Cover Sheet: Dr. Qiong Liu, P.E. PTOE Director, Public Works Department Date Jennifer E. Doody, P.E. CFM Manager, Development and Flood Control Division Date Lorena Candelario, SR/WA Manager, Real Property Services Division Date Ismael Garza, P.E. PTOE CNLV Traffic Engineer Date Utilities Department - Engineering Services Division Date Approval of these plans shall not be construed to be a perm it for construction, a com m itm ent to supply water and/or sewer service, or an approval of any violation of C N LV water and/or sewer service rules and regulations or design and construction standards. CNLV Fire Department Date Grading Plan Sheets: Jennifer E. Doody, P.E. CFM Manager, Development and Flood Control Division Date Utility Plan Sheets: Utilities Department - Engineering Services Division Date Approval of these plans shall not be construed to be a perm it for construction, a com m itm ent to supply water and/or sewer service, or an approval of any violation of C N LV water and/or sewer service rules and regulations or design and construction standards. CNLV Fire Department Date Lorena Candelario, SR/WA Date Manager, Real Property Services Division (Outside city water plans only) Temp. Fire Hydrant: Utilities Department - Engineering Services Division Date Approval of these plans shall not be construed to be a perm it for construction, a com m itm ent to supply water and/or sewer service, or an approval of any violation of C N LV water and/or sewer service rules and regulations or design and construction standards. Traffic Plan Sheets: Ismael Garza, P.E. PTOE CNLV Traffic Engineer Rev. January 27, 2010 Date Development and Flood Control Division • 2266 Civic Center Drive • North Las Vegas, NV 89030 Ph. (702) 633-1200 • Fax (702) 649-4696 • TDD (800) 326-6868 www.cityofnorthlasvegas.com
© Copyright 2024