3 CONTACT PERSONS F DESCRIPTION: PERSON: PROJECT MANAGER JEFF BURTON MECHANICAL ENGINEER BLAIR HAWN 2 MECHANICAL SYMBOLS LIST MECHANICAL SYMBOLS LIST SYMBOL: SYMBOL: DESCRIPTION: 2. 3. 4. PIPE CAP EXISTING TO BE REMOVED PIPE DOWN NEW PIPE UP OR UP/DOWN EXISTING DUCT TO REMAIN UNDERFLOOR PIPING (LONG DASHES) PITCH PIPE IN DIRECTION EXISTING DUCT TO BE REMOVED THE DRAWINGS ARE INTENDED TO INDICATE THE SCOPE OF DEMOLITION WORK REQUIRED AND DO NOT INDICATE EVERY PIPE, DUCT, OR PIECE OF EQUIPMENT THAT MUST BE REMOVED. ACCESSIBILITY OF EQUIPMENT AND SYSTEMS IS NOT SHOWN NOR SHOULD IT BE INFERRED. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID AND VERIFY EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL PENETRATIONS CREATED BY REMOVAL OF EQUIPMENT, DUCTWORK, PIPING, ETC. TO MATCH EXISTING. REPAIR ADJACENT CONSTRUCTION AND FINISHES DAMAGED DURING DEMOLITION AND EXTENSION WORK. PATCH TO MATCH ORIGINAL CONSTRUCTION. VERIFY ALTERNATIVE OR SPECIAL REPAIR METHODS WITH ARCHITECT/ENGINEER BEFORE PROCEEDING WITH DEMOLITION. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT THAT HAS BEEN REMOVED. MECHANICAL ITEMS REMOVED AND NOT RELOCATED REMAIN THE PROPERTY OF THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF MATERIAL THE OWNER DOES NOT WANT TO REUSE OR RETAIN FOR MAINTENANCE PURPOSES. DIRECTION OF FLOW IN PIPE NEW CONNECTION NEW DUCT SHUTOFF VALVE NORMALLY OPEN FLEXIBLE DUCT SHUTOFF VALVE NORMALLY CLOSED 0.5 MANUAL VOLUME DAMPER D PRESSURE REDUCING VALVE (LIQUID/GAS) PRESSURE/TEMPERATURE TEST PLUG DUCT UP REDUCER - REFERENCE SPECIFICATION FOR CONCENTRIC/ECCENTRIC AND FOT/FOB SUPPLY/OUTSIDE AIR DUCT SECTION "WYE" - STRAINER RETURN AIR DUCT SECTION 4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION 1. D CD-E 8/200 EXISTING AIR TERMINAL PROPERTIES CD-1 6/115 AIR TERMINAL PROPERTIES SYMBOL NECK SIZE/CFM ### SYMBOL NECK SIZE/CFM TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE) H HUMIDITY SENSOR T THERMOSTAT/SENSOR T THERMOSTAT/SENSOR w/HEAVY DUTY ENCLOSURE 2 CARBON DIOXIDE SENSOR 2 CARBON DIOXIDE SENSOR W/HEAVY DUTY ENCLOSURE co co CWR CHILLED WATER RETURN CWS CHILLED WATER SUPPLY D DRAIN LINE G NATURAL GAS HWR HEATING WATER RETURN HWS HEATING WATER SUPPLY LIQ REFRIGERANT LIQUID SUC REFRIGERANT SUCTION LPC LOW PRESSURE CONDENSATE LPS LOW PRESSURE STEAM CS CONDENSER WATER SUPPLY CR CONDENSER WATER RETURN GENERAL CONTROL NOTES: 1. 2. 3. 4. 5. 6. 7. C 8. 9. 10. KJWW # 12.0374.00 - Northbrook Public Library - Renovations || \\svkjwwrvt4\12\12.0374.00\MEPT13_12.0374.00_NORTHBROOK LIBRARY_CENTRAL.rvt 11. 12. 13. 14. MECHANICAL COVER SHEET GROUND LEVEL - MECHANICAL DEMOLITION SECOND LEVEL - MECHANICAL DEMOLITION ROOF LEVEL - MECHANICAL DEMOLITION GROUND LEVEL - VENTILATION PLAN SECOND LEVEL - VENTILATION PLAN ROOF LEVEL - VENTILATION PLAN GROUND LEVEL - HEATING PLAN SECOND LEVEL - HEATING PLAN ROOF LEVEL - HEATING PLAN ENLARGED MECHANICAL ROOM PLAN MECHANICAL CONTROL DIAGRAMS MECHANICAL CONTROL DIAGRAMS MECHANICAL CONTROL DIAGRAMS MECHANICAL DETAILS MECHANICAL DETAILS MECHANICAL DETAILS MECHANICAL DETAILS MECHANICAL SCHEDULES MECHANICAL SCHEDULES DUCT DOWN EXHAUST/RELIEF AIR DUCT SECTION E BALANCING VALVE (NO. INDICATES GPM) CHECK VALVE DROP IN DIRECTION OF AIR FLOW GENERAL MECHANICAL NOTES DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT ACTUAL INSTALLATION CONDITIONS. DRAWINGS SHOW THE GENERAL ARRANGEMENT OF ALL DUCTWORK, PIPING, EQUIPMENT, ETC., AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT. 2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR PHYSICALLY AT SITE. READ ALL SPECIFICATIONS. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES. 3. LAYOUT AND COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH ANY FABRICATION OR EQUIPMENT ORDERS. 4. CONTRACTOR IS RESPONSIBLE FOR REVIEW OF SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKING REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER ACCESS. 5. ANY CHANGES THAT ARE REQUIRED TO ELIMINATE CONFLICTS AND RESULT FROM A FAILURE TO COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR EXPENSE TO THE OWNER. 6. CAULK ALL PIPE PENETRATIONS OF FULL HEIGHT NON FIRE RATED WALLS, PARTITIONS, FLOORS AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS WITHIN THE ROOMS. 7. CONTRACTOR IS RESPONSIBLE FOR ALL COST ASSOCIATED WITH ELECTRICAL CHANGES REQUIRED FOR EQUIPMENT DIFFERENT THAN SCHEDULED. 8. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATIONS OF ALL CEILING MOUNTED DEVICES. 9. ALIGN WALL SWITCHES AND SENSORS WHEN IN CLOSE PROXIMITY TO EACH OTHER. 10. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT. MECHANICAL SHEET INDEX M-000 MD-101 MD-102 MD-103 M-101 M-102 M-103 M-201 M-202 M-203 M-301 M-401 M-402 M-403 M-601 M-602 M-603 M-604 M-701 M-702 DESCRIPTION: EXISTING TO REMAIN GENERAL MECHANICAL DEMOLITION NOTES 1. 1 REFER TO EQUIPMENT SCHEDULES TO CROSS REFERENCE WHICH CONTROL DIAGRAMS APPLY TO WHICH ITEMS OF EQUIPMENT. REFER TO TERMINAL AIR BOX (TAB) SCHEDULES FOR TEMP SENSOR REQUIREMENTS FOR EACH TAB. EACH D.I., D.O., A.I. AND A.O. POINT SHOWN FOR ALL CONTROL DIAGRAMS SHALL BE DISCRETE FROM ALL OTHER POINTS EXCEPT AS SPECIFICALLY NOTED. ALL WIRING, CONTROL COMPONENTS, DEVICES AND PROGRAMMING SHOWN ON THE CONTROL DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE. ALL MODULATING DAMPER AND VALVE ACTUATORS SHOWN WITH POSITION FEEDBACK SHALL HAVE THE VALVE POSITION DISPLAYED ON GRAPHICAL SCREEN ADJACENT TO THE DAMPER/VALVE COMMAND SIGNAL. DISPLAYED VALVE POSITION SHALL BE FROM THE FEEDBACK DEVICE/CIRCUIT (OUTPUT SIGNAL FROM THE FMCS TO THE ACTUATOR IS NOT ACCEPTABLE). MODULATING SIGNALS SHALL BE DISPAYED AS % OPEN (SIGNALS DISPLAYED AS % CLOSED ARE NOT ACCEPTABLE). PRESSURE TRANSMITTERS WHOSE SIGNAL IS UTILIZED FOR MAINTAINING DUCT STATIC PRESSURE SHALL BE WIRED DIRECTLY TO THE CONTROLLER WHICH MODULATES FAN SPEED. SIGNAL SHALL BE COMPLETELY INDEPENDENT OF THE FMCS NETWORK. PRESSURE TRANSMITTERS WHOSE SIGNAL IS UTILIZED FOR MAINTAINING DIFFERENTIAL PRESSURE OF ANY PUMPED WATER SYSTEM SHALL BE WIRED DIRECTLY TO THE CONTROLLER WHICH MODULATES PUMP SPEED. SIGNAL SHALL BE COMPLETELY INDEPENDENT OF THE FMCS NETWORK. ALL CONTROL COMPONENTS SUCH AS RELAYS, SWITCHES, DDC CONTROLLERS, ETC. SHALL BE MOUNTED IN STEEL ENCLOSURES WITH STEEL MOUNTING BACKPLATES PER SPECIFICATION 23 09 00. EACH CONTROL PANEL SHALL HAVE A LAMINATED COPY OF THE APPLICABLE SEQUENCE OF OPERATION AND CONTROL DIAGRAM INDICATING THE POINTS, COMPONENTS AND OPERATION OF EQUIPMENT ASSOCIATED WITH EACH PANEL. REFER TO SECTION 23 09 00 FOR ADDITIONAL REQUIREMENTS. CONTRACTOR SHALL EXTEND CONTROL SIGNAL FROM ADDRESSABLE RELAY DEVICE SERVING EACH ROOFTOP UNIT. REFER TO ELECTRICAL DRAWINGS FOR LOCATIONS. CONTRACTOR SHALL EXTEND AND TERMINATE WIRING AS REQUIRED FOR EQUIPMENT SHUTDOWN. CONTRACTOR SHALL EXTEND 24 VOLT POWER FROM CONTROL POWER SHOWN ON FLOOR PLANS TO ALL TERMINAL AIR BOX CONTROLLERS JUNCTION BOX. CONTRACTOR SHALL PROVIDE ALL WIRING, SUPPORTS, FUSING SPACE, TOGGLE SWITCHES, AND ALL OTHER ELECTRICAL COMPONENTS REQUIRED FOR COMPLETE INSTALLATION. CONTROL DIAGRAMS ARE SCHEMATIC IN NATURE AND DO NOT SHOW ALL REQUIRED CONTROL DEVICES AND COMPONENTS. REFER TO FLOOR PLANS, FLOW DIAGRAMS AND DETAILS FOR ADDITIONAL CONTROL DEVICES, COMPONENTS AND REQUIREMENTS NOT SHOWN ON THESE CONTROL DRAWINGS. CONTRACTOR SHALL PROVIDE ALL CONTROL COMPONENTS AND ACCESSORIES AS REQUIRED FOR EQUIPMENT TO BE CONTROLLED AS DESCRIBED IN THE SEQUENCE OF OPERATION REGARDLESS OF WHETHER ALL CONTROL COMPONENTS OR POINTS ARE SHOWN IN THE ASSOCIATED CONTROL DIAGRAM. TCC SHALL EXTEND 120 VOLT POWER FROM THE AVAILABLE CIRCUITS TO THE BAS CONTROL PANELS. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL PANEL LOCATIONS. COORDINATE LOCATIONS WITH THE EC. TCC SHALL PROVIDE ALL WIRING, CONDUIT, TRANSFORMERS, FUSING AND ALL OTHER COMPONENTS REQUIRED FOR COMPLETE INSTALLATION. AD ACCESS DOOR AFF ABOVE FINISHED FLOOR EA EXHAUST/RELIEF AIR E.C. ELECTRICAL CONTRACTOR FD FIRE DAMPER G.C. GENERAL CONTRACTOR NC NEW CONNECTION OA OUTSIDE AIR P.C. PLUMBING CONTRACTOR RA RETURN AIR SA SUPPLY AIR TD TRANSFER DUCT DUCT / PIPE LAGGING CONTROL SYMBOLS LIST CONTROL SYMBOLS LIST SYMBOL: SYMBOL: DESCRIPTION: FAN EA NORMALLY OPEN OA OUTSIDE AIR RA RETURN AIR SA SUPPLY AIR FDBK FEEDBACK FMCS FACILITY MANAGEMENT CONTROL SYSTEM STATIC SWITCH C 2 CARBON DIOXIDE SENSOR H HUMIDISTAT/SENSOR (DUCT MOUNTED) P PRESSURE SENSOR (DUCT MOUNTED) TCC TEMPERATURE SENSOR (DUCT MOUNTED) ACTUATOR DP DIFFERENTIAL PRESSURE SWITCH CS CURRENT SWITCH FM FLOW METER SP STATIC PRESSURE SENSOR HWR HEATING WATER RETURN HWS HEATING WATER SUPPLY CONTROL VALVE (THREE-WAY) SEAL TEMPERATURE CONTROLS CONTRACTOR AI ANALOG INPUT AO ANALOG OUTPUT T ACT EXHAUST/RELIEF AIR N.O. PUMP SP DESCRIPTION: 1201 CEDAR LANE NORTHBROOK, IL 60062 4 AUDITORIUM AND FIRST FLOOR IMPROVEMENTS 5 NORTHBROOK PUBLIC LIBRARY 6 KEY PLAN DI DIGITAL INPUT DO DIGITAL OUTPUT HEATING/COOLING COIL SCALE CONTROL VALVE (TWO-WAY) T TEMPERATURE SENSOR WITH WELL THERMOMETER WITH WELL (FILLED TYPE) P NO SCALE FILTER PRESSURE GAUGE (FURNISHED WITH BALL VALVE) TERMINAL AIR BOX W/REHEAT COIL P PRESSURE SENSOR WITH WELL OPPOSED BLADE DAMPER PARALLEL BLADE DAMPER B 2 1 ISSUED FOR BID PERMIT RESPONSE #1 ISSUED FOR PERMIT Desccription No. 02/27/14 02/06/14 12/12/13 Date REVISIONS DRAWN BY DAW APPROVED BY PMM BLH CHECKED BY FEBRUARY 27, 2014 DATE TITLE MECHANICAL COVER SHEET A FIRE BARRIER DESIGNATIONS THE SYMBOLS SHOWN ARE FOR THE CONVIENIENCE OF THE CONTRACTOR. THE CONTRACTOR SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT. ALL FLOOR, FLOOR CEILING, AND ROOF CEILING ASSEMBLIES SHALL BE DESIGNATED AS 1 HOUR FIRE , BARRIER(S), UNLESS NOTED OTHERWISE ON THE PLANS. 1 HOUR FIRE BARRIER PROJECT NO. 1100 WARRENVILLE ROAD, SUITE 400W NAPERVILLE, ILLINOIS 60563 630.527.2320 FAX: 630.527.2321 www.kjww.com Experience you can build on. TM PROJECT # 12.0374.00 Illinois Design Firm Registration #184-000973 KJWW ENGINEERING RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF KJWW ENGINEERING AND SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF KJWW ENGINEERING. © 2014 KJWW, P.C. ENGINEERING CONSULTANTS 0 REFERENCE SCALE IN INCHES 1 2 3 M-000 SHEET NO. 50043997
© Copyright 2024