Detached House

DOMESTIC CASE STUDY: DETACHED 5 BEDROOMED HOUSE
Report No: ETDETACH
Approved by: B McMullen (CEng. MIChemE)
KEY INFORMATION
INSTALL DATE:
JAN 12th2013
TEST PERIOD:
12 MONTHS
REPORTED SAVINGS:
13.2%
The Performance of EndoThermTM was tested in a domestic detached property
INTRODUCTION
The domestic performance of Endo Enterprises (UK) Ltd’s EndoThermTM was tested in a detached house
in Manchester. The property had 5 bedrooms with underfloor heating downstairs and 9 radiators upstairs
The property is powered by a combi boiler and the heating system is currenlty beind protected with a
leading brand chemcial inhibitor.
A total of 1 Litres of EndoThermTM was installed into this domestic property on the 12th January 2013.
RESULTS
The recorded usage using actual gas bills from the 1st February 2013 until 2014 were compared with the same
figures for the year before the EndoThermTM installation. For the purpose of this test, the results were
compensated using degree day information from a nearby weather station at Manchester Airport.
Time Period
kWh
Degree Day (15.5°C)
Feb 2012 - Jan 2013
21,845
18,589
2395
2348
Feb 2013 - Jan 2014
kWh / DD
9.121
7.917
Comparisons between the two years showed a clear saving due to EndoThermTM. Uncompensated there was
a recorded 14.9% saving due to EndoThermTM. Using the degree day data from Manchester Airport, the
compensated saving was recorded at 13.2%
Total Saving - 13.2%
T. 0191 447 8008
E. [email protected]
W. www.safesol.co.uk
CASE STUDY: DETACHED2013 1