DOMESTIC CASE STUDY: DETACHED 5 BEDROOMED HOUSE Report No: ETDETACH Approved by: B McMullen (CEng. MIChemE) KEY INFORMATION INSTALL DATE: JAN 12th2013 TEST PERIOD: 12 MONTHS REPORTED SAVINGS: 13.2% The Performance of EndoThermTM was tested in a domestic detached property INTRODUCTION The domestic performance of Endo Enterprises (UK) Ltd’s EndoThermTM was tested in a detached house in Manchester. The property had 5 bedrooms with underfloor heating downstairs and 9 radiators upstairs The property is powered by a combi boiler and the heating system is currenlty beind protected with a leading brand chemcial inhibitor. A total of 1 Litres of EndoThermTM was installed into this domestic property on the 12th January 2013. RESULTS The recorded usage using actual gas bills from the 1st February 2013 until 2014 were compared with the same figures for the year before the EndoThermTM installation. For the purpose of this test, the results were compensated using degree day information from a nearby weather station at Manchester Airport. Time Period kWh Degree Day (15.5°C) Feb 2012 - Jan 2013 21,845 18,589 2395 2348 Feb 2013 - Jan 2014 kWh / DD 9.121 7.917 Comparisons between the two years showed a clear saving due to EndoThermTM. Uncompensated there was a recorded 14.9% saving due to EndoThermTM. Using the degree day data from Manchester Airport, the compensated saving was recorded at 13.2% Total Saving - 13.2% T. 0191 447 8008 E. [email protected] W. www.safesol.co.uk CASE STUDY: DETACHED2013 1
© Copyright 2024