Replies to Queries raised during Pre-Bid meeting on 21.02.2015 for Procurement of 215MW Solar Power S. N. 1 2 3 Queries/Suggestions Received 1. Multiple financial bid for multiple projects: Although UPNEDA has allowed to go for two locations in case the proposed capacity is more than 20 MW, we request UPNEDA to allow the bidder to submit multiple financial bids for multiple projects proposed at same locations/different locations. Under this mechanism, the projects will be separated by different switching stations & boundaries so that each project will be treated as individual project for the offered capacity and accordingly, separate PPA for effecting separate Tariff would be signed for each project for the development of project. Query Raised by Clarification/Amendment 1. ACME Solar Energy a. Amended Pvt. Ltd. 2. Technical Associates Ltd. PPA Addition of 18 months (for the project capacity above 25 1. Welspun Amended MW) should be made under clause 13.1.1 (i), in page no 42. Renewables Energy Pvt. Ltd. We would also request you to include the provision of 1. ACME Solar Energy pooling so that the energy generated by multiple projects set Pvt. Ltd. Pooling substations not envisaged in up at same location can be pooled at Interconnection point compliance with Grant of Connectivity Act by setting up Pooling Substation. This is in line with the CERC 2. Green Power 2012. (Terms and Conditions for Tariff determination from International Pvt. Ltd Renewable Energy Sources) Regulations, 2012 dated 06.02.2012. The relevant extract of the said Regulation is reproduced as below: (xvi) (Inter-connection Point shall mean interface point of renewable energy generating facility with the transmission system or distribution system, as the case may be: i. in relation to wind energy projects and Solar Photovoltaic Projects, inter-connection point shall be line isolator on outgoing feeder on HV side of the 1 S. N. Queries/Suggestions Received Query Raised by pooling sub-station;$B!I(B Further, Hon$B!G(Bble CERC in the Statement of Reasons (SOR) dated 06.02.2012 for the said Regulations has clarified that the $B!H(BPooling Substation$B!I(B means the generator$B!G(Bs substation where pooling of generation from individual turbine is done for interface with receiving sub$B!>(Bstation. The relevant extract of the said SOR is reproduced as below; $B!H(B2.3.2 COMMISSION$B!G(BS DECISION The definition as suggested by the stakeholder is not appropriate and rather more confusing. The term $B!H(BPooling sub$B!>(Bstation$B!I(B is very commonly understood in the industry meaning a sub$B!>(Bstation developed by the developer /generator where pooling of generation from individual turbine is done for interface with receiving sub$B!>(Bstation.$B!I(B As per the above, the pooling concept is very commonly understood in the industry and multiple projects in the same location can be connected through pooling arrangement only. Hence, multiple projects in same locations have been allowed to construct pooling substation for power evacuation under Central Government JNNSM Scheme for allocation of solar projects. Further, various other State Governments such as Gujarat, Madhya Pradesh, Bihar etc. have also allowed multiple projects with different Tariff at same location under such arrangement. Clarification/Amendment In this regard, we would request UPNEDA to provide the minimum Tariff which shall at least be applicable for further 13 years based on current APPC price and UPNEDA projection. This will hedge the risk of the solar power Conditions as per Clause 2.5 and 2.6 of RFP shall prevail. 4 2 S. N. 5 6 Queries/Suggestions Received developer on account of any abrupt change in APPC in next 12 years and it will have the flexibility to choose the best of two options - a) Actual APPC on 11th year and b) minimum guaranteed Tariff as per the present scenario. As per the Solar Policy of Uttar Pradesh 2013, we appreciate that the expenditure on the construction of transmission line and substation at the Transco / Discom end will be borne by Government of Uttar Pradesh. However as per clause 2.7.6 of RFP, it would be difficult for the solar power developer for taking the responsibility for Construction and operation/maintenance of evacuation system associated with plants. As the very nature of the developer business is to develop, construct, operation & maintenance of the power plant for which they have got the expertise. Hence, we would request you to amend the clause by transferring the responsibility of Construction and operation/maintenance of evacuation system from generating company to State transmission utility which is set up for that purpose only Query Raised by Clarification/Amendment 1. ACME Solar Energy Pvt. Ltd. Construction of transmission lines in the regions identified in Clause 2.7.5 is an 2. Welspun additional incentive by the state Renewables Energy government. Developer has the option of Pvt. Ltd. constructing transmission lines at their own cost in these regions as well. 3. Rattan India The developer shall bear the cost for 4. The Indure Pvt. Ltd. construction of transmission lines not identified in Clause 2.7.5 of RFP. 5. Technical Associates, Lucknow The developer shall be responsible for operation and maintenance of dedicated transmission line up to the point of connectivity as specified in Clause 2.7.4 of RFP. RFP Cl. 2.3.2 1. Welspun The clause mentions that the bidding process is being Renewables Energy UPERC approval of bidding documents not conducted under ICB route as per Section 63 of Electricity Pvt. Ltd. required. Act 2003. Therefore please clarify whether the bid document has been approved by the Hon’ble UPERC? If not then when UPNEDA will take the approval of UPERC? 7 The PPA tenure will be for 12 years based upon tariff 1. Welspun Conditions as per Clause 2.5 and 2.6 of RFP discovered under bidding route and for next 13 years PPA Renewables Energy shall prevail. will be based upon then prevailing APCC. Since the project Pvt. Ltd. debt service period is generally runs for 15 years (which includes 1 year construction period; 1 year moratorium 3 S. N. Queries/Suggestions Received Query Raised by period and 13 years for debt repayment), therefore for the bankability of the project we suggest the PPA tenure based upon tariff discovered under bidding process may be extended upto 15 years aligning with the debt servicing period, whereas the remaining 10 years under then prevailing APPC tariff. Clarification/Amendment Please ensure that UPNEDA/UPPCL will continue the PPA period for the project life cycle of 25 years. 8 9 Considering the PPA tenure of 15 years under bidding tariff the APPC price of 14th year need to be considered instead of 11th year tariff. RFP Cl. 2.7 1. Please clarify whether Development & Construction would be done totally by DISCOM/STU? 2. Since the transmission line up to the nearest / feeding substation of STU / DISCOM will be developed by either STU or DISCOM whereas the cost has to be borne by the Solar Project Developer (SPD), therefore the construction of transmission line should be include in the Condition Subsequent by Procurer clause (Article 3 of PPA) of the Procurer and also in the Procurers Event of Default Clause (Clause no 13.2 of PPA). STU / DISCOM responsible for development of transmission line should also submit Bank Guarantee equivalent to the cost of the transmission line. 3. If it is a dedicated transmission line of our project, then can we (SPD) construct and do the O&M of the transmission line? Does this include the 1. Welspun Conditions as per Clause 2.5 and 2.6 of RFP Renewables Energy shall prevail. Pvt. Ltd. 1. Welspun 1. Conditions as per Clause 2.7.5 of RFP shall Renewables Energy be applicable. Pvt. Ltd. 2. Development of transmission line to the nearest substation of STU/DISCOM shall be developers’ responsibility, except for regions identified in the RFP. Developers should suitably frame agreements with the competent agencies to ensure timely completion of transmission lines from the solar project to the nearest substation identified by UPNEDA/STU/DISCOM. 3. Conditions as per Clause 2.7.4 of RFP shall be applicable. 4 S. N. Queries/Suggestions Received Query Raised by operation/maintenance of the Feeder Bay at the STU or DISCOM substation? Clarification/Amendment 4. We would like to know the Supervision and O&M charges, if any. Please confirm. 4. The supervision and/or O&M changes applicable for the transmission line shall be as per the bidders’ arrangement. 5. SPD should not be charged wheeling charges, losses, etc for the promotion of Green Solar Power in the state. However cost of transmission line for evacuation of power project can be borne by the SPD. 10 11 5. Conditions as per Clause 2.7.2 of RFP shall be applicable. For what quantum of Plant capacity (in MW or MVA) the 1. Welspun As per UPERC CRE Regulations, 2014; connectivity will be provided at 33 kV, 132 kV & 220 kV Renewables Energy Chapter 4 – Cl. 36: voltage level and by whom? Pvt. Ltd. “i. Installed capacity upto 1 MW on 11 KV. 2. Technical Associates ii. installed capacity upto 10 MW on 33 KV; Ltd., Lucknow iii. installed capacity above 10 MW on 132 KV;” RFP Cl. 2.7.2 Please confirm, 1. Welspun 1. Conditions as per Clause 2.7.5 and 2.7.6 of 1. Who will bear the cost of Bay Renewables Energy RFP shall be applicable. construction/extension at STU or Discom substation? Pvt. Ltd. . 2. The Transmission line shall be constructed by STU or Discom, so in case of delay in completion of Transmission 1. Welspun Line who will be responsible? Renewables Energy Pvt. Ltd. 2. Technical Associates Ltd., Lucknow 3. Green Power 2. The DISCOM/STU shall be encouraged to complete construction of Transmission Line within the stipulated period. In case of any unforeseen delays in completion of transmission line, the developer shall not be penalized for the same. However, the developer shall not be compensated for such delays. 5 S. N. Queries/Suggestions Received Query Raised by International Pvt. Ltd. Clarification/Amendment 1. Welspun 3. Conditions as per Clause 2.7.6 of RFP shall Renewables Energy be applicable. Pvt. Ltd. 3. Will developer be allowed to construct the Transmission Line on their own by paying requisite supervision/demand charges to STU or Discom? 1. Welspun 4. As the PPA will be signed between developer & UP Renewables Energy Power Corporation Ltd. and UPPCL has already a BPTA with Pvt. Ltd. 4. Conditions as per Clause 2.7.2 of RFP shall Transmission licensee & BPWA with distribution licensee. be applicable. Since the power is being sold directly to the beneficiary of the state i.e. UPPCL, Discom & so in this case the associated wheeling charges, losses should not be charged on the account of SPD. 12 RFP Cl. 2.7.7 1. Metering point will be at the STU or DISCOM substation, 1. Welspun 1. Conditions as per Clause 2.7.2 of RFP shall then why the SPD need to pay losses for supply of power to Renewables Energy be applicable. the procurer? Pvt. Ltd. 2. The power from solar plant to nearest “feed in substation” of STU or DISCOM is being evacuated by a dedicated transmission line, so the power is not flowing over the assets 2. Conditions as per Clause 2.7.2 of RFP shall owned by the STU or Discom. So in this case also the be applicable. associated wheeling charges, losses should not be charged on the head of Solar Developers. 3. Who will approve the Metering Scheme and what is required from the developer in this regards i.e. number of Meters, CT & PT etc 6 S. N. 13 14 15 Queries/Suggestions Received Query Raised by Explanation: The transmission line loss up to interconnection point is already being considered on the SPD’s account then why the repetitive losses need to be considered? RFP Cl. 2.10.2.1 1. Please clarify, what documents will be eligible for suitable certificate from regulatory/govt. agency? 2. We suggest, Experience Criteria for bidders quoting more than 10 MW should have successfully commissioned 50% of the bid quantity and should be in operation for minimum 3 months. Capacity commissioned as associate/group level is also admissible. RFP Cl. 2.10.3.1 Land requirement for project development @1.5 Hectares/MW should be modified to as per the requirement of the project on per MW basis. Due to usage of new and advanced technology the requirement of land has been changed for different technologies. Requirement of per MW land has been reduced in comparison to old technology. Therefore we suggest UPNEDA to keep the per MW land requirement as per the requirement of the developers. Because it’ll help the developers from purchasing excess land to fulfill the compliance of UPNEDA. Submission of land document should be aligned with the Financial Closure documentation timeline i.e. 210 days from signing of PPA instead of 150 days. The timeline of 15 days for signing of PPA & submission of PBG is too onerous for the SPD. Arranging PBG within 15 days from issuance of LOI will be very difficult. Besides formation of SPV is not possible within this timeframe. As a general practice in solar bid One (1) month timeline is given to SPD for submission of PBG and signing of PPA. We suggest Clarification/Amendment 3. Conditions as per Annexure-A, Clause-8 to RFP shall be applicable. As per 1. Welspun Conditions as per Clause 2.10.2.1 of RFP shall Renewables Energy be applicable. Pvt. Ltd. 1. Welspun Conditions as per Clause 2.27.2 of RFP shall Renewables Energy be applicable. Pvt. Ltd. 1. Welspun Conditions as per Clause 2.16 of RFP shall be Renewables Energy applicable. Pvt. Ltd. 7 S. N. Queries/Suggestions Received Query Raised by UPNEDA to follow the same timeline of 1 month and give SPD a realistic timeline for submission of PBG & signing of PPA. Clarification/Amendment 16 17 Its general practice in the sector for Solar Projects across various state & central projects, validity of the CPG should be 3 months after Scheduled Delivery Date. Therefore request you to consider the validity of the CPG upto 3 months from Scheduled Delivery Date. And after the commissioning of the project CPG should be released within 1 month from commissioning. RFP Cl. 2.20 In case bidder selected as successful developer for the Solar Project the Bid Bond submitted as EMD can be converted into CPG with the approval of UPNEDA and extending its validity. Because the BID Bond amount already submitted to UPNEDA will be locked until the CPG amount is being submitted to them. Request UPNEDA to consider our suggestion. 1. Welspun Conditions as per Clause 2.19 of RFP shall be Renewables Energy applicable. Pvt. Ltd. 1. Welspun Conditions as per Clause 2.20 of RFP shall be Renewables Energy applicable. Pvt. Ltd. 18 We suggest for a maximum equity lock-in period of 6 months 1. Welspun Conditions as per Clause 2.25 of RFP shall be after commencement of supply of power. Renewables Energy applicable. Pvt. Ltd. 19 Construction and commissioning of grid connected solar projects would entail activities like land acquisition, 1. Welspun Conditions as per Clause 2.28.1 of RFP shall approvals and permits, ROW for transmission line, estimates Renewables Energy be applicable. for power evacuation, design of solar field, tendering and Pvt. Ltd. purchase of solar equipments, obtaining necessary duty exemption certificates from UPNEDA/MNRE erection and commissioning of various equipments including modules. Hence the timelines have to be realistic in line with the requirements of Project. Therefore we request UPNEDA to 8 S. N. 20 21 22 Queries/Suggestions Received Query Raised by consider commissioning timeline for Solar projects as per the below mentioned timeline for different capacity: • Capacity upto 10 MW – 12 months • Capacity > 10 MW – 18 months Kindly elaborate the requirement of SLDC & what kind of on line link is required for this? 1. Welspun Renewables Energy Pvt. Ltd. Conditions Subsequent to Procurers must include implementation of transmission line from plant location to 1. Welspun nearest substation of STU/DISCOM. Renewables Energy Pvt. Ltd. It is understood, that the mentioned clause will be retained in the final PPA if the Seller intends to maintain it. Kindly 1. Welspun confirm. Renewables Energy Pvt. Ltd. Clarification/Amendment Shall be as per the latest SLDC guidelines. Conditions as per Article 3 of PPA shall be applicable. Yes 23 Escrow account of RPO receivables of UP DISCOMs 1. Welspun Conditions as per Article 10.4 of PPA shall be need to be made as payment security mechanism. Renewables Energy applicable. The operation of the subsidiary escrow account and Pvt. Ltd. default escrow account is unclear. Please confirm the same. Whether the default escrow account will only come into play during the default under PPA? Kindly confirm. Waterflow mechanism needs to be clearly defined in the normal course. 24 Provision to Clause 10.4.9 in PPA says ‘Provided that the 1. Welspun Conditions as per Article 10.4 of PPA shall be Procurers shall ensure that the Seller shall have first ranking Renewables Energy applicable. charge on the Receivables in accordance with the terms of Pvt. Ltd. the Agreement to Hypothecate Cum Deed of Hypothecation’. However, a similar provision providing for first charge on Receivables not found in Hypothecation Agreement. Only charge on Incremental Receivables has 9 S. N. 25 26 27 Queries/Suggestions Received been given. Please amend the Hypothecation Agreement as per the provision of Article 10.4.9 of PPA. ESCROW – Cl. 9.7 Assignment of the Escrow account in favour of lenders needs to be specifically allowed in the Escrow Agreement document (clause 9.7 of Escrow Agreement talks about assignment but in favour of Selectee which has not been defined under the agreement or under the PPA). Instead of selectee it should be specifically mentioned as lenders. Please amend the same. RFP – Cl. 2.4 & PPA – Article 4.2.1 Solar Power generation depends on solar radiation which is a natural phenomenon. A Solar plant can’t generate same unit during summer, winter, rainy & any other seasons? Therefore it can’t be assured that a plant will generate the minimum CUF of 15% throughout the year. Besides limiting the minimum CUF limit of SPD at 15% in any given contract year is too onerous to maintain whereas maximum radiation of UP is around 5 kWh. Therefore the minimum CUF limit should be in line with the NSM bid i.e.12%. In case the SPD fails to maintain 12% CUF then the SPD may be penalized. There should not be any restriction on purchase of excess energy beyond a particular CUF. 100% generated energy should be procured by the procurer. Query Raised by Clarification/Amendment 1. Welspun Conditions as per conditions of PPA and Renewables Energy Clause 9.7 of Escrow Agreement shall be Pvt. Ltd. applicable. 1. Welspun Conditions as per Clause 2.4 of RFP shall be Renewables Energy applicable. Pvt. Ltd. 2. Green Power International Pvt. Ltd. 1. Welspun Conditions as per Clause 2.4 of RFP and Renewables Energy Article 4.2.1 of PPA shall be applicable. Pvt. Ltd. 28 Please note that all states/NVVN/SECI who have invited bids to develop solar projects have not kept any technical criteria & whosoever met financial criteria were allowed to bid. The bidding was great success & lot of projects have been commissioned without technical failure. Solar technology is proven technology therefore no states keep technical criteria. 1. Rattan India Conditions as per Clause 2.10.2 of RFP shall be applicable. 2. PSM Energy 3. Rolta Power Pvt. Ltd. 10 S. N. Queries/Suggestions Received Query Raised by Clarification/Amendment By keeping stringent technical requirement, it will limit 4. Jakson Engineers competition only to few developers having prior project Ltd. experience in infrastructure. This will lead to lesser competition further leading to cartelization and thereby lower revenue. 29 30 31 32 33 In view of wider participation in the bidding process by serious developer, It is proposed that technical criteria to be deleted. CPG requirement is Rs. 30 Lakhs/ MW at Clause no 2.19.1 1. Rattan India whereas it is mentioned Rs. 75 lakhs/MW in format 4.9. Kindly clarify exact requirement. As per industry practice CPG is suggested to keep @ Rs. 30 Lakhs/MW. We understand that metering will be at STU/Discom substation. From this clause, it appears that metering will be 1. Rattan India at plant. Kindly clarify point of metering. We understand that seller will provide meter at its own cost which procurer will test, seal & install. Kindly clarify. 1. Rattan India In solar plant, separate synchronization equipment is not installed. Invertors which converts DC to AC, synchronies 1. Rattan India with grid & export power. In solar plants, we don’t need approval of synchronization scheme. We only have to take approval of SLD of plants from DISCOM & Electrical safety department. We suggest that this clause may be suitably reworded keeping solar power technology in mind. It is proposed that since transmission line is to be constructed by STU/DISCOM than Operation & maintenance 1. Rattan India of transmission line is to be maintained by STU/ DISCOM. You are requested to provide transmission cost voltage wise before bidding so that bidder can take into account before Conditions as per Clause 2.19 of RFP shall be applicable. Conditions as per Article 4.3.2 of PPA shall be applicable. Conditions as per Article 7.1.4 of PPA shall be applicable. Conditions as per Article 5 of PPA shall be applicable. Conditions as per Clause 2.7 of RFP shall be applicable. 11 S. N. 34 35 36 37 38 39 40 Queries/Suggestions Received quoting tariff. Query Raised by We propose that appointment of agency & requisite acceptance/ performance test to be mutually accepted by 1. Rattan India Seller & procurer before implementation. Kindly clarify who will be an authority to issue certificate of 1. Rattan India commissioning at the project site. Suggestion: Explosion, accident or breakage of transmission facilities to 1. Rattan India deliver power from the Delivery Points to the receiving substation or power plant to Delivery Point. Explanation: We suggest to include breakage of transmission facility from solar plant to delivery point as this condition is also not in control of Seller. We need assurance from Procurer that payment as per monthly invoice will be given to Seller even if UPNEDA 1. Rattan India doesn’t pay to UPPCL for any reason. This is internal matter between UPNEDA & UPPCL and Seller won’t be denied payment due to above reasons. Kindly provide draft letter of credit one week before bidding date to analyse in payment security mechanism. 1. Rattan India Please note that invertor suppliers in India don't follow UL1741 statdard for anti-islanding protection grid. Kindly 1. Rattan India delete from above standard. Please note that solar plants are must run power plant and would require connected load or grid so that entire power 1. Rattan India generated can be exported to grid. Solar plant develOper would need continuous grid at least at day time to ensure export of entire power generated from plant to substation irrespective of schedule power cut. Clarification/Amendment Shall be as per charges STU/DISCOM. levied by Conditions as per Article 4.9 of PPA shall be applicable. Certificate of commissioning shall be issued by UPPCL. Conditions as per Article 11 of PPA shall be applicable. Conditions as per Clause 2.6 and Article 10.4 of PPA shall be applicable. Conditions as per provisions of Article 10.4 of PPA. Conditions as per Annexure A of RFP shall be applicable. Conditions as per Article 7.1.4 of PPA shall be applicable. 12 S. N. 41 42 43 Queries/Suggestions Received Query Raised by At bidding stage, we need a confirmation from UPPCL/SLDC for all support during plant operation to provide a continuous grid which will provide a much needed confidence to put solar power plant in state of UP. Solar Power plants modules performance degrades with time which is general phenomena. We request you that 1. Rattan India minimum CUF guarantee to be adjusted as per mutually approved degradation factor & should not be restricted to 15% as it is difficult to ascertain at bidding stage. Also we request you to that while calculation of CUF, nonavailability of grid should be consider & non-availability of grid should be consider as deemed generation & developer to be compensated accordingly. Our request is to please allow Limited liabilities partnership 1. KM Sugar Mills Ltd. for bidding in solar project. We would like to technically qualify on the basis of our EPC work experience of the Captive Power Plants for Natural Gas 1. Green Power Generator Sets, EPC works experience of the Bio mass & Bio International Pvt. Ltd. Gas based captive and grid connected Independent Power Plants using generating sets and also on Running & Maintenance of the Power Plants works of Captive Power Plant using Generator Sets. Experience Details of our such projects complete is attached as Annexure ‐ A. Clarification/Amendment Conditions as per Clause 2.4 of RFP shall be applicable. Conditions as per Clause 2.10 of RFP shall be applicable. Conditions as per Clause 2.10.2.1 shall be applicable. Experience of Infrastructure Projects as given under the Definition of “Infrastructure Projects” shall be applicable. 44 The bid bond required to be submitted as per clause 2.18.1 1. Green Power Conditions as per Clause 2.18 of RFP shall be is for 20 Lk/ MW. We feel this amount is very high for a new International Pvt. Ltd. applicable. developer and it should be around 10‐15 Lk/MW 45 The time required for providing the Contract Performance 1. Green Power Conditions as per Clause 2.19.1 of RFP shall Guarantee is very short. It should be increased from 15 days International Pvt. Ltd. be applicable. to 25 days from the issue of Letter of Intent. 13 S. N. 46 47 Queries/Suggestions Received Can the 3 nos bank guarantees be issued from Different Banks from the List of Banks provided in the RFP? Clause 2.27.1: In case of delay in completion of Financial Closure by the developer due to reasons beyond their control, will the authority allow any additional time to complete the financial closure before invoking the BG? Query Raised by Clarification/Amendment Conditions of clause 2.29.1.A attracting Liquidated Damages for 10 MW projects are very strict. Liquidated Damages should be calculated like Late Payment Surcharge under clause 10.3.3 in PPA, i.e. to be computed from 60 days of the due commissioning date. Clause 2.7.2 and Clause 2.7.3: Please clarify whether the transmission losses of the lines developed by the State in the areas mentioned in clause 2.7.3 will be borne by the State itself, as they have developed the lines. Will UPPCL bear the entire cost of transmission line and evacuation for the projects located in Bundelkhand Please confirm. As per clause 2.7.6, Operation and Maintanence of evacuation system shall be the responsibility of the generating company. Does this also include projects developed in regions mentioned in clause 2.7.5. Who will maintain and operate the transmission lines available in the areas mentioned in clause 2.7.5? Format 4.7: Please clarify if we need to mention a tentative location for the project or we can also leave it blank? 1. Green Power Conditions as per lause 2.29.2 of RFP shall be International Pvt. Ltd. applicable. 1. Green Power Conditions as per Clause 2.19.2 shall be International Pvt. Ltd. applicable. 1. Green Power Conditions as per Article 11 of the PPA shall International Pvt. Ltd. be applicable. 48 49 50 51 52 1. Green Power Conditions as per Clause 2.7.2 of RFP shall be International Pvt. Ltd. applicable. 1. Green Power Conditions as per the Clause 2.7.3 of RFP International Pvt. Ltd. shall be applicable. 1. Green Power Conditions as per the Clause 2.7.4 of RFP International Pvt. Ltd. shall be applicable. 1. Green Power Conditions as per the Clause 2.10.3.1 shall International Pvt. Ltd. be applicable. 53 14 S. N. 54 55 56 57 58 59 60 61 Queries/Suggestions Received Late payment surcharges should be at least 2%, as this is the amount of rebate offered to Procurer in clause 10.3.4. Are there any import restrictions on importing of modules, panels, invertors etc? What is the incentive offered under U.P. Budgetary support? How can we claim the same? Query Raised by 1. Green Power International Pvt. Ltd. 1. Green Power International Pvt. Ltd. 1. Green Power International Pvt. Ltd. Clarification/Amendment Conditions as per Article 10, Clause 10.3.3 of PPA shall be applicable. There is no import restriction on importing of modules, panels, invertors etc. Support provided by the Government of Uttar Pradesh are listed under Clause 2.7 of RFP. UPNEDA shall assist all successful bidders in getting clearances and signing of PPA with the procurer. Is there any maximum limit on the distance up to which the 1. Green Power Conditions as per the Clause 2.7.5 and 2.7.8 transmission lines will be developed by Procurer in International Pvt. Ltd. of RFP shall be applicable. Bundelkhand area? Land: Are there any project areas / land parcels identified 1. The Indure Pvt. Ltd. There are no project areas / land parcels by NEDA based on prefeasibility / techno- commercial identified by NEDA based on prefeasibility viability of such projects? If yes-kindly share. / techno- commercial viability of such projects. Are there any measures adopted by NEDA to ensure at 1. The Indure Pvt. Ltd. The developers are free to choose any least a semblance of even distribution of projects across location in the state of Uttar Pradesh. the state? Conditions as per the clause 2.10.3 of RFP shall be applicable. What support can NEDA provide to ensure smooth, 1. The Indure Pvt. Ltd. Conditions as per the clause 2.10.3 of the glitch and legal-issues free acquisition of land by RFP shall be applicable. prospective bidders. Are there any incentives on registration/other charges especially for renewable UPNEDA shall assist the developers in projects? getting the necessary clearances in the stipulated timeframe as and when the bidders submit their requests in the prescribed format to the relevant departments within time. Grid stability studies and grid reliability statistics if 1. The Indure Pvt. Ltd. available should be provided? Is it mandatory to form a project company for execution or 1. The Indure Pvt. Ltd. Shall be made available during feasibility study after selection of developer. Conditions as per the Clause 2.16 of RFP 15 S. N. 62 63 64 Queries/Suggestions Received is it an option entirely with the bidder? What is the provision for accelerated depreciation while computing tariff? Kindly provide correction formula / calculations for arriving at deemed/corrected generation based on actual solar radiation/site conditions. Guaranteed capacity-is it MW or million units sold (at the metering point)? Query Raised by 1. The Indure Pvt. Ltd. 1. The Indure Pvt. Ltd. 1. The Indure Pvt. Ltd. 65 CPG is required to be submitted within 15 days of LOA 1. The Indure Pvt. Ltd. should be revised to within 30 days of LOI. 66 Bid selection process: kindly elaborate how and in what 1. The Indure Pvt. Ltd. proportion will l2/L3/L4 ....onwards bids be awarded? 67 Clarification/Amendment shall be applicable. There is no provision for accelerated depreciation while computing tariff. Not relevant to RFP. Shall be in Million Units and shall have the same meaning as provided in CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 Conditions as per the Clause 2.19 of RFP shall be applicable. Condition to bidders qualifying as per the conditions of the bidding documents, the bidder with the lowest quoted tariff in Rs./kWh shall be declared as L1 and allocated capacity as per the terms of RFP. Other successful bidders shall be ranked in ascending order and allocated projects until the capacity of 215 MW is exhausted. Please review the Clauses 4.3.5 and 4.3.7 of the draft PPA Conditions as per Clause 2.7.5 & 2.7.6 of RFP and advice us of the changes if any to take care of the 1. Jakson Engineers and 4.3.5 & 4.3.7 of PPA shall be applicable. dichotomy mentioned above. Ltd. If desired by the developer, the cost towards development of transmission lines in regions identified in Clause 4.3.7 shall be borne by Government of Uttar Pradesh. However, the bidder shall be responsible for O&M of transmission lines from plant to the STU/DISCOM substation. 16 S. N. Queries/Suggestions Received 68 Query: Will UPPCL sign the PPA or the DISCOM or UPTCL 69 70 71 72 73 Query Raised by Clarification/Amendment 1. Technical Associates Conditions as per the Clause 1.1.4 of RFP Ltd. shall be applicable. As per the provisions of RFP, UPPCL shall sign the PPA. Query: 1. Technical Associates • What is the present rate of tariff determined by Ltd. 1. Conditions as per the Clause 2.6.2 of RFP “Latest finalized case-1” bidding ? shall be applicable. The tariff finalized as per • Will there be single payment by UPPCL or in 2 parts ? latest Case-1 bidding tariff finalized before opening of bids shall be considered. 2. Developers shall receive single payment from UPPCL against the energy delivered at the metering point as per the terms of RFP Clause 2.6. Query: 1. Technical Associates Conditions as per the Clause 2.7.3 & 2.7.5 of • Can it be done by a Project developer subject to his Ltd. RFP shall be applicable. following all regulations of UPERC and specs. Of STU/DISCOM for similar line. The developer may construct the transmission line between the project substation to the STU/DISCOM substation. Which are the districts covered in the specified Mandals in 1. Technical Associates Conditions as per RFP and PPA shall prevail. BundelKhand & Purvanchal regions. Ltd. Bidders shall refer the administrative maps of the region. Please specify the financial years to be considered? 1. Technical Associates Bidders shall submit the audited balance Ltd. sheets of the previous three financial years, i.e., FY 2011-12, 2012-13 & 2013-14 for evaluation. Query: 1. Technical Associates Conditions as per the Clause 2.10.1.3 of RFP • At what stage the project company can be Ltd. shall be applicable. incorporated or if already present assigned the work of supply of power? • Can such project company also install the project 17 S. N. 74 75 76 77 Queries/Suggestions Received Query Raised by assigned to the bidder? Query: 1. Technical Associates • Please clarify whether infrastructure work i.e. Ltd. construction of Transmission & Distribution infrastructure completed as EPC (Engineering Procurement Construction & Commissioning) basis shall be considered for experience in infrastructure sector? • Please clarify whether it is necessary to submit all documentary evidences as mentioned or if only one out of three may be sufficient? • We are already operating a 2MW Solar Power Project on BOO basis. What certificate needs to be submitted regarding the project cost/ revenue earned from said project? Clarification/Amendment 1. Infrastructure work i.e. construction of Transmission & Distribution infrastructure completed as EPC (Engineering Procurement Construction & Commissioning) basis shall be considered for experience in infrastructure sector. 2. Yes it is necessary to submit all the documents mentioned in the RFP. 3. For the plant under operation, Bidder shall submit LoI, PPA, Invoices raised and payments received against the same. A statement certified by CA indicating the project cost and payments received from sale of power shall be submitted by the bidder. Query: 1. Technical Associates SPV may be read as the Project Company as SPV has not been defined in the document. The same has to Ltd. indicated in Clause 2.10.2.3 of RFP. be defined. Query: 1. Technical Associates All such consents, clearances and permits What is the time limit for this transfer from bidder to project Ltd. shall be obtained in the name of project company? company that shall be indicated by the bidder in their proposal or formed within the stipulated time period post allocation of capacity. 1. Technical Associates Apart from the details of the parent Query: Ltd. company, the following documents shall be What details of the project company are to be submitted provided: with the bid? 1. Certificate of Incorporation 2. Shareholding pattern 18 S. N. 78 79 80 81 82 Queries/Suggestions Received Query Raised by Query: 1. Technical Associates • Does project company need to sign the bid offer? Ltd. • Can the investment also be done by the project company? Clarification/Amendment 1. The bid shall be signed by the authorized representative of the Sole Bidder/ Lead Bidder of a consortium. 2. Conditions as per the Clause 2.10.1.4 of RFP shall be applicable. Query: 1. Technical Associates Conditions as per the Clause 2.18.3 of RFP Within how many days will it be returned after a valid Ltd. shall be applicable. performance been submitted? Query: 1. Technical Associates Conditions as per the Clause 2.26 of RFP Should not be done within the last 10 days of the date of Ltd. shall be applicable. Bidders shall be given submission of Bid. adequate time for submitting their bids after guidelines are modified. Query: 1. Technical Associates Conditions as per the Clause 2.27.2 of RFP This conversion has to be done by U.P Govt. or its Ltd. shall be applicable. functionaries Project developer can only submit application UPNEDA shall assist the developers in as per rules for the conversion of land for industrial use The receiving appropriate clearances if the duly cannot guarantee the time limit of getting the conversion. filled applications are submitted in time with the concerned departments. Query: 1. Technical Associates In case of part commissioning within the Delivery period Ltd. Conditions as per the Clause 2.29 of RFP please confirm that no penalty shall be applicable for that shall be applicable. cart of the Project which has been commissioned. 19
© Copyright 2024