Port of London - River Thames NOTICE TO MARINERS M22 of 2015 KINGS REACH MILLENNIUM FOOTBRIDGE REDUCED HEAD ROOM 21ST & 22ND APRIL 2015 Contractors working on behalf of the City of London will be conducting surveys on the Millennium Footbridge on the 21st and 22nd April 2015. In order to facilitate these works the head room of the bridge will be reduced by no more than 2 metres. The reduced headroom in the main navigational arch (Arch No 2) will reduce the bridge height to: 13.8m above Chart Datum or 6.9m above Mean High Water Springs. Where the headroom is reduced the contractor will suspend a bundle of straw beneath the bridge in accordance with the Port of London Authority Thames Byelaws 2012 namely: By Day – A bundle of straw large enough to be easily visible and displayed at the height of restricted headroom; By Night – A white light in place of the bundle of straw Further details will be broadcast by London VTS on VHF Channel 14. 13 April 2015 Port of London Authority London River House, Royal Pier Road, Gravesend, Kent DA12 2BG EXPIRY DATE: 23 rd April 2015 TO RECEIVE FUTURE NOTICES TO MARINERS BY E-MAIL, PLEASE REGISTER VIA OUR WEBSITE www.pla.co.uk Telephone calls, VHF radio traffic, CCTV and radar traffic images may be recorded in the VTS Centres at Gravesend and Woolwich DAVID PHILLIPS CHIEF HARBOUR MASTER
© Copyright 2024