MCB PORTLAND PSU Capital Projects & Construction MCB STATE FOUNDATION UNIVERSITY 7th Floor INTERIOR OFFICE REMODEL (Block 087) 1600 SW 4TH Ave. Portland, Oregon 97201 7TH FLR. - MARKET CENTER BLDG. ARCHITECTURAL MECHANICAL / PLUMBING (7 -sheets) Dated: 6 /30 / 2014 A1.1 A1.2 A2.1 A2.2 A3.1 A4.1 A4.2 CODE NOTES (6- sheets) Dated: 6 / 30 / 2014 Cover Sheet Specification Notes Floor / Demolition Plans Ceiling / Furniture-Finish Plans Details - Sections - Elevations Schedules - Room / Doors / Hdwr. Schedules - Color / Finish G-1 M1-4 M5 ELECTRICAL (5 - sheets ) Dated: 6 / 30 / 2014 E1 - 3 E4 - 5 Sheet Index 1. 2. 3. 4. 5. 6. 7. 8. 9. Symbols / Abbreviations / Notes Plans Specifications Plans and Diagrams Specifications Remodel PSU Offices @ Market Center Bldg. 2010 OSSC. TYPE 1 Construction Group B Office Occupancy Existing Fire Sprinklers Floor Remodel area = 8300 sf +/Existing Bldg. = 9 Stories Total Bldg. Floor Area = 130,000 sf +/Typ. Net Floor Area = 14,000 sf +/- Occ. Load @ each floor = 14,000sf/ 100 sf/ occupant = 140 occupants 10. 11. 12. 13. 140 Occ. = > 50 req'd = (2) exits 100' max. com. path egress (sect.1014.3) 200' max. access travel (sect.1016.1) Refer to City Facilities Permits Agreement, GVA Kidder Mathews/Washington Capital Management and City of Portland dated 7 /6 /2010. 14. Codes - All work to conform to latest applicable codes for City of Portland, including ADA, Environmental, and Waste management regulations. Code / General Notes ( Total = 18 sheets at 34" x 22" size ) PSU Capital Projects and Construction. University Svcs. Bldg. - 617 SW Montgomery St. #202 Portland, OR 97201 (503) 725-3738 SW MARKET ST. AV S <--> Ron Blaj - Director Steve Rounds - Asst. Director Kay Byrne - Project Manager Gail Hamilton - Const Mgr. PSU Crews. Tom Arnich - Architect PSU Network -Teleco OIT Todd King Tech. Services Bldg. 2121 SW 4th Ave. #400 Portland, OR 97201 (503) 725-4434 Mech / Elect / Plumbing Engineer INSITE Group inc. Chris Wierman (503)-222-2044 Structural Engineer ABHT Structural Engineers. Clinton Ambrose (503)-222-4378 City of Portland-BDS Facility Permit Program 1900 SW 4th Ave. #5000 Portland, OR 97201 Scott Burris - Inspector (503) 823-0668 Jeff Galvin - Fire Marshal (503) 823-4032 PSU Client Contacts Kay Bryne PSU Facilities and Planning (503) 725-3738 Bldg. Manager NBS B2 Floor Level, Suite B207 PSU Campus Public Safety 503-725-4407- Non-Emergency 503-725-4404 - Emergency SW 4TH AVE. Contacts ENTRY SW MARKET ST. Main Egress Path to (2) Exit stairs. 6/30/2014 SW 4TH AVE. FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL, TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION SEE ENGINEER'S DRAWINGS and SPECIFICATIONS. Cover Sheet MARKET CENTER BLDG. Revisions : Location / Egress Plan Symbols scale: 1 /16 " = 1'- 0" Cover Sheet w/ notes, symbols, and index. no scale I:\Staff\Facilities\Projects\087_MCB\2014_MCB-Projects\2014_087_MCB_PSU Foundation-7th-Floor\2 - Design Documents\3-ACAD dwgs\A1 - MCB7Notes.dwg, 6/30/2014 9:43:14 AM, ANSI full bleed D (34.00 x 22.00 Inches) Site View Vicinity Map No Scale Date : scale: 1 /32 " = 1'- 0" East View Drawn : Checked : A1.1 A.General Items A.1. General and Code Notes -- See Cover Sheet. A.2. Contract Documents and Work - Conform to PSU General Conditions of Contract and Bid Documents. A.3. Area / Location of Work -- See drawings. A.4. All Products shall be installed per manufacturer's specifications and recommendations. Products listed shall be as noted. Approved equals shall be allowed by contractor submitted substitution request form prior to Bid Invitation deadline. Provide product submittals samples for PSU to review prior to ordering product. Product Review approval does not imply or change the contract documents without an approved change request and change order. A.5. See Schedules --- for color / finish / material / room /roof / door schedules for more specification information. A.6. Dimensions -- All drawing dimensions shall have preference over scale. Verify all dimensions prior to commencement of work. Notify PSU of any discrepancy. A.7. Structural Engineer Approvals - Penetrations of Structure by Contractor, including anchoring, coring, scraping, cutting or removal is not permitted unless approved by PSU Structural Engineer. B.Demolition B.1. General Demo --- Remove existing walls, doors, frames, finishes, electrical, mechanical, and other building items as required to accommodate new construction. Remove all abandoned mech., elect., and plumbing lines in area of work. Verify all existing structure and protect. Protect all egress paths and exits. C. Walls C.1. Wall Finish -- Smooth texture or to match existing surrounding surfaces. C.2. New Wall Assembly --- See Structural drawings for min. requirements. Walls to be minimum unless noted other wise 3 -1/2" metal studs x 20ga. @ 16" o.c. w/ 5 /8" type 'X' gyp. bd. typical both sides. C.3. Wall Bracing --- See Structural drawings for minimums. Unless notes otherwise. Brace above all walls, windows, relites, to be minimum unless noted otherwise---3-1/2" x 20 ga. metal studs @ 4' o.c. alternating direction at 45 deg. angle max. C.4. Wall Board -- Typ. Gypsum Board -- Georgia Pacific, Greenguard certified, or approved equal, smooth finish. C.5. Existing + New Wall Blocking, Patching / Painting -- Block, Patch and Prep and Paint as required to include at new and existing gypsum brd / plaster and framing, demo work, cabinetry, woodwork, all new mechanical and electrical work. Contractor to install hidden fire retardant or metal framing blocking at all wall mount accessories. D. Doors / Windows D.1. Door Wood Species --- Stain grade Maple D.2. Wood Doors --- 1-3/4" solid core by Vancouver Door Company or approved equal. Include Doors with lites, Flush doors, and multi-folding flush door types. All doors to be internally blocked for closer and panic bar installation support. D.3. Hollow Metal Frame at Doors / Relites --- Painted Finish -Ceco or approved equal 16 gauge hollow metal welded frames. D.4. Glass -- All glass to conform to City of Portland code safety impact requirements. 1 /4" thk. tempered clear glass at relites with complete metal framing surround. 1/ 2" thk. tempered clear glass at butt joint glass installations. Clear Silicone at butt joints. D.5. Hollow Metal Doors -- Painted Finish. Ceco or approved equal --16 ga.solid core interior door. E. Door Hardware E.1. Finish -- See hardware Schedule. E.2. Standards --- Provide complete installation per ADA handicap accessibility standards. All hardware to be manufactured, specified, and installed per specifications and standards per the American Society of Architectural Hardware Consultants. Review all hardware operation settings with PSU locksmith prior to final city permit inspector review. E.3. Submittal List --- Provide to PSU a complete hardware submittal list for review and approval prior to ordering and construction. F. Signage F.1. Signage -- BY PSU -- New floor and building interior signage per code, ADA, and PSU standard requirements . G.Access Control M. Insulation, Acoustical, Fire Caulk, and Safing M.1. Wall Insulation Batts -- Approved smoke / flame spread ratings per code, Certainteed, Greenguard certified approved equal R-11 unfaced batts of rock wool , in areas of new construction or restored demolition. M.2. Fire Caulking / Fire Safing --Manuf. 3M, STI, or approved equal -- 1-hr. rated include at penetrations at floors, roof, fire rated walls, concrete block walls,stairway or shaft walls, fire corridors, mechanical /electrical rooms, and vertical pipe and duct chases thru floors. M.3. Ceiling Insulation -- Same as Typical Wall Insulation Batts to be above all ceiling areas of new construction or demolition . PSU Capital Projects & Construction MCB FOUNDATION 7th Floor INTERIOR OFFICE REMODEL (Block 087) 1600 SW 4TH Ave. Portland, Oregon 97201 M.4. Fire Doors / Smoke Gaskets -- Replace at all doors in Stairs. See hardware schedule for details. G.1. None Required H. Cabinetry / Woodwork N. Ceilings H.1. New Woodwork --- All woodwork to conform to "Custom Grade" - Architectural Woodwork Institute standards and specifications. H.2. WB -- Wood Base --- 1 x 4 Maple to Match existing. I. Flooring / Base / Surfaces I.1. I.2. See Schedules. Floor Hole Patching --- Verify with Structural Engineer. For max. 4" dia holes use 6" dia. x 16 ga. galv metal plate and epoxy. Fill with 1 hr. rated fire safing and caulk. J. Paint / Coatings / Colors/ Sealants N.1. New 2' x 4' Acoustical Tiles - Replace damaged or stained existing Suspended Ceiling Tiles to match existing with Armstrong " Cortega" or approved equal. Color white, Second look type. See drawings for location area. N.2. Existing Ceiling Grid - To Remain. Any retrofit or repair to existing grid to be Heavy Duty typematerial and installation. O. Audio Visual O.1. AV Equipment / Anchors and Cabeling -- by PSU dept. of OIT . P. Telco J.1. Colors --- See Schedules. Provide (3) 8-1 /2 x 11" draw-down samples of each color on material for review. J.2. Products J.2.1. TYPE - A -- Acro Pure, Miller or approved equal, water based, Satin sheen unless noted otherwise. Primer and (2) finish coats. Satin sheen. J.2.2. TYPE - B -- 100% Acrylic for use on metal, PPG Pitt. Tech. Breakthrough or approved equal, water base, Satin sheen. Primer and (2) finish coats J.2.3. TYPE - C -- Clear Flat Finish, Waterborne Varnish, Emtech EM 8000cv, EM8428, Pre Cat Waterborne Conversion Varnish, by Target Coatings or approved equal, clear natural coating for wood. (4) coats. J.2.4. TYPE - D -- Gloss Finish, #472 Aluminum Paint. Primer and (2) coats. J.3. General Locations J.3.1. General Painting, Gypsum Board / Plaster Walls and Ceilings -- TYPE A J.3.2. Exposed Natural Wood Work including Doors, Trim or Base -- TYPE C J.3.3. Existing painted Wood Work with Existing Oil Based Paint including Doors, Frames, Trim , or Base. -TYPE B J.3.4. Metal Doors, Frames, Metal Work, Metal Ceiling grids, or Railings -- TYPE B J.3.5. Interior Hollow Metal Frames for Doors and Windows. -TYPE D J.3.6. Interior Joint Sealers -- Silicone GE, Dow, or approved equal. Sanitary type at bathrooms. J.4. General Notes : Paint all Areas of Work including exposed areas / surfaces remaining after-demolition, including exposed mechanical ductwork and electrical conduit + wiremold and exposed low voltage wiring. J.5. Filler Strip - at wall glass mullion jamb, wall head to suspended ceiling -- black closed cell neoprene filler strip by K-Mac Distribution or approved equal. K. Furnishings u t o n d e s K.1. Tack Boards -- Claridge Product and Equipment Inc. -Vinyl faced tack board, 12" mineral fiber, Class"A" Koroseal fabric, 100% vinyl w/ mitered frame, satin Anodized Alum. with clear anodic coating. K.2. White Boards -- Claridge or approved equal. Deluxe white porcelain enamel steel marker brd. with satin anodized alum. trim and tray. White # 75 low gloss. K.3. Systems Furniture - PSU to demo, provide, reconfigure, and install. P.1. Telephone and Computer Network Cabling and WIFI -- by PSU Dept. of OIT. Q.Lighting / Electrical Q.1. Electrical and Lighting --- See Electrical Engineer's drawings for more information. Protect existing as required.Provide new lighting as indicated on drawings. Q.2. Pathway & Boxes - Contractor to provide all boxes at ceiling, walls, and floors, conduit, and pathway as req'd. to include Electrical, Audio Visual, Telco, Alarms and other devises. Q.3. Exit and Emergency -- Contractor to complete Construction so as to provide minimum exit, egress, audible strobe alarms, and emergency lighting as required by City of Portland, including (1) footcandle min at floor during construction. All doors, exits, and hardware, to meet min.code requirements of the City of Portland for exits and ADA clearances. Q.4. Systems Furniture -- Provide all power conductivity, power poles and data poles, electical whips from adjacent walls, and connect to systems furniture. R.Mechanical / Air Grilles R.1. Mechanical -- See Mechanical Engineer's drawings for mechanical items. R.2. Balance HVAC system--- Contractor to Balance per code requirements and submit an Engineer's approved report for PSU Mechanical Engineer review and approval. S.Plumbing S.1. Plumbing -- See Mechanical Engineer's drawings for plumbing items. S.2. Refrigerator water -- Provide new line and finished assembly at wall with exposed valve box. S.3. Fire - Systems S.3.1. Fire Alarm / Sprinkler Systems. -- Contractor to Submit to city fire marshal and provide PSU with City of Portland fire marshal signed and dated approved fire system drawings. Refer to Mech/ Elect. Engineer drawings and specifications for additional requirements. Provide new work to conform to NFPA and include demolition, relocation, materials and labor for a complete code compliant installation. S.3.2. Fire Sprinkler Heads - Provide Quick Response Fire Sprinkler heads to match existing at all new work. Verify existing. Move fire sprinkler / heads or add new to accommodate new work per code. 6/30/2014 FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL, TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION SEE ENGINEER'S DRAWINGS and SPECIFICATIONS. Spec. Notes Revisions : L. Appliances -L.1. Relocate existing Refrigerator and water line for ice maker. Date : T. Miscellaneous T.1. XXXX Drawn : Specification I:\Staff\Facilities\Projects\087_MCB\2014_MCB-Projects\2014_087_MCB_PSU Foundation-7th-Floor\2 - Design Documents\3-ACAD dwgs\A1 - MCB7Notes.dwg, 6/30/2014 9:43:16 AM, ANSI full bleed D (34.00 x 22.00 Inches) Checked : A1.2 PSU Capital Projects & Construction MCB FOUNDATION 7th Floor INTERIOR OFFICE REMODEL (Block 087) 1600 SW 4TH Ave. Portland, Oregon 97201 Plan Notes 1. See specification sheet and room / finish schedules. 2. AREA OF WORK approx. 8300 SF +/- (cross-hatch) 3. 4. Remove existing base cabinet at new opening. Relocate existing Refrigerator. 6/30/2014 FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL, TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION SEE ENGINEER'S DRAWINGS and SPECIFICATIONS. Floor / Demo Plans Verify All Dimensions and Existing Conditions prior to accommodating new construction. Revisions : Date : Drawn : " EXISTING PLAN " DEMOLITION " NEW " FLOOR scale: 3 /32 " = 1'- 0" I:\Staff\Facilities\Projects\087_MCB\2014_MCB-Projects\2014_087_MCB_PSU Foundation-7th-Floor\2 - Design Documents\3-ACAD dwgs\A2 - MCB7Plans.dwg, 6/30/2014 9:43:18 AM, ANSI full bleed D (34.00 x 22.00 Inches) Checked : A2.1 PSU Capital Projects & Construction MCB FOUNDATION 7th Floor INTERIOR OFFICE REMODEL (Block 087) 1600 SW 4TH Ave. Portland, Oregon 97201 Plan Notes 1. 2. See specification sheet and room / finish schedules. Existing Utilities - Verify existing MEP ,Telco, Fire Sprinkler items to remain. See Engineer dwgs. 3. New Utilities - Verify locations of new mechanical, electrical, plumbing, and Telco items. See Engineer dwgs. 3.1. Provide general ceiling light switch controls at entry suite doors. 3.2. Provide min. power and telco outlets at all new cubes and remodeled offices. 3.3. Provide elect / telco whip from interior stud walls to new cube walls or provide, if necessary vert. power data poles from ceiling to top of cube. Color to match cube wall trim. 4. Relocate Existing Refrigerator. - Provide new electical outlet and new water with connection to valve at wall for ice-maker water. Relocate wall switch near new door. 5. Flat Screen Video - Secure to wall at new blocking. Verify locations of (Elect. and Telco - AV) controls at wall and at floor below conference table. Core drill floor per requirements. 6. White Board 7. Replace existing light fixtures - between grids G & F and 4 & 5 with new fixtures to match west side reception area. Verify exact locations. See Eng. dwgs. 8. Existing Suspended Acoust. Ceiling - Replace damaged tiles in area of work. Existing Grid to remain. Patch as required with heavy duty type construction and per code. 9. Existing carpet - area to be replaced by new carpet. - Patch other areas to accommodate new work. 10. Accent Wall Paint - see finish schedules, 10.1. AW-1 10.2. AW-2 TYPICAL 6/30/2014 FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL, TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION SEE ENGINEER'S DRAWINGS and SPECIFICATIONS. Ceiling / Finish Plans Verify All Dimensions and Existing Conditions prior to accommodating new construction. Revisions : Date : Drawn : Checked : CEILING FINISH / FURNITURE PLAN scale: 3 /32 " = 1'- 0" I:\Staff\Facilities\Projects\087_MCB\2014_MCB-Projects\2014_087_MCB_PSU Foundation-7th-Floor\2 - Design Documents\3-ACAD dwgs\A2 - MCB7Plans.dwg, 6/30/2014 9:43:19 AM, ANSI full bleed D (22.00 x 34.00 Inches) A2.2 d e s u t o n d e s d e s u t CEILING CEILING no RELITE DOOR +/(verify width) d e s CEILING RELITE u t u t no PSU Capital Projects & Construction MCB no GLASS WALL FOUNDATION WALL 7th Floor Flush Door 1 intregal relite / lite in door hollow metal frame 2 flush door / separated relite hollow metal frame head @ door and relite hollow metal frame all glass windows / all-glass door aluminum frame / vert. butt jt. glass door / window elevations 3/16 " = 1' - 0" head @ all-glass door aluminum frame / butt jt. glass head @ relite aluminum frame / butt jt. glass jamb @ butt joint glass aluminum frame / butt jt. glass INTERIOR OFFICE REMODEL (Block 087) 1600 SW 4TH Ave. Portland, Oregon 97201 door / window details 1-1/2 " = 1' - 0" TYPICAL SEE SPECIFICATION NOTES . RELITE RELITE d e s INSIDE RM. u t (verify width) CEILING no CEILING RELITE DOOR DOOR FLOOR Plan Notes 1. See specification sheet for notes. RELITE FLOOR +/equal (verify width) wall head @ structure 1.2. 2.2. 2.3. 2.4. 2.5. 2.6. 2.7. 2.8. 2.9. 3.2. 3.3. 3.4. 3.5. 3.6. jamb - door / intregal relite hollow metal frame 1-1/2 " = 1' - 0" 1-1/2 " = 1' - 0" 3.7. Framing and Anchoring -- See Section 1 for framing and anchoring of stud walls, doors, relites, and glass walls to structure. Typical products listed or approved equal. See spec. notes sheet A2 for more details. 3.8. 3.9. Drywall metal edge at gyp. brd. for level smooth continuous line. New Upper Wall - Provide typical vert. studwall, insulation and bracing above ceiling where full ht. walls are required per plan. Patch Drywall - smooth patch and finish paint drywall at joining of (2) walls. 5.4. 5.5. 5.6. 4. Doors / Windows Code -- Ceiling installation to be per latest city of Portland approved IBC / 25 / # 2 standards. Hangers -- Provide additional hangers at all members within 8" of the ceiling perimeter. Hanger connection devices --Secure all hangers to bldg. structure with approved connector of min 100 lb. capability. Stabilizer bar to be between all members at ceiling perimeter. Vertical Struts -- to be at 12' oc each way. Sloped Hangers -- Provide (2) counter slope hangers if more than 1 to 6 out of plumb. Trapeze Hangers around ductwork and other large obstructions. Ceiling Grid -- Suspended ceiling grid to be Heavy Duty type. Runners -- Secure cross runners between main runners. 4.1. 4.2. 4.3. 4.4. 4.5. 4.6. 4.7. 4.8. New Walls typical --- Unless noted otherwise, walls to be min. 3-1 /2" x 20 ga. metal studs @ 16" o.c.with 5 /8" type 'X' gyp. brd. both sides. Do not secure walls to suspended ceiling grid. Do not cut ceiling grid at below ceiling walls. Bracing -- At wall and windows to be min. 3-1 /2" x 20 ga. metal studs @ 4' o.c. alternating direction at 45 deg. angle max. (w/ vert. studs at window locations). Secure to L2"x2"x12" x 16 ga. metal angle at conc. structure above. Filler Strip - Jamb to Mullion - 1 /2" thk. x 2" black closed cell neoprene filler strip. Filler Strip - Wall Head to Suspended Ceiling - 1/ 4" thk. x 2" wide. Filler - Floor holes --Core Drills or existing max 4" dia holes patch with 6" dia x 18 ga. metal plate and epoxy. Fill with 2-hr. safing and fire caulk. Filler - Rigid Insulation - fire rated, secure in metal track framing. Ceiling & Wall Insulation - R-11 min. Doors and Windows. Wood door w/ lite -- 1/4" glass lite and wood stops to match door. Hollow Metal Frame . Ceiling break to accommodate continuous wall or window-door frame. Hollow Metal Frame Relites (R1 and R2) 1/ 4" clear temp glass in hollow metal frames. Continuous Ceiling - at walls that are constructed below ceiling. Glass Walls (GW) -- 1/2" clear temp. butt joint glass at jambs with alum. frame sill and continuous head over door. Clear silicone sealer at butt joints. not us ed 5.7. 5.8. 5.9. wall jamb - door / sep. relite hollow metal frame Hollow Metal Frame Sill -- Powers Fasteners at Concrete --- Typ. min. (1) 1 /2" dia flat head hd sleeve anchor-conc. embed 2-1/ 2" min. 32"o.c. through metal frame support sleeve. Wall Sill Track -- Ramset low veloc. shot pin anchors at Concrete -- Typ. min. 0.145 " dia. embed min. 3 /4" at 16" o.c. Wall Head Track - 18 ga. Slotted expansion head track fastened to structure with 1 /4" dia Hit Anchors at concrete min 3 /4" embed at 16"oc. Alt. condition: double anchors when trackspan is between waffle slab ribs. Hollow Metal Frame Fastener Straps --(3) min per jamb. Secure to framing with Typ. min. (3) #8 Tek screws each side of strap. Window Head. -- Steeler Tek Screws Typ. min. #8 x 3/4 " at 12" o.c. --secure to metal wall track...not to suspended ceiling grid. Joint of (2) Vertical Walls - Use (2) #8 at 16" oc to join top track of existing wall to new sill track of upper wall. sill @ relite aluminum frame / butt jt. glass New Wall Above Glass Door (GD)-- 1/2" thick clear tempered glass, to butt joint glass walls, with 1" x door ht. manuf. tublar alum door pull each side. Alum. frame head and sill, floor pivot, hidden in frame, ADA closer at head. At Suite Entry locations for door exit out requirements provide push activated latch release at vert. exit bar. Key latch at min 36" ht. at exterior side of door always activated by interior vert. push bar. Butt Joint -- Clear Transparent Caulk Butt Joint glass at wall and at glass joints. not use d 3. Walls , Bracing, Fillers, and Insulation. 3.1. sill @ relite hollow metal frame door / window details 2. Ceilings 2.1. head @ wall below ceiling wall details 1. General Items 1.1. wall above ceiling wall jamb @ window equal 4.9. not us Existing Wall or Door / Window ed 6/30/2014 FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL, TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION SEE ENGINEER'S DRAWINGS and SPECIFICATIONS. 5. Fasteners (Secured to Structure) 5.1. 5.2. 5.3. Wall Bracing -- 16 ga . x 3-1 /2" metal stud min. 48" oc alternating -- Fasteners to metal framing includes, brace to angle at deck, or brace to wall plate track. Steeler Tek Screws --- Typ. min. (3) #8 x 3/4 . Do not screw to suspended ceiling grid. Alum. Window Sill -- Simpson Titen HD Mini Screws at Concrete --- Typ. min. 1/4" dia. -- conc. embed min 1-3/4" at 16" o.c. Angle to Deck --12" x 16 ga. Fasten with Powers Fasteners Hit Anchors at Concrete --- Typ. min (3)1 /4" dia -conc. embed min. 3/4" at 3" o.c. Wall Door / Window Metal Stud Wall Metal Stud Wall Hollow Metal Frames WB WF Below Ceiling Full Height Continuous WF - A Above Ceiling L Door with Lite F Flush Door R Glass Relites d e s u t no Door / Window Aluminum Frames , Vert. Butt Joint Glass GD Glass Door GW Glass Wall Details / Sections Revisions : Date : Drawn : bldg section / detail notes bldg. section - diagramatic 3 /16 " = 1' - 0" 3 /8 " = 1' - 0" See details and section this sheet. Wall I:\Staff\Facilities\Projects\087_MCB\2014_MCB-Projects\2014_087_MCB_PSU Foundation-7th-Floor\2 - Design Documents\3-ACAD dwgs\A3 - MCB7Det-Elev.dwg, 6/30/2014 9:43:21 AM, ANSI full bleed D (34.00 x 22.00 Inches) Checked : A3.1 PSU Capital Projects & Construction MCB FOUNDATION 7th Floor INTERIOR OFFICE REMODEL (Block 087) 1600 SW 4TH Ave. Portland, Oregon 97201 Plan Notes 1. See specification sheet for notes. not used not used 6/30/2014 Door Hardware List FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL, TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION SEE ENGINEER'S DRAWINGS and SPECIFICATIONS. Rooms / Doors Revisions : Date : Drawn : schedules no scale I:\Staff\Facilities\Projects\087_MCB\2014_MCB-Projects\2014_087_MCB_PSU Foundation-7th-Floor\2 - Design Documents\3-ACAD dwgs\A4 - MCB7Schedules.dwg, 6/30/2014 9:43:24 AM, ANSI full bleed D (34.00 x 22.00 Inches) Checked : A4.1 PSU Capital Projects & Construction MCB FOUNDATION 7th Floor INTERIOR OFFICE REMODEL (Block 087) 1600 SW 4TH Ave. Portland, Oregon 97201 Plan Notes 1. See specification sheet for notes and ALTERNATES. not used not used not used not used 6/30/2014 FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL, TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION SEE ENGINEER'S DRAWINGS and SPECIFICATIONS. Colors and Finish Revisions : Date : Drawn : schedules no scale I:\Staff\Facilities\Projects\087_MCB\2014_MCB-Projects\2014_087_MCB_PSU Foundation-7th-Floor\2 - Design Documents\3-ACAD dwgs\A4 - MCB7Schedules.dwg, 6/30/2014 9:43:24 AM, ANSI full bleed D (34.00 x 22.00 Inches) Checked : A4.2
© Copyright 2024