Hva har skjedd siden sist? Morten Person – ÅSC Deputy Marine Ops. Manager Haramskonferansen Brattvåg, Februar 13th 2014 Classification: Internal 2013-11-18 Haramskonferansen 2014 Åsgard Subsea Compression Project ÅSC, Hva har skjedd siden sist? – Agenda; - Kort status Åsgard Subsea Compression Februar 2014 - ÅSC Modul håndtering; krav til intervensjon - Endringer og Modifikasjoner siden 2011 til nå - Modell testing for å kartlegge krefter - SHS Status - Bruk av North Sea Giant & SHS 2018 2 Classification: Internal 2013-11-18 •Åsgard transport •Åsgard C •Åsgard B •Smørbukk •Åsgard A •Smørbukk sør •Kristin Partners Statoil ASA (operator) 34,57 % Eni Norge AS 14,82 % Exxon Mobil E&P Norway AS Petoro AS Total E&P Norge AS 7,24 % 35,69 % 7,68 % •Åsgard transport to Kårstø •Midgard SCSt Sail Away Aker Egersund - 18. Juni 2013 Åsgard Subsea Compression Station 4 - Classification: Internal 2011-11-10 27. Juni 2013 Classif ication •5 4. Juli 2013 Classif ication •6 Åsgard B ÅSC Marine Operations 2013 X From Yttergryta S-7000 ÅSG A Mod, SCMS, SCSt 12 Days Y Åsgard A North Sea Giant Lorelay Risers, RFO, Spools, Tie-In Pipelines and PLEMs 215 Days 97 Days Vessel Days in 2013; 706 Deep Orient Riser Replacement ÅSG A 92 Days Olympic Challenger Tie-in, RFO 88 Days Z Rockpiper Rock Installation 72 Days Volstad Surveyor Survey Hot tap tee 130 Days From Mikkel Åsgard B ÅSC Field Status – Today.... From Yttergryta X Subsea Line Legend Handed over to Drift (decommissioned) FCG Completed (Flooded) Installed (Empty) Spool Legend RB-SC-102 Handed over to Drift Tied-in (not flushed/leaktested) Installed (not tied-in) X-102 To be Installed Y Åsgard A Existing lines/spools SC-102 Y-105 Y-104 Z-101 Z SCMS-A SC-101 Hot tap tee From Mikkel Haramskonferansen 2014 Åsgard Subsea Compression Project ÅSC, Hva har skjedd siden sist? – Agenda; - Kort status Åsgard Subsea Compression Februar 2014 - ÅSC Modul håndtering; krav til intervensjon & fartøy - Endringer og Modifikasjoner siden 2011 til nå - Modell testing for å kartlegge krefter - SHS Status - Bruk av North Sea Giant & SHS 2018 9 Classification: Internal 2013-11-18 Åsgard Subsea Compression – BIG THINGS! Åsgard Subsea Compression – Svære Greier! Compressor train assembled on cassette base frame 289 tons 12 x 8 x 11 m 235 tons 15 x 10 x 8 m 107 tons 9x6x6m 210 tons 8 x 8 x 12 m 45 tons 5x5x6m 2011-06-14 Availability Requirements • Availability is MTBF (Mean Time Before Failure) & Repair Time • For Åsgard, availability is set to ~96% uptime of subsea plant (20 d pr year) • Means; REPAIR TIME = 5 days response time + 5 d replacement / year • Means; COMPRESSOR MODULE REPAIR IN Hs = 4.5m Hs = 4.5m / Hmax = 9m ???????? Are you CRAZZZY? • Crane operations / heavy structures are normally < 2.5m Hs • Guided system for modules is required, i.e. Horizontal Forces • No heavy manned operations at deck, e.g. sea fastening • Vessel without green water on deck required • Strong enough modules – Structural Integrity! Hs = 4.5m / Hmax = 9m ???????? Structural Integrity • Module Design Criteria in Aker Contract (2010); • DAF = 2.0 of Submerged weight (Slack Sling Criteria) • Modules to be designed for Guiding / Handling System (not defined) • Installation forces to be calculated by Technip (2012) • North Sea Giant – RAO • Orcaflex - Irregular waves – DnV «Planning of Marine Operations» • Model testing Drag / Added Mass / Slamming Coeffisients • Aker to verify structural integrity (after modules being built ) • VERY EXITING………… Results – Installation Criteria @ Structural Integrity Inlet Cooler Module Compressor Module + 4 more ~2.5 m Hs ~4.5 m Hs 15 x 10 x 8 m 240 Tons 12 x 8 x 11 m 289 Tons 16 Classification: Internal 2012-01-03 Haramskonferansen 2014 Åsgard Subsea Compression Project ÅSC, Hva har skjedd siden sist? – Agenda; - Kort status Åsgard Subsea Compression Februar 2014 - ÅSC Modul håndtering; krav til intervensjon - Endringer og Modifikasjoner siden 2011 til nå - Modell testing for å kartlegge krefter - SHS Status - Bruk av North Sea Giant & SHS 2018 17 Classification: Internal 2013-11-18 NSG & SHS - Interim Intervention Solution • Built in 2011 • World largest Construction vessel in its class – 160 x 30m • DP3 capabilities • Large deck space (2900 m2) • 400 and 50 Tons cranes • Voith Schneider Propulsion Hva har skjedd siden sist? Axtech konsept – Tilbud, sent 2011 Kompressor vekt; 150t SHS Høyde; 24m 19 Classification: Internal 2013-11-18 Contract Award, 2Q2012 Kompressor vekt; 220t SHS Høyde; 28m Hva har skjedd siden sist? 3 moduler pr. tur, 3Q2012 Kompressor vekt; 290t SHS Høyde; 35m 20 Classification: Internal 2013-11-18 2 moduler pr tur, 4Q2012 Kompressor vekt; 290t SHS Høyde; 33m Hva har skjedd siden sist? Optimalisert “Palle Ramme”, 2013 Våt parkering av “syk” modul Kompressor vekt; 290t SHS Høyde; 30m 21 Classification: Internal 2013-11-18 Hva har skjedd siden sist? 30m Ramme 24m Palle Axtech konsept – Tilbud, sent 2011 Kompressor vekt; 150t SHS Høyde; 24m 22 Classification: Internal 2013-11-18 Optimalisert “Palle Ramme”, 2014 Kompressor vekt; 290t SHS Høyde; 30m Optimised Seafasten & Grillage Skids Inlet Cooler Compressor Spool Interface Discharge Cooler Scrubber CPDU Haramskonferansen 2014 Åsgard Subsea Compression Project ÅSC, Hva har skjedd siden sist? – Agenda; - Kort status Åsgard Subsea Compression Februar 2014 - ÅSC Modul håndtering; krav til intervensjon - Endringer og Modifikasjoner siden 2011 til nå - Modell testing for å kartlegge krefter - SHS Status - Bruk av North Sea Giant & SHS 2018 24 Classification: Internal 2013-11-18 Conclusive Model Testing Model Testing – Campaign 1 Forced Oscillation and Slamming Tests in Calm Water Definition of the hydrodynamic coefficients to be used in the analysis Led to a significant reduction in the drag loads compared to previous analysis based on DNV coefficients 25 Classification: Internal 2013-11-18 Model Testing – Campaign 2 Fixed Modules in Regular Waves with and without current Study of the wave loads during the splash zone crossing Little influence of wave period and current, less conservative estimation of slamming Realization of the same setup in OrcaFlex and SIMO show good agreement and conservatism in the peak loads Conclusive Model Testing Model Testing – Campaign 3 Vessel in Irregular Waves - SHS and Moonpool Estimation of loads in scenarios closer to reality The loads from analysis (used in the structural design) are proved to be on the safe side The scales effects are verified to be acceptable (1:30 vs. 1:10) No green water on deck, some spray 26 Classification: Internal 2013-11-18 Conclusive Model Testing Compressor module: 11m x 7.6m x 10.8m (L x W x H) 300Te (installation mass) 333Te (retrieval mass) Load reduction in Hs 4.5m (from DNV approach vs. Model testing results) DNV calculation Max. Longitudinal force (Te) 370 Max. Lateral force (Te) 97 Max. Vertical force (Te) 676 27 Classification: Internal 2013-11-18 Model test Load Reduction 188 49 % 55 43 % 512 24 % Conclusive Model Testing Moon Pool Modules Pump Pump Trafo CPDU Trafo MEG Module SCM Tool Baskets Sliding Spools 28 Classification: Internal 2013-11-18 Conclusive Model Testing Moon Pool Pump Module Significant reduction in forces in model testing results compared to DNV results in moonpool. (use of Orcaflex based on DNV recommendations) Max shear Max shear force force – Module Elevation Model testing Orcaflex (DNV) kN kN Half below Hull Below Hull 29 Classification: Internal 70,6 69,1 2013-11-18 192,4 139,6 Pump Installation Mass = 48t Maximum vertical forces on the Pump module (with 10% contingency) is 62t “DAF” = 1.29 (in Hs 4.5m) Haramskonferansen 2014 Åsgard Subsea Compression Project ÅSC, Hva har skjedd siden sist? – Agenda; - Kort status Åsgard Subsea Compression Februar 2014 - ÅSC Modul håndtering; krav til intervensjon - Endringer og Modifikasjoner siden 2011 til nå - SHS Status - Bruk av North Sea Giant & SHS 2018 30 Classification: Internal 2013-11-18 SHS Fabrication status February 13th 2014 SHS Weights King Post 105t Superstructure 380t 2 x MLWs 172t Misc 45t Tools 110t TOTAL 812 SHS Dimensions Height 30m Swing Radius 13m Width 18m SHS – Special Handling System, verdens råeste! Pr 04.01.14 32 Classification: Internal 2013-10-22 SHS Machining, +/- 0.02 mm 33 Classification: Internal 2013-11-18 Marine Ops - Pictures 34 Classification: Internal 2012-02-19 NSG at Fayard (Lindø / Odense Ståværft) 35 Classification: Internal 2012-02-19 Fayard (Lindø / Odense Ståværft) 36 Classification: Internal 2012-02-19 Marine Ops - Pictures 37 Classification: Internal 2012-02-19 Haramskonferansen 2014 Åsgard Subsea Compression Project ÅSC, Hva har skjedd siden sist? – Agenda; - Kort status Åsgard Subsea Compression Februar 2014 - ÅSC Modul håndtering; krav til intervensjon - Endringer og Modifikasjoner siden 2011 til nå - Modell testing for å kartlegge krefter - SHS Status - Bruk av North Sea Giant & SHS 2018 38 Classification: Internal 2013-11-18 NSG – SHS & MHS operation modus North Sea Giant will in the Option period perform – Module Intervention – appr. 30 days / year – Then, she has to work the remaining 335 days The SHS will occupy less than 1/3 of the 3.000 m2 aft working deck NSG w/ SHS will be an extremely powerfull Subsea Construction Vessel – SHS; 300t Modules – SHS; Other structures such as Suction Anchors – 400t AHC Main crane – 800t twin lift SHS – Main Crane, e.g. lift out old subsea structures – 50 AHC Anxillary crane – MHS for modules up to 60t – deployment in Hs 4.5m – Large / Heavy Spools 39 Classification: Internal 2013-11-18 NSG – MHS & MHS operation modus 400t AHC Vast space below deck 2.000 m2 50t AHC 400t AHC NSG Free Deck Area Construction Modes Deck Demob • Clean Deck 3.000m2 • Light Construction Small Quick • MHS 2.500m2 • Spools & Tie-In Large Quick • SHS & MHS 2.000m2 • RFO & Grouting Large Slow • SURF Large Slow 40 Classification: Internal 2013-11-18 NSG – MHS operation modus «Small» Modules W < 60t Size < 6x6x6 m Pump Pump Trafo CPDU Trafo MEG Module SCM Tool Baskets Sliding Spools X-Tree 41 Classification: Internal 2013-11-18 SHS – Some Breakthroughs HPU Pack below deck Modular control cabin, below bridge, port side MHS together with SHS (small modules & tools) No skidding of large modules (safety, deck strength) Subsea Process Intervention System (SPIS) Awarded to IKM Testing, Stavanger Direct Contract IKM – Statoil Modular system – no vessel integration No Shallow Water Test 42 Training in Simulator Awarded to Offshore Simulation Centre (OSC) Direct Contract OSC – Statoil Testing & Optimizing offshore procedures Training operators and crew Classification: Internal 2013-11-18 SPIS = Subsea Process Intervention System • Glycol flushing (MEG) of Hydro Carbons (HC) in the subsea process/piping system • Nitrogen purging and HC gas freeing of the subsea compressor and pump modules • Leak testing of connections prior to and after replacement of subsea modules 43 Classification: Internal 2013-11-18 Thank you!
© Copyright 2024