September 14 PARC CWG/32 Jerome CONDIS - AIRBUS Baseline 2 perspectives SESAR Deployment & Airbus Plans September 14 Europe short-term priority: ATN/VDL2 infrastructure maturity • DLS IR (EC 29/2009) update • 1st EC consultation workshop (17 Jun 2014) Global consensus: key to address the data link issues as early as possible to secure return on investments as soon as possible, maintain the momentum and reestablish confidence from users • 2nd consultation workshop is planned on 09 Oct 2014 • Proposed two-step approach • Step 1: “suspend” the obligation requirements until a validated technical session is available, while maintaining legal certainty. Relaxing the dates, adoption in Nov 2014 SSC • Step 2: “review” and “re-assess” the regulation and the legal elements on the basis of sound technical solution, possibly enlarging scope to B2 (consistency with PCP) • ATN/VDL2 Maturity • In parallel, SESAR has issued a RFP for ATN/VDL2 Maturity project (SJU/LC/0109-CFT, VDL Mode 2 Measurement, analysis and simulation campaign) RFP now public, answers by 31 Oct 2014, execution Jan 2015-Jun 2016 Page 2 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. September 14 SESAR follow-up and outcomes • SESAR 2020 • SJU completion date will be extended with limited change of membership • Continuation of SESAR 1 phase during the next European budget period (2014-2020 leading to activities up to 2023) • ATM Master Plan step 2 & 3 concepts validation based on airborne and ground prototypes and/or simulations • ATM Master Plan step 1 & 2 concepts operations validation based on revenue flights in real environments through Very Large Demonstrations (VLD) • SESAR Deployment Page 3 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. September 14 SESAR 2020 VLD • “Fill the gap” between the R&D and the deployment phases • Very large demonstrations (VLD) based on revenue flights involving a significant number of aircraft from different airlines operating in different environments • Reinforce the confidence of the airlines in the programme as it will give them the opportunity to measure the benefits of the new systems and procedures on their revenue flights • Support industrialization decisions as it reduces significantly the business risks for airlines and for the airborne industry • Prompt synchronization between ground and airborne deployments • Complement validation of VDL2 enhancements on a large scale basis • Call For Tender in progress • Scope and timeline under definition • CDA, RTA, D-TAXI and i4D strong candidates Page 4 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. September 14 SESAR Deployment Pilot Common Project (PCP) • Content (aircraft capabilities) • • • RNP APP and RNP 1 ADS-C EPP Timeline • • PCP now approved IOC 2018 Common project #2 targets • Content (aircraft capabilities) • • • • • Timeline • Page 5 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. I4D/CTA Taxi route ATSA-SURF/IA Runway Occupancy Time reduction IOC 2021+ September 14 SESAR Deployment Manager body • Deployment Manager body to be led by A6 (ANSP’s), A4 (airlines) and Airports • Airbus supports a strong A4 lead in the Deployment • In charge of Common Projects deployment • Coordination of all stakeholders • Definition of consistent and balanced incentive programs • Secure A6/Airports commitment for ground capabilities development and EIS • SESAR Deployment Manager selection by end 2014 • Deployment manager selection • Draft Deployment Programme Page 6 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. End 2014 Mid-2015 September 14 Pilot Common Project (PCP) – Impact on aircraft COMMUNICATION NAVIGATION SURVEILLANCE Air-Ground Datalink Flight Management Traffic Access to SWIM Flight Control Weather Voice Positioning Terrain Baseline 2 Enhanced CPDLC Enhanced ADS-C For Airbus, PCP deployment implies B2 industrialisation (full compliance with ED228, ED229, ED230 and ED231) SENSORS & ANTENNAS DATABASES ALERTS DISPLAYS & CONTROLS RECORDING ⇒ Easiness of retrofit for aircraft equipped with recent generation of FMS/EIS and compliant with DLS mandate (ATN B1) S.A.S. All rights reserved. Confidential and proprietary document. Improved time guidance Indication of RTA mode RESOURCES © AIRBUS Operations Enhanced meteorological data processing September 14 B2 standards • FAA implementation for “B2 Final” (Segment 2) planned from 2023 as per the NGIP. Final Investment Decision is planned for 2018 • SESAR Master Plan initiates deployment based on “B2 Initial Release” from 2018 but does not include any plan to introduce future revisions yet • No operational driver/needs identified so far • no plan to introduce dynamic RNP management for EU airspace • no plan to introduce advanced ASAS services • no EU ANSP plan to take over on AOC/SWIM for Wind forecast updates • European and US implementation timescales may differ for “B2 Final” • Backwards compatibility between B2 Final and B2 Initial needs to be considered as part of the definition of a B2/B2n migration path Page 8 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. September 14 Airbus B2 roadmap • Airbus plans to build an A320 FANS A+C in compliance with B2 standards (Mar 2014) to fulfill the PCP Implementing Rule and support SESAR 2020 Very Large Demonstrations • Opportunity for roll-over on A330/A340 may be considered • Airbus will focus on A320 first (SESAR firstly targets short-haul aircraft), targeting both forward-fit and retrofit opportunities • Retrofit by software upgrade from a FANS B+ aircraft • Airbus will develop a FANS A+C upgrade based on “B2 Final” for all aircraft programs when deemed relevant • For A320s already equipped with FANS A+C (B2), objective would be to propose a retrofit by software upgrade Page 9 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. September 14 Airbus B2 roadmap : air/ground networks • Current situation and long-term roadmap • First priority Need to secure VDL2 infrastructure robustness to restore confidence in ATN B1 systems AND secure technical baseline for ulterior data link steps (e.g. B2) • Prepare the transition to ATN/IPS, which is the natural long-term A/G network technology • How to ensure the smoothest transition • Short to mid term Capitalize on existing ACARS and ATN/OSI to maximize for all the community, return on huge investments made on latest FANS 1/A and ATN B1 products ⇒ B2 Initial deployment in Europe will rely on ATN/OSI over VDL2 validated infrastructure ⇒ In parallel, SESAR investigates opportunities to add SATCOM capability to ATN/OSI (Iris Precursor project) • Long-term Introduce ATN/IPS for avionics when next generation IP-native ATS data link comm means (e.g. LDACS, IRIS) emerge (2028+) Page 10 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. September 14 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS Operations S.A.S. No intellectual property rights are granted by the delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS Operations S.A.S. This document and its content shall not be used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting grounds for these statements are not shown, AIRBUS Operations S.A.S. will be pleased to explain the basis thereof. AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks. Page 11 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
© Copyright 2024