PROJECT MANUAL FOR SECURITY UPGRADES AT CJ HICKS ELEMENTARY SCHOOL LORRAINE ELEMENTARY SCHOOL PEEK’S CHAPEL ELEMENTARY SCHOOL & ROCKDALE COUNTY HIGH SCHOOL ROCKDALE COUNTY PUBLIC SCHOOLS BUILDINGS AND GROUNDS DEPARTMENT 1062 NORTH STREET CONYERS, GEORGIA 30012 (770) 860-4251 DATED: March 22, 2014 TABLE OF CONTENTS - PROJECT MANUAL Request for Quotes 3-4 Quote Instructions 4 Examination of Documents and Site Conditions 4 Owner's Representative 5 Quote Form 6-7 Project Award 8 Execution of the Agreement 8 Commencement Date 8 Completion Date 8 Drug Free & Tobacco Free Policy 8 Performance and Payment Bonds 8 Insurance 9 Work Location 9 Special Project Conditions 9 - 10 Scope of Work 10 - 13 List of Drawings 14 Products and Materials 14 Execution of Work 14 Inspection 14 Permits 14 Affidavit 14 E-Verify Affidavit 14 Statutory Affidavit 14 Contractor's Warranty 14 Project Close Out and Payment 15 Affidavit Form 16 E-Verify Affidavit Form 17 Statutory Affidavit Form 18 Contractor's Warranty Form 19 Form of Agreement 20 - 23 Drawings 24 - 27 Page 2 of 27 REQUEST FOR QUOTE SECURITY UPGRADES AT CJ HICKS ELEMENTARY SCHOOL LORRAINE ELEMENTARY SCHOOL 930 ROWLAND ROAD CONYERS, GA 30012 3343 EAST FAIRVIEW ROAD STOCKBRIDGE, GA 30281 2800 AVALON PARKWAY CONYERS, GA 30013 1174 BULLDOG CIRCLE CONYERS, GA 30012 PEEK’S CHAPEL ELEMENTARY SCHOOL ROCKDALE COUNTY HIGH SCHOOL This project consists of structural facility changes for enhanced security purposes on the campuses of CJ Hicks Elementary School, Peek’s Chapel Elementary School, Lorraine Elementary School, and Rockdale County HS. The scope consists of creating secure vestibules upon front door entry, plus additional door installations and improvements for enhanced control, all in compliance with this Project Manual for the project. Quotes are requested to be submitted for receipt by the Rockdale County Board of Education at the Buildings and Grounds Department Office located at 1062 North Street, Conyers, Georgia 30012 by 2:00 P.M., prevailing time on Tuesday, April 22, 2014. Faxed quotes will not be accepted. After receipt of the quotes, they will be reviewed for completeness and a listing of the quotes will be forwarded to all who submitted a quote. It is requested that all companies interested in quoting, submit an AIA A305 Qualification Statement with their quote to provide appropriate background on their ability to perform the work of this project. In lieu of an A305, RCPS will accept a statement that reflects a contractor’s current and prior work of similar scope, with references. Note: A Qualification Statement document will be considered "Non-Responsive" if not complete. Rockdale County Schools (Owner) reserves the right to reject a quote if satisfactory documentation is not submitted. Companies quoting who do not submit a Qualification Statement will be subject to disqualification. The Owner reserves the right to waive any portion of requirements for Contractors with previous experience working for Rockdale County Schools. AS PART OF THE QUALIFICATION PROCESS, THE OWNER WILL CONDUCT A MANDATORY CONFERENCE PRIOR TO THE QUOTE RECEIPT TIME/DATE AND IT WILL BE HELD ON TUESDAY, APRIL 15, 2014 AT 10:00 AM AT THE FOLLOWING LOCATION: CJ HICKS ELEMENTARY SCHOOL 930 ROWLAND ROAD CONYERS, GA 30012 Followed by a visit across the street to: ROCKDALE COUNTY HIGH SCHOOL 1174 BULLDOG CIRCLE CONYERS, GA 30012 Representative at mandatory Conference shall be Project Manager or Estimator directly responsible for the Quoting of this project. Failure to attend the Conference will result in disqualification. Contract, if awarded, will be on a stipulated sum basis. Quotes shall state they are valid for period of sixty (60) days after the receipt of the quotes. The owner requests that submitted quotes be accompanied by the Bid Affidavit (normally required on bid projects) and the Contractor Page 3 of 27 Affidavit for E-Verify included in this manual. Any protest of this Quote process must be filed with the Office of the Executive Director of Facilities & Transportation, 1062 North Street, Conyers, Georgia 30012 no later than 72 hours prior to the established receipt of quote time. Any protest of the Quote results must be filed with the Office of the Executive Director of Facilities & Transportation, 1062 North Street, Conyers, Georgia 30012 no later than 72 hours after the actual time established for the receipt of quotes. Copies of this manual are posted in the Office of Executive Director of Facilities & Transportation, 1062 North Street, Conyers, Georgia 30012, (770) 860-4251. The Owner will be prepared to issue a Notice to Proceed Insurance Forms are submitted and the properly executed Owner/Contractor Agreement is received, and all are in compliance with the Contract Document requirements. The above description is an advertisement for the request of submission of quotes which are to be considered as offers for performance of work by the submitting party. The Owner reserves the right to accept or reject any or all quotes and to waive technicalities. It is the belief that these quotes will be received in compliance with the school system’s policies for purchasing, etc., and if the quotes fall outside those guidelines, the owner reserves the right to reject all quotes and resolicit pricing that complies with those policies OWNER: ROCKDALE COUNTY BOARD OF EDUCATION RICHARD AUTRY SUPERINTENDENT QUOTE INSTRUCTIONS: All Quotes must be prepared on the form provided in the Project Manual and in accordance with the instructions provided. Mark the outside of the sealed envelope: SECURITY UPGRADES AT CJ HICKS ELEMENTARY SCHOOL, LORRAINE ELEMENTARY SCHOOL, PEEK’S CHAPEL ELEMENTARY SCHOOL & ROCKDALE COUNTY HIGH SCHOOL A Quote will be declared invalid if it has not been received at the designated location prior to the time and date indicated in the Project Manual. Companies quoting shall submit a bid affidavit and the employment verification form with their bid. Sample forms can be provided by the owner. EXAMINATION OF DOCUMENTS AND SITE CONDITIONS: Before submitting a Quote, the Contractor shall be responsible for reviewing the Project Manual and visiting the work location. Each Contractor shall fully inform himself, prior to submitting a Quote, as to all existing conditions and limitations under which the work is to be performed and shall include in the Quote a total sum to cover all costs of materials and labor to perform the work as set forth in the Project Manual. Page 4 of 27 OWNER'S REPRESENTATIVE: BRUCE STUART 1062 NORTH STREET CONYERS, GEORGIA 30012 TELEPHONE (770) 860-4251 Page 5 of 27 QUOTE FORM DATE: ___________________________ TO: ROCKDALE COUNTY BOARD OF EDUCATION 1062 NORTH STREET CONYERS, GEORGIA 30012 ATTN: BRUCE STUART FROM: _______________________________________ _______________________________________ _______________________________________ Addenda Received: _____________________________________________ QUOTE FOR THE SECURITY UPGRADES AT CJ HICKS ELEMENTARY SCHOOL LORRAINE ELEMENTARY SCHOOL PEEK’S CHAPEL ELEMENTARY SCHOOL & ROCKDALE COUNTY HIGH SCHOOL AS OUTLINED IN PROJECT MANUAL DATED MARCH 22, 2014. THE UNDERSIGNED HAVING CAREFULLY EXAMINED THE PROJECT MANUAL AND SITE CONDITIONS, DO PROPOSE TO FURNISH ALL SERVICES, LABOR, AND MATERIAL COVERED THEREIN TO COMPLETE THE PROJECT FOR THE SUM OF: FOR A TOTAL SUM OF (all 4 locations): ______________________________________________________________________________ _____________________ DOLLARS AND ($_______________________________). Page 1 0f 2 Page 6 of 27 FIRM NAME: ADDRESS: TELEPHONE: BY: PRINT NAME AND TITLE SIGNATURE Page 2 0f 2 Page 7 of 27 PROJECT AWARD: Award will be made, at the option of the Owner, on a lump sum basis and within the funds available, to the lowest responsible Contractor who is able to furnish the satisfactory Insurance Certificates, Performance and Payment Bonds if necessary, as specified in the Project Manual. The Contractor may be required, before the awarding of the project, to show to the complete satisfaction of the Owner, that he has the necessary facilities, ability, and financial resources to execute the work in a satisfactory manner, and within the time specified. A copy of the Form of Agreement to be used is included in this Project Manual. EXECUTION OF THE AGREEMENT: The Contractor who is awarded the project shall receive a Letter of Intent from the Owner and within seven (7) days after notice of award, agrees to execute a contract as outlined in the Project Manual. The Contractor shall deliver to the Owner the Insurance Certificates and Performance and Payment Bonds, if necessary, as specified in the Project Manual. The Owner will issue a Notice to Proceed when all documents are reviewed and found to be in conformance to the Project Manual. COMMENCEMENT DATE: Actual construction may begin upon receipt by the Contractor of Notice to Proceed letter, and an agreed upon schedule with the owner that allows progression of the work without disruption of the operation of the school. The earliest possible date would be May 20, 2014, for ESs, May 30, 2014 for RCHS. All required submittals shall be submitted by contractor and approved by Owner prior to beginning any work. COMPLETION DATE: Contractor is to be complete with all work by no later than July 25, 2014. DRUG FREE AND TOBACCO FREE POLICY: The Contractor agrees to abide by the requirements of the Drug Free Workplace Act and the Rockdale County Board of Education policy prohibiting the use of any tobacco products on any property owned by the Rockdale County Board of Education, and all other governmental applicable laws, ordinances, and statutes in effect at the time of this agreement. PERFORMANCE AND PAYMENT BONDS: A Performance Bond satisfactory to the Owner in the amount of 100% of the Bid amount and a Payment Bond in the amount of 100% of the Bid amount will be required of the successful Contractor to guarantee delivery of completed work, if the value of the contract is greater than $50,000.00. These bonds shall be delivered to the Owner prior to receiving a Notice to Proceed. The Surety must be licensed to do business in Georgia and qualified by the Insurance Commissioners to underwrite bonds as required in this Project Manual. The Surety must also have not less than an “A” financial rating from “Best”. The Surety will use the Owner’s standard Payment and Performance Bonds. Page 8 of 27 INSURANCE: The Contractor agrees to comply with the provisions of the Workman’s Compensation laws of the State of Georgia and to require all subcontractors likewise to comply. The Contractor shall secure the following insurance at his own expense and shall file Certificates of Insurance with the Owner. Workmen’s Compensation --------Statutory Limits Employer’s Liability ------------------$500,000.00 Comprehensive General Liability a. Bodily injury: $1,000,000.00 each occurrence; $2,000,000.00 aggregate. b. Personal injury: $1,000,000.00 each occurrence; $2,000,000.00 aggregate. c. Personal damage: $1,000,000.00 each occurrence; $2,000,000.00 aggregate. Comprehensive Automobile Liability a. Automobile liability: $100,000.00 each person. b. Bodily injury: $300,000.00 each occurrence. c. Property damage: $100,000.00 each occurrence. WORK LOCATIONS: CJ HICKS ELEMENTARY SCHOOL LORRAINE ELEMENTARY SCHOOL 930 ROWLAND ROAD CONYERS, GA 30012 3343 EAST FAIRVIEW ROAD STOCKBRIDGE, GA 30281 PEEK’S CHAPEL ELEMENTARY SCHOOL ROCKDALE COUNTY HIGH SCHOOL 2800 AVALON PARKWAY CONYERS, GA 30013 1174 BULLDOG CIRCLE CONYERS, GA 30012 SPECIAL PROJECT CONDITIONS: Submittals (product data and/or shop drawings) are required on all materials specified. All submittals are to be submitted to and will be reviewed by the Owner and then returned to the Contractor. Work Area - as designated by the Owner. Staging Area - The Contractor may stage his materials in an area to be designated by the Owner. Page 9 of 27 Contractor will clean up the entire area at completion of the project and remove debris from the school sites and dispose of properly. Contractor will take all measures necessary to protect existing conditions from dirt and damage and will be responsible for any work, etc. to return the area to the conditions s existed at start of project. Contractor will coordinate with the RCPS representative noted and administrators at each facility so as not to interrupt a school’s daily operations, and to insure the safety of students and staff. Contractor is responsible for confirming all measurements of existing facilities relative to the work to be performed. SCOPE OF WORK: SECURITY UPGRADES AT CJ HICKS ELEMENTARY SCHOOL, LORRAINE ELEMENTARY SCHOOL, PEEK’S CHAPEL ELEMENTARY SCHOOL, & ROCKDALE COUNTY HIGH SCHOOL o CJ Hicks ES, Lorraine ES, Peek’s Chapel ES Install aluminum storefront in front lobby to create a vestibule that directs visitors into the front office, storefront will have two doors, hardware will be integral with the store front system and consists of hinges, closers, panic devices (keyed cylinder “dogdown” function), securable. Storefront will secure to sheetrock framing at top, CMU at sides, and concrete at base. Cut opening in corridor wall for installing a door from front office into the building corridor, hollow metal rated frames, sidelight, wood door, door hardware consisting of closer, butt hinges, office function passage set, rated glass. Rated sheetrock construction will be used to secure frame in wall, and will seal to structure above. All hardware will match manufacturer, etc. as that being used elsewhere in the facility. Painting is N.I.C. All existing conditions are to be thoroughly protected from damage, etc. Door from office to corridor will have an electronic release for the strike, owner will provide and frame should be prepped accordingly, contractor will extend wiring from strike to a point above the ceiling for the owner’s use. o Rockdale County HS Install aluminum storefront in front lobby to create a vestibule that directs visitors into the front office, portion of the storefront will have two doors, hardware will be integral with the store front system and consists of hinges, closers, panic devices (keyed cylinder “dogdown” function), securable. A structural tube frame will be installed by others prior to storefront installation. Storefront will secure to tube steel framing at top, tube steel framing at sides, and concrete at base. General Specifications 1. The General Conditions of the Contract for Construction AIA Document A201 Articles 1 through 12 inclusive, is hereby made part of this contract. Page 10 of 27 GENERAL NOTES 1. All work shall be plumb, true, complete and in accordance with all applicable codes and/or ordinances. Work is subject to the inspection and final approval of the Rockdale County Board of Education. 2. The contractor and sub-contractors shall visit the site, verify existing conditions and dimensions. Adjust new work as necessary to accommodate existing conditions. 3. Shop Drawings shall be provided as indicated in two (2) copies. No work shall be fabricated prior to the approval of shop drawings. DIVISION 4 - MASONRY 1. Mortar: Shall be type M or S and shall contain an integral color. Color as selected by Architect from manufacture's standard colors. Gray mortar will not be allowed. 2. Masonry Accessories: Masonry reinforcing shall be dovetail corrugated masonry anchor Model # 106 (5 1/2” long) as manufactured by Hickman or equal. Anchors shall be located as indicated on drawings. 3. Masonry shall be thoroughly cleaned with a standard manufactured cleaning agent and flushed with clean water. 4. Concrete Masonry Units shall comply with ASTM C-129 (hollow non-load bearing), Grade N-1, 7 5/8" x 7 5/8" x 15 5/8" or 5 5/8” x 7 5/8” x 15 5/8”as indicated on drawings, complete with all necessary units such as lintel blocks and etc. Exposed surfaces of all blocks and special units shall be uniform in color and texture. No seconds shall be allowed. Blocks shall be gray in color. DIVISION 5 - METALS 1. Structural steel shall conform to ASTM Specification A36-70A structural steel. No member shall be spliced, connected or extended except as shown, or approved by the Architect and Structural Engineer. 2. All members, including anchor bolts shall be cleaned of scale, rust, dirt, and given one coat of zinc chromate primer before leaving the shop. Any shop coat damage in delivery or erection or by welding shall be repainted with same material. 3. Any miscellaneous bent plate sections, angles, closures, shim plates, and channel shapes shall be fabricated from ASTM Specifications A36-70A steel, and shall be of size and shape detailed. Provide bolts and welds for anchoring and connecting work specified under this section. DIVISION 6 - WOOD 1. All wood in contact with concrete or masonry shall be pressure treated. Page 11 of 27 2. All other wood shall be # 2 or better yellow pine or Douglas fir. DIVISION 7 – MOISTURE PROTECTION 1. Caulking: Shall be a Silicone type as manufactured by Dow Corning or equal DIVISION 8 – DOORS, WINDOWS & GLASS ALUMINUM STOREFRONT SYSTEM 1. System for the project shall be Kawneer Tri-Fab 450 Series (4 ¼” x 1 ¾” profile) with 500 Wide Stile Doors. Color shall be brushed aluminum. Doors shall be single acting, provided with a panic device on one side and pull handle on the other side. Approved Manufactures – Vista Wall and YKK. VERIFY WITH BOE VENDOR. METAL DOORS AND FRAMES 1. Anchor frames at each side to floor slab. Provided temporary spreaders to be removed after securement. 2. Metal Doors shall be 1 3/4" thick, flush., commercial type zinc coated bonderized, 18 gauge sheet metal, as manufactured by CECO Corporation Regent Model or approved equal. 3. Doors shall be reinforced for all door hardware, drilled and tapped in the field for surfaced applied items such as closures, stops, escutcheons, kickplates, and etc. 4. Hardware- See attached hardware schedule. Hardware finish shall match existing found in the school. GLASS AND GLAZING 1. Shall be new delivered to the job site marked with manufacturer's name, weight, and grade of glass. Labels to remain on glass until set and approved by the Rockdale County Fire Department. 2. Glazing for all doors shall be tempered glass, Fire Rated glass, as required by a the Georgia Glass Code and/or local ordinances. 3. Broken glass or damaged before final completion and acceptance of the building shall be replaced, and replaced by the Glazing Contractor at no extra cost to the General Contractor or owner. 4. Fire Rated Glass shall be FireLiteNT as required for a one hour rated wall. Installation of this product shall be in strict accordance with the Manufacturer’s recommendations which includes but is not limited to: a- all permanent glass labeling, certification by Underwrites Laboratories, b-thickness 3/16”, c- surface finish – premium grade – ground and polished on both sides, d- glazing tape – closed cell polyvinyl chloride (PVC, e- silicone sealant - Dow Corning 795, Silglaze-II 2800 by General Electric, Page 12 of 27 or Spectrum 2 by Tremco, Inc. f- setting blocks – neoprene, EPDM, or silicone tested for compatiablity with glazing compound. g- cleaners, primers, and sealers – type recommended by manufacturer for glass and gaskets. 5. Protect glass surfaces during construction, from staining or etching by deposits, draining, dripping from masonry or other trades. Clean all glass at completion of job. No scrappers or sharp instruments shall be used. HARDWARE 1. Aluminum Storefront Door 1 ½ butts Panic Device (keyed panic device) Closer 2. Solid Core Wood Door (Hardware Manufacturer, Grade, Finish, Etc. to Match Existing in School) 1 ½ butts Closer Lever Handle Silencers Office function passage set (will be keyed to existing Best System installed in School) DIVISION 9 – Gypsum Wallboard Systems GYPSUM BOARD & METAL STUDS 1. Provide a complete and finished system in accordance with manufacture's instructions, U. S. Gypsum or approved equal. 2. Gypsum wallboard: Shall be 5/8” thick Firecode Core Gypsum Board as required for a one hour rated wall. Reference is UL Design # U-419. Provide 3/8” Gypsum Board as indicated on drawings. Securement, mudding and taping shall be in strict accordance with UL Design # U-419 3. Joint systems by U.S. Gypsum or equal shall be used to finish all joints, consisting of types applied over joint, tape, a skim coat of compound in strict accordance with USG Recommendations for one hour rated wall - UL Design # U-419. 4. Clean and sand for painting. Prior to painting, the Owner shall decide whether the surface is acceptable for painting. 5. Interior steel studs shall be 4” and 6” (25 ga.) at 16" oc. Brace interior walls at 8'-0" oc to structure above and attach as required. Page 13 of 27 LIST OF DRAWINGS: Drawings are as follows: Attached sheets (4)– 1 Drawing of each school, PDF format. (8 ½ x 11) (note: contractors are responsible for verifying dimensions shown on drawings) PRODUCTS AND MATERIAL: Contractor shall review Project Manual and provide all material and work indicated. EXECUTION OF WORK: Contractor shall furnish and install the work as indicated in the Project Manual. INSPECTION: Upon completion of all areas, the Contractor will notify the Owner that the areas are ready for inspection. The Owner will have a representative accompany the Contractor on the inspection and will prepare a punch list which must be completed before final payment is made. PERMITS: Contractor to provide all required permits, if any, and is to obtain all required inspections and/or approvals from all regulatory agencies having jurisdiction over this project. AFFIDAVIT: The Contractor shall furnish to the Owner with quote, a non-influence Affidavit on the form provided in the Project Manual. E-VERIFY AFFIDAVIT: The Contractor shall furnish to the Owner with quote, an E-Verity Affidavit on the form provided in the Project Manual. STATUTORY AFFIDAVIT: The Contractor shall furnish to the Owner upon completion of the project a Statutory Affidavit on the form provided in the Project Manual. CONTRACTOR'S WARRANTY: The Contractor shall furnish to the Owner upon completion of the project a one year workmanship warranty and ten (10) year motor warranty for each building, using the Contractor’s Warranty Form provided in the Project Manual. P Page 14 of 27 ROJECT CLOSE OUT AND PAYMENT: One payment in the amount of 100% of the contract sum will be made at the completion of the project subject to the requirements listed in this section. Partial payment for materials or labor will not be made. Completion of all Punch List items Acceptance of work by Owner Contractor’s Warranty (included in Project Manual) Statutory Affidavit (included in Project Manual) Page 15 of 27 AFFIDAVIT (This form to be executed in compliance with Official Code of Georgia Annotated Section 36-91-21(e). If the contractor is a partnership, the Affidavit shall be executed by all of the partners and any officer, agent, or other person who may have represented or acted for them in bidding for or procuring the contract. If the contractor is a corporation, all officers, agents, or other persons who may have acted for or represented the corporation in bidding for or procuring the contract shall execute the Affidavit.) State of Georgia County of ______________________ ________________________________________, being duly sworn, hereby deposes and says (Insert Name of Affiant) that he/she has read, and is familiar with, the provisions of Official Code of Georgia Annotated Section 36-91-21(d) which provide as follows: (d) Whenever a public works construction contract for any governmental entity subject to the requirements of this chapter is to be let out by competitive sealed bid or proposal, no person, by himself or herself or otherwise, shall prevent or attempt to prevent competition in such bidding or proposals by any means whatever. No person who desires to procure such work for himself or herself or for another shall prevent or endeavor to prevent anyone from making a bid or proposal therefore by any means whatever, nor shall such person so desiring the work cause or induce another to withdraw a bid or proposal for the work. and that he/she has not directly or indirectly violated said provisions of the law. Further, Affiant saith not. This _________________day of ____________, 2014. Sworn to and subscribed before me this ___________of________,2014. ________________________________________________ Notary Public SECURITY UPGRADES AT CJ HICKS ELEMENTARY SCHOOL, LORRAINE ELEMENTARY SCHOOL, PEEK’S CHAPEL ELEMENTARY SCHOOL, & ROCKDALE COUNTY HIGH SCHOOL Project Being Quoted for Rockdale County Public Schools Page 16 of 27 Contractor Affidavit under O.C.G.A. § 13-10-91(b)(1) By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 1310-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of Rockdale County Public Schools has registered with, is authorized to use, and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows: _________________________________ Federal Work Authorization User Identification Number _________________________________ Date of Authorization _________________________________ Name of Contractor _________________________________ Name of Project Rockdale County Public Schools Name of Public Employer I hereby declare under penalty of perjury that the foregoing is true and correct. Executed on ______, ___, 2014 in __________(city), _____________(state). _________________________________ Signature of Authorized Officer or Agent _______________________________ Printed Name and Title of Authorized Officer or Agent SUBSCRIBED AND SWORN BEFORE ME ON THIS THE ______ DAY OF ______________,2014. _________________________________ NOTARY PUBLIC My Commission Expires: _________________________________ Page 17 of 27 STATUTORY AFFIDAVIT TO: ROCKDALE COUNTY BOARD OF EDUCATION, OWNER FROM: _____________________________________________, CONTRACTOR SUBJECT: CONTRACT ENTERED INTO THE ____ DAY OF ________, 2014, BETWEEN THE ABOVE-MENTIONED PARTIES FOR: SECURITY UPGRADES AT CJ HICKS ELEMENTARY SCHOOL, LORRAINE ELEMENTARY SCHOOL, PEEK’S CHAPEL ELEMENTARY SCHOOL, & ROCKDALE COUNTY HIGH SCHOOL KNOW ALL MEN BY THESE PRESENTS: 1. The undersigned hereby certifies that all work required under the above contract has been performed in accordance with the terms thereof, that all materialmen, subcontractors, mechanics, and laborers have been paid and satisfied in full, and that there are no outstanding claims of any character (including disputed claims or any claims to which the contractor has or will assert any defense) arising out of the performance of the contract which have not been paid and satisfied in full. 2. The undersigned further certifies that to the best of his knowledge and belief, there are no unsatisfied claims for damages resulting from injury or death to any employees, subcontractors, or the public at large arising out of the performance of the contract, or any suits or claims for any other damage of any kind, nature, or description which might constitute a lien upon the property of the owner. 3. The undersigned makes this affidavit as provided by law and for the purpose of receiving final payment in full settlement of all claims against the owner arising under or by virtue of the release of the owner from any and all claims arising under or by virtue of the contract. PRINTED NAME AND TITLE FIRM NAME NOTARY PUBLIC THIS DAY OF FIRM ADDRESS , ______. SIGNATURE MY COMMISSION EXPIRES: Page 18 of 27 CONTRACTOR’S WARRANTY OWNER: ROCKDALE COUNTY BOARD OF EDUCATION 1062 NORTH STREET CONYERS, GEORGIA 30012 PROJECT NAME: SECURITY UPGRADES AT CJ HICKS ELEMENTARY SCHOOL, LORRAINE ELEMENTARY SCHOOL, PEEK’S CHAPEL ELEMENTARY SCHOOL, & ROCKDALE COUNTY HIGH SCHOOL COUNTY OF: ROCKDALE STATE OF: GEORGIA DATE: _________________________ SCHOOL NAME: ____________________________________________________ ______________________________, as Contractor on the above job do hereby guarantee that all work executed under the Project Manual will be free from defects of workmanship for a period of ONE (1) YEAR, beginning _______________________, and ending _________________________; and free from defects of materials for a period of Two (2) YEARS, beginning _______________________, and ending _________________________ for motorization; and that all defects occurring within the warranty periods shall be replaced or repaired at no cost to the Owner. This guarantee covers all work as shown on the Drawings and called for in the Project Manual. Nothing in the above shall be deemed to imply that this guarantee shall apply to any work which has been abused or neglected by the Owner. LEGAL NAME OF FIRM BY: NOTARY PUBLIC THIS DAY OF PRINTED NAME AND TITLE , ______. SIGNATURE MY COMMISSION EXPIRES: Page 19 of 27 ROCKDALE COUNTY BOARD OF EDUCATION 954 North Main Street, Conyers, Georgia 30012-4480 FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR OR VENDOR AGREEMENT: Made as of the 9th day of December in the year of Two Thousand Fourteen. BETWEEN THE OWNER: ROCKDALE COUNTY BOARD OF EDUCATION 954 NORTH MAIN STREET CONYERS, GEORGIA 30012 and CONTRACTOR: for PROJECT NAME: SECURITY UPGRADES AT CJ HICKS ELEMENTARY SCHOOL, LORRAINE ELEMENTARY SCHOOL, PEEK’S CHAPEL ELEMENTARY SCHOOL, & ROCKDALE COUNTY HIGH SCHOOL Page 20 of 27 The Owner and Contractor/Vendor agree as set forth below. ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Project Manual, Drawings, Specifications, and Addenda issued prior to the execution of this Agreement, other documents listed in the Agreement and Specifications issued after execution of Agreement. These form the Contract, and are as fully a part of the Contract as if attached to the agreement or repeated herein. This Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representation or agreement, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 6. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall execute the entire work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of other, or as follows: None. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION COMMENCEMENT DATE: 3.1 Actual construction may begin upon receipt by the Contractor of a Notice to Proceed letter from the Owner. All required submittals shall be submitted by contractor and approved by Owner prior to beginning any work. SUBSTANTIAL COMPLETION DATE: 3.2 Contractor is to be complete with all work at by no later than July 25, 2014. ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor for the Contractor’s performance of the Contract, the sum of ----------------------------------- ($--, ---), subject to additions and deductions provided in the Contract Documents. Page 21 of 27 4.2 The Contract sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: None. 4.3 Unit prices, if any, are as follows: None. ARTICLE 5 FINAL PAYMENT 5.1 Based upon Application for Payment submitted to the Owner by the Contractor, the Owner will make lump sum payment as provided in the Contract Documents. Partial payment for material or labor will not be made. ARTICLE 6 ENUMERATION OF CONTRACT DOCUMENTS 6.1 The Contract Documents, except for Modifications issued after execution of this Agreement are enumerated as follows: a. Project Manual dated March 22, 2014. 6.2 The Agreement is the executed Form of Agreement between Owner and Contractor as provided in the Project Manual dated March 22, 2014. 6.3 The Supplementary and other Condition of the Contract are those contained in the Project Manual dated March 22, 2014. 6.4 The Specifications are those contained in the Project Manual dated March 22, 2014. 6.5 The Addenda, if any, are as follows: None. 6.6 Other documents, if any, forming part of the Contract Documents are as follows: None. Page 22 of 27 This Agreement is entered into as of the day and year first written above and is executed in at least two original copies of which one is to be delivered to the Contractor and the remaining copy to be retained by the Owner. OWNER: (SEAL) CONTRACTOR: (SEAL) ROCKDALE COUNTY BOARD OF EDUCATION SIGNED: BY: Richard Autry Superintendent SIGNED: BY: ROCKDALE COUNTY BOARD OF EDUCATION 954 North Main Street, Conyers, Georgia 30012-4480 Page 23 of 27
© Copyright 2024