This section shows SAMPLE crossing plan that needs to be submitted with each crossing request. Crossing plan should have clear identification of proposed facility and existing facility. Secondly this section requires applicant to provide tag numbers of AltaLink’s powerpole and distances to crossing location. POWERPOLE/TOWER (1) TAG#............. (e.g.904L76) POWERPOLE/TOWER (1) DIRECTION: East/West/North/South POWERPOLE/TOWER (2) TAG#............. (e.g.904L76) POWERPOLE/TOWER (2) DIRECTION: East/West/North/South DISTANCES FROM POWERPOLE/TOWER TO EDGE OF PROPOSED RIGHT OF WAY………… meters NOTE: ‐ A minimum separation of 10.0 meters is required between all AltaLink's powerpoles, anchors and any soil disturbance. ‐ A minimum separation of 25.0 meters is required between all AltaLink's towers, anchors and any soil disturbance. Section: B
This section shows SAMPLE survey data sheet that needs to be submitted with each crossing request. All details on surveyor data sheet need to be filled. Blank copy of surveyors data sheet is available for download on www.AltaLink.ca. Section: C
This section is required when abvoe ground facility is proposed. In this section applicant will need to provide following details on above ground facility: ‐
Description on above ground facility :  What is it? ‐  How it will be installed above ground? ‐  What it is made of? ‐ ‐
‐
‐
‐
‐
Any ground elevation change occuring? – Distance from existing ground to highest point of proposed facility ‐ …………meters (if applicable) Height of above ground facility ‐ ……………meters (if applicable) Permanent/temporary? ‐ Drawings of proposed facility ‐ Section: D
‐
‐
‐
Voltages of upcoming powerline: ……………kV Upcoming powerline conductor type: Ruling span of upcoming powerline: …........meters Span length of crossing span (distance from first powerpole to second powerpole): ……...meters ‐
‐
‐
‐
‐
‐
‐
‐
‐
Number of insulators: Distance between AltaLink’s powerpole and closest phase of upcoming powerline: ……….meters Permanent/temporary : AEUC and CSA clearance requirement between two circuits at crossing location: ………..meters Calculated clearance between line of sight of upcoming powerline and lowest wire of AltaLink’s powerline sagging at 100⁰C at crossing location: ………. meters (if available) Drawings of power pole that will be located on either side of AltaLink powerline: Ground elevation change occurring at crossing location? : If answered “yes” to above question then specify following details: Cut: …….... meters Fill: ………. meters Height/distance from existing ground to upcoming powerline’s line of sight at crossing location: …….. meters Section: E This section shows SAMPLE well site plan that is required with each well site proximity request. This plan should show distances between AltaLink’s powerlines and well site as shown in plan below. Two distances are required for this type of request: 1). Distance between AltaLink’s closest right of way boundary and well site: ………….meters 2). Distance between AltaLink’s closest power line (wire) and well site: ………….meters *Courtesy of Boundary Technical Group Inc. Section: F
This section shows SAMPLE plan of pipeline proximity request that each pipeline or cable proximity request requires. SECTION: G
This section shows AltaLink requirement when pipeline is paralleling AltaLink powerline. This type of drawing is required when minimum separation requirements are not fulfilled. Minimum separation requirements: 10.0m of distance will need to be maintained between any soil disturbance and wood pole. 25.0m of distance will need to be maintained between any soil disturbance and steel tower. Details in this section need to be filled out based on worst case scenario (i.e.: lowest separation between powerpole and edge of trench/steepest slope of trench...). X1: …..meters
X2: …..meters
Y1: …..meters
Y2: …..meters
Z:
Type of pipeline:
Method of pipeline installation:
Engineer stamp Section: H
This section shows SAMPLE plan that is required with each road proximity request.
*Courtesy of Boundary Technical Group Inc. Section: I
This section shows SAMPLE plan that is required with each log deck proximity request. Section: J
This section shows SAMPLE plan that is required with each traffic signal/light pole proximity & encroachment request. On this plan distance between each light/traffic signal and powerline needs to be shown clearly. If lights/traffic signal has devit arms then distance need to be shown between closest edge of light pole/traffic signal and powerline. Section: K
This section shows SAMPLE specification drawing that is required for each type of light/traffic signal that is
being used in project. This type of drawing needs to be submitted with traffic signal/light poriximity &
encroachment request.
Section: L
This section shows SAMPLE plan of riser site proximity request that is required with each riser site/metering site proximity request. Distance between edge of AltaLink right of way/VCE/LOC/EZE and closest edge of riser site/pumping
station/metering station: ……….meters
Section: M
This section shows SAMPLE plan for houses proposed in proximity to AltaLink’s right of way. This type of plan is required with each house proximity request. Section: N
If house is proposed within AltaLink provided powerline horizontal setback then this type of plans needs to
be submitted with each house proximity request. This plan should have house’s maximum height and all
the facilities will be located in the lot.
SECTION: O
‐
‐
‐
Voltages of upcoming powerline: ……………kV Upcoming powerline conductor type: Ruling span of upcoming powerline: …........meters Maximum/highest span length of upcoming powerline: ……...meters ‐
‐
‐
‐
‐
‐
Number of insulators: Distance between AltaLink’s closest phase and closest phase of upcoming powerline: ……….meters Distance from AltaLink’s centerline of powerline to outer most phase of upcoming powerline:……… meters Permanent/temporary : Drawings: Section: P
This section shows SAMPLE plan that is required with each temporary workspace proximity request. Section: Q
This section shows SAMPLE of plan that is required with each road widening request. This plan should
show all utilities clearly and extra right of way that is purchased for road widening (if applicable).
Project schedule: