YOW 225 TUH WINDOW SYSTEM ThermaBond Plus YOW 225 TUH PERFORMANCE FEATURES

YOW 225 TUH WINDOW SYSTEM
ThermaBond Plus®
Poured & Debridged
Technology
YOW 225 TUH
SYSTEM DESCRIPTION
YOW 225 TUH
PERFORMANCE FEATURES
• 2-1/4” Overall Depth
• ThermaBond Plus® Poured & Debridged
Thermal Break
• Variations: Casement, Projected Vents,
& Fixed Windows
• 1-1/16” Glazing
• Optional Screens
•
•
•
•
•
ANSI/AAMA 101-97
AW-65 Rating (Operable & Fixed)
U Value = 0.45 BTU/HR/FT2/°F
CRF of 60
Factory Assembled & Sealed
Installation Manual
05-4005-01 | ©2014 YKK AP America Inc. is a subsidiary of
YKK Corporation of America.
YOW 225 TUH Window System
TABLE OF CONTENTS
Installation Notes ................................................................................. Page ii & iii
INSTALLATION
Determine Window Reference Point ................................................... Page 1
Ventilator Installation & Adjustment ..................................................... Page 1
Determine Type of Anchor Fastener To Be Used .............................. Page 1
Installation............................................................................................ Page 2
GLAZING
Calculating Glass Sizes ....................................................................... Pages 3 & 4
Prep Casement Windows .................................................................... Page 5
Prep Fixed & Projected Windows ........................................................ Page 6
Large Missile Glazing .......................................................................... Page 7
Small Missile & Non-Impact Glazing ................................................... Page 8
INSTALLATION OPTIONS
Install Stacking Mullions ...................................................................... Pages 9 to 12
HARDWARE OPTIONS
Hardware Guide .................................................................................. Page 13
Anchoring Hardware ............................................................................ Page 14
Hinge & Support Hardware ................................................................. Page 14
Locking Hardware ................................................................................ Page 15
GLAZING ACCESSORIES
Glazing Chart ....................................................................................... Page 16
Glass Stops ......................................................................................... Page 16
Backer Tape & Gaskets ...................................................................... Page 17
Effective Date: January 3, 2014 | 05-4005-01
Page-i
YOW 225 TUH Window System
INSTALLATION NOTES
1. Do not drop, roll or drag boxes of aluminum framing. Move and stack boxes with proper
support to prevent distortion. If fork lifts are used, be especially careful about striking the
boxes when lifting or moving.
2. Store in a dry, out of the way area. If rain exposure, condensation or any water contact is
likely, then all packaging material should be removed. Wet packaging materials will discolor
and may stain aluminum finishes and paints.
3. All materials should be checked for quantity and quality upon receipt, YKK AP must be
notified immediately of any discrepancies in shipment. Check to make sure that you have the
required shims, sealants, supplies, and tools necessary for the installation.
4. Carefully check the openings and surrounding conditions that will receive your material.
Remember, if the construction is not per the construction documents, it is your responsibility
to notify the general contractor in writing. Any discrepancies must be brought to the general
contractor’s attention before you proceed with the installation.
5. Collect your shop drawings, materials, packing list, and this installation manual.
Carefully review parts location, the sequence of installation, when you glaze it, and how you
seal it. Installation instructions are of a general nature and may not cover every condition you
will encounter. The shop drawings and/or installation manuals were prepared specifically for
the product.
6. Any material substitutions must be of equal or greater quality.
7. Make certain that material samples have been sent for compatibility and adhesion testing for
all manufacturer’s sealants involved. Make certain that sealants have been installed in strict
accordance with the manufacturer’s recommendations and specifications.
8. Consult sealant manufacturer for proper sealant and backer rod selection.
A. Large Missile: Use only Dow Corning 995 Structural Silicone
9. Remember to isolate, in an approved manner, all aluminum from uncured masonry or
other incompatible materials.
10. System-to-structure fasteners are not supplied by YKK AP. Fasteners called out on shop
drawings are to indicate minimum sizes for design loading.
11. If any questions arise concerning YKK AP products or their installation, contact YKK AP
for clarification before proceeding.
Page-ii
05-4005-01 | Effective Date: January 3, 2014
YOW 225 TUH Window System
INSTALLATION NOTES
12. YKK AP window installation is typically completed before drywall, flooring and other
products which may still be in process. Take the extra time to wrap and protect the installed
material.
13. Cutting tolerances are plus or minus one thirty second of an inch (1/32”) unless otherwise
specified.
14. YKK AP Model YOW 225 TUH windows are prefinished, prefabricated, and preassembled
products, and must be protected against damage.
15. Concrete, mortar, plaster, muriatic acid and other alkaline and acid based construction
and cleaning materials may be very harmful to window finishes and should be removed with
water and mild soap immediately or permanent damage or staining of the finishes will occur.
A spot test is recommended before any cleaning agent is used, and abrasive type cleaners
must never be used.
16. Windows are never to be used as ladders, step stools, scaffolds or scaffold supports.
17. All work must start from and be referenced to benchmarks, offset lines and/or column
centerlines established by the architectural drawings and the general contractor.
18. All windows must be installed plumb, square, and level, and in accordance with approved
shop drawings and these installation instructions.
19. Glass and glazing building codes governing the design and use of products vary widely.
YKK AP America Inc. does not control the selection of products, product configurations,
operating hardware and function, or glazing materials, and YKK AP assumes no responsibility
for these design considerations. It is the responsibility of the design professional, owner,
architect, specifier, general contractor, and the installer to make these selections in strict
accordance with all applicable codes.
20. For projects that require a Florida product approval compliance letter or installation drawings, refer to the floridabuilding.org website. Contact YKK’s Engineering Center for specific
product approval numbers.
21. Check our website, www.ykkap.com, for the latest installation manual updates prior to
commencing work.
8. Consult sealant manufacturer for proper sealant and backer rod selection.
A. Small Missile: Dry Glaze interior, YKK AP approved structural silicone for exterior cap
bead.
B. Large Missile: Use only YKK AP approved structural silicone.
Page 8, step 9 calls for Tremco Tremsil® 600 sealant or equal.
Effective Date: January 3, 2014 | 05-4005-01
Page-iii
YOW 225 TUH Window System
INSTALLATION
STEP 1
DETERMINE WINDOW REFERENCE POINT
Establish the window reference lines or the exterior/interior plane of the windows to be installed
using either bench marks, offset lines, or column centerlines provided by the general contractor
and referenced on the shop drawings. Use the established reference points to determine the
installation points for each window opening at the head, jambs, and sill.
STEP 2
DETERMINE TYPE OF ANCHOR FASTENER TO BE USED
-Fastener size and location to be determined by engineering calculations.
-For Dade County installations refer to the table below for minimum anchoring requirements.
Steel strap anchors are available and when used, must be installed:
-A minimum of 3” from the corner of all frames.
-At 15” on center.
-A maximum of 3” on each side from the centerline of ventilator locking points.
-A maximum of 3” from the edge of framing joints, or mullions.
TABLE 1 – DADE COUNTY ANCHOR REQUIREMENTS
2 By Wood Frame
3/8”
1-1/2”
#14 Wood Screw
1 By Wood Into Masonry
3/8”
1-1/4”
1/4” ITW Tapcon
1 By Wood Into Concrete
3/8”
1-1/4”
1/4” ITW Tapcon
Directly Into Masonry or Concrete
3/8”
1-1/4”
1/4” ITW Tapcon
Into Steel (18 Ga. Min.)
3/8”
3 threads
1/4-20 Self-Drilling
Into 1/8” Thick Min. Alumium
3/8”
3 threads
1/4-20 Self-Drilling
STEP 3
VENTILATOR INSTALLATION AND ADJUSTMENT
All operating hardware and components must be checked for proper alignment, margins,
and operation.
-If necessary adjust the hinges, keepers, friction arms and pivots to ensure the proper
operation of locking devices and the compression of the weather seal.
-All hardware must be cleaned and lubricated as necessary to provide smooth operation.
Effective Date: January 3, 2014 | 05-4005-01
Page-1
YOW 225 TUH Window System
INSTALLATION
STEP 4
INSTALLATION
Install the window frame plumb, square, and level.
-Shim at all anchor locations unless installing into
steel or aluminum.
-Seal the heads of perimeter anchor fasteners
as shown.
-Install backer rod and apply perimeter sealant.
E9-4578
BE9-4577
1-1/4” [31.75mm]
See Details 1 to 4 for typical anchoring conditions.
DETAIL 2
DETAIL 1
DETAIL 3
Page-2
DETAIL 4
05-4005-01 | Effective Date: January 3, 2014
YOW 225 TUH Window System
CALCULATING GLASS SIZES
FW – 3 3/8” [85.7mm]
FW – 3 3/8” [85.7mm]
w1,w2 – 2 15/16 [74.6mm]
FH – 3 3/8” [85.7mm]
h1,h2 – 2 15/16 [74.6mm]
FH – 3 3/8” [85.7mm]
FW – 5 7/8” [149.2mm]
FW – 5 7/8” [149.2mm]
FW – 5 7/8” [149.2mm]
FH – 5 7/8” [149.2mm]
h1 – 5 7/16” [138.1mm]
h2 – 5 7/16” [138.1mm]
N/A
FW – 3 3/8” [85.7mm]
FW – 3 3/8” [85.7mm]
N/A
h2 – 2 3/8” [60.3mm]
h1 – 2 3/8” [60.3mm]
w2
w1
w1
w2
w3
w1
w2
w1 – 5 7/16” [138.1mm]
w1,w3 – 5 7/16” [138.1mm]
w1,w2 – 5 7/16” [138.1mm]
FH – 5 7/8” [149.2mm]
FH –5 7/8” [149.2mm]
FH – 5 7/8” [149.2mm]
w2 – 2 3/8” [60.3mm]
w2 – 1 3/8” [34.9mm]
N/A
FH – 3 3/8” [85.7mm]
N/A
3
FH – 3 /8” [85.7mm]
NOTE: GLASS BITE = 1/2”
Effective Date: January 3, 2014 | 05-4005-01
Page-3
YOW 225 TUH Window System
CALCULATING GLASS SIZES (CONTINUED)
w1
w2
FW – 5 7/8” [149.2mm]
FW – 5 7/8” [149.2mm]
w1,w2 – 5 7/16” [138.1mm]
FH – 5 7/8” [149.2mm]
h1 – 5 7/16” [138.1mm]
h1 –5 7/16” [138.1mm]
N/A
FW – 3 3/8” [85.7mm]
w1,w2 – 2 15/16” [74.6mm]
N/A
h2 – 2 3/8” [60.3mm]
h2 – 2 3/8” [60.3mm]
FW – 5 7/8” [149.2mm]
FW – 5 7/8” [149.2mm]
h2 – 5 7/16” [138.1mm]
h1,h2 – 5 7/16” [138.1mm]
FW – 3 3/8” [85.7mm]
N/A
h1 – 2 3/8” [60.3mm]
N/A
Stack Mullion
w1
w2
w1,w2 – 6 1/4” [158.8mm]
h1 – 5 7/16” [138.1mm]
w1,w2 – 3 3/4” [95.3mm]
h2 – 2 3/8” [60.3mm]
Page-4
NOTE: GLASS BITE = 1/2”
05-4005-01 | Effective Date: January 3, 2014
YOW 225 TUH Window System
GLAZING
STEP 5
PREP CASEMENT WINDOWS
1/8”
Casement windows require “Corner Blocking”
for proper operation.
E2-0670
Vent
1. Verify that the frame and vent are properly
aligned with a 1/8” margin around the entire
perimeter of the vent.
2. Remove the glazing beads and clean the
exterior glazing leg with an approved cleaning
agent using the “two cloth” cleaning method.
3. Install exterior glazing tape, E2-0670, on all
four sides:
-Leave a 1/8” gap between the edge of the
tape and the edge of the ventilator.
-Make certain that the corners of the tape
do not overlap as this will prevent full
contact around the perimeter of the glass.
4. Peel back the tape adhesive backing 3” to 4” at each
corner and fold them towards the inside of the vent.
1/8”
DETAIL 5
3
See Detail 5.
1”
4”
1”
4”
4
Hinge
Side
1/16”
**
4”
1
Adhesive
Backing
5. Install setting blocks at locations 1, 2, and 4.
6. If bench glazing, make sure that the casement
is fully supported from underneath before pro
ceeding.
7. Unlock ventilator lock and install a setting
block at location 3.
8. Change setting blocks as required to square
up the vent.
9. Raise up the vent’s locking rail 1/16” and shim
so that as the setting blocks compress the
locks will align properly.
1”
See Detail 6.
1”
4”
2
Raise vent rail
with head
setting block
Finish Glazing in accordance with glazing
instructions in Steps 7 thru 9.
** Glass weight is transferred to bottom corner and hinge.
Effective Date: January 3, 2014 | 05-4005-01
DETAIL 6
Page-5
YOW 225 TUH Window System
GLAZING
STEP 6
PREP FIXED AND PROJECTED WINDOWS
1/8”
1. Verify that the frame and vent are properly
aligned with a 1/8” margin around the entire
perimeter of the vent.
2. Clean the glazing leg that is to receive
the glazing tape using the “two cloth”
cleaning method and an approved cleaner.
3. Install exterior glazing tape, E2-0670, on all
four sides:
-Leave a 1/8” gap between the edge of the
tape and the edge of the ventilator/frame.
-Make certain that the corners of the tape
do not overlap as this will prevent full
contact around the perimeter of the glass.
4. Peel back the tape adhesive backing 3” to 4”
at each corner and fold them towards the inside
of the vent/window.
E2-0670
Adhesive
Backing
1/8”
Vent
See Detail 7.
DETAIL 7
1/4 Pts.
FIXED
1/8 Pts.
(6” Min.)
1/8 Pts.
(6” Min.)
5. Install setting/side blocks for fixed and projected
windows as shown in Detail 8.
Finish Glazing in accordance with glazing
instructions in Steps 7 thru 9.
1/3 Pts.
PROJECTED
VENT
1/8 Pts.
(6” Min.)
1/8 Pts.
(6” Min.)
DETAIL 8
Page-6
05-4005-01 | Effective Date: January 3, 2014
YOW 225 TUH Window System
GLAZING
STEP 7
LARGE MISSILE GLAZING
1. Center the glass and carefully set the unit down onto
the setting blocks.
2. From the exterior of the window gently pull the folded
adhesive backing ends to remove it and adhere the
glass to glazing tape.
3. Press the glass firmly against the exterior glazing tape.
4. For Casement and Projected vents install a 1” piece of
E2-0359 down into the small channel 3” from each
end and then 10” on center.
5. Install the head and sill glass stops and attach them at
3” from each end and then 10” on center using
PC-0808-SS fasteners for casements and projected vents
and PC-1016-SS for fixed windows.
Adhesive Back
PC-0808-SS (Oper.)
PC-1016-SS (Fixed)
Glass Stop
DETAIL 9
See Detail 9.
6. Snap on the interior glass stop trim members.
7. Install the glass stops for jambs and repeat steps 4 & 5.
8. Cut silicone spacer E2-0359 into 1” pieces. Install the
pieces into the glazing pocket 3” from each end and then
10” on center to align with the fasteners.
See Detail 10.
9. Make sure all silicone contact surfaces and joints have
been cleaned in accordance with silicone manufacturer’s
recommendations.
10. Apply masking tape to the window and glass as shown.
11. Apply an approved, ykk tested structural silicone into the
cavity between the window and the glass. Use positive
pressure so that the silicone sealant completely fills the
cavity.
12. Using a nylon or teflon spatula or other non-scratching
implement, tool the silicone sealant immediately after
running the joint. Exert positive pressure while tooling to
ensure that the silicone sealant makes complete contact
with all surfaces.Be careful not to remove too much silicone.
13. Remove masking tape within ten minutes of tooling.
DETAIL 10
See Detail 11.
Caution: Do not permit the silicone sealant to skin over
before it is tooled. Immediately remove masking
tape after tooling silicone sealant..
Effective Date: January 3, 2014 | 05-4005-01
DETAIL 11
Page-7
YOW 225 TUH Window System
GLAZING
STEP 8
SMALL MISSILE & NON-IMPACT GLAZING
1. Center the glass and carefully set the unit
down onto the setting blocks.
2. From the exterior of the window gently pull the
folded adhesive backing ends to remove it and
adhere the glass to glazing tape.
3. Press the glass firmly against the exterior
glazing tape.
See Detail 12.
Side Block
E2-0670
Adhesive Back
DETAIL 12
4. Install the interior glass stops.
5. Cut interior wedge gasket to the day light
opening dimension plus 1/8” per foot.
6. Install the wedge gasket, first install each
end and then the center of the gasket; push
in the remainder of the gasket, working from
the center toward each end.
Glass Stop
Interior
Wedge
Gasket
See Detail 13.
DETAIL 13
STEP 9
APPLY CAP BEAD (FOR LARGE MISSILE, SMALL
MISSILE, AND NON-IMPACT)
1. Apply Tremco Tremsil® 600 sealant or equal
to the joint between the glass and glazing leg.
When applying sealant vertically, start at the
bottom and work your way up. Make sure the
sealant completely fills the joint.
2. Using a non-scratching implement, tool the
sealant immediately after running the bead.
Exert positive pressure to ensure that the
sealant makes complete contact with all surfaces.
Be careful not to remove too much sealant.
Applied Stop E9-4546
E9-4547 Cover
DETAIL 14
Cap Bead
See Detail 14.
Page-8
05-4005-01 | Effective Date: January 3, 2014
YOW 225 TUH Window System
INSTALLATION OPTIONS
STEP 10 (Optional)
INSTALL STACKING MULLION (65 PSF Maximum)
HM-2516-W3
PC-1008-SS
PC-1208-SS
PC-1006-SS
Exterior of Building
1.
2.
3.
4.
5.
6.
7.
8.
9.
Anchor Clip As Req’d
(See Florida Product
Approvals for Design
Pressure Limits for
Clipped and Unclipped)
DETAIL 15
Install the first window assembly into the opening according to the instructions on Pages 1 & 2.
Cut two pieces of gasket, E2-0051, to stacking mullion height and install into the reglets.
Install mullion end cap, E1-1536, to each end of the stacking mullion with a PC-1006-SS fastener.
Attach anchor clips to what will be the open side of the stacking mullion:
-Attach anchor clip, E1-1537, to the top and bottom of one side of the stacking mullion such
that each clip extends 1/4” past the end of the mullion.
-Attach anchor clips with two PC-1208-SS fasteners at each end (do not completely tighten yet).
Install the stacking mullion into the opening according to Detail 15:
-Slide each anchor clip tight against the masonry.
-Attach each anchor clip to the masonry with two flat head fasteners.
-Now completely tighten the PC-1208-SS fasteners used to attach the anchor clips to the
mullion.
Carefully slide the second window assembly in and anchor it to the masonry.
To ensure a watertight seal run a bead of sealant up each interior frame jamb at the stacking
mullion. Additionally, run a cap seal along the joint between the exterior frame jambs and the
stacking mullion. If the exterior of the window is inaccessible, run a bead of sealant along the
backside of each stacking mullion leg prior to installing the windows into the stacking mullion.
Attach the pressure plate, AS-4231, to the stacking mullion:
-Install HM-2516-W3 fasteners at 1-1/2” from each end maximum and then 9” on center.
Pressure plates are pre-drilled; drill additional 0.281” diameter (#9/32) holes if necessary.
-Start installing fasteners at the center of the pressure plate and work towards each end.
-Torque each fastener to 50 inch pounds.
Install PC-1008-SS fasteners, one on each side, through the pressure plate into the window frames:
-(2) 6” below the top of the frame.
-(2) 6” above the bottom of the frame.
Effective Date: January 3, 2014 | 05-4005-01
Page-9
YOW 225 TUH Window System
INSTALLATION OPTIONS
STEP 10 (Continued, Optional)
INSTALL STACKING MULLION (CONTINUED)
10. Install snap cover, E9-5111, starting from the bottom and work up the mullion.
11. Run a cap seal between the frame and receptor at the exterior. If the exterior of the window is
inaccessible, run a bead of sealant along the backside of the receptor leg prior installing the
windows.
Page-10
05-4005-01 | Effective Date: January 3, 2014
YOW 225 TUH Window System
INSTALLATION OPTIONS
STEP 10a (Optional)
INSTALL STACKING MULLION (80 PSF Maximum)
E9-5111
HM-2516-W3
PC-1008-SS
AS-4231
BE9-4502
#14-FC
E1-1965
HM-2514-SS
WS-2500-SS
HM-2500-SS
Sealant
PC-1006-SS
E9-4562
E1-1962
End Cap
1.
2.
3.
4.
5.
6.
7.
8.
DETAIL 16
Install the first window assembly into the opening according to the instructions on Pages 1 & 2.
Cut two pieces of gasket, E2-0051, to stacking mullion height and install into the reglets.
Install mullion end cap, E1-1962, to each end of the stacking mullion with a PC-1006-SS fastener.
Attach anchor clips to what will be the open side of the stacking mullion:
-Attach anchor clip, E1-1965, to the top and bottom of one side of the stacking mullion such
that each clip extends 1/4” past the end of the mullion.
-Attach anchor clips with two HM-2514-SS bolts, two WS-2500-SS washers, and two
HM-2500-SS nuts (do not completely tighten yet).
Install the stacking mullion into the opening according to Detail 16:
-Slide each anchor clip tight against the masonry.
-Attach each anchor clip to the masonry with two flat head fasteners.
-Now completely tighten the HM-2514-SS bolts used to attach the anchor clips to the mullion.
Carefully slide the second window assembly in and anchor it to the masonry.
To ensure a watertight seal run a bead of sealant up each interior frame jamb at the stacking
mullion. Additionally, run a cap seal along the joint between the exterior frame jambs and the
stacking mullion. If the exterior of the window is inaccessible, run a bead of sealant along the
backside of each stacking mullion leg prior to installing the windows into the stacking mullion.
Attach the pressure plate, AS-4231, to the stacking mullion:
-Install HM-2516-W3 fasteners at 1-1/2” from each end maximum and then 9” on center.
Pressure plates are pre-drilled; drill additional 0.281” diameter (#9/32) holes if necessary.
-Start installing fasteners at the center of the pressure plate and work towards each end.
-Torque each fastener to 50 inch pounds.
Effective Date: January 3, 2014 | 05-4005-01
Page-11
YOW 225 TUH Window System
INSTALLATION OPTIONS
STEP 10A (Continued, Optional)
INSTALL STACKING MULLION (80 PSF Maximum, CONTINUED)
9. Install PC-1008-SS fasteners, one on each side, through the pressure plate into the window
frames:
-(2) 6” below the top of the frame.
-(2) 6” above the bottom of the frame.
10. Install snap cover, E9-5111, starting from the bottom and work up the mullion.
11. Run a cap seal between the frame and receptor at the exterior. If the exterior of the window is
Page-12
05-4005-01 | Effective Date: January 3, 2014
YOW 225 TUH Window System
YOW 225 TUH HARDWARE GUIDE
STANDARD
@ 65 PSF
STANDARD
HINGE & LIMIT STOP
HARDWARE
OPTIONAL @ 65 PSF,
STANDARD @ 80 PSF
or OVERSIZED
STD. W/ MULTILOCK, OPTIONAL
ELSEWHERE
STANDARD
w/ butt hinges
4-BAR HINGE &
LIMIT STOP
FRICTION ADJUSTERS
Effective Date: January 3, 2014 | 05-4005-01
Page-13
YOW 225 TUH Window System
ANCHORING HARDWARE
STRAP ANCHOR E1-1760
CLIP ANCHOR
E1-1922
4-1/2” length of BE9-4529, used at
indicated locations to add strength
at anchor points.
ALUMINUM
Clip anchor located as reqiuired.
ALUMINUM
HINGE & SUPPORT HARDWARE
4-bar hinges allow for efficient
and durable operation of
projected and casement vents.
Limit stops allow vents to be
opened to a preset maximum
opening.
(LH)
(RH)
Butt hinges are optional on
casement outswing vents.
Support arms hold casement
outswing vents in the open
position.
Casement out roto-operators
include E1-1592 (track),
E1-1599 (handle), & E2-0656
(corner gasket)
Roto-operators are available
as an option to operate
casement outswing
and project out vents.
Project out roto-operators
include E1-9931 (track),
E1-9932 (handle), & E2-9912
(corner gasket)
Page-14
05-4005-01 | Effective Date: January 3, 2014
YOW 225 TUH Window System
LOCKING HARDWARE
White bronze cam handles
for manual operation of vents.
E1-1541/E1-1542 are standard
on outswings.
WHITE
BRONZE
Custodial locks are offered for
maintenance operation.
These type of locks are used in
place of cam handles.
WHITE
BRONZE
Multi-Lock handles are used
to secure casement outswing
vents.
WHITE
BRONZE
White bronze pull handles
are optional for casement
outswing vents.
WHITE
BRONZE
Push Bars are available as an
option to open project out vents.
ALUMINUM/
WHITE
BRONZE
Permits the window to be opened
a maximum of 6” and return to
the closed position without the
use of a special tool or key. For
maintenance or washing, key
releases the window from the
limit arm for reversal. When
reversed, the window can be
washed from the interior.
Re-closing of window and
reengagement of limit arm is
accomplished without key.
STAINLESS
STEEL
Not on Y-View
Effective Date: January 3, 2014 | 05-4005-01
Page-15
YOW 225 TUH Window System
GLAZING CHART
GLASS/PANEL
DEPTH
GLASS
OPENING
EXTERIOR
INTERIOR
F.C.
BACKER TAPE
F.C.
WEDGE GASKET
3/16”
1/8”
E2-0670”
5/16”
E2-0160”
1/4”
1/8”
E2-0670”
1/4”
E2-0512”
5/16”
1/8”
E2-0670”
3/16”
E2-0617”
3/8”
1/8”
E2-0670”
1/8”
E2-0630”
15/16”
1/8”
E2-0670”
5/16”
E2-0160”
1”
1/8”
E2-0670”
1/4”
E2-0512”
1 1/16”
1/8”
E2-0670”
3/16”
E2-0617”
1 1/8”
1/8”
E2-0670”
1/8”
E2-0630”
5/8”
1 3/8”
GLASS STOPS
5/8” GLASS OPENING
PART NUMBER
DETAIL
1 3/8” GLASS OPENING
PART NUMBER
E9-4521
E9-4506
E9-4522
E9-4507
E9-4523
E9-4508
Page-16
DETAIL
05-4005-01 | Effective Date: January 3, 2014
YOW 225 TUH Window System
BACKER TAPE & GASKETS
FACE CLEARANCE
DESCRIPTION
1/8”
3/16”
1/4”
5/16”
E2-0670
E2-0670
E2-0670
E2-0670
E2-0630
E2-0617
E2-0512
E2-0160
BACKER TAPE
WEDGE GASKET
Effective Date: January 3, 2014 | 05-4005-01