Fire Pit Assembly 6. Apply adhesive to the top of the second course and set third course of eight A blocks. (FIG. 4) Use your level and mallet to make adjustments and to set blocks firmly on surface. Also use mallet to make sure blocks are flush vertically after each course is added. 7. Apply adhesive to the top of the third course and set fourth course of eight A blocks. (FIG. 5) FIGURE 5 8. Apply adhesive to top of fourth course and prepare to lay top course. (FIG. 6) 9. Begin laying top course by setting one D corner block on corner, making sure rounded edge is on the outside. There will be a 2" overhang. 10.Working counterclockwise, lay three B blocks, one C block and then another D corner block. Make sure to push blocks down to spread adhesive and remove any gaps. Continue to be sure blocks are level. FIGURE 6 Assembling your new SQ UA RE FIRE PIT 11.Continue using same procedure until entire top course is in place. 12.Allow adhesive to cure 24 hours before dropping in the insert. General Shale would like to thank you for the purchase of this fire pit. We sincerely hope it will give you years of enjoyment. This instruction booklet was created to help you assemble FIGURE 7 your new fire pit as quickly and easily as possible. If anything is unclear or you have any 13. After 24 hours have passed, set the steel insert into the center of the fire pit walls. (FIG. 7) questions, please don’t hesitate to contact us at 1-800-414-4661. You can use adhesive to keep the steel insert in place. Although you may choose not to so that you can flip the insert over when not in use. 14. Enjoy your new fire pit. (FIG. 8) Refer to manufacturer’s instructions for safety, operating, care and maintenance information. FIGURE 4 P.O. Box 3547 · Johnson City, Tennessee 37602 · 1-800-414-4661 · www.GeneralShale.com Welcome Fire Pit Assembly VOCABULARY 1. Choose the ideal location for your fire pit. Before you begin, we’d like to familiarize you with several terms that will be used throughout the building process. COURSE — A continuous layer of building material such as bricks, blocks or tiles. A layer of blocks is generally referred to as a course. Projects may have anywhere between four and 18 courses. 2. Prepare an area that is 4' square and 4" deep. If installing optional hearth/knee wall, extend base as required. DRYSTACK — To lay a course of blocks first without adhesive or thinset to get an idea of how the blocks will fit together. a. First remove sod, vegetation and soil to prepare a level spot. MATERIALS and TOOLS Included: (32) 4" x 8" x 16" Blocks (A) (12) 4" x 8" x 8" Bullnose Blocks (B) (4) 4" x 4" x 8" Bullnose Blocks (C) (4) 4" x 8" x 8" Bullnose Corner Blocks (D) (3) Tubes of Outdoor Adhesive Caulk (1) Steel Insert with Cover Actual fire pit will be a 3'4" with an 8" outer crusher run base. 3. Lay the first course with eight A blocks. Check to make sure the blocks are level. (FIG. 2) DIFFICULTY RATING This project has been given the BEGINNER rating. The project should take about an hour to complete, plus prep time. This kit can be constructed with no building knowledge. FIGURE 1 c. Drystack your courses to test for proper levels and location. Additional Materials Required (Not Included): Caulking Gun Concrete or Gravel for Setting Base (if needed) Level Rubber Mallet Tape Measure b. If soil underneath sod is hard, the soil can be leveled out and used as your base material. If soil is not hard enough, create a base with gravel. If you choose to use concrete, simply follow manufacturer’s instructions. (FIG. 1) 4. Apply a generous bead of adhesive to the top of your first layer. Don’t lay bead too close to the edges or it will squeeze out and become visible. (FIG. 3) If some adhesive does squeeze out, don’t wipe it off immediately. Wait until it’s almost dry and gently break it off with a chisel. Unload blocks into groups with corresponding letters. Be sure to place with letters faceup so you can quickly recognize them. This unit is designed for outdoor use only. You should not place your fire pit on a wood deck or under a roof enclosure. Locate unit at a reasonable distance from any combustible materials. Follow local building code and burning permits. Please retain these instructions with this unit. FIGURE 2 FIGURE 3 5. Lay the second course with another eight A blocks, alternating blocks so seams are offset. Make sure to push blocks down to spread adhesive and remove any gaps. Continue to be sure blocks are level. (FIG. 4) Alternate pattern to ensure proper bonding and look. Whenever possible, alternate block colors for a more pleasing aesthetic. FIGURE 4
© Copyright 2024