CORPS ON THE COAST North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, 2015 Jim Medlock Chief, Programs Management Branch US Army Corps of Engineers BUILDING STRONG® OVERVIEW What Are The Corps Responsibilities/Missions? Coastal Activities/Challenges: Navigation Coastal Storm Damage Reduction Ecosystem Restoration Regulatory Takeaways Port of Wilmington, Eagle Island in background 2 BUILDING STRONG® CORPS OF ENGINEERS RESPONSIBILITIES/MISSIONS • Defend Nation by Enhancing our Military and Economic Capabilities • Wilmington District operates in North Carolina and southern Virginia • Civil Works Program (many activities are cost shared) includes: Conduct of Studies Construction Operation and Maintenance •Civil Works Missions include: Navigation Flood Risk Management incl. Coastal Storm Damage Reduction Ecosystem Restoration Recreation/Hydropower/Water Supply/Environmental Regulatory Permit Program Readiness Contingency Operations/Emergency Management 3 BUILDING STRONG® NAVIGATION PROJECTS in NC Roanoke VA Manteo (Shallowbag) Bay {Oregon Inlet} NC Greensboro Manteo Asheville Washington Raleigh Charlotte Fayetteville Morehead City Morehead City Harbor William O. Huske Lock and Dam 2 Lock and Dam 1 Wilmington Bogue Inlet New River Inlet New Topsail Inlet Masonboro Inlet Carolina Beach Inlet Lockwoods Folly River Inlet Wilmington Harbor 4 BUILDING STRONG® End of Federal Harbor Project (30.8 mi. from mouth) Hilton RR Bridge Wilmington, NC WILMINGTON HARBOR, NC VA. N.C. Cape Fear Memorial Bridge N Raleigh State Port N.C. S.C. Wilmington ANCHORAGE BASIN . O&M for Dredging Contracts & associated costs FY2015 FY 2015 FY 2016 ALLOCATION BUDGET BUDGET (incl. Work Plan) Brunswick Co. $14,127,000 MOTSU (Sunny Point) Mouth of Cape Fear River N Cape Fear River $13,986,000 $15,019,000 -Study finishing w/Battery Island Turn & Channel Entrance Realignment via O&M - Further Studies BATTERY ISLAND TURN CHANNEL ENTRANCE 5 BUILDING STRONG® Morehead City Harbor, NC O&M for Dredging Contracts & associated costs 6 FY 2015 BUDGET FY2015 ALLOCATION (incl. Work Plan) FY 2016 BUDGET $4,855,000 $8,906,000 $8,796,000 BUILDING STRONG® Manteo (Shallowbag) Bay, NC O&M for Hydrographic Surveys & minimal Dredging by Gov’t Plant & associated costs FY 2015 BUDGET FY2015 ALLOCATION (incl. Work Plan) FY 2016 BUDGET $800,000 $1,992,000 $2,000,000 7 BUILDING STRONG® Rollinson Channel and Alternate Ferry Route Silver Lake Harbor FY 2015 BUDGET FY2015 ALLOCATION (incl. Work Plan) FY 2016 BUDGET ROLLINSON CHANNEL inc. Hatteras Ferry Channel $550,000 $545,000 $300,000 SILVER LAKE HARBOR, NC $300,000 $297,000 $300,000 8 BUILDING STRONG® Coastal Storm Damage Reduction in NC Roanoke Dare County Beaches / Bodie Island VA NC Manteo Greensboro Raleigh Asheville Charlotte Morehead City Bogue Banks N. Topsail, Surf City Topsail Beach Wilmington Wrightsville Beach Ocean Isle Beach Oak Island, Caswell, and Holden Beaches 9 Carolina Beach Kure Beach BUILDING STRONG® West Onslow (Topsail Beach) and Surf City / North Topsail Beach, NC Project Location Need Construction New Start Appropriations; Sunset to Authorizations? 10 BUILDING STRONG® Carolina Beach and Vicinity, NC - Nourishment contract late summer 2015 - Still awaiting WRRDA implementation guidance on 15 year extension analysis 11 BUILDING STRONG® Ecosystem Restoration in NC MANTEO SEC. 204 - Creation of 15 Acres Oyster Habitat near Old House Channel MANTEO (SHALLOWBAG) BAY - Creation of 42 acres of oyster habitat for mitigation for prior dredging of Wanchese Harbor 12 BUILDING STRONG® Regulatory – Terminal Groins, NC • • In 2011, the North Carolina General Assembly lifted a 25-year ban on the construction of terminal groins (TG) along the coast of North Carolina. The Corps has or is reviewing 4 TG proposals including Bald Head Island, Figure Eight Island, Ocean Isle Beach and Holden Beach. 13 BUILDING STRONG® Regulatory - Shallow Draft Inlets, NC • State/local governments anticipated to request permits to perform maintenance dredging in Federal channels including: Bogue Inlet, • Carolina Beach Inlet • Lockwoods Folly River • New River Inlet • New Topsail Inlet and • Shallotte Inlet • Carolina Beach Inlet 14 BUILDING STRONG® Regulatory – Coastal Nourishment Projects, NC • Permits being requested for numerous coastal nourishment projects are being undertaken and funded by municipalities. • Recent projects include: • Topsail Beach • North Topsail Beach • Oak Island • Town Of Nags Head (completed) • Duck, Kitty Hawk and Kill Devil Hills 15 Topsail Beach BUILDING STRONG® Takeaways • Active civil works program on the coast of North Carolina • Federal funding to meet all challenges not certain • New strategies for moving forward: • Contributed funds • Sponsors taking action in era of Federal fiscal constraints 16 BUILDING STRONG® 17 BUILDING STRONG®
© Copyright 2024