WHO CAN I CONTACT ABOUT THE SR-79 REALIGNMENT PROJECT? If you have comments or questions about the SR-79 Realignment Project contact us through our website at www.sr79project.info/contact or call (951) 824-8706. You may also write to: Cathy Bechtel—Project Development Director Riverside County Transportation Commission P.O. Box 12008 • Riverside, CA 92502-2208 PROJECT MILESTONES 2004 Public scoping meetings held Formal start of environmental process 2005 Evaluate and redefine alternatives 2008 Conduct required field surveys and prepare technical reports Prepare Draft Environmental Impact Report/ Environmental Impact Statement Circulate Draft Environmental Impact Report/ Environmental Impact Statement for public review and comment, conduct open house hearings and review comments, identify Preferred Alternative for Project Publish Final Environmental Impact Report/Environmental Impact Statement, prepare and publish Record Of Decision 2009-2012 2013 2014 2015 and beyond WHERE CAN I SEE THE DRAFT ENVIRONMENTAL IMPACT REPORT/ENVIRONMENTAL IMPACT STATEMENT? Online at www.sr79project.info Hard copies at: Riverside County Transportation Commission 4080 Lemon Street, 3rd Floor Riverside, CA 92501 California Department of Transportation, District 8 Office 464 West 4th Street, San Bernardino, CA 92401 Hemet Public Library 300 E. Latham Avenue Hemet, CA 92543 San Jacinto Public Library 500 Idyllwild Drive San Jacinto, CA 92583 WHO ARE THE PROJECT PARTNERS? The Riverside County Transportation Commission is working in partnership with: • California Department of Transportation • U.S. Army Corps of Engineers Florida Avenue (near Warren Road) • Federal Highway Administration • County of Riverside • City of Hemet • City of San Jacinto WHAT IS HAPPENING WITH THE SR-79 REALIGNMENT PROJECT? Ramona Expressway (near Sanderson Avenue) Esplanade Avenue/Trailwood Road Final design, Right Of Way acquisition, begin construction* * All contingent on available funding A Project of the Riverside County Transportation Commission Florida Avenue (near California Avenue) WHAT IS THE SR-79 REALIGNMENT PROJECT? The SR-79 Realignment Project (Project) proposes to realign SR-79 between Domenigoni Parkway and Gilman Springs Road. Currently, the highway follows a circuitous route through the downtown areas of Hemet and San Jacinto. The Project would realign the highway to provide a more direct north-south route through the San Jacinto Valley. RCTC and Caltrans have prepared and released a Draft Environmental Impact Report/ Environmental Impact Statement (Draft EIR/EIS) for public review and comment. The Draft EIR/EIS describes the four proposed Build alternatives and two design options to realign SR-79 to the western area of the San Jacinto Valley (see pages 2 and 3). The Build alternatives propose to construct a limited access expressway with two lanes in each direction, divided in the center, with on and off ramps for access. In addition, two of the Build alternatives were revised in response to agency and public input to include a variation (design option) with a lowered roadway profile to reduce visual impacts to surrounding communities, mainly in the area south of Florida Avenue. RCTC and Caltrans will be accepting comments on the Draft EIR/EIS for 45 days after the release of the document. Comments are due by March 25, 2013. Two open house hearings will be held to give the public an opportunity to ask questions and comment on the proposed project. Comments may also be made online at www.sr79project.info and by mail during the comment period. Following the comment period, a Final Environmental Impact Report/Environmental Impact Statement (Final EIR/EIS) will be prepared that includes responses to the comments and identify the Preferred Alternative for the project. WHY IS THE PROJECT NEEDED? Today, SR-79 traverses heavily populated areas in Winchester, Hemet, and San Jacinto. Regional traffic competes with local traffic for the limited SR-79 roadway capacity. There are numerous at-grade intersections, driveways, and traffic signals that affect traffic and efficiency. Finally, SR-79 and SR-74 are collocated along Florida Avenue, combining north-south and east-west traffic in one roadway. The realignment of SR-79 would allow regional motorists to use a safer, more efficient, more direct, north-south route while residents of Hemet and San Jacinto will enjoy better mobility on local streets. Domenigoni Parkway/SR-79 Riverside County Transportation Commission www.rctc.org www.sr79project.info (951) 824-8706 Q&A Sheet #7 February 2013 WHAT ARE THE PROJECT ALTERNATIVES? WHAT IS THE ENVIRONMENTAL PROCESS? BEAUMONT G I CALIFORNIA R AC IN INT OR GS IVE R SO BO R IVER AQUEDUCT O AM N EX A PY N SAN JACINTO Draft EIS Public and Agency Review EPA Filing; Federal Register State Clearinghouse Review Public Hearing and Review Period Final EIR Final EIS Review of Responses by Commenting Agencies Public and Agency review; EPA Filing; Federal Register Notice SOUTH SAN JACINTO ST STATE ST LYON AVE AC NJ 79 INE HEMET SA Y W PK Agency Decision Not to Scale Agency Decision CALIFORNIA WARREN RD ODELL AVE A CANAL WARREN RD ALABASTER DR WINCHESTER RD LYON AVE CAWSTON AVE LYON AVE SANDERSON AVE A CANAL SANDERSON AVE CAWSTON AVE AL CAN GO DIE SAN WINCHESTER RD AL ODELL AVE ALABASTER DR MAZE STONE CT STATE ST LYON AVE SANDERSON AVE CAWSTON AVE SOUTH SAN JACINTO ST WHITTIER AVE WARREN RD WARREN RD A CANAL ALABASTER DR SOUTH SAN JACINTO ST LYON AVE MAZE STONE CT AL CAN GO DIE SAN CALIFORNIA AVE ODELL AVE WARREN RD A CANAL SANDERSON AVE CAWSTON AVE STATE ST WINCHESTER RD WHITTIER AVE WARREN RD CALIFORNIA AVE ODELL AVE WARREN RD ALABASTER DR MAZE STONE CT AL CAN DIE GO SAN CALIFORNIA AVE WINCHESTER RD WHITTIER AVE Build Alternative 1a: Starts in the south on Winchester Road, proceeds north on the west side of the West Hemet Hills, then joins the alignment from Florida to Cottonwood. In the north, Alternative 1a is closer to Warren. TEMECULA WHITTIER AVE K DOMENIGO N I P OAKLAND AVE SR 74/FLORIDA AVE LT CR E E SA NNE HA KC AC NJ SA R OB INT CH E LIN CALIFORNIA 79 HEMET L Y W Not to Scale CALIFORNIA 79 CALIFORNIA Southern Limit of Project PM R15.78 79 EXISTING ROUTE E NEWPORT RD PROJECT BUILD ALTERNATIVE VD BL DIAMOND VALLEY LAKE A Southern Limit of Project PM R15.78 OLIVE AVE PY TEMECULA EXISTING ROUTE E NEWPORT RD N 79 RD 79 EL NN HA MAIN ST MENLO RD AN SIMPSON RD Not to Scale CALIFORNIA CALIFORNIA O Y W SAN JACINTO STETSON AVE TC ME HE EX WINCHESTER M ESPLANADE AVE HEMET-RYAN AIRPORT RD A Not to Scale AM L NNE HA KC N K DOMENIGO N I P R STOWE RD MILAN RD E GRAND AVE HADDOCK ST OLIVE AVE WEST HEMET HILLS BA O SR 74/FLORIDA AVE HEMET LO SEVENTH ST TRES CERRITOS HILLS CALIFORNIA RANCHLAND RD LT CR E E SA N AC NJ SA R OB INT AM HIDDEN SPRINGS RD TRES CERRITOS AVE 79 BO R VD BL CH AN SIMPSON RD Lower roadway profile and changes to local access from Newport Road to Florida Avenue. Roadway alignment would not vary significantly from Build Alternative 2b. DEVONSHIRE AVE E LIN SO COTTONWOOD AVE OAKLAND AVE SR 74/FLORIDA AVE P A PY N MENLO RD AC RAMONA EXPY SA Build Alternative 2b Design Option 2b1 R IN GS INT OR IVE R NJ IVER AQUEDUC T CA MAIN ST SA S AN LM RD O EX Y W A Not to Scale AM WINCHESTER L NE AN RD SAN JACINTO ESPLANADE AVE HEMET-RYAN AIRPORT LO RA DO R M STETSON AVE H TC ME HE N K DOMENIGO N I P R STOWE RD MILAN RD E GRAND AVE HADDOCK ST OLIVE AVE WEST HEMET HILLS BA O SR 74/FLORIDA AVE HEMET L NNE HA KC LO SEVENTH ST TRES CERRITOS HILLS CALIFORNIA RANCHLAND RD LT CR E E SA N HIDDEN SPRINGS RD TRES CERRITOS AVE 79 AM SIMPSON RD AC NJ SA R L NE AN CH AN R OB INT CO BO COTTONWOOD AVE DEVONSHIRE AVE E LIN AC SO Build Alternative 2a OAKLAND AVE SR 74/FLORIDA AVE Northern Limit of Project PM R33.80 P VD BL MENLO RD S AN LM A PY N Y W RD O WINCHESTER ME HE EX L NNE HA KC SA MAIN ST 79 R IN GS INT OR IVE R NJ G I CALIFORNIA RAMONA EXPY CA SAN JACINTO STETSON AVE H TC RD SA IVER AQUEDUC T M ESPLANADE AVE HEMET-RYAN AIRPORT LO RA DO R A AM STOWE RD MILAN RD N K DOMENIGO N I P WEST HEMET HILLS E GRAND AVE HADDOCK ST OLIVE AVE R SR 74/FLORIDA AVE HEMET BA O AC NJ SA R OB INT LO SEVENTH ST TRES CERRITOS HILLS CALIFORNIA RANCHLAND RD LT CR E E SA N CH AN SIMPSON RD HIDDEN SPRINGS RD TRES CERRITOS AVE 79 AM VD BL L NE AN Lower roadway profile and changes to local access from Newport Road to Florida Avenue. Roadway alignment would not vary significantly from Build Alternative 1b. DEVONSHIRE AVE E LIN BO COTTONWOOD AVE OAKLAND AVE SR 74/FLORIDA AVE CO SO R A PY N O EX HADDOCK ST A AM WINCHESTER MENLO RD Build Alternative 1b Design Option 1b1 AC RAMONA EXPY SA MAIN ST R IN GS INT OR IVE R NJ IVER AQUEDUC T CA ESPLANADE AVE HEMET-RYAN AIRPORT RD SAN JACINTO STETSON AVE H TC ME HE N R SR 74/FLORIDA AVE LO RA DO R M SEVENTH ST TRES CERRITOS HILLS DEVONSHIRE AVE E GRAND AVE O N HIDDEN SPRINGS RD STOWE RD BA COTTONWOOD AVE TRES CERRITOS AVE MILAN RD AM LO Build Alternative 1a RANCHLAND RD BO R SA CO SO SA P RAMONA EXPY IVER AQUEDUC T CA WEST HEMET HILLS AC 79 Northern Limit of Project PM R33.80 BEAUMONT G I CALIFORNIA S AN LM NJ RD LO RA DO R Northern Limit of Project PM R33.80 R IN GS INT OR IVE R P CO SA 79 Record of Decision BEAUMONT G I CALIFORNIA S AN LM Northern Limit of Project PM R33.80 BEAUMONT G I 79 SOUTH SAN JACINTO ST BEAUMONT CALIFORNIA PROJECT BUILD ALTERNATIVES DIAMOND VALLEY LAKE Southern Limit of Project PM R15.78 TEMECULA Findings; Statement of Overriding Consideration; Mitigation Monitoring Program EXISTING ROUTE E NEWPORT RD STATE ST 79 MAZE STONE CT LT CR E E SA L NNE HA KC CAN DOMENIGO N I Draft EIR CALIFORNIA GO SIMPSON RD OLIVE AVE Scoping DIE WHITTIER AVE HADDOCK ST EL NN HA TC ME HE Scoping HL NC RA OB INT STETSON AVE WARREN RD MILAN RD RANCHLAND RD E GRAND AVE Notice of Preparation OAKLAND AVE SR 74/FLORIDA AVE HEMET-RYAN AIRPORT SAN CALIFORNIA AVE E DIE G WINCHESTER RD WEST ET HEMET S HILLS STOWE RD WINCHESTER MENLO RD O SR 74/FLORIDA AVE Notice of Preparation WARREN RD CAN AL DEVONSHIRE AVE SANDERSON AVE TRES CERRITOS HILLS TRES CERRITOS AVE A Preferred Alternative has not been identified for the Project. The Cities of Hemet and San Jacinto have identified their preference for a Locally Preferred Alternative (LPA) for the Project. The City of Hemet’s LPA was adopted by resolution on May 13, 2008, and is shown on the Project Location Map in green. The City of San Jacinto LPA was adopted as part of their general plan in January 2006 and is shown on the Project Location Map in yellow. The County of Riverside has not selected an LPA. ESPLANADE AVE CAWSTON AVE HIDDEN SPRINGS RD NEPA—ENVIRONMENTAL IMPACT STATEMENT MAIN ST SEVENTH ST ALABASTER DR HAS A PREFERRED ALTERNATIVE BEEN IDENTIFIED FOR THE PROJECT? MAZE STONE CT M COTTONWOOD AVE CEQA—ENVIRONMENTAL IMPACT REPORT SOUTH SAN JACINTO ST M SAN LO STATE ST A CANAL VD BL SA RD A O AM N R CA BA The California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA) require agencies to prepare environmental analyses of proposed projects that could have significant effects on the environment and to circulate these documents to other agencies and the public before making decisions. The steps for each process are shown in these charts. CALIFORNIA AVE RA DO R ODELL AVE LO NJ RAMONA EXPY WARREN RD CO SA RD Northern Limit of Project PM R33.80 P The proposed Project Build alternatives are shown on the maps below. All begin south of Domenigoni Parkway and end south of the San Jacinto River on Sanderson Avenue. As you review their locations on the maps notice that there are two main choices in the south near the community of Winchester and two main choices in the north in the city of San Jacinto. Between Florida Avenue and Cottonwood Avenue, all Build alternatives are similar. S AN LM 79 DIAMOND VALLEY LAKE PROJECT BUILD ALTERNATIVE Build Alternative 1b and Design Option 1b1: Starts in the south on Winchester Road and proceeds east to an interchange with Domenigoni, then north on the west side of the West Hemet Hills and then joins the common alignment from Florida to Cottonwood. Design Option 1b1 is on the same alignment but provides a lower roadway profile from Domenigoni to California. In the north, Alternative 1b is closer to Sanderson. TEMECULA EXISTING ROUTE E NEWPORT RD Southern Limit of Project PM R15.78 DIAMOND VALLEY LAKE Build Alternative 2a: Starts in the south on Winchester Road, proceeds north through the West Hemet Hills, then joins the alignment from Florida to Cottonwood. In the north, Alternative 2a is closer to Warren. EXISTING ROUTE E NEWPORT RD PROJECT BUILD ALTERNATIVE TEMECULA Southern Limit of Project PM R15.78 DIAMOND VALLEY LAKE PROJECT BUILD ALTERNATIVE Build Alternative 2b and Design Option 2b1: Starts in the south on Winchester Road and proceeds east to an interchange with Domenigoni, then north through the West Hemet Hills and then joins the alignment from Florida to Cottonwood. Design Option 2b1 is on the same alignment but provides a lower roadway profile from Domenigoni to California. In the north, Alternative 2b is closer to Sanderson.
© Copyright 2024