulate the power sector strategy / policy aligned not just to the development of the state but to the development of the region. This needs to be in the context of the national power sector policy and long term power sector development plans for the region. Streamlining of Commercial & Projects related business processes and institutionalisation of performance review mechanisms: With recent unbundling and transformation proposed on various fronts, the utility has processes at various levels of maturity. The Institutional Reforms and the Capacity Building exercise should focus on streamlining the various core processes in the utility. The review of the execution of the processes is also extremely critical during the transformational stage and therefore establishing a business review framework to monitor implementation is an extremely critical focus area. Capacity building of utility human resources: The implementation of any reform initiative lies with the human resources in the organization. The Institutional Reforms and the Capacity Building exercise should therefore also focus on the key enablers like the utilities’ structure, manpower, competencies and the HR processes of performance management & career growth. 17 Section 2: Scope of work • Focus on Communitisation: The development of the electricity sector in Manipur cannot be successful without the community’s involvement in sharing the responsibility for the development, operations and maintenance of the assets of the utilities. Inclusive development of the communities is hinged in many ways on sustained and reliable power supply. Building a sense of co-ownership is critical in Manipur. The Institutional Reforms and the Capacity Building exercise should provide for effective engagement and development of the communities / ethnic groups of Manipur. 3. Scope of Work The scope of work focuses on detailed design and implementation of following Institutional Strengthening and Capacity building aspects keeping the context of the demographic and ethnic context of Manipur in mind: 3.1 Strategy / Policy Articulation 1. Define the objectives, guidelines and framework in guiding the state’s power policy contextual to state’s unique demographic, ethnic and power sector requirements and also aligned with the mandate of the Electricity Act, 2003 and market best practices. 2. Conduct a Vision / Mission workshop at MSPDCL’s HQ with all MSPDCL’s key Engineers, stakeholders of the state government and community representation, etc. to set direction for Manipur power distribution over the next five years. 3. Provide a strategic business plan for the distribution utility keeping in mind the existing business performance, the constraints related to unbundling, and potential opportunities. 3.2 Business Processes 1. Detailed As-Is Analysis of key business processes related to Commercial and Projects. 2. Benchmarking the processes with high performing utilities across India with a special focus on utilities in the North east India and other parts of the country wherein models of community involvement have been explored/ implemented. 3. Streamlining of the business processes and design of to-be processes at various levels in the organisation integrating communitisation where relevant. 4. Recommendation on core and non-core processes. Suggestion on outsourcing of noncore activities in line with the process study. Suggestions on activities that can be owned/ co-owned through communitisation initiatives. 5. Implementation / handholding support on re-designed to-be processes to MSPDCL’s employees over a period of 1 year 6. The handholding support to not be limited to field offices in the valley. The same to be inclusive and cover Division offices in the Hills as well. 18 Section 2: Scope of work 3.3 Business Performance Review Mechanism MSPDCL is in the process of establishing a business and technical performance review framework / information flow mechanisms. It intends to take it forward and institutionalize it in form of a defined system. Thus the consultant is expected to handhold MSPDCL’s management / employees in the following: 1. In line with proposed power sector strategy / to-be business processes, design Organizational Level KRA/KPIs for the power distribution company. 2. Cascade organizational performance measures to the departmental level (process alignment) for all departments / divisions / site offices. Establish a performance data capture mechanism. This will also include a system for registering grievances of customers, communities and other stakeholders with regard to infrastructure and power supply. Implement MIS mechanisms for smooth flow of information from the consumer and the field to the functional heads to the Managing Director. Create necessary dashboards for the same to capture technical and operational measures. 3. Suggest suitable IT intervention to enhance better monitoring & control and reduce the overall turnaround time of the organization. 4. Implement review frameworks for the Projects, O&M and Commercial functions. Establish schedule of meetings, agendas etc for performance monitoring and review and redressal of grievances. 5. Participate / facilitate / Handhold business review meetings at the head office and field offices on above aspects for a period of 1 year after design of to-be processes The above will require an understanding of communitisation specifically in the socio-ethnic context of Manipur. Understanding of institutional strengthening linkages such as strategy to processes to business review and organization setup is a critical aspect and hence the consultant is expected to deploy suitable resources with experience in Industrial Engineering and HR to lead the Institutional strengthening exercise at MSPDCL. (Refer section 5.2a) 3.4 Organization Structure and Job Description 1. Provide recommendations / changes to organization structure in line with To-be business processes. 2. Benchmarking organization structure with relevant utilities specific to changes required. 3. Implementation of Organizational Structure including detailed Job description for each process owner. Detail roles and responsibilities in the context of communitisation. Detail roles within the utility in relation with the roles shared by the community. 4. Various Structural models to be explored keeping in mind Demography, Geography and communitisation models. 19 Section 2: Scope of work 3.5 Manpower, Cadres & Grades 1. As-Is manpower status Corporate/Circle/Division/Sub Division/Section Office wise & depletion on retirements 2. Conduct detailed manpower mapping with techno commercial analysis & current business processes 3. In line with proposed process changes including O&M & suitable benchmarking considering demography/geography/outsourcing/ communitisation define to-be manpower requirement for MSPDCL 4. Corporate manpower to be defined as per market practices/proposed structure 5. Provide a manpower plan for 5-10 years building in a maturity model for the utility. 6. Handhold HR department of MSPDCL in rolling out the Manpower plan including the re-deployment of surplus manpower if any 7. Provide strategies for managing concerns of contract employees / Muster Rolls / Work Charges and community engagement. 3.6 Training & Skill development This is a key focus area for MSPDCL and would require rigorous on field support. 1. Design and develop a Competency Framework with a specific focus on: • Project Management • Operations and Maintenance • Commercial orientation • Customer Service Delivery • Technology/IT 2. The competency framework to be aligned to the on the ground realities of MSPDCL. The same should be defined for both executive and non-executive staff. Certain specific competencies related to Community involvement in O&M, Commercial, Projects aspects to be defined. 3. In line with the defined competency framework, conduct a skill gap analysis for MSPDCL. The same to be aligned to the to-be business processes as well. 4. Design and implement a training and skill development plan across MSPDCL, both corporate and field offices. The consultant to support in designing the training setup at MSPDCL and handhold the training department in conduct / facilitation of trainings for executives / non-executives at MSPDCL. Design and develop a training and skill development plan for community involvement. The consultant will help design the training setup for the communitisation initiatives. 20 Section 2: Scope of work The facilitation of designed training delivery and skill development programs to continue for a period of 18 months i.e. till six months after the envisaged duration of the assignment. 3.7 Recruitment 1. Implementation / handholding support to recruitment in line with skill requirements defined earlier 3.8 Performance Management & Rewards 1. Design detailed Individual PMS framework based on both objective KRA/KPIs & competencies 2. The Individual PMS to be aligned to business review framework of MSPDCL 3. Design forms / formats for all levels / roles 4. The consultant to provide handholding support during the first performance cycle. 3.9 Career and Succession Planning 1. Implement policies for faster career growth / progression in line with re-defined PMS. Include impact of Transfer /posting linked to career management. Conduct benchmarking study to identify best practices and provide recommendations on building second line leadership at MSPDCL. Initiate the succession planning / grooming of the next line leaders as part of the six months skill development exercise. 21 Section 2: Scope of work 4. Deliverable Milestones & Payment Schedule Deliverable Description Timeline Payment as % of Total Within 3 months of issue of work order 20% Within 6 months of issue of work order 20% Within 9 months of issue of work order 20% Within 12 months of issue of work order 20% Between months 7 and 18 after issue of work order 20% On Submission of Interim Report I (Covering deliverables on Strategy / Policy Articulation and Business Processes) On Submission of Interim Report II (Covering deliverables on Business Performance Review Mechanism, Organizational Structure & Job Descriptions, Manpower Cadres & Grades) On Submission of Interim Report III (Covering deliverables on Training & Development, Recruitment, Performance Management & Rewards and Career & Succession Planning) Submission and approval of final report Implementation Support Handhold business review meetings and facilitate delivery of training programs 22 Section 3: Technical Proposal Template Section 3. T echnical Pr oposal T emplate Technical Proposal Submission Form Location, Date To: GM (Purchase) MSPDCL, Electricity Complex, Khawi Bazaar, Keishampat, District Imphal West, Manipur – 795001 Dear Sir: We, the undersigned, offer to provide the consulting services for “DETAILED DESIGN & IMPLEMENTATION OF INSTITUTIONAL STRENGTHENING AND CAPACITY BUILDING AT MSPDCL” in accordance with your Request for Proposals dated _____ and our Proposal. “We are hereby submitting our Proposal, which includes this Technical Proposal and a Financial Proposal sealed in a separate envelope”. We hereby declare that: (a) All the information and statements made in this Proposal are true and we accept that any misinterpretation or misrepresentation contained in this Proposal may lead to our disqualification. (b) Our Proposal shall be valid and remain binding upon us for the period of time specified in the Data Sheet. (c) We have no conflict of interest. (d) Our Proposal is binding upon us and subject to any modifications resulting from the Contract negotiations. We understand that MSPDCL is not bound to accept any or all the Proposal that it receives. Yours sincerely, Name and Title of Signatory: Name of Consultant: In the capacity of: Address: Tel: Email: 23 Section 3: Technical Proposal Template Consultant’s Experience Assignment name: Approx. value of the contract (in INR): Country: Location within country: Duration of assignment (months): Name of Client: Total No of staff-months of the assignment: Address: Approx. value of the services provided by your firm under the contract (in INR): Start date (month/year): Completion date (month/year): No of professional staff-months provided by associated Consultants: Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader): Narrative description of Project: Description of actual services provided by your staff within the assignment: Attach a copy of Work Order / Completion Certification as a proof 24 Section 3: Technical Proposal Template Approach and Methodology a) Technical Approach and Methodology, b) Work Plan, and c) Organization and Staffing, a) Technical Approach and Methodology. In this chapter you should explain your understanding of the objectives of the assignment, approach to the services, methodology for carrying out the activities and obtaining the expected output, and the degree of detail of such output. You should highlight the problems being addressed and their importance, and explain the technical approach you would adopt to address them. You should also explain the methodologies you propose to adopt and highlight the compatibility of those methodologies with the proposed approach. b) Work Plan. In this chapter you should propose the main activities of the assignment, their content and duration, phasing and interrelations, milestones (including interim approvals by the Client), and delivery dates of the reports. The proposed work plan should be consistent with the technical approach and methodology, showing understanding of the TOR and ability to translate them into a feasible working plan. A list of the final documents, including reports, drawings, and tables to be delivered as final output, should be included here. The work plan should be consistent with the Work Schedule of Form TECH-8. c) Organization and Staffing. In this chapter you should propose the structure and composition of your team. You should list the main disciplines of the assignment, the key expert responsible, and proposed technical and support staff.] Team Composition and Task Assignments Professional Staff Name of Staff Firm Area of Expertise 25 Position Assigned Task Assigned Section 3: Technical Proposal Template Curriculum Vitae (CV) for Proposed Professional Staff 1. Proposed Position [only one candidate shall be nominated for each position]: 2. Name of Firm [Insert name of firm proposing the staff]: 3. Name of Staff [Insert full name]: 4. Date of Birth: Nationality: 5. Education [Indicate college/university and other specialized education of staff member, giving names of institutions, degrees obtained, and dates of obtainment]: 6. Membership of Professional Associations: 7. Other Training [Indicate significant training since degrees under 5 - Education were obtained]: 8. Countries of Work Experience: [List countries where staff has worked in the last ten years]: 9. Languages [For each language indicate proficiency: good, fair, or poor in speaking, reading, and writing]: 10. Employment Record [Starting with present position, list in reverse order every employment held by staff member since graduation, giving for each employment (see format here below): dates of employment, name of employing organization, positions held.]: From [Year]: To [Year]: Employer: Positions held: 11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned [Among the assignments in which the staff has been involved, indicate the following information for those assignments that best illustrate staff capability to handle the tasks listed under point 11.] [List all tasks to be performed Name of assignment or project: Year: 26 Section 3: Technical Proposal Template under this assignment] Location: Client: Main project features: Positions held: Activities performed: 13. Certification: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged. 27 Section 3: Technical Proposal Template Staffing Schedule No Name of Staff Staff input (in the form of a bar chart)2 1 2 3 4 5 Total staff-month input 6 7 8 9 10 11 12 n Home Field3 Total Foreign [Home] [Field] 1 2 n Subtotal Local [Home] [Field] 1 2 n Subtotal Total 1 2 3 For Professional Staff the input should be indicated individually; for Support Staff it should be indicated by category (e.g.: draftsmen, clerical staff, etc.). Months are counted from the start of the assignment. For each staff indicate separately staff input for home and field work. Field work means work carried out at a place other than the Consultant's home office. Full time input Part time input 28 Section 3: Technical Proposal Template Work Schedule 2 No Months 1 Activity 1 2 3 4 5 6 7 8 9 10 11 12 n 1 2 3 4 5 n 1 2 Indicate all main activities of the assignment, including delivery of reports (e.g.: inception, interim, and final reports), and other benchmarks such as Client approvals. For phased assignments indicate activities, delivery of reports, and benchmarks separately for each phase. Duration of activities shall be indicated in the form of a bar chart. 29 Section 4: Financial Section 4: F inancial Pr oposal T emplate Financial Proposal Submission Form Location, Date To: GM (Purchase) MSPDCL, Electricity Complex, Khawi Bazaar, Keishampat, District Imphal West, Manipur – 795001 Dear Sir: We, the undersigned, offer to provide the consulting services for “DETAILED DESIGN & IMPLEMENTATION OF INSTITUTIONAL STRENGTHENING AND CAPACITY BUILDING AT MSPDCL” in accordance with your Request for Proposals dated _____ and our Proposal. Our attached Financial Proposal is for the amount of Rs. _______/- (Rupees _________), inclusive of all taxes as applicable Our Financial Proposal shall be binding upon us subject to the modifications resulting from Contract negotiations, up to expiration of the validity period of the Proposal, i.e. before the date indicated in the Data Sheet. We understand you are not bound to accept any Proposal you receive. We remain, Yours sincerely, Name and Title of Signatory: Name of Consultant: In the capacity of: Address: Tel: Email: 30 Section 4: Financial Financial Bid Provide your total quote / financial bid in the format below COST (In Indian Rupees – INR) Head Total Price inclusive all expenses as per Data sheet Taxes applicable TOTAL (inclusive of tax) 31
© Copyright 2024