CONSTRUCTION NOTICE Muskrat Falls Project – Grounding Station at Dowden’s Point, CBS Dowden’s Point Grounding Station Lance Cove Pond La re n su t i o o c Cl t r u ay n s w l o ai c R g T’ r in du nc eC ov eR S eal Co v e Po n d Cem ete ry R d y S l ea v Co eR d y Hw Rd Se al Co ve n Ba s Access from Dowden's Point via Cemetery Road Rd Driving Route eptio ar Conc Le d Access to Dowden’s Point from Lears Rd Important Information for Residents As part of the Muskrat Falls Project an electrode, or grounding station, will be constructed at Dowden’s Point. Construction will start at Dowden’s Point in early April 2015. HJ O’Connell Construction Ltd. is the contractor for this work. When construction begins, residents of will see increased traffic and heavy equipment as stone, materials and equipment are trucked to the site. Traffic is expected to be heaviest in May and June, when the bulk of materials will be transported. Construction will take place Monday to Friday, 7 a.m. to 7 p.m., and is expected to take six months to complete. At Nalcor Energy, safety is our number one priority. We are taking a number of steps to ensure work is carried out safely in your community, and encourage residents to use caution during construction: • Access to the construction site will be restricted during construction. • Signage will be clearly posted to mark speed limits and other safety precautions. • A project representative will be on site at all times to ensure our commitment to safety is being met. • Public notices will be issued as required to advise the public about construction activities in the area. • Be cautious of equipment and trucks, particularly when entering or exiting your driveway, approaching intersections, and walking or cycling in the area. • For the safety of the public, the T’Railway at Dowden’s Point will be closed during construction. Trail users are asked to detour the site using an alternate route, as indicated on trail signage. For more information or to speak to a project team member, please contact us at: 1-888-576-5454 or [email protected] muskratfalls.nalcorenergy.com
© Copyright 2024